Loading...
HomeMy WebLinkAbout20220621_Mine_MapsACCESSIHAUL ROAD WITH TEMPORARY CONSTRUCTION ENTRACE, SEE SHEET C002 FOR DEAIL DONALD & kOLGAA MARTIN JBX PROPEF LLC MARK & PAIGE CHIMNEY ROCK BAPTIST CHURCH 3 1mvR W Q 1. FLOODPLAIN ACCESS ROAD } NG PFHMIT a \ MINI -BOUNDARY (4.08 AC) o MAR T `� C RENTALS SULKER SILT GODLE LLG" j� FENCE s r HORACE&� BETTY d #i MARLOWE ATMENTBf+SIN #2 �l AP RO JME .500i . SHIRLEY & A G \ A°P PROX i A XO APPfEOX. �A4 (CPs iLCAAR SEED AND RESTORE BASINS AFTE CONSTRUCTION, SEE SHEET C002 FOR SEEDING DETAILS 25'UNEXCAVATED UNDISTURBED BUFFER STOCKPILE &PEEIEITAFTER ROCESSING 100-YR CONSTRUCTION IS COMPLETE N FLOODPLAIN (APPROX. AREA: 0.15 AC.) SONNY i BEACHUM INC. ACCESS ROAD WITH SWAMP MATS FOR EXCAVATION DURING PERIODS OF LOW WATER ELEVATIONS TOWN OF ,us T 9/ LAKE LURE 4MFZ%0 s SILT FENCE Y PERMIT BOUNDARY I MONETO LLC t06.18 AC) 0=41; 90UNOANY (95.05 AC) EMORIAL HIGHWAY LLC TOWN OF LAKE LURE L&RL _ram TRr OAMEYER, THOMAS NS, THOMMOAS WENS, \\ & MICHAEL OWENS ACQUISITION JOHN & ANGELA HOLDINGS, LCC PETTIT GREGQRY & N(1AMI KEefflAweLANOCCO /' RgitR JAMES EDWARDS & SUSAN HARRISON ROYCE & KARENf MQSELY LORIBARDOL OLD MARSH r PARTNERS 1 lLQ i PERMITS NDARY (106.:18 A ! DREDGE BOU ANY (95.05 AC) LAKE LURE PROPERTIES. LLC . TOWN OF KE LURE 25'UNEXCAVATED & UNDISTURBED BUFFER TOWN OF LAKE LURE OLD TREATMENT AREA TO BE TAKEN OUT OF SERVICE, SEEDED AND RELEASED JAMES & ROBERTA PROCTOR LAKE LURE 25'UNEXCAVATED & UNDISTURBED BUFFER TOWN OF LAKE LURE EXIST. POND FRANCIS & CAROLYN PROCTOR Q ram" PATRICK & <� DEANNA MCCLARY Qe �L O PFRhd1T R(5tlNRARV / (106.18 AC) DREDGE BOUNDARY -(95.05AC) 125E UNEXCAVATED & / UNDISTURBED BUFFER PERMIT BOUNDARY (106.12 AC) TOWN OF LAKE LURE 25'UNEXCAVATED & UNDISTURBED BUFFER HAYNES HILL i ESTATES LLC / PERMIT BOUNDARY (196.18 AC) DREDGE BOUNDARY (95,05 AG) STEVEN & LCMUrL A WENDY LAMAN LAKE LURE SANDRA PATES WILLIAM & PAMELA HAYMOND JOHN & VIRGINIA EDWARDS TOWN OF LAKE LURE w^- LAURALARSON LAKE LURE 41 PROPERTIES LLC O � oe� OP0 QP - O�'�Q�PPOP, �PQOP �kF fp90PFRjEs !/ I i00-YR ( / FLUOUPLAIN TOWN HICKORY GREGORY & DEBRA GARDNE�,` 1 ERIC & ANGELA HEATf 1 KEITH & KAREN HICKS \ JOSEPH & CAROL ' p AMY B. OLSON-- / TYPICAL WATER 11 TO B' SIDE SPOIL MATERIAL FROM LEVEL SLOPE HYDRAULIC DREDGING STREAM BED IN SITU SLOPOgg E TO i BE MAINTAINED i NON -ROCK EXCAVATION NON -ROCK EXCAVATION i f' f (r S RICHMOND _ BOURNE HENRY EINHORN f ACCESS RD. WITH TEMPORARY pj CONTRUGTION ENTRANCE, $EE EO, �2 / SHEET C002 FOR DETAIL JULIA RO $ F 0 � j /` CHARLES 8 GASPER & o g MARY'MARSHALL _ _ JCVCL MARINO _ DAV1D & SUSAN I JAY & SARA J GONINO GRONK (( PATRICIA M. ) RODDY. TRUSTEE ROGER & DEBORAH JAMES g `�� J JAMES & JANET WALTERS JAMES & MARIA ff LOGAN 4 -- CARNEL'NORTH, � \ BYRON & JULIE LLC - rLINDSEY ACCESS ROAD WITH SWAMP MATS FOR EXCAVATION — HOWELL _ DURING \PERIODS /E �O/F LOW WATER ELEVATION A 1 \A \/ _ SILT FENC- TRAVIS V ak, GATES- Y U Q ic LAKE LUREDANIEL AND ' TRAILINGS/SEDIMENT PONDS: 1.21 AC SUSAN MURPHYJ BARBARA MEVER / _. __. STOCKPILES: 0:16 AC 100-YR DILLARD \ PROCE89INe ARE"AUL ROADO: 3.95 AC FLOODPLAN PROPERTIES, LLC' RELLIC MINE EXCAVATION: 95.05 AC THOMAS & FILAR HOLDINGS, LLC TOTAL AFFECTED AREA: 100.22 AC \ / MARY BERTSCH & A TOTAL PERMITTED ACREAGE: 111.13 AC HARTMANN — MELANY FURIMSK'r' LYNN PRICE- ., - -- HAYNES HILL,, Y \ / JONATHAN & CCTATCCII!`I P _ _ 25' ELEANOR OAKM �U in, La LLU \ RUSStLL& 1tKIU PAINt&KftliN.t ` _ LYNN PITTS MCCORQUODALE RAYMOND PROP STEVEN & 25'UNEXCAVATED & STACICOLE �UNDISTURBED BUFFER I CHARLES & JOSEPH & HAYNES HILL HUGH & d DIANE TALERT MARY SAWYER PERMIT BOUNDARY ESTATES LLC ALICE COLS t ,✓ CLAUDE & (106.18 AC) CLARENCE & J / DAWN LUVIS / - - "� �-DREDGE BOUN JOSEPHINE STOKES // � MICKEY II (95,05 AC) DARY MICHAEL L. ZUTTY LAKE LURE � BANJOS GOTTLIEB CABIN, LLC REALTY LLC SR-/ Ll RED BY THE LF KE, LLC IOU YR FLO )DPLAIN INA THOMAS & DEBORAHJACKSON PHLP& JE^ N!"'ER BROWN W A.TAUB k TAU � 0- tQz u, m U = O �r i-1 LaBeLln. I" E3 Powered by partnership. 400 S. Tryon SUM, Suite 13@® Charlotte, NC 28285 704-376-6423 labellapc.com I i -T- I � I 1 I T CORPORATE ENGINEERING LICENSE NO. C-0430 CARp'''�ii� P PSsocl T q `csA 045305 _ I CERT. NO. 52904 'a91 �$INiti� P� N P \\ O\\ 0R�M CA0.0PP M. I/gnlniQ�U� ygR(OTTE. 0 © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NC 28746 �M rr Al !iL7 j Al IVI-- MORSE PARK MINING SITE FOR TOWN OF LAKE LURE NO f DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: JSB REVIEWED BY: BRH ISSUED FOR: ISSUED FOR PERMITTING DATE: JUNE 16, 2022 DRAWING NAME: MINING MAP (BROAD RIVER BASIN, RUTHERFORD COUNTY) DRAWING NUMBER; SIOMMEA PLAN 6'ID. SCH.40 PVC PIPE FLOAT 4' PC VENT .� SP=Hue -. STN.STL. HOSE 4'PVCTFF 4-x4-PVC TEE CLAMPST1r 4" KEpOLE 4- PVC RANGE 4- LILPVC 40 �' FLOW CONTROL ORIFICE CUT SMOOTH CIRCULAR OPENING TO DIMENSION WOICATED ON OWN SITE PLAN SIOMMER ELEVATION Floating Surface Skimmer CONSTRUCTION SPECIFICATIONS 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS, OR AS DESIGNED. VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF N 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED INLET OF THE BARREL PIPE, ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE BELOW BASIN AS NEEDED. SKIMMER AND ANCHOR IT TO THE RIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE 7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6INCHES TO ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF ALLOW FOR SETTLEMENT. THE SPILLWAY. THE SPILLWAY SHOULD BE LIKED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE SKIMMING DEVICE FROM SET i i.iNG INTO THE iviUU ax cnw%vgi live i% `CUUCO ivini oe aewR57 WITH &INCH STAPLES OR PINS, THE FAGH{G MUo I o'c Lunn i:i;"vuuri SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT TO EXTEND DOWN THE SLOPE AND EIBT ONTO STABLE GROUND, THE WIDTH OF THE FABRIC UNDER THE SKIMMER OF STONE OR BLOCK, MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC 1E INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, 4. PLACE THE BARREL (TYPICALLY ONCH SCHEDULE 40 PVC PIPE) ON A MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAY BE USED, THE UPPER SECTIONS) FIRM, SMOOTH FOUNDATION OF IMPERVIOUS $OIL, 00 NOT USE SHOULD OVERLAP THE LOWER EEOf1ON(S) SO THAT WATER CANNOT FLOW UNDER THE FABRIC. PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A fiRENCR WITH STAPLES OR PINS. BACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND 8. INLETS • DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION, USE THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED 9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER EMBANKMENT IS COMPLETE. CONSTRUCTION. 10. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. TREATMENT BASIN #1 MAN 24" DIP FLOW DESCRIPTION STABILIZATION STABILIZATION TIMEFRAME TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & 7 DAYS NONE SLOPES SLOPES STEEPER THAN 7 DAYS IF SLOPES ARE 10' OR LESS IN 3.1 LENGTH THAN 2:1.14 DAYS ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES > so, FLATTER IN LENGTH ALL OTHER AREAS WITH SLOPES 14 DAYS NONE FLATTER THAN 4:1 VTO3' SLOPE SAND STOCKPILE C000002 NTS SPOIL MATERIAL FROM HYDRAULIC DREDGING ?-/ MAINTENANCE IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKDIG nMT ronocim.t.X,T„�n,.,.....�.,...,,�....... ......... ..... ...... ..____._ DEBRIS. REL PIPE IS SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE, ROJECT EROSION CONTROL PLAN FOR SPECFIC BASIN DIMENSIONS AND ORIENTATION rtMAL BASIN PLAN WN DESIGN FLOATING SURFACE SIOMME , SEE DETAIL BASIN wnoM aEVAT10N E BANIM M PARTIAL RON SECTION TREATMENT BASIN #2 v STEEL POST CLASS I OR 2 RIP_PAP 4' MAX STEEL POST WIRE FENCING (IF APPLICABLE) �WION i STABUZED OUTLET PROTECTION WASHED STONE (NCONIT #5 OR #57) WOVEN CLASS I OR 2 RIP -RAP WITH 6 FILTER INCHES OF WASHED STONE ON FABRIC UPSTREAM FACE GENERAL NOTES: MAINTENANCE NOTES: 1. SEDIMENT FILTER OUTLET SHALL BE 16INCHES 1. FILTER OUTLETS SHALL BE INSPECTED BY THE HIGH BUT NO TALLER THAN 18 INCHES FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST 2. CLASS 1 OR 2 RIP -RAP SHALL BE USED AND DAILY DURING PROLONGED RAINFALL. ANY REPAIRS COVERED WITH 61NCHES OF NCDOT #5 OR #57 NEEDED SHALL BE MADE IMMEDIATELY. WASHED STONE ON THE UPSLOPE SIDE. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. EVENT THAT HAS CLOGGED OR REMOVED IT. 4. SITE OUTLETS AT ANY POINT SMALL 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN CONCENTRATED FLOWS ARE ANTICIPATED AND AT DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. THE DIRECTION OF THE INSPECTOR. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER 5. THE SILT FENCE OUTLET IS REMOVED SHALL BE ONE ACRE MAXIMUM DRAINAGE AREA PER DRESSED TO CONFORM TO THE EXISTING GRADE, OUTLET. PREPARED AND SEEDED. SILT FENCE STONE OUTLET 0002 / NTS EROSION CONTROL SEQUENCE NOTES 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL Ah D PERMIT. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH PRE CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ----EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF E PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS, THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION ND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING ROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OF DEWLOPMENT. 6. ESTABLISHMENT OF PERMANENT GROU COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL ERG 31ON CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/DOT AT NORTH P K DRIVE, B. THIS SITE HAS TEMPORARY SKIMMER BASINS AS SHOWN. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING L CPCLn LIMPAAI VRAWIEC Amn nvzn Ra Fnn APPAe yr mmnrm OMn I Drum -ri r ° %A ATTR rompcin\O I IPTMI rnhADI LTUtM nr CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA OW FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS QUIRED. ARTHEN-MATERIAL STOCKPILES OWSITE FOR LATER DISTRIBUTI N AND/OR REMOVAL. AREAS DEDICATED FOR MANAGEMENT OF AND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE -OCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER I LT€RNATIV€S ARE REASONABLY AVAILABLE), AND WITHIN ARAM PROTECTED BY EROSION CONTROL MEASURES, h BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICI S IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL 4DDmONAL EROSION CONTROL MEASURES AS REQUIRED. I. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE S (AT APPROXIMATELY 45 DAYS PRIOR TO DEMOBILIZATION), THE TNANCIAL RESPONSIBLE PARTY (OR THEIR DESIGNEE) WILL NOTIF f THE ENGINEER AND THE DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN 0 -SITE INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE )ATE BY THE ENGINEER AND/OR THE DESIGNATED EROSION AN INSPECTOR TO MAKE CERTAIN ALL ACTIONS ITEMS HAVE BEEN LODRESSED BY THE CONTRACTOR. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL IISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND LPROVAL BY ENGINEER. 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEV EACH RAINFALL EVENT. 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEP 3. REMOVED ACCUMULATED SILT/SEDIMENT FROM BEHIND TE APPROXIMATELY 05. REPAIR AND REPLACE SILT FENCE AS NECES 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEI DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND PROVISION OF THE GENERAL NPDES STORMWATER DISCHARGE PEI SEEDING AND VFGFT FOR STABILITY AND FUNCTION EACH WEEK AND FOLLOWING ACCUMULATED VOLUME HAS REACHED 50% CAPACITY. 1PORARY SEDIMEN I FENCE WHEN DEPTH EXCEEDS AFTER CONSTRUCTION INCLUDING "CLEAN" WATER ITAIN RECORDS OF INSPECTIONS IN ACCORDANCE WITH THE FOR CONSTRUCTION ACTIVITIES. PREPARE SEEDBED BY RIPPING, CHISELINR, HARROWING OR PLOWING TO DEPTH OF�SIX INCHES 60 AS TO PRODUCE A LOSE, FRIABLE SURFACE. REMOVE ALL ETON[% BOULDERS, STUMPS CR DEBRIS FROM THE SURFACE WHICH OULD PROHIBIT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10.10 FERTILIZER PLUS 5 30 POUNDS OF TWENTY PERCENT (20%) SUPERPIEWPHATE PER ACRE AND TO TONS Of DOLOMITIC WE PER ACRE UNLESS SOIL TESTS INM LTE THAT A LOWER RATE Of LIME CAN BE USED.. MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND EITHER CRI AP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. PERMANENT SEEDI GS DI AAITC ■ANTI IDC DI AamalO DaT[N !`DC DI AAITIRIC fIAT[C IFLMIV iO MIA I vnL rL 11 I IINU TIMIL/ t.nL rL IM I UVU U11I LO TALLFESCUE 100-150 LBS. AUG 15-OCT 15 (LOW MAINTENANCE) TALLFESCUE 200-250 LBS. WATERWAYS AND LAWNS (HIGH MAINT.) oL[xo OC TWO TUQ VFIG DOo-"o Lao, TALL FESCUES (90%) AND TWO OF MORE IMPROVED KENTUCKY BLUEGRASS VARIETIES (10%) (HIGH MAINTENANCE) TALLFESCUE 100 LBS. AND KOBE OR KOREAN LESPEDEZA 20-25 LBS. (SEE NOTE 1 BELO" TALL FESCUE 50 LBS. SERICEA LESPEDEZA 60 LBS./ACRE TALL FESCUE AND 60 LBS. GERMAN MILLET OR SUDANGRASS AND 30 LBS. (SEE NOTE 2 BELOW) TALLFESCUE 70 LBS. AND RYEGRAIN AND 25 LBS. (SEE NOTE 2 BELOW) COMMON BERMUDAGRASS 8 LBS. (HULLED) AND KOBE OR KOREAN LESPEDEZA 15-2 LBS. (UNHULLED) (SEE NOTE 1 BELOW) (1) FOR SPRING SEEDING$, USE SCARIFIED LESPEDEZA SEED. FOR LATE FALL AND (2) ANNUALS SUCH AS MILLET, SUNDANGRASS AND RYEGRAIN MUST BE KEPT AT SEEDING SCHEDULE C002 / NTS FEB. 15 - MAY 1 AUG. 15-OCT. 15 FEB. 15 -PRAY 1 AW. tFOOT. 16 FEB. 15 - MAY 1 AUG. 15-OCT. 15 FEB. 15 - MAY 1 NOV. 1-FEB. 1 (UNSCARIFIED) JULY AND AUGUST NOV. WAN.30 APR. 15-JUNE 30 FEB. 1 -MAY 30 1 SEEDINGS, USE UNSCARIFIED SEEDS. MAXIMUM HEIGHT. eJgv\Gop 6" MIN AGGREGATE (SURGE STONE) AS �12' MIN REQUIRED 71 CONSTRUCTION SPECIFICATIONS i. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUTIABLE OUTLET. 4. USE NONWOVEN GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LC CATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY CONSTRUCTION ENTRANCE C002 NTS a WIRE MESH SUPPORT FENCE FILTER FABRIC - CO APACTED FILL STEEL POST TYP. MATERIAL SPECIFICATIONS: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 65% BY WEIGHT OF POLYOLERNS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFAMFIER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM 06461. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS, 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1,33 LB/LINEAR FEET STEEL WITH A MINIMUM LENOD I OF 5-FEET, MAKE SURE THAT STEEL POSTS NAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. A. FAA RaNFORCURNT U STANDARD STRENGTH FILTER FABRIC, wE WIRE FENCE WITH A MINIMUM 14- GUAGE AND A MAXIMUM MESH SPACING OF 6-INCHES. CONSTRUCTION SPECIFICATIONS: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTEF FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 18-INCHES ABOVE THE GROUND SURFACE (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE). 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH OVERLAP TO THE NEXT POST. 4. GUPPORT GTANDARD GTRENGTH FILTER FABRIC BV VHRE MESH GASTENED SECURLV TO THE UPSLOPE GI DE OF THE POSTS USING HEAVY DUTY TIE WIRES. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF TI IE TRENCH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8-FEET APART. STEEL SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND TO A MINIMUM OF 18-INCHES. WIRE MESH SUPPORT FENCE MATERIAL SHALL BE AGRICULTURAL QUALITY 14-GAGE ANNEALED STEEL WIRE WITH A 4' x 5° MAX. SPACING PATTERN. 6. EXTRA STRENGTH FILTER FABRIC WITH 6-FT POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. TIE WIRE THE FILTER FABRIC DIRECTLY TO POSTS. 7. EXCAVATE A TRENCH APPROXIMATELY 4-INCHES WIDE AND 8-INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. BACKFILL THE TRENCH WITH COMPACTED SOIL PLACED OVER THE FILTER FABRIC. 9. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REPLACE BURLAP EVERY 60 DAYS. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABILIZED SEDIMENT DEPOSITS. BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE:' AREA HAS BEEN PROPERLY STABILIZED. ;TEMPORARY SEDIMENT FENCE n- E3 I a Rlr�l l aj Powered by partnership. 400 S. Tryon Street, Suite 1300 Charlotte, NC 28285 704-376-6423 labellapc.com F I TCORPORATE ENGINEERING LICENSE NO. C-0430 F0�0 0 ASSOC'4TF V.\TECT644 3q co. O CERT. NO. 52904 Hp "\ C5 NORTH CAROV� T/T/gfTlll lll%%%Txx` A'9LOTTE, 'A' © 2020 LaBella Associates Town of Lake Lure 2948 Memorial Highway PO Box 225 Lake Lure, NG 28746 :-own o/f�+Qyau lA�� K� eSt. 1927 WNorth Carolina MORSE PARK MINING SITE FOR TOWN OF LAKE LURE JUN 21 2022 N0: DATE: DESCRIPTION: Revisions PROJECT NUMBER: 2200559 DRAWN BY: REVIEWED BY: JSB BRH ISSUED FOR: ISSUED FOR PERMITTING DATE: JUNE 16, 2022 DRAWING NAME EROSION CONTROL NOTES AND DETAILS DRAWING NUMBER: C002 L;UU2 J NTS