HomeMy WebLinkAbout20210430_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
09-16 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
The Tara Group of Lumberton
Applicant's Email:
taragroup8199@gmail.com
County:
Project Name:
Tara-Bladen 1
YES
NO
Date Commencing
Have land disturbing activities started??
—
05/19/2005
Latitude:
34.7167
Longitude:
-78.8141
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 05/21/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
Z
El
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Big Swamp C;Sw
DWR Compliance Status of Mine:
401 Wetland Cert. required?
El
171
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Possible need for 401 Cert.
Does DWR RO have enough information to determine if a 401 certification is required?
❑
I
❑✓
Is an O & M Plan needed?
Are wetlands disturbed at this site?
I
❑
❑
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓
I
❑
Is a wetland delineation required prior to DWR issuing the permit?
I
✓
JD
Consultant
�/
Onsite
El
I
Offsite
❑
❑
Stream Determination Needed?
1
❑
1
❑
Stream Determination Completed?
I
❑✓
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
O&M Requirements
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
Other
7
Please describe the reason to hold the permit:
Wetland delineation info needed. Can't determine if there are wetlands associated with stream. Removal of existing culvert may require 404/401 permitting.
RO contact:
I Chad Turington
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed by
Central Office Date Regional Office
LI
Date
DWR RO Surface Water I Chad Turlington
04/30/2021
RO Aquifer Protection Section
Rev. December 2020-2020r1