Loading...
HomeMy WebLinkAbout20210430_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 09-16 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: The Tara Group of Lumberton Applicant's Email: taragroup8199@gmail.com County: Project Name: Tara-Bladen 1 YES NO Date Commencing Have land disturbing activities started?? — 05/19/2005 Latitude: 34.7167 Longitude: -78.8141 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 05/21/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? Is the RO concerned that the operation, as proposed, would violate standards of water quality? Z El Comments: Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Big Swamp C;Sw DWR Compliance Status of Mine: 401 Wetland Cert. required? El 171 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Possible need for 401 Cert. Does DWR RO have enough information to determine if a 401 certification is required? ❑ I ❑✓ Is an O & M Plan needed? Are wetlands disturbed at this site? I ❑ ❑ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓ I ❑ Is a wetland delineation required prior to DWR issuing the permit? I ✓ JD Consultant �/ Onsite El I Offsite ❑ ❑ Stream Determination Needed? 1 ❑ 1 ❑ Stream Determination Completed? I ❑✓ ❑ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑ (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ Has Violation O&M Requirements HQW/7Q10 Concerns Pay back fees or renew DWR permit Other 7 Please describe the reason to hold the permit: Wetland delineation info needed. Can't determine if there are wetlands associated with stream. Removal of existing culvert may require 404/401 permitting. RO contact: I Chad Turington Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed by Central Office Date Regional Office LI Date DWR RO Surface Water I Chad Turlington 04/30/2021 RO Aquifer Protection Section Rev. December 2020-2020r1