Loading...
HomeMy WebLinkAbout20210614_DWR_Comment_09-12Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 09-12 Project Action New OUT BY DEIVILR Modification Transfer Release Applicant Name: Barnhill Contracting Company X Applicant's Email: swaters@barnhillcontracting.com County: Bladen Project Name: Whatchamacallit Pit YES NO Date Commencing Have land disturbing activities started?? — 06/23/1997 Latitude: 34.5156 Longitude: -78.8482 Please return comments to (at DEMLR CO): Jenna Spencer jenna.spencer@ncdenr.gov Comments due by: 07/08/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? Is the RO concerned that the operation, as proposed, would violate standards of water quality? El ✓ Comments: by applicant. Map reViQ1A1 does not appear to show SUSPQr-tQd WetlAnd/strearn Per prov Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Big Swamp C;Sw DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ ✓ Is a Pumping Operation & Monitoring (OM) Plan needed? Are wetlands disturbed at this site? I ❑ I ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1❑✓ Is a wetland delineation required prior to DWR issuing the permit? I El I✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑ (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ ❑✓ Has Violation O&M Requirements HQW/7Q10 Concerns Pay back fees or renew DWR permitEl Other ❑ Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed Central Office ❑ Date Regional Office Date DWR RO Surface Water Chad Turlington 06/14/2021 RO Aquifer Protection Section Rev. April 2021