HomeMy WebLinkAbout20210616_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
07-36 Project Action New
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Rogers Nursery & Landscaping LLC
X
Applicant's Email:
rnursery762@gmail.com
County:
Beaufort
Project Name:
Rogers Pit #2
YES
NO
Date Commencing
Have land disturbing activities started??
—
01/05/2017
Latitude:
35.5366
Longitude:
-77.0198
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 05/21/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W/
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
El
Comments:
north n;ast of the exi tong mine. 50 foot
Does this mine (or previous owner) have DWR back fees to pay?
Ll/
(If Yes, amount):
Watershed/Stream Name & Classification:
UT TO SNODE CREEK
DWR Compliance Status of Mine:
401 Wetland Cert. required?
I ✓
401 Wetland Cert. existing?
❑
I ✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑
1
❑✓
Is a wetland delineation required prior to DWR issuing the permit?
I
El
I
✓
JD
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑✓
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑✓
❑
Recycle system permit existing?
❑
✓❑
(If Yes, Permit #):
New Recycle System permit required?
✓
Enough information to determine?
✓
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
1,(I
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
❑✓
Has Violation
O&M Requirements
HQW/7Q10 Concerns
El
Pay back fees or renew DWR permit
❑
Other
❑
Please describe the reason to hold the permit:
RO contact:
I Robert Tankard
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed by
Central Office Date Regional Office
El
Date
DWR RO Surface Water I Robert Tankard
06/16/2021
RO Aquifer Protection Section
Rev. December 2020-2020r1