Loading...
HomeMy WebLinkAbout20210616_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 07-36 Project Action New OUT BY DEIVILR Modification Transfer Release Applicant Name: Rogers Nursery & Landscaping LLC X Applicant's Email: rnursery762@gmail.com County: Beaufort Project Name: Rogers Pit #2 YES NO Date Commencing Have land disturbing activities started?? — 01/05/2017 Latitude: 35.5366 Longitude: -77.0198 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 05/21/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W/ Is the RO concerned that the operation, as proposed, would violate standards of water quality? El Comments: north n;ast of the exi tong mine. 50 foot Does this mine (or previous owner) have DWR back fees to pay? Ll/ (If Yes, amount): Watershed/Stream Name & Classification: UT TO SNODE CREEK DWR Compliance Status of Mine: 401 Wetland Cert. required? I ✓ 401 Wetland Cert. existing? ❑ I ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1 ❑✓ Is a wetland delineation required prior to DWR issuing the permit? I El I ✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑✓ ❑ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑✓ ❑ Recycle system permit existing? ❑ ✓❑ (If Yes, Permit #): New Recycle System permit required? ✓ Enough information to determine? ✓ Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? LI I 1,(I (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ ❑✓ Has Violation O&M Requirements HQW/7Q10 Concerns El Pay back fees or renew DWR permit ❑ Other ❑ Please describe the reason to hold the permit: RO contact: I Robert Tankard Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed by Central Office Date Regional Office El Date DWR RO Surface Water I Robert Tankard 06/16/2021 RO Aquifer Protection Section Rev. December 2020-2020r1