Loading...
HomeMy WebLinkAboutFW_ _External_ _Mining Permit 92-10_ Stop RDU Quarry (2)Johnson, Robert E From: Sams, Dan Sent: Friday, July 17, 2020 4:22 PM To: NCMiningProgram Subject: FW: [External] [Mining Permit 92-10] Stop RDU Quarry From: Elizabeth Adams [mailto:info@sg.actionnetwork.org] Sent: Friday, July 17, 2020 4:00 PM To: Sams, Dan <dan.sams@ncdenr.gov> Subject: [External] [Mining Permit 92-10] Stop RDU Quarry Dear Mr. Dan Sams, The imiinlling Ipeirmit mo6fication is lInconsistent with our ireglioinall comprehensive Ipllains. If a quarry Ipit is alklowed on the Ipubllic use hand imainaged by the Airport Authority, it wound IIIimGt options for the Ipllainined Tir9�ainglle 1:111keway http://trianglebikeway.com/ connecting Ralleigh, Research Tiriainglle Park (RTP), Durham and Chapell KlIkl alloing l 40. Rease see the trliainglle corridor map at the Ikinik albove. Rease deny t1his mi6ling Ipeirmit mo6fication due to the negative llimpact on the Ipuirposes of a Ipairk, as the quarry expansion wiH Ihairm accessibility to Uimstead State Park from the Tiriainglle 1:111keway . Elizabeth Adams elizabeth.a.adamsCaD_qmail.com 103 IL.arkslpur 1-in Cary, North Cairofina 27513 1