HomeMy WebLinkAbout16-82 DWR Mine Permit ChecklistReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
16-82 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Thomas Simpson Construction Inc
Applicant's Email:
noah@thomassimpsonconstruction.com
County:
Carteret
Project Name:
Simpson Hocutt Mine
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
34.783275
Longitude:
-76.925228
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 11/30/2020
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
W
Comments: DWR requests a JD from the USACE before mining begins so that wetland boundaries
on site can be accurately buffered.
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Southwest prong of Newport River - Class C - Stream Index 21-3
DWR Compliance Status of Mine:
N/A - new mining permit review
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
,/
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
1,(I
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
O&M Requirements
HQW/7Q10 Concerns
El
Pay back fees or renew DWR permit
❑
Other
❑
Please describe the reason to hold the permit:
Need a JD to determine wetland boundaries prior to issuing the permit.
RO contact:
I
I Hold Until:
Mine must wait to dewater until an O&M plan is approved? El
Reviewed by
Central Office Date Regional Office
I Z
Date
DWR RO Surface Water I Holley Snider & Megan Faulkner
12/01/2020
RO Aquifer Protection Section
Rev. December 2020-2020r1