Loading...
HomeMy WebLinkAbout16-82 DWR Mine Permit ChecklistReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 16-82 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Thomas Simpson Construction Inc Applicant's Email: noah@thomassimpsonconstruction.com County: Carteret Project Name: Simpson Hocutt Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 34.783275 Longitude: -76.925228 Please return comments to (at DEMLR CO): Adam Parr adam,parr@ncdenr,gov Comments due by: 11/30/2020 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: DWR requests a JD from the USACE before mining begins so that wetland boundaries on site can be accurately buffered. Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Southwest prong of Newport River - Class C - Stream Index 21-3 DWR Compliance Status of Mine: N/A - new mining permit review 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD ,/ Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? LI I 1,(I (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ Has Violation O&M Requirements HQW/7Q10 Concerns El Pay back fees or renew DWR permit ❑ Other ❑ Please describe the reason to hold the permit: Need a JD to determine wetland boundaries prior to issuing the permit. RO contact: I I Hold Until: Mine must wait to dewater until an O&M plan is approved? El Reviewed by Central Office Date Regional Office I Z Date DWR RO Surface Water I Holley Snider & Megan Faulkner 12/01/2020 RO Aquifer Protection Section Rev. December 2020-2020r1