HomeMy WebLinkAbout20210730_LQS_CommentsFrom:
Jones. Jerry R
To:
Parr, Adam
Subject:
Nichols Pit Comments
Date:
Friday, July 30, 2021 2:55:57 PM
Hello Adam,
My main concern with the Nichols Pit expansion would be that drainage ditch to the north, looks like
that's where they stop, but the berm is right on top of it.
So my question would be what's their plan to mitigate the drainage, unless it's not going to matter
anymore since it's no longer going to be farmed. My maps show it not to be a blue line, so it's not a
deal breaker. A person does live directly to the east of that ditch, but I don't think that ditch applies
to him. I think he's got his own ditch network on the other side of the path.
My only other comment is they need to keep the sediment off Alvin Road, I need to slip back out
there to see if they've cleaned up their mess.
Please let me know if you need anything else. Whatever works for you, I'll be back in the office
Monday and I can scan whatever.
Thanks,
J. Randall Jones, Jr., PE
Environmental Engineer
Division of Energy, Mineral, and Land Resources
Department of Environmental Quality
252-948-3857 office (primary)
919-280-0148 work cell
randall.jones&ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
�i�wi�n"c d ratixonarrn� i ns�.�uly
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.