HomeMy WebLinkAbout20210728_DAQ_CommentsDIVISION OF AIR QUALITY
MINING PERMIT APPLICATION REVIEW CHECKLIST
Application / Project No.: 74.99 Project Name:
� Nichols Sand Pit
County: I Pitt
Please return comments back to: Adam Parr Samir Dumpor
Comments due by: 07/29/2021
Will the operation, as proposed, violate standards of air quality? 4i
Comments: f'VI
Yes
No
Permit # if Existing
Air Permit Required
Air Permit Existing
Other Comments:
Reviewed By: S(" Date: �L
Print Name: i 0IL-6 vAt(I fi"
Central Office Reviewer: AP
Rev. Sept 2020 rO
APPLICATION FOR A MINING PERMIT
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
APPLICATION FOR A MINING PERMIT
(PLEASE PRINT OR TYPE)
Name of Mine N 6t; 615 .9MID p i�. County A (�E
River Basin `rAQ
Latitude (decimal degrees to four places) 3 S, 5 c '� r7
Longitude (decimal degrees to four places) - 7 % , Z Z q Z
2. Name of Applicant* P-6D 6PreP`- i -
3. Permanent address for receipt of official mail** (603, F-9D VS � p; Lie tlUl lL ��
Telephone 053L�_q i `l - 3 qW Alternate No. (as-) 5,31 - �y
4. Mine Office
Telephone () )) 61 t 7 - 34 p b
5. Mine Manager �tl�� 5ttii �l
6. E-mail Address: 9-" V atloo 1 176
I certify that all details contained in this Permit Application are true and correct to the best of our
knowledge. We fully understand that any willful misrepresentation of facts will be cause for permit
revocation.
Date � - 10 - Z-
Print Name yr & V
Title tj1&jg6*2
This will be the name that the mining permit will be issued to and the name that must be indicated on the
reclamation bond (security) that corresponds to this site.
* * The Division of Energy, Mineral, and Land Resources must be notified of any changes in the permanent address
or telephone number.
*** Signature of company officer required
G.S. 74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a
complete application or, if a public hearing is held, within 30 days following the hearing and the filing of any
supplemental information required by the Department. All questions must be addressed and all required maps
-1-
APPLICATION FOR A MINING PERMIT
Will any part of the proposed mine excavation(s) extend below the watex table? Yes e No ❑.
If yes, do you intend to dewater the excavation(s)? Yes ❑ No ❑✓"
"Yes
what impact, if any, will mine dewateno have on neighboring wells? Estimated withdrawal rate
in gallons per day: Locate all existing wells on the mine maps) that [ie within
S00 feet of the proposed excavation area. Provide data to support any conclusions or statements made,
including any monitoring well data, well construction data and current water withdrawal rates. Indicate
whether the proposed mine locale is served by a public water system or private wells.
d. If you answered yes to any of the above questions, provide evidence that you have applied for or
obtained the appropriate water quality permit(s) (i.e., non -discharge, NPDES, Stormwater, etc.) from the
Stormwater Program. In addition, the applicant is required to register water use with the Division of
Water Resources, Ground Water Management Branch, if the operation withdraws more than 10,000
gallons per day and needs a capacity use permit from the Division of Water Resources, Ground Water
Management Branch, if the operation lies in a capacity use area and withdraws more than I00,000
gallons per day.
4. a. Will the operation involve crushing or any other air contaminant emissions? Yes ❑ No P'
If yes, indicate evidence that you have applied for or obtained an air quality permit issued by the
Division of Air Quality or local governing body.
b. How will dust from stockpiles, haul roads, etc., be controlled?
6cl kJ'A(+Rw<irov oP G,cL,,t�L rZ Yes
-8-