Loading...
HomeMy WebLinkAbout20210716_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 74-99 Project Action New OUT BY DEIVILR Modification Transfer Release Applicant Name: PSD Properties LLC X Applicant's Email: rexsmithfarms@yahoo.com County: Pitt Project Name: Nichols Sand Pit YES NO Date Commencing Have land disturbing activities started?? — Latitude: 35.59370 Longitude: -77.22420 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 07/29/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: NA 0 n e e, adjacent or a s;trearn that nencis; to he deloniated Also, Wetl2ncis ..n. possible Does this mine (or previous owner) have DWR back fees to pay? Ll./ (If Yes, amount): Watershed/Stream Name & Classification: UT to Tar River 28-99 CLASS IFICATION:B NSW DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ 1 ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ ❑✓ Is a Pumping Operation & Monitoring (OM) Plan needed? ✓ Are wetlands disturbed at this site? ❑✓ I ❑ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓ I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD ,/ Consultant F I W Onsite ❑ �/ Offsite ❑ Stream Determination Needed? ❑✓ ❑ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ✓ ❑ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑✓ (If Yes, Permit #): New Recycle System permit required? ✓ Enough information to determine? ✓ Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? �✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other ❑ Please describe the reason to hold the JDpermit: & Stream Determination RO contact: 7Robert Tankard Hold Until: Mine must wait to dewater until an O&M plan is approved? ✓ Reviewed b Central Office Date Regional Office ✓� Date DWR RO Surface Water Robert Tankard 07/16/2021 RO Aquifer Protection Section Rev. April 2021