Loading...
HomeMy WebLinkAbout20210506 HDR-NCDEQ Response to Comments TransmittalMay 6, 2021 Adam Parr Assistant State Mining Engineer Division of Energy, Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 Re: Response to NCDEMLR Comments Dated April 16, 2021 Permit Modification: Colon Mine site Mining Permit No. 53-05 Dear Mr. Parr, HDR is in receipt of your letter dated April 16, 2021 which outlines comments related to the following document: • Permit Modification: Colon Mine Site, Permit No. 53-05, Green Meadow, Inc., Sanford, NC. Prepared by HDR Engineering, Inc. of the Carolinas, Charlotte, NC (HDR). Dated March 2021. The comments are repeated below, with responses provided in italics. 1. Please clearly indicate and label the existing permit boundary on the mine map and provide geographic controls for the boundary (e.g. metes and bounds, coordinates, etc.) Response: The existing permit boundary and geographic controls have been added to the Mine Map (Sheet OOG-02). Note that due to space limitations, additional boundary information is included in new Detail 5 on Sheet OOC-05. 2. Please indicate the County in which the mine is located on the Mine map. Response: The mine location (i.e. Lee County) has been added to the cover sheet and Mine Map (Sheet OOG-02) as Note 9. 3. Please clearly show the location of all planned on -site buildings. Response: There are currently no plans to construct any on -site buildings. This has been noted on the Mine Map (Sheet OOG-02) as Note 10. 4. Please provide the acreage table on the mine map. Response: The acreage table has been added to the Mine Map (Sheet OOG-02). hdrinc.com 440 S Church Street, Suite 1000, Charlotte, NC 28202-2075 (704)338-6700 A. Parr May 6, 2021 Page 2 5. Please identify and label the location of onsite storage facilities for fuel tanks, solvents, or other chemical reagents. Response: There are currently no plans for on -site storage facilities for fuel tanks, solvents, or other chemical reagents. This has been noted on the Mine Map (Sheet OOG-02) as Note 11. 6. Please refer to Section D: Reclamation, of the Mine permit application. Please provide a scaled cross section through proposed bodies of water that will be left as part of reclamation. Response: Sections A and 8 on Sheet OOC-04 have been revised to indicate proposed bodies of water that will be left in the future mine area as part of reclamation. 7. Please identify onsite roadways that will be left as part of reclamation and provide details on permanent road and ditch line stabilization. Sheet OOC-03, shows roads crossing through the post reclamation lake. Response: The locations of on -site roadways that will be left as part of reclamation have been added to Sheet OOC-03. A permanent road detail has been added as Detail 6 on Sheet OOC-05. If you have any questions regarding these response to the permit amendment request, please do not hesitate to call me at (704) 338-6843. Sincerely, HDR Engineering, Inc. of the Carolinas Michael D. Plummer, PE Project Manager cc: Norman Divers, Green Meadow, Inc.