Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20210308 Colon Mine Permit Modification to DEMLR
Permit Modification: Colon Mine Site Permit No. 53-05 Green Meadow, Inc. Santord, NC March 2021 HDR Engineering, Inc. of the Carolinas 440 South Church Street, Suite 1000 Charlotte, NC 28202-2075 704.338.66700 NC License F0116 hdrinc.com March 8, 2021 Mr. David Miller Land Quality Section Division of Energy, Mineral, and Land Resources Department of Environment and Natural Resources 1612 Mail Service Center Raleigh NC 27699-1612 Re: Colon Mine Site Mining Permit No. 53-05 Dear Mr. Miller, On behalf of Green Meadow, LLC and Charah, Inc., HDR is requesting a major permit modification for the Colon Mine Site, Mining Permit No. 53-05. The purpose of the major permit modification is to remove the currently permitted use of Coal Combustion Byproducts (CCBs) structural fill as part of the reclamation plan and to essentially restore the permit to reflect the mining and reclamation plans as contained in the December 12, 2014 permit renewal for the facility. Attached you will find six complete hard copies and one electronic copy of the following information: • Completed permit application form. • Updated sediment basin calculations reflecting the removal of the previously permitted CCBs structural fill. • Drawings reflecting the proposed modified mining and reclamation plans. Also attached is a check for $1,000 as required for submittal of a major permit modification. If you have any questions, comments, or require additional information, please contact me at 704. 338.6843. Sincerely, HDR Engineering, Inc. of the Carolinas { Michael D. Plummer, PE Project Manager 440 S Church Street, Suite 1000, Charlotte, NC 28202-2075 704.338.6700 PERMIT APPLICATION FORM This page intentionally left blank. APPLICATION FOR A MINING PERMIT NORTH CAROLINA MINING PERMIT APPLICATION State of North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 (919) 707-9220 Revised: 2017 —1— APPLICATION FOR A MINING PERMIT NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY APPLICATION FOR A MINING PERMIT (PLEASE PRINT OR TYPE) 1. Name of Mine Colon Mine County Lee River Basin Cape Fear Latitude (decimal degrees to four places) 35.5348 Longitude (decimal degrees to four places)-79.1598 2. Name of Applicant* Green Meadow, Inc. 3. Permanent address for receipt of official mail** 12601 Plantside Drive, Louisville, KY 40299 Telephone: (502) 245-1353 4. Mine Office Address same as above 5. Mine Manager Norman Divers 6. E-mail Address: ndivers(u�charah.com Alternate No.: (704) 731-2200 Telephone ( ) same as above I certify that all details contained in this Permit Application are true and correct to the best of our knowledge. We f y understand that any willful misrepresentation of facts will be cause for permit revocation. ***Signature Date 3/2/2021 Print Name Norman E. Divers, III Title VP -Quality, Environment, Health & Safety This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond (security) that corresponds to this site. ** The Division of Energy, Mineral, and Land Resources must be notified of any changes in the permanent address or telephone number. ***.Signature of company officer required. G.S. 74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or, if a public hearing is held, within 30 days following the hearing and the filing of any supplemental information required by the Department. All questions must be addressed and all required maps provided before this application can be considered complete. Attach additional sheets as needed. -2- APPLICATION FOR A MINING PERMIT NOTE: All of the following questions must be thoroughly answered regarding your mining operation for the intended life of the mine. All responses must be clearly conveyed on a corresponding, detailed mine map. A. GENERAL CHARACTERISTICS OF THE MINE 1. Answer all of the following that apply: ❑ If this is an application for a NEW permit, indicate the total acreage at the site to be covered by the permit (this is the acreage that the "new permit" fee will be based upon): Of this acreage, how much is owned and how much is leased? Acres owned: Acres leased: Property owner if leased: ® If this is an application for a MODIFICATION to a mining permit, indicate the mining permit number and the total (overall) acreage covered by the existing permit. Mining Permit No.: 53-05 Total permitted acreage: 371 Does the modification involve acreage within the previously approved permitted boundary? Yes ® No ❑. If yes, indicate the acreage to be covered by this modification (this is the acreage that the "major modification" fee will be based upon): 371 Does the modification involve acreage outside the previously approved permitted boundary? Yes ❑ No Z. If yes, indicate the additional acreage to be covered by this modification: . (NOTE: you must complete all of Section F. of this application form entitled Notification of Adjoining Landowners). Of this acreage to be added to the permit, will any portion of this acreage be affected (i.e.: disturbed, ground cover removed) by the mining operation? Yes ❑ No ❑ (If no, a "minor modification" fee of $100.00 is required, despite the "undisturbed" acreage to be added). If yes, indicate the acreage to be affected within the acreage to be added to the permit (the total acreage to be added to the permit is the acreage that the "major modification" fee will be based upon): ❑ If this is an application for TRANSFER of a mining permit, indicate the mining permit number and the total (overall) acreage covered by the existing permit. Mining Permit No.: Total permitted acreage: SEE THE FEE SCHEDULE AT THE END OF THIS FORM FOR THE PROPER FEE AMOUNT TO BE PAID FOR THE REQUESTED PERMIT ACTION(S) AND CORRESPONDING ACREAGE NOTED ABOVE 2. Name of all materials mined: 3. Mining method: H Hydraulic Dredge ® Front-end Loader & Truck ® Shovel & Truck Dragline & Truck Self -loading Scraper Other (explain): 4. a. Expected maximum depth of mine (feet) 32 Depth is relative to what benchmark? (e.g., natural ground level, mean sea level, road elevation, etc Natural around level b. Expected average depth of mine (feet) 10 5. Has any area(s) at this site been mined in the past? Yes ® No ❑ If yes, when and by whom was this activity conducted? General Shale Brick Inc./Cherokee Sanford has mined the site since 1972. -3- APPLICATION FOR A MINING PERMIT 6. Number of years for which the permit is requested (Life of the Mining Operation or Life of Lease from Public Entity): Life of Mining Operation B. MAPS 1. Clearly mark and label the location of your mining operation on six (6) copies of a 7.5-minute quadrangle and a county highway map. These maps, in addition to six (6) copies of all mine maps and reclamation maps, must be submitted with each permit application. 7.5-minute quadrangles may be obtained from the N.C. Geological Survey: Mailing Address: Physical Address: 1612 Mail Service Center OR 512 North Salisbury Street, 5tn Floor Raleigh, North Carolina 27699-1612 Raleigh, North Carolina 27604 (919) 733-2423 httn://nortal.ncdenr.orL,/web/lr/geological home County highway maps may be obtained from the N.C. Department of Transportation: North Carolina Department of Transportation — Geographic Information Systems (GIS) Mailing Address: NCDOT GIS Unit 1587 Mail Service Center Raleigh, North Carolina 27699-1587 Physical Address: NCDOT GIS Unit 3401 Carl Sandburg Court Raleigh, North Carolina 27610 (919) 212-6000 hiip://www.ncdot.orWit/gis/ 2. Mine maps must be accurate and appropriately scaled drawings, aerial photographs or enlarged topographic maps of the entire mine site. All aspects of the mine site must be clearly labeled on the maps along with their corresponding (approximate) acreage. Thus, all mine and reclamation maps must denote those activities that are intended to be conducted during the life of the mining permit. All maps must be of a scale sufficient (see minimum requirements listed below) to clearly illustrate the following, at a minimum: a. Property lines of the tract or tracts of land on which the proposed mining activity is to be located including easements and rights -of -way. b. Existing or proposed permit boundaries. c. Initial and ultimate limits of clearing and grading. d. Outline and width of all buffer zones (both undisturbed and unexcavated). e. Outline and acreage of all pits/excavations. f. Outline and acreage of all stockpile areas. g. Outline and acreage of all temporary and/or permanent overburden disposal areas. h. Location and acreage of all processing plants (processing plants may be described as to location and distance from mine if sufficiently far removed). i. Locations and names of all streams, rivers and lakes. j. Outline and acreage of all settling and/or processing wastewater ponds. k. Location and acreage of all planned and existing access roads and on -site haul roads. 1. Location of planned and existing on -site buildings. in. Location and dimensions of all proposed sediment and erosion control measures. n. Location of 100-year floodplain limits and wetland boundaries. o. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts, that are within 1,000 feet of the mining permit boundary, must be provided on the mine map. APPLICATION FOR A MINING PERMIT p. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway, creek, stream, river, or other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts, that are within 1,000 feet of the mining permit boundary, must be provided on the mine map(s). NOTE: "Highway" means a road that has four lanes of travel or less and is not designated as an Interstate Highway. q. Map legend: 1. Name of applicant 2. Name of mine 3. North arrow 4. County 5. Scale 6. Symbols used and corresponding names 7. Date prepared and revised 8. Name and title of person preparing map Map scales should meet the following guidelines: PERMITTED ACREAGE MAP SCALE 0-49 Acres 1 inch = 50 feet 50-199 Acres 1 inch = 100 feet 200+ Acres 1 inch = 200 feet (NOTE: Smaller scaled maps may be acceptable if they clearly illustrate the above items) WeZ APPLICATION FOR A MINING PERMIT A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds, stockpiles, wastepiles, processing area/haul roads, mine excavation and any other major aspect of the mining operation that is proposed to be affected/disturbed during the life of the mining permit. A table/chart similar to the following will be acceptable: CATEGORY AFFECTED ACREAGE Tailings/Sediment Ponds 28.5 Stockpiles 7.4 Wastepiles 5.0 Processing Area/Haul Roads 17.5 Mine Excavation 255.6 Other (Explain) 0 [Total Disturbed Acreage F31 NOTE: IN ADDITION TO THE ABOVE, THE MAPS MUST ALSO INCLUDE ANY SITE -SPECIFIC INFORMATION THAT IS PROVIDED IN THE ANSWERS TO THE FOLLOWING QUESTIONS IN THIS APPLICATION FORM (PLEASE NOTE THE ITALICIZED QUESTIONS/STATEMENTS THROUGHOUT THE FORM). THIS APPLICATION WILL NOT BE CONSIDERED COMPLETE WITHOUT ALL RELEVANT ITEMS BEING ADEQUATELY ADDRESSED ON THE MINE MAPS. APPLICATION FOR A MINING PERMIT C. PROTECTION OF NATURAL RESOURCES Describe in detail the sequence of events for the development and operation of the mine and reference the sequence to the mine map(s). Attach additional sheets as needed. Clay mining will continue as indicated on the mining maps. Sediment basins 17 through 21 will be installed as needed before mining takes place within the drainage areas to these basins. 2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to prevent offsite sedimentation (include specific plans for sediment and erosion control for mine excavation(s), waste piles, access/mine roads and process areas), and give a detailed sequence of installation and schedule for maintenance of the measures. Locate and label all sediment and erosion control measures on the mine map(s) and provide typical cross-sections/construction details of each measure. Engineering designs and calculations are required to justify the adequacy of any proposed measures. Erosion control within previously mined areas will be provided by large bodies of water within mined pits that will allow sediment to settle out of stormwater prior to discharge. Diversion berms and grading will be used to direct runoff to these bodies of water. Dry detention sediment basins with skimmers will be constructed within the previously unmined areas on the north side of the permitted property prior to commencing mining within the watersheds to these basins. These sediment basins were designed to contain the 10-year design storm and to safely pass the 100-yr design storm without overtopping the berm. Diversion berms and grading will be used to direct runoff to these basins. Revegetation will be performed within disturbed areas according to the seeding requirements in the mining plans. Reclamation will be conducted simultaneously with mining to the extent feasible. 3. a. Will the operation involve washing the material mined, recycling process water, or other waste water handling? Yes ❑ No M. If yes, briefly describe all such processes including any chemicals to be used. b. Will the operation involve dischar ing fresh or waste water from the mine or plant as a point discharge to the waters of the State? Yes No ❑. If yes, briefly describe the nature of the discharge and locate all proposed discharge points (along with their method of stabilization) on your mine map(s). Stormwater runoff from mined areas will either be directed to existing large bodies of water or proposed dry detention sediment basins to provide sediment removal prior to offsite discharge. Discharge locations are shown on the mine maps. C. Will any part of the proposed mine excavation(s) extend below the water table? Yes ® NoEl. If yes, do you intend to dewater the excavation(s)? Yes ® No ❑. If yes, what impact, if any, will mine dewatering have on neighboring wells? Estimated withdrawal rate in gallons per day: 5,000 . Locate all existing wells on the mine map(s) that lie within 500 feet of the proposed excavation area. Provide data to support any conclusions or statements made, including any monitoring well data, well construction data and current water withdrawal rates. Indicate whether the proposed mine locale is served by a public water system or private wells. No existing water wells have been identified within 500 feet of the proposed excavation area. Area is served by private wells. Most of the water removed is surface water accumulated in the mine excavations. -7- APPLICATION FOR A MINING PERMIT d. If you answered yes to any of the above questions, provide evidence that you have applied for or obtained the appropriate water quality permit(s) (i.e., non -discharge, NPDES, Stormwater, etc.) from the Stormwater Program. In addition, the applicant is required to register water use with the Division of Water Resources, Ground Water Management Branch, if the operation withdraws more than 10,000 gallons per day and needs a capacity use permit from the Division of Water Resources, Ground Water Management Branch, if the operation lies in a capacity use area and withdraws more than 100,000 gallons per day. The mine has an existing NPDES permit No. NCG020854. 4. a. Will the operation involve crushing or any other air contaminant emissions? Yes ❑ No M. If yes, indicate evidence that you have applied for or obtained an air quality permit issued by the Division of Air Quality or local governing body. b. How will dust from stockpiles, haul roads, etc., be controlled? The natural moisture of the materials stockpiled will limit dusting from stockpiles. Haul roads are wetted as needed to prevent dusting. 5. a. A buffer will be required between any mining activity and any mining permit boundary or right-of- way. It may be an unexcavated buffer (no excavation, but roadways, berms and erosion & sedimentation control measures may be installed within it), an undisturbed buffer (no disturbance within the buffer whatsoever), or a combination of the two, depending upon the site conditions. Note that all buffers must be located within the mining permit boundaries. How wide a buffer will be maintained between any mining activity and any mining permit boundary or right-of-way at this site? A minimum buffer of 25 feet is recommended, although a wider buffer may be needed depending on site conditions. Show all buffer locations and widths on the mine map(s). A 50-foot undisturbed property line buffer is maintained. A 300-foot buffer is maintained to residences and private groundwater wells. b. A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands unless smaller undisturbed buffers can be justified. Depending on site conditions, a buffer wider than 50 feet may be needed. How wide an undisturbed buffer will be maintained between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands at this site? Show all buffer locations and widths on the mine map(s). A 50-foot buffer to wetlands and streams is also maintained except where impacts are permitted through the USACE and NCDWQ. 6. a. Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries during mining. Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and minimum 3 horizontal to 1 vertical slopes or flatter for sandy material are generally required, unless technical justification can be provided to allow steeper slopes. A 2:1 (H:V) slope is maintained along exterior slopes. APPLICATION FOR A MINING PERMIT b. Provide a cross-section on the mine map(s) for all fill slopes (berms, wastepiles, overburden disposal areas, etc.), clearly indicating the intended side slope gradient, installation of any benches and/or slope drains (with supporting design information) if needed, and the method of final stabilization. See Drawing OOC-05. c. In excavation(s) of unconsolidated (non -rock) materials, specify the angle of all cut slopes including specifications for benching and sloping. Cross -sections for all cut slopes must be provided on the mine map(s). No benching will be conducted. Cut slopes will be 2:1 (H:V) along the exterior of the mine. d. In hardrock excavations, specify proposed bench widths and heights in feet. Provide cross -sections of the mine excavation clearly noting the angles of the cut slopes, widths of all safety benches and mine benches, and the expected maximum depth of the excavation. N/A 7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling house, public road, public, commercial or industrial building from any mine excavation. Locate all such structures on the mine map if they are within 300 feet of any proposed excavation. N/A Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area and when it will be implemented. Vegetated earthen berms, appropriate fencing and adequate boulder barriers may be acceptable high wall barricades. A construction detail/cross-section and location of each type of barricade to be used must be indicated on the mine map(s). N/A 9. Are acid producing minerals or soils present? Yes ❑ No M. If yes, how will acid water pollution from the excavation, stockpiles and waste areas be controlled? 10. a. Describe specific plans (including a schedule of implementation) for screening the operation from public view such as maintaining or planting trees, bushes or other vegetation, building berms or other measures. Show the location of all visual screening on the mine map(s) and provide cross - sections through all proposed berms or proposed spacing, sizes and species for tree plantings. The mine is screened from public view by wooded areas. b. Could the operation have a significantly adverse effect on the purposes of a publicly owned park, forest or recreation area? If so, how will such effects (i.e., noise, visibility, etc.) be mitigated? No. APPLICATION FOR A MINING PERMIT 11. Will explosives be used? Yes ❑ No M. If yes, specify the types of explosive(s) and describe what precaution(s) will be used to prevent physical hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations. Depending on the mine's location to nearby structures, more detailed technical information may be required on the blasting program (such as a third -party blasting study). Locate the nearest offsite occupied structure(s) to the proposed excavation(s) on the mine map and indicate its approximate distance to the proposed excavation. 12. Will fuel tanks, solvents, or other chemical reagents be stored on -site? Yes ® NoFT If yes, describe these materials, how they will be stored and method of containment in case of spill. Indicate the location(s) of all storage facilities on the mine map(s). Motor oil and other products required for equipment maintenance will be stored in on -site facility storage buildings. Above ground petroleum tanks will have secondary containment systems. -10- APPLICATION FOR A MINING PERMIT D. RECLAMATION PLAN Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate the sequence and general methods to be used in reclaiming this land. This must include the method of reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment of any permanent drainage channels to a condition minimizing erosion, siltation and other pollution. This information must be illustrated on a reclamation map and must correspond directly with the information provided on the mine map(s). In addition, design information, including typical cross -sections, of any permanent channels to be constructed as part of the reclamation plan and the location(s) of all permanent channels must be indicated on the reclamation map. The land will be revegetated in grass. Mine pits will be allowed to flood to form permanents lakes and ponds. Land above water will be sloped to drain by gravity to the water bodies formed by the excavation. 2. Is an excavated or impounded body of water to be left as a part of the reclamation? Yes ® No ❑. If yes, illustrate the location of the body(s) of water on the reclamation map and provide a scaled cross-section(s) through the proposed body(s) of water. The minimum water depth must be at least 4 feet, measured from the normal low water table elevation, unless information is provided to indicate that a more shallow water body will be productive and beneficial at this site. Will the body(s) of water be stocked with fish? Yes ® NoFT If yes, specify species. The lakes will be stocked with bass, bream, and other species of fish native to the area. 3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock including what kind of permanent barricade will be left. Acceptable permanent barricades are appropriate fencing, large boulders placed end -to -end, etc. Construction details and locations of all permanent barricades must be shown on the reclamation map. N/A 4. Indicate the method(s) of reclamation of overburden, refuse, spoil banks or other such on -site mine waste areas, including specifications for benching and sloping. Final cross -sections and locations for such areas must be provided on the reclamation map. Overburden, refuse, and spoil banks are minimal for a clay mine. Such stockpiles will be spread on the ground to allow positive drainage and revegetated. a. Describe reclamation of processing facilities, stockpile areas, and on -site roadways. Any processing facilities will be removed as part of reclamation and vegetated. Stockpile areas will be graded for positive drainage before revegetation. The haul roads in the mine will remain in place for site access. These roadways are flush with the ground or are located on embankment fill. b. Will any on -site roadways be left as part of the reclamation? Yes ® NoFT If yes, identify such roadways on the reclamation map and provide details on permanent road and ditch line stabilization. See Sheet OOC-04, Mine Reclamation Plan, for on -site roadways that will be left as part of the reclamation. Roads will either be soil or gravel surfaced. Ditches will be stabilized with vegetation. -11- APPLICATION FOR A MINING PERMIT 6. Describe the method of control of contaminants and disposal of scrap metal, junk machinery, cables, or other such waste products of mining. (Note definition of refuse in The Mining Act of 1971.) No off -site generated waste shall be disposed of on the mine site without prior written approval from the NC Department of Environmental Quality, Division of Energy, Mineral, and Land Resources and either the Division of Waste Management (DWM) or local governing body. If a disposal permit has been issued by DWM for the site, a copy of said permit must be attached to this application. All temporary and permanent refuse disposal areas must be clearly delineated on the mine map(s) and reclamation map, along with a list of items to be disposed in said areas. No scrap metal or other debris will be left on -site. 7. Describe your plan for revegetation or other surface treatment of the affected areas. This plan must include recommendations for year-round seeding, including the time of seeding and the amount and type of seed, fertilizer, lime and 'mulch per acre. The recommendations must include general seeding instructions for both permanent and temporary revegetation. Revegetation utilizing only tree plantings is not acceptable. Recommendations can be sought from: a. Authorized representatives of the local Soil and Water Conservation District; b. Authorized representatives of the NC Forest Service, Department of Agriculture and Consumer Services; C. Authorized county representatives of the North Carolina Cooperative Extension Service, specialists and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at North Carolina State University; d. North Carolina licensed landscape architects; e. Private consulting foresters referred by the NC Forest Service, Department of Agriculture and Consumer Services; f. N.C. Erosion and Sedimentation Control Planning and Design Manual; g. N.C. Surface Mining Manual: A Guide for Permitting, Operation and Reclamation; h. Others as may be approved by the Department. LIME - RATE OF APPLICATION (tons/acre): FERTILIZER - ANALYSIS AND RATE OF APPLICATION (pounds/acre): SEED - TYPE(S) AND RATE(S) OF APPLICATION INCLUDING YEAR-ROUND SEEDING SCHEDULE (pounds/acre): [NOTE: Include Legumes] Seed Types: Seeding Dates: Seeding Rates: See seeding detail on Sheet OOC-06. MULCH - TYPE AND RATE OF APPLICATION (pounds/acre) AND METHOD OF ANCHORING: OTHER VEGETATIVE COVERS - TYPE (S) AND RATE (S) OF APPLICATION INCLUDING SEEDING SCHEDULE (pounds/acre, trees/acre, spacing of trees/shrubs, etc): Revegetation and/or reforestation plan approved by: Signature Print Name Title Agency -12- Date APPLICATION FOR A MINING PERMIT E. DETERMINATION OF AFFECTED ACREAGE AND BOND The following bond calculation worksheet is to be used to establish an appropriate bond (based upon a range of $500 to $5, 000 per affected acre) for each permitted mine site based upon the acreage approved by the Department to be affected during the life of the miningpermit. Please insert the approximate acreage,° or each aspect ofthe mining operation, that you intend to affect during the life ofthis mining permit (in addition, please insert the appropriate reclamation cost/acre for each cateaoty from the Schedule of Reclamation Costs provided with this annlication form) OR you can defer to the Department to calculate vour bond for you based AFFECTED RECLAMATION RECLAMATION CATEGORY ACREAGE COST/ACRE* COST Tailings/Sediment Ponds: 28.5 Ac. X $ 1000 /Ac. $ 28,500 Stockpiles: 7.4 Ac. X $ 2500 /Ac. _ $ 18,500 Wastepiles: 5.0 Ac. X $ 5000 /Ac. _ $ 25,000 Processing Area/Haul Roads: 17.5 Ac. X $ 5000 /Ac. _ $ 87,500 Mine Excavation: 255.6 Ac. X $ 2000 /Ac. _ $ 511,200 Other: Ac. X $ /Ac. _ $ TOTAL AFFECTED AC.: 314.0 Ac. (TOTAL PERMITTED AC.: 371.0 Ac.) Temporary & Permanent Sedimentation & Erosion Control Measures: Divide the TOTAL AFFECTED AC. above into the following two categories: a) affected acres that drain into proposed/existing excavation and/or b) affected acres that will be graded for positive drainage where measures will be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands. a) Internal Drainage 181.5 Ac. b) Positive Drainage 132.5 Ac. X $1,500.00 = $ 198,750.00 SUBTOTAL COST: $ 869,450.00 Inflation Factor: 0.02 X SUBTOTAL COST: $ 17,389.00 X Permit Life Provided by Applicant (Life of the Mining Operation or Life of Lease from Public Entity (in Years)): 10 years INFLATION COST: $ 173,890.00 Total Reclamation Bond Cost: $ 1,043,300.00 (round down to the nearest $100.00) (NOTE: The reclamation bond cannot exceed $1 million per GS 74-54) -13- APPLICATION FOR A MINING PERMIT F. NOTIFICATION OF ADJOINING LANDOWNERS The "Notice" form, or a facsimile thereof, attached to this application must be sent certified or registered mail, return receipt requested, to: (1) the chief administrative officer of each county and municipality in which any part of the permitted area is located as indicated on the mine map(s); (2) all owners of record, both public and private, of all tracts of land that are adjoining the mining permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, all owners of record of tracts adjoining these tracts must be notified (that are within 1,000 feet of the mining permit boundary) as indicated on the mine map(s); and (3) all owners of record, both public and private, of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway, creek, stream, river, or other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, all owners of record of tracts adjoining these tracts must be notified (that are within 1,000 feet of the mining permit boundary) as indicated on the mine map(s). "Highway" means a road that has four lanes of travel or less and is not designated as an Interstate Highway. The only exception to the above method of giving notice is if another means of notice is approved in advance by the Director, Division of Energy, Mineral, and Land Resources. A copy of a tax map (or other alternative acceptable to the Department) must be mailed with the completed "Notice" form (the proposed overall permit boundaries and the names and locations of all owners of record of lands adjoining said boundaries must be clearly denoted on the tax map). The "Affidavit of Notification" attached to this application must be completed, notarized and submitted to the Department, with the remainder of the completed application form, before the application will be considered complete. NOTES: THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS AND ALL MODIFICATIONS OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA, AS REQUIRED BY NCGS 74-50(bl). SEE THE NEXT TWO PAGES FOR THE "NOTICE" FORM AND THE "AFFIDAVIT OF NOTIFICATION" -14- APPLICATION FOR A MINING PERMIT G. LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S. 74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S. 74-59. LANDOWNER: Signature: Print Name: Scott Sewell, Manager (Title, if applicable) Company Green Meadow, LLC (If applicable) Address: 12601 Plantside Drive Louisville, KY 40299 Telephone: (502) 245-1353 APPLICANT: Signature: * Print Name: Norman E. Divers, III Title: VP - QEH&S Company: Green Meadow, LLC Mine Name: Colon Mine Telephone: (502) 245-1353 Date Signed: 3/2/2021 Date Signed: 3/2/2021_ *Signature must be the same as the individual who signed Page 1 of this application. One original and five (5) copies of the completed application, six (6) copies of all location maps, mine maps and reclamation maps, and the appropriate processing fee (see next page for fee schedule) in the form a check or money order payable to the North Carolina Department of Environmental Quality must be sent to the Raleigh Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at (919) 707-9220. -15- APPLICATION FOR A MINING PERMIT MINING FEE SCHEDULE A nonrefundable permit application processing fee when filing for a new mining permit, permit modification or transferred permit is required as follows: 0-25 acres 26+acres New Permit Applications $3,750.00 $5,000.00 Permit Modifications $750.00 $100.00 Permit Transfers $100.00 $100.00 Annual Operating Fee $400.00 $400.00 Acres for new permits means the total acreage at the site. Acres for modification of permits means that area of land affected by the modification within the permitted mine area, or any additional land that is to be disturbed and added to an existing permitted area, or both. MOM APPLICATION FOR A MINING PERMIT SCHEDULE OF RECLAMATION COSTS (Based upon range of $500 - $5,000 per affected acre) COMMODITY CODES: SG = Sand and/or Gravel, GS = Gemstone, Borrow = Borrow/fill dirt, CS = Crushed Stone, DS = Dimension Stone, FS = Feldspar, MI = Mica, LI = Lithium, PF = Pyrophyllite, OL = Olivine, KY = Kyanite/Sillimanite/Andalusite, PH = Phosphate, CL = Clay/Shale, PE = Peat, AU = Gold, TI = Titanium, and OT = Other Type T/S Ponds S.piles W.piles P.area/H.R. Mine Excay. SG, GS, $500/ac.(L) $1800/ac. $2000/ac. $1800/ac. $500/ac.(L) Borrow 1500(FI) $2000(PD) CS, DS, 500(L) 1800 2000 2000 500(L) FS, MI, 1500(FI) 2500(PD) LI, PF, OL, KY PH 1000(L) 2500 5000 5000 2000(L) 2500(FI) 5000(PD) CL 1000(L) 2500 5000 5000 2000(L) 2500(FI) 3700(PD) PE, AU, I000(L) 2500 3000 3500 2000(L) TI, OT 2500(FI) 5000(PD) (L) = reclamation to a lake and revegetating sideslopes (FI) = reclamation by filling in and revegetating (PD) = reclamation by grading for positive drainage & revegetating AS PER NCAC 15A 5B.0003, IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE BOND CALCULATION WORKSHEET, YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS FROM A THIRD PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO THE FOLLOWING ADDRESS: Mining Program,1612 Mail Service Center, Raleigh, North Carolina 27699-1612 ALL ESTIMATES MUST INCLUDE THE FOLLOWING, AS A MINIMUM: • FINAL GRADING COSTS PER ACRE • LIME AND FERTILIZER COSTS PER ACRE • YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE (FROM APPROVED REVEGETATION PLAN IN APPLICATION/PERMIT DOCUMENT) • MULCH AND ANCHORING COSTS PER ACRE • ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED RECLAMATION PLAN FOR THE SITE IN QUESTION YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION. -17- This page intentionally left blank. SEDIMENT BASIN CALCULATIONS This page intentionally left blank. FYa Calculation Cover Sheet Client: Charah Solutions Project: Colon (Sanford) Mine Permit Modification Project No: 10021146 Rev: 0 Title: Erosion and Sediment Control Modification Page: 1 of 5 Purpose: Addition of Sediment Basins to the mine area to facilitate the capture of drainage and the stabilization of stormwater Originator: Patrick D. Brownson, PE Checked by: Thomas M. Yanoschak, PE Computed: 2/25/2021 Checked: 2/26/2021 Objective Locate and design the necessary sediment basins to capture stormwater flow across the mine site while observing buffers. References Elements of Urban Stormwater Design, Malcom, H. Rooney (1989 & 2003 Supplement), NC State Univ., Raleigh, NC. North Carolina Erosion & Sediment Control Planning & Design Manual, North Carolina Division of Land Resources (2013 Updates), Raleigh, NC. HydroCAD Stormwater Modeling System, Version 10.0, HydroCAD Software Solutions, LLC (2019). Chororua, New Hampshire. Bonnin, G.M. et. al., "NOAA Atlas 14, Volume 2, Version 3, Point Precipitation Frequency Estimates", NOAA National Weather Service, obtained February 24, 2021. Assumptions There is a 50-foot property line buffer that runs the perimeter of the north, east, and south parts of the site in which no land disturbance will occur. Runoff was conservatively computed assuming bare soil on Hydrologic Soil Group B (according to the United States Department of Agriculture Natural Resources Conservation Service's Web Soil Survey). These assumptions generated a curve number of 86 for all drainage areas (see Attachment 1). The analysis is based on the 10 year-24 hour design storm as defined by the NOAA Atlas 14, Volume 2, Version 3[EAw1] for 1303 Brickyard Road, Sanford, NC. The depth of rainfall for this design storm is 5.27 inches (see Attachment 2). Analysis HDR used the following approach to located and design each sediment basin for the revised drainage system: hdrinc.com 440 S Church Street, Suite 1000, Charlotte, NC 28202-2075 704.338.6700 1 FYa 1. The site was broken up into individual drainage areas by identifying high points, ridge lines, and areas where water would naturally begin to collect. One basin was located in each drainage area (seven basins total) and was placed so as to capture as much overland flow as possible. 2. HydroCAD was used to determine a runoff amount for the design storm for each drainage area. Per the North Carolina Erosion and Sediment Control Planning and Design Manual (E&SCP&DM) Section 6.61, "Sediment Basins", the runoff determined both the required surface area at the crest of the basin riser, and the drainage area was used to determine the required storage at the crest of the basin riser. Basins were then sized to first satisfy the surface area requirement, and basin depth was adjusted to satisfy the storage requirement. 3. The basins were modeled as detention ponds in HydroCAD to ensure the height of the emergency spillway was adequate to pass the design storm while ensuring 1 foot of freeboard to the top of the basin's berm crest. A riser and culvert barrel system was iteratively sized (riser diameter was 1.5 times the barrel diameter per the E&SCP&DM) and a skimmer was added to dewater the pond between the 2 to 5 day time frame. 4. Outlet protection was designed using riprap aprons according to the standards in Section 8.06 of the E&SCP&DM to prevent any downstream erosion. Calculations All calculations were performed using HydroCAD software. The model and outputs are included in Attachment 3. Conclusions The combination of the seven (7) proposed sediment basins at the site effectively detain, stabilize, and carefully discharge stormwater flows at the site, controlling sediment and preventing erosion. Attachments • Attachment 1: NRCS Web Soil Survey • Attachment 2: NOAA Precipitation Frequency Data • Attachment 3: HydroCAD Report Attachment 1: NRCS Web Soil Survey This page intentionally left blank. 3 'a A 697400 350 32' 5T' N 35o 31' 57' N Hydrologic Soil Group —Lee County, North Carolina 667700 66WM 66M 6686W 66M 669200 697400 667700 668000 668300 668600 6689W 3 v Map Scale: 1:12,900 if printed on A landscape (11" x 8.5") sheet Meters N 0 150 300 600 900 Feet 0 500 1000 2000 3000 Map projection: Web Mercabr Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 G}DA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 6692W 669500 6698W 3 N F 670100 35' 32' 57 N I 350 31' 57' N 670100 3 N F m 2/24/2021 Page 1 of 4 Hydrologic Soil Group —Lee County, North Carolina MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D Not rated or not available Soil Rating Lines r r A r r A/D r B B/D r r C 0 C/D r r D r r Not rated or not available Soil Rating Points 0 A 0 A/D ■ B ■ B/D MAP INFORMATION p C The soil surveys that comprise your AOI were mapped at 1:24,000. 0 C/D 0 D Warning: Soil Map may not be valid at this scale. p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil Water Features line placement. The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed scale. Transportation §_§_+ Rails Please rely on the bar scale on each map sheet for map #%-0 Interstate Highways measurements. US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Major Roads Coordinate System: Web Mercator (EPSG:3857) Local Roads Maps from the Web Soil Survey are based on the Web Mercator Background projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the ® Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Lee County, North Carolina Survey Area Data: Version 18, Jun 4, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 28, 2019—Jul 30, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. UU� Natural Resources Web Soil Survey 2/24/2021 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Lee County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Ch Chewacla silt loam, 0 to B/D 67.2 16.0% 2 percent slopes, frequently flooded CrB Creedmoor fine sandy C/D 34.4 8.2% loam, 2 to 8 percent slopes CrD Creedmoor fine sandy C/D 17.7 4.2% loam, 8 to 15 percent slopes MfB Mayodan fine sandy B 123.3 29.3% loam, 2 to 8 percent slopes MfD Mayodan fine sandy B 66.2 15.7% loam, 8 to 15 percent slopes MfE Mayodan fine sandy B 33.7 8.0% loam, 15 to 25 percent slopes PfB Pinkston silt loam, 2 to 8 C 15.6 3.7% percent slopes PfD Pinkston silt loam, 8 to C 53.6 12.7% 15 percent slopes ToB Tillery fine sandy loam, C 9.1 2.2% 1 to 4 percent slopes, rarely flooded Totals for Area of Interest 420.9 100.0% USDA Natural Resources Web Soil Survey 2/24/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Lee County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher uSDA Natural Resources Web Soil Survey 2/24/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 Attachment 2: NOAA Precipitation Frequency Data This page intentionally left blank. 2/24/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 ' Location name: Sanford, North Carolina, USA* �, Latitude: 35.5469°, Longitude:-79.1383° Elevation: 280.6 ft** source: ESRI MapsmV140'r ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, I Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.425 0.502 -0-.5-8-2T 0.640 IF 0.706 IF 0.750 IF 0.792 IF 0.8-27-IF 0.868 IF 0.898 (0.388-0.467) (0.458-0.552) (0.531-0.641) (0.582-0.703) (0.639-0.774) (0.677-0.822) (0.710-0.867) (0.739-0.907) (0.768-0.952) (0.789-0.986) 10-min 0.679 0.803 0.933 1.02 1.13 1.20 1.26 1.31 1.37 1.42 (0.620-0.746) (0.733-0.884) (0.850-1.03) (0.931-1.12) 1 (1.02-1.23) 1 (1.08-1.31) 1 (1.13-1.38) 1 (1.17-1.44) 1 (1.22-1.51) 1 (1.24-1.55) 15-min 0.848 1.01 1.18 1.30 1.43 1.51 1.59 1.65 1.73 1.78 (0.775-0.932) (0.921-1.11) 1 (1.08-1.30) 1 (1.18-1.42) 1 (1.29-1.56) (1.37-1.66) (1.43-1.74) 11 (1.48-1.82) 1 (1.53-1.90) 11 (1.56-1.95) 30-min 1.16 1.39 1.68 1.88 2.11 2.28 2.44 2.58 2.75 2.88 (1.06-1.28) (1.27-1.53) (1.53-1.84) (1.71-2.06) (1.91-2.32) (2.06-2.50) (2.19-2.67) (2.30-2.83) 1 (2.44-3.02) 1 (2.53-3.16) 60-min 1.45 1.75 2.15 2.44 2.81 3.09 3.35 3.61 3.95 4.20 (1.32-1.59) (1.60-1.93) (1.96-2.36) (2.22-2.68) 1 (2.55-3.08) (2.79-3.38) 1 (3.01-3.68) (3.23-3.96) (3.49-4.33) (3.69-4.61) 2-hr 1.71 2.07 2.58 2.95 3.45 3.82 4.20 4.57 5.06 5.43 (1.55-1.90) (1.88-2.30) (2.33-2.86) (2.67-3.27) (3.09-3.82) (3.42-4.23) (3.73-4.64) (4.03-5.05) (4.41-5.59) (4.70-6.01) 3-hr 1 1.81 2.19 2.74 3.17 3.74 4.18 4.63 5.10 5.73 6.23 ( .65-2.01) (2.00-2.44) (2.49-3.05) (2.87-3.51) (3.36-4.13) (3.74-4.63) (4.11-5.12) (4.48-5.63) (4.98-6.34) (5.36-6.90) 6-hr 2.17 2.62 3.28 3.80 4.50 5.06 5.63 6.23 7.05 7.70 (1.98-2.40) (2.40-2.90) (2.99-3.62) (3.45-4.18) (4.06-4.94) (4.53-5.55) (5.00-6.17) (5.48-6.82) (6.11-7.71) (6.60-8.43) 12-hr 2.57 3.11 3.91 4.55 5.43 6.15 6.90 7.68 8.79 9.68 (2.35-2.84) (2.84-3.43) (3.56-4.32) (4.12-5.01) (4.88-5.97) (5.49-6.74) (6.09-7.55) (6.71-8.40) (7.55-9.61) 1 (8.20-10.6) 24-hr 3.00 3.61 4.54 5.27 6.26 7.06 (77.87 8.71 9.86 10.8 (2.79-3.21) (3.38-3.89) (4.24-4.88) (4.90-5.66) (5.81-6.73) (6.53-7.57) .26-8.44) (8.01-9.34) (9.03-10.6) (9.83-11.6) 2-day 3.48 4.20 .2 5.24 6.06 7.17 8.05 8.95 9.88 11.1 12 (3.24-3.74) fl (3.91-4.51) 1 (4.88-5.63) 1 (5.63-6.50) 1 (6.64-7.69) (7.43-8.63) 1 (8.24-9.61) 11 (9.07-10.6) 1 (11.1-13.1) 3-day 3.69 4.44 5.51 6.35 7.50 8.41 9.35 10.3 11.6 12.7 (3.44-3.96) fl (4.14-4.76) 1 (5.13-5.90) 1 (5.90-6.80) 1 (6.95-8.04) 1 (7.77-9.02) 1 (8.61-10.0) 1 (9.47-11.1) 1 (10.6-12.5) 1 (11.5-13.6) 4-day 3.90 4.68 5.78 6.65 7.84 8.79 9.75 10.8 12.1 13.2 (3.64-4.17) (4.36-5.01) (5.38-6.18) (6.18-7.11) (7.25-8.39) (8.10-9.40) (8.97-10.4) (9.87-11.5) (11.1-13.0) 1 (12.0-14.2) 7-day 4.49 5.35 6.53 7.46 8.74 9.76 10.8 11.9 13.4 14.5 (4.19-4.79) 1 (5.01-5.72) 1 (6.10-6.97) 1 (6.96-7.97) 1 (8.13-9.33) 1 (9.05-10.4) (9.99-11.5) (11.0-12.7) (12.3-14.3) 11 (13.3-15.6) 10-day 5.11 6.09 7.32 8.30 9.60 10.6 11.7 12.7 14.1 15.3 (4.81-5.45) (5.72-6.49) 1 (6.88-7.80) 1 (7.78-8.83) 1 (8.97-10.2) 1 (9.90-11.3) 1 (10.8-12.4) 1 (11.8-13.6) 1 (14.0-16.3) 20-day 6.88 8.12 9.60 10.8 12.3 13.6 14.8 16.1 17.8 19.1 (6.47-7.31) (7.65-8.63) (9.02-10.2) 1 (10.1-11.4) 1 (11.5-13.1) 1 (12.7-14.4) (13.8-15.7) (14.9-17.1) (16.4-18.9) 1 (17.6-20.4) �-d:a:y] 8.55 10.1 11.7 13.0 14.7 15.9 17.2 18.5 20.2 21.5 (8.07-9.07) (9.48-10.7) (11.0-12.4) (12.2-13.8) (13.8-15.6) (14.9-16.9) (16.1-18.3) (17.3-19.7) (18.8-21.6) 1 (20.0-23.0) [457day 10.9 12.8 14.6 16.0 17.8 19.2 20.6 21.9 23.7 25.0 (10.3-11.5) (12.1-13.5) (13.8-15.4) (15.1-16.9) (16.9-18.8) (18.1-20.3) (19.4-21.7) (20.6-23.2) 1 (23.3-26.5) �-day 13.0 15.2 17.2 18.7 20.7 22.2 23.7 25.1 26.9 28.2 (124-13.7) (14.4-16.0) J L (16.3-18.1) J L (17.8-19.7) J L (19.6-21.8) j(21.0-23.4) (22.3-24.9) (23.6-26.4) (25.3-28.4) (26.5-29.9) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5469&Ion=-79.1383&data=depth&units=engIish&series=pds 1/4 2/24/2021 Precipitation Frequency Data Server PDS-based depth -duration -frequency (DDF) curves Latitude: 35.54691, Longitude:-79.13831 30 25 5 0 L L L L L ry O O O N A4b H A 4 V � O O O Ln O -I H m [aH ry rn v Ln Duration 30 25 c = 20 rz m 15 9 CL .� 10 iL 5 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created (GMT): Thu Feb 25 00:15-52 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — 76-min — 3-day 15-min — 4-day — 30-min — 7-day — 60-min — 10-eay — 2-nr — 20-day — 3-hr — 30-clay — 6-hr — 45-tlay — 12-hr — 6o-eay — 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5469&Ion=-79.1383&data=depth&units=english&series=pds 2/4 2/24/2021 Precipitation Frequency Data Server SANF}gR� LFF CORGNLA PURT r Lar a scale terrain wii75ton-Salem • . Durliam Greensboro * 4CIfy Mount Raleigh . NORTH CAROLINTF 'Green 'Charlotte Fayetteville+ sor 100km 60mi Wilmingwi7 BdV Large scale map wmstantia[em Greensboro o Durham Rocky Mount 4 Raleigkti North I Greenvi Caroling ad.tte F etteville :r I son 100km 60mi Wilmington Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?lat=35.5469&Ion=-79.1383&data=depth&units=engIish&series=pds 3/4 2/24/2021 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5469&Ion=-79.1383&data=depth&units=english&series=pds 4/4 M Attachment 3: HydroCAD Report This page intentionally left blank. n #22 DA #23 j DA #22 5S 7", DA #21 4S DA #20 Subcat Reach Pon Link 1 S DA # 7 14P Basin #17 r' 13P asi 2�% DA #19 3S DA #11 Routing Diagram for Charah Colon ESC Prepared by HDR, Inc, Printed 3/1/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC This page intentionally left blank. Charah Colon ESC Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 2 Project Notes Defined 10 rainfall events from NC-Sanford-Charah Colon OF Charah Colon ESC Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 132.485 86 Fallow, bare soil, HSG B (1S, 2S, 3S, 4S, 5S, 6S, 7S) 132.485 86 TOTAL AREA Charah Colon ESC Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 4 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 132.485 HSG B 1 S, 2S, 3S, 4S, 5S, 6S, 7S 0.000 HSG C 0.000 HSG D 0.000 Other 132.485 TOTAL AREA Charah Colon ESC Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Printed 2/28/2021 Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 132.485 0.000 0.000 0.000 132.485 Fallow, bare soil 1 S, 2S, 3S, 4S, 5S, 6S, 7S 0.000 132.485 0.000 0.000 0.000 132.485 TOTAL AREA Charah Colon ESC Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Printed 2/28/2021 Page 6 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 8P 262.00 258.00 80.0 0.0500 0.011 18.0 0.0 0.0 2 91D 258.00 256.00 50.0 0.0400 0.011 12.0 0.0 0.0 3 10P 254.00 252.00 80.0 0.0250 0.011 36.0 0.0 0.0 4 11 P 252.00 248.00 50.0 0.0800 0.011 18.0 0.0 0.0 5 12P 232.00 230.00 50.0 0.0400 0.011 12.0 0.0 0.0 6 13P 250.00 246.00 50.0 0.0800 0.011 18.0 0.0 0.0 7 14P 274.00 272.00 80.0 0.0250 0.011 12.0 0.0 0.0 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 7 Time span =5.00-144.00 hrs, dt=0.05 hrs, 2781 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment1S: DA#17 Runoff Area=678,290 sf 0.00% Impervious Runoff Depth>3.72" Flow Length=704' Slope=0.0370 T Tc=6.3 min CN=86 Runoff=94.79 cfs 4.827 of Subcatchment2S: DA#19 Runoff Area=1,038,391 sf 0.00% Impervious Runoff Depth>3.72" Flow Length=904' Slope=0.0600 '/' Tc=6.0 min CN=86 Runoff=146.80 cfs 7.389 of Subcatchment3S: DA #18 Runoff Area=442,070 sf 0.00% Impervious Runoff Depth>3.72" Flow Length=742' Slope=0.0460 '/' Tc=6.0 min CN=86 Runoff=62.50 cfs 3.146 of Subcatchment4S: DA #20 Runoff Area=752,264 sf 0.00% Impervious Runoff Depth=3.72" Flow Length=1,465' Slope=0.0290'/' Tc=11.6 min CN=86 Runoff=89.78 cfs 5.353 of Subcatchment5S: DA#21 Runoff Area=1,672,534 sf 0.00% Impervious Runoff Depth=3.72" Flow Length=2,136' Slope=0.0310'/' Tc=15.2 min CN=86 Runoff=178.63 cfs 11.902 of Subcatchment6S: DA#22 Runoff Area=467,812 sf 0.00% Impervious Runoff Depth=3.72" Flow Length=1,394' Slope=0.0430'/' Tc=9.3 min CN=86 Runoff=60.26 cfs 3.329 of Subcatchment7S: DA#23 Runoff Area=719,697 sf 0.00% Impervious Runoff Depth=3.72" Flow Length=1,435' Slope=0.0450 '/' Tc=9.3 min CN=86 Runoff=92.70 cfs 5.121 of Pond 8P: Basin #23 Peak Elev=266.15' Storage=152,228 cf Inflow=92.70 cfs 5.121 of Primary=2.63 cfs 5.109 of Secondary=0.00 cfs 0.000 of Outflow=2.63 cfs 5.109 of Pond 9P: Basin #22 Peak Elev=262.17' Storage=99,692 cf Inflow=60.26 cfs 3.329 of Primary=1.71 cfs 3.322 of Secondary=0.00 cfs 0.000 of Outflow=1.71 cfs 3.322 of Pond 10P: Basin #21 Peak Elev=259.94' Storage=403,437 cf Inflow=178.63 cfs 11.902 of Primary=2.27 cfs 11.867 of Secondary=0.00 cfs 0.000 of Outflow=2.27 cfs 11.867 of Pond 11P: Basin#20 Peak Elev=256.23' Storage=149,737 cf Inflow=89.78 cfs 5.353 of Primary=3.98 cfs 5.341 of Secondary=0.00 cfs 0.000 of Outflow=3.98 cfs 5.341 of Pond 12P: Basin #18 Peak Elev=236.11' Storage=99,070 cf Inflow=62.50 cfs 3.146 of Primary=1.20 cfs 3.139 of Secondary=0.00 cfs 0.000 of Outflow=1.20 cfs 3.139 of Pond 13P: Basin #19 Peak Elev=254.15' Storage=240,711 cf Inflow=146.80 cfs 7.389 of Primary=2.61 cfs 7.349 of Secondary=0.00 cfs 0.000 of Outflow=2.61 cfs 7.349 of Pond 14P: Basin #17 Peak Elev=278.15' Storage=147,692 cf Inflow=94.79 cfs 4.827 of Primary=2.03 cfs 4.814 of Secondary=0.00 cfs 0.000 of Outflow=2.03 cfs 4.814 of Total Runoff Area = 132.485 ac Runoff Volume = 41.067 of Average Runoff Depth = 3.72" 100.00% Pervious = 132.485 ac 0.00% Impervious = 0.000 ac Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 1S: DA #17 Runoff = 94.79 cfs @ 11.97 hrs, Volume= 4.827 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 678,290 86 Fallow, bare soil, HSG B 678,290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.0370 0.56 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 3.3 604 0.0370 3.10 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 6.3 704 Total Subcatchment 1S: DA #17 Hydrograph 105 t � —1 - — 1— t- rt —1 — I— f t � —I— - I - - - - - - - - I— t- rt i— t ❑Runoff 100 94.79 cfs - T-T -1 - 1- r T T- I- 1- T 1- I 1- r T-1 1 1 I I I 1 1 95 T-F FTT T 7 1 T-T-1-'Weh244hrr 90 85 ---- - - 1 1 1 - - 1 1 1 1 1 1 1 1 1 Ip I -j/I il�41r1f9lF� � 80 I 1 I 1 I 1� 75 1 _1 _ I_ 1 1 _1 _ I_ 1 _I_ I_ 1 1 I�uh*ffAteA=167�8-,2-901sf 65 - —1 - 1- - A -11 -1- L - - -1- 1-- -Runoff Vo1uime=4&827 iaf- R� h 55 1 -1 - 1- 4 -1 -1- + -1- 1- 4 -I - I `��{f�'� `fp12�� _0 50 1 -1 - I- t -t -1 - I- t t -I - I- t -t -1 - I- TtoW L�-n LL 45 1 1 t_f Ott 1 t_f 1 1 1-t�+�� 40 T11Trt11r-TT1ITrt11rT�718pe=0.Oa7-V1�/T 35 30 1 77 FTT T--TT-T-1 I � jT I - II. T tc 6.3I "T � 20 1 1 1 1 -C-I=86- 15 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 1S: DA #17 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.41 10.00 0.95 0.17 1.50 12.50 3.87 2.43 8.12 15.00 4.50 3.00 2.34 17.50 4.80 3.29 1.50 20.00 5.02 3.48 1.02 22.50 5.18 3.64 0.91 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 2S: DA #19 Runoff = 146.80 cfs @ 11.97 hrs, Volume= 7.389 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 1,038,391 86 Fallow, bare soil, HSG B 1,038,391 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.5 100 0.0600 0.68 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 3.4 804 0.0600 3.94 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 5.9 904 Total, Increased to minimum Tc = 6.0 min Subcatchment 2S: DA #19 Hydrograph --- -1 1- 1--- L J___ --1-' 160 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 150 af5 1 1 1 1 1 1 1 F 1 I i TyM 11-24*h r 146.80 140 130 ��// 4 1 I + + 1- + 4 Ito+7�Ta,1i11f1p�-.�7�� 120 1 1 -I I L 1 J_ I_ 1- L AZu+n1ef# Area'-0-39,39a1-sf 110 1 1 1 1 1 1 _1_ IVII I_ I_ I I_ 100 1 1 1 1 1 1 1 unQ�lyQtwme�7T 1 a 90 -1 F�L n�ff' D60hl> .12" 1- T-T 1- 1- L T T 1 T 7 1 1 1- 1 1nA� 0 80 1 -1 - 1- t -t -1 - 1- t � -1 - 1- t- -t CCT -1 - 1- i- F1owl L�nif�th�904T LL 60---��-1L11LLLL_�L11LLL_11L�-LLr4p611� 50 - - - - - - - - - - - - - - - - TW=6.0 MirL 40 30 I T 20-------++--1-+4-1-1- 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) ❑ Runoff Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 2S: DA #19 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.63 10.00 0.95 0.17 2.30 12.50 3.87 2.43 12.32 15.00 4.50 3.00 3.58 17.50 4.80 3.29 2.29 20.00 5.02 3.48 1.56 22.50 5.18 3.64 1.40 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 3S: DA #18 Runoff = 62.50 cfs @ 11.97 hrs, Volume= 3.146 af, Depth> 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 442,070 86 Fallow, bare soil, HSG B 442,070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.7 100 0.0460 0.61 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 3.1 642 0.0460 3.45 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 5.8 742 Total, Increased to minimum Tc = 6.0 min Subcatchment 3S: DA #18 Hydrograph ��---��-1-1— -4-1—I-1-- I I I I I I I I I I I I I I I —1-1— 4-1-1— —1-1—4- ■Runoff 65 szso rs I 60 1 1 1 1 I— 1 1 —I 1 1 —I — Ty11�411r 55 -� -- I _II _ �- I I -I -- I 1 _1 _ �- 1 �r1 R0 11foll� 7�' — 50 I I I I I I I I I I I I y� y, 9 1 R-ahoff'Ai-e��44210701Sf 45 — — I— —I — I— —I — 1— 4 w 1�1 1' . `1.,,,�I,� 1 � wI c '1,��1 —1 Run Foff—Votu Npc�3J 146-a-N w 40 I —I — I —II — I— I —I — II— I —II — �— -moo Ogoh���2.� 3 35 _o ---firt-1—'—firt—I-1—t---r �y — r-TIOn L#r1 11�7421 LL30 J___1L___L�_I_I_LL_I_I_L1_I_I_L1__I—L1L 25 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Sllope=0.046017 20 1 �1 1 1. 1 1.1 C—I--��-Mll0 —I—I—+-4-1-1-4-4-1—I— —I—I— —I-- 15 1 1 1 1 1 1 1 1 1 G '= $6 10 I I I I I I I I I I I I I I I I I I I I I I I - I T —1 — I— 7 1 —1 - I I I I I I T —1 —1— r- rt-I 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment 3S: DA #18 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.27 10.00 0.95 0.17 0.98 12.50 3.87 2.43 5.24 15.00 4.50 3.00 1.52 17.50 4.80 3.29 0.98 20.00 5.02 3.48 0.67 22.50 5.18 3.64 0.60 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 4S: DA #20 Runoff = 89.78 cfs @ 12.03 hrs, Volume= 5.353 af, Depth= 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 752,264 86 Fallow, bare soil, HSG B 752,264 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.3 100 0.0290 0.50 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 8.3 1,365 0.0290 2.74 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 11.6 1,465 Total Subcatchment 4S: DA #20 Hydrograph 100 ————firtIIC rt�—firtLrt�T�II� ❑Runoff 95 as.�acrs - Trt -- I —�T T--— 90 T——I—T7 1 1 FT-1 1 T7 1 I FT-1 Ty eH244hrr 85 80 T7 FTT T7 A �7 �T� .I TTT j —1 ——— T 1 1 I T I I 1 11 � RAinf`I"I� �T 75 70 T T —1 T - - - - ' Rur'�offAte-�t Z52t2641sf 65 — —I -- 1 1 1 —1 — I— 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1_ 1 1 T -Ru- toff VoluimegS-�3531_af 60 55 _I _ _1_ I�74 �012 3 50 `0 45 —I — I— —I — I— —I — I— —I YN — — — — III 1 f I W Ldaotp'f14 40 I— —1— —--1 ---1 S1dW-0.0290i/l 35 30 25 20 _I _ _ _ I_ _I_I_ _I_ I_ —I—I— —I—I_ t► =86 15 —1_1—L-1-1_1—L1L I L-1 1 1 LL-1 1 LL 1 1 L 10 —-1_1——LL_1_1—LA 1 1 LLJ I 1L-1_1—L 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment 4S: DA #20 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.44 10.00 0.95 0.17 1.58 12.50 3.87 2.43 10.85 15.00 4.50 3.00 2.64 17.50 4.80 3.29 1.68 20.00 5.02 3.48 1.15 22.50 5.18 3.64 1.02 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 5S: DA #21 Runoff = 178.63 cfs @ 12.07 hrs, Volume= 11.902 af, Depth= 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 1,672,534 86 Fallow, bare soil, HSG B 1,672,534 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.2 100 0.0310 0.52 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 12.0 2,036 0.0310 2.83 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 15.2 2,136 Total Subcatchment 5S: DA #21 Hydrograph 200 1 7 ITT 77 T-T-1-1-1 190 8.63 cfs -----I I I I I I I I I I I I I I I I I I 1 17 170 160 -I -I - I- -I- I- -I - 1-� Iy Oai'Rf' R=$$ 7.i 140 - - - - -1-1- 1_ 11Off Arta� F-1}6-Z�r341-sf 120 - - - - - - - - - - - - - - - - - - - - - -- - - - 110 Runb#1 D61#h=3-72 1 3 100 - -I- -I- I- -I -I 90 _1 - - - 1 - - 1 1 1 1 Flow- Length-:;2 C367 80 60 _I _ I_ _1 _ I_ _I _ 1_ _1 Tod 5.2 aCnin 50 40 - --- -I-I- ---L -I-I- M1+!�-1-- 30 1_1-I_LI_1-1_I11 1 LI I I L1-1 1 11 I I L 20 1_ 1_ _ 1 1_ 1_ 1_ L 1 I I L 1 J 1 1 1 I 1 L 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) ❑ Runoff Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 17 Hydrograph for Subcatchment 5S: DA #21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.95 10.00 0.95 0.17 3.39 12.50 3.87 2.43 29.68 15.00 4.50 3.00 5.94 17.50 4.80 3.29 3.76 20.00 5.02 3.48 2.59 22.50 5.18 3.64 2.27 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 6S: DA #22 Runoff = 60.26 cfs @ 12.00 hrs, Volume= 3.329 af, Depth= 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 467,812 86 Fallow, bare soil, HSG B 467,812 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.8 100 0.0430 0.59 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 6.5 1,294 0.0430 3.34 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 9.3 1,394 Total Subcatchment 6S: DA #22 Hydrograph 65 ■Runoff CfS so.zsfi���Lfi�fi�fi�I�t� 60 I_ I_ 1 1 I_ 1 1 I_ 1 1 I_ Type-I1124J11 55 _I _ _I _ _I _ _I _ _I _ I ' - -1 - 1- T T 1 I T 1 1 I- L T 1 11 'o T'R1"'i1•�Y11L-�� 50 J -1- 1- T L 1 I L 1 1 I L L y�� /� y+ZyF,�1AFQ11 1 RtjhdfF1Ai--e6�4$718'-21s# 45 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Bumf �/Q�pen�3j3��� 40 �`I'N h7 35 1 1 1 1 1 1 1 1 1 1 1 1 ' �lun+-o 0 30 -1 -1 - 1 1 1 -1 - 1- 1 1 -1 - 1- 1 1 -1 - 1- 1 FIlo 1LdnPth�1,'3941 -I-1-+-4-1-1-4-4-1-1- -4-1-1- 4-1-I-�--I-�+� 25 1 1 1 1 1 1 1 1 1 1 1 1 1 SI1ope=0.04301 '/I 20 . 15 10 I-TT-1--T1 1-1--T-1--T--1-I--T TTT 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 19 Hydrograph for Subcatchment 6S: DA #22 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.28 10.00 0.95 0.17 1.00 12.50 3.87 2.43 6.14 15.00 4.50 3.00 1.63 17.50 4.80 3.29 1.04 20.00 5.02 3.48 0.71 22.50 5.18 3.64 0.63 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 7S: DA #23 Runoff = 92.70 cfs @ 12.00 hrs, Volume= 5.121 af, Depth= 3.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.27" Area (sf) CN Description 719,697 86 Fallow, bare soil, HSG B 719,697 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 2.8 100 0.0450 0.60 Sheet Flow, Fallow n= 0.050 P2= 3.61 " 6.5 1,335 0.0450 3.42 Shallow Concentrated Flow, Unaaved Kv= 16.1 fos 9.3 1,435 Total Subcatchment 7S: DA #23 Hydrograph I_ ❑Runoff 100 _ _ _ _ _ _ _ _ _ _ _ _ 95 90 1 _ I_ 1 1 _I _ I_ I_ 1 _I -1- 1_ 1 1 11 I_ 1 1 _I _Type u 244hr 85 1 I_ L 1 _1 _ I_ L 1 L _I _ I_ L 1 _1 _ I 1 J I I 1 „I �� 80 � -. - .- 1 1 -1 - I- L 1 1 -I - I- 1 1 -1 110-yywr�yRy��nf�_�If- . 75 1 1 4 1- 1- 4 1 1- 1 4 Rthof eA-17 70 1�11 1.7�6971sf 1 -1-1- 4- 4 -1-I- - I - 1- 4- 4-�1�-I- k � � - I - I- 4- 4-1-I-s� 65 1 I + -f 1 1 f + I + -Runoff Vo I ulm a=; �. -21 1 of 55Irr��" - I- M45 ,�x�12�� T -1 - L T T 7 r1oW-1L�nOth� 1-. 35r ——— 1 1—LTT 1 I T7 1 1—FTC 140 T T -I- -1-_ Slope=0.045fl11/' 35 30 1 1 F T- i I I- F T _�lAI 31 pp��1. I_ 1 1—I—I-1 1—I—I-1 1 1---ITI---- 25 20 _I_ -I-N=96- 15 10 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 21 Hydrograph for Subcatchment 7S: DA #23 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 5.00 0.33 0.00 0.00 7.50 0.58 0.03 0.43 10.00 0.95 0.17 1.54 12.50 3.87 2.43 9.44 15.00 4.50 3.00 2.51 17.50 4.80 3.29 1.60 20.00 5.02 3.48 1.09 22.50 5.18 3.64 0.97 25.00 5.27 3.72 0.00 27.50 5.27 3.72 0.00 30.00 5.27 3.72 0.00 32.50 5.27 3.72 0.00 35.00 5.27 3.72 0.00 37.50 5.27 3.72 0.00 40.00 5.27 3.72 0.00 42.50 5.27 3.72 0.00 45.00 5.27 3.72 0.00 47.50 5.27 3.72 0.00 50.00 5.27 3.72 0.00 52.50 5.27 3.72 0.00 55.00 5.27 3.72 0.00 57.50 5.27 3.72 0.00 60.00 5.27 3.72 0.00 62.50 5.27 3.72 0.00 65.00 5.27 3.72 0.00 67.50 5.27 3.72 0.00 70.00 5.27 3.72 0.00 72.50 5.27 3.72 0.00 75.00 5.27 3.72 0.00 77.50 5.27 3.72 0.00 80.00 5.27 3.72 0.00 82.50 5.27 3.72 0.00 85.00 5.27 3.72 0.00 87.50 5.27 3.72 0.00 90.00 5.27 3.72 0.00 92.50 5.27 3.72 0.00 95.00 5.27 3.72 0.00 97.50 5.27 3.72 0.00 100.00 5.27 3.72 0.00 102.50 5.27 3.72 0.00 105.00 5.27 3.72 0.00 107.50 5.27 3.72 0.00 110.00 5.27 3.72 0.00 112.50 5.27 3.72 0.00 115.00 5.27 3.72 0.00 117.50 5.27 3.72 0.00 120.00 5.27 3.72 0.00 122.50 5.27 3.72 0.00 125.00 5.27 3.72 0.00 127.50 5.27 3.72 0.00 130.00 5.27 3.72 0.00 132.50 5.27 3.72 0.00 Time Precip. Excess Runoff ;hours) (inches) (inches) (cfs) 135.00 5.27 3.72 0.00 137.50 5.27 3.72 0.00 140.00 5.27 3.72 0.00 142.50 5.27 3.72 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 22 Summary for Pond 8P: Basin #23 Inflow Area = 16.522 ac, 0.00% Impervious, Inflow Depth = 3.72" for 10-yr event Inflow = 92.70 cfs @ 12.00 hrs, Volume= 5.121 of Outflow = 2.63 cfs @ 14.77 hrs, Volume= 5.109 af, Atten= 97%, Lag= 165.9 min Primary = 2.63 cfs @ 14.77 hrs, Volume= 5.109 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 266.15' @ 14.77 hrs Surf.Area= 42,026 sf Storage= 152,228 cf Plug -Flow detention time=1,207.1 min calculated for 5.109 of (100% of inflow) Center -of -Mass det. time= 1,205.4 min ( 2,007.9 - 802.4 ) Volume Invert Avail.Storage Storage Description #1 262.00' 234,674 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 262.00 31,514 0 0 264.00 36,404 67,918 67,918 266.00 41,610 78,014 145,932 268.00 47,132 88,742 234,674 Device Routing Invert Outlet Devices #1 Primary 262.00' 18.0" Round RCP -Round 18" L= 80.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 262.00' / 258.00' S= 0.0500 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 262.00' 1.134 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 266.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 267.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=2.63 cfs @ 14.77 hrs HW=266.15' (Free Discharge) t-1=RCP_Round 18" (Passes 2.63 cfs of 15.69 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 1.13 cfs) 3=Orifice/G rate (Weir Controls 1.50 cfs @ 1.27 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=262.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 23 Pond 8P: Basin #23 Hydrograph / L - - - � - -1 - -1- - 1-- / 92.70 cfs / � �QW-- �--- aG rt 1 1 1 r 95 ,, ----------PeeikElEv-=�26&1-5- I I I I I I 90 85 / , / ; ; --41 I I 4- g e mr 1 a5�j GLAD , 80 /, fi � 1 I I 1- + -1 1 I I r T 75 //, T T 1 I I L T T 1 I I F T 70 / / 65 w 60 /// L 1 L L L 1 I I L I 55 // -4 1 I I L + -4 1 I I + c 50 //, t I 1 I I L t -1 1 I I r T u 45 / / 40 //,/ I I I I I I I I I 1 1 35 // -- _ 30 / - - I I L I � 1 I I 25 //, -I--I--♦--+-� 1 1--I---+ 20 15 / , / / 2.63 cfs 10 / 2.63 cfs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Lry Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 24 Hydrograph for Pond 8P: Basin #23 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 262.00 0.00 0.00 0.00 10.00 1.54 8,473 262.27 0.37 0.37 0.00 15.00 2.51 152,179 266.15 2.62 2.62 0.00 20.00 1.09 147,635 266.04 1.35 1.35 0.00 25.00 0.00 141,304 265.89 1.13 1.13 0.00 30.00 0.00 120,892 265.39 1.13 1.13 0.00 35.00 0.00 100,480 264.87 1.13 1.13 0.00 40.00 0.00 80,068 264.33 1.13 1.13 0.00 45.00 0.00 59,656 263.77 1.13 1.13 0.00 50.00 0.00 39,244 263.19 1.13 1.13 0.00 55.00 0.00 18,832 262.58 1.13 1.13 0.00 60.00 0.00 7,080 262.22 0.26 0.26 0.00 65.00 0.00 4,215 262.13 0.10 0.10 0.00 70.00 0.00 2,986 262.09 0.05 0.05 0.00 75.00 0.00 2,308 262.07 0.03 0.03 0.00 80.00 0.00 1,879 262.06 0.02 0.02 0.00 85.00 0.00 1,584 262.05 0.01 0.01 0.00 90.00 0.00 1,368 262.04 0.01 0.01 0.00 95.00 0.00 1,204 262.04 0.01 0.01 0.00 100.00 0.00 1,075 262.03 0.01 0.01 0.00 105.00 0.00 971 262.03 0.01 0.01 0.00 110.00 0.00 885 262.03 0.00 0.00 0.00 115.00 0.00 813 262.03 0.00 0.00 0.00 120.00 0.00 752 262.02 0.00 0.00 0.00 125.00 0.00 699 262.02 0.00 0.00 0.00 130.00 0.00 653 262.02 0.00 0.00 0.00 135.00 0.00 613 262.02 0.00 0.00 0.00 140.00 0.00 578 262.02 0.00 0.00 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 25 Summary for Pond 9P: Basin #22 Inflow Area = 10.739 ac, 0.00% Impervious, Inflow Depth = 3.72" for 10-yr event Inflow = 60.26 cfs @ 12.00 hrs, Volume= 3.329 of Outflow = 1.71 cfs @ 14.77 hrs, Volume= 3.322 af, Atten= 97%, Lag= 166.2 min Primary = 1.71 cfs @ 14.77 hrs, Volume= 3.322 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 262.17' @ 14.77 hrs Surf.Area= 28,050 sf Storage= 99,692 cf Plug -Flow detention time=1,385.3 min calculated for 3.322 of (100% of inflow) Center -of -Mass det. time= 1,384.0 min ( 2,186.4 - 802.4 ) Volume Invert Avail.Storage Storage Description #1 258.00' 154,561 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 258.00 19,914 0 0 260.00 23,640 43,554 43,554 262.00 27,674 51,314 94,868 264.00 32,019 59,693 154,561 Device Routing Invert Outlet Devices #1 Primary 258.00' 12.0" Round CMP_Round 12" L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 258.00' / 256.00' S= 0.0400 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf #2 Device 1 258.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 262.00' 18.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 263.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=1.71 cfs @ 14.77 hrs HW=262.17' (Free Discharge) t-1=CMP_Round 12" (Passes 1.71 cfs of 7.25 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 0.60 cfs) 3=Orifice/G rate (Weir Controls 1.11 cfs @ 1.36 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=258.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 26 Pond 9P: Basin #22 Hydrograph / / 60.26 � — I I I I I I I I I I I Inflpw re a 0.730-a 651 , PeAk Glev:1:LV2.179 60 55 � � I I I I I 1 I I I I I I I Storage=99,F92-c, —1 50 F I 1 45 / / I_ _ J _ —I— _ I— _ L _ L _ J _ —1 _ _ 1— _ L _ L _ -1_ —1 w 40 //// I I I I I I I I I I I I I 35 30 25 20- 15 / 10 / 1.71 cfs / 1 71 +k i 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Lry Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 27 Hydrograph for Pond 9P: Basin #22 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 258.00 0.00 0.00 0.00 10.00 1.00 5,322 258.26 0.29 0.29 0.00 15.00 1.63 99,662 262.17 1.70 1.70 0.00 20.00 0.71 96,717 262.07 0.87 0.87 0.00 25.00 0.00 93,594 261.95 0.60 0.60 0.00 30.00 0.00 82,794 261.56 0.60 0.60 0.00 35.00 0.00 71,994 261.15 0.60 0.60 0.00 40.00 0.00 61,194 260.72 0.60 0.60 0.00 45.00 0.00 50,394 260.29 0.60 0.60 0.00 50.00 0.00 39,594 259.83 0.60 0.60 0.00 55.00 0.00 28,794 259.36 0.60 0.60 0.00 60.00 0.00 17,994 258.87 0.60 0.60 0.00 65.00 0.00 7,245 258.36 0.51 0.51 0.00 70.00 0.00 3,075 258.15 0.10 0.10 0.00 75.00 0.00 1,918 258.10 0.04 0.04 0.00 80.00 0.00 1,387 258.07 0.02 0.02 0.00 85.00 0.00 1,085 258.05 0.01 0.01 0.00 90.00 0.00 890 258.04 0.01 0.01 0.00 95.00 0.00 754 258.04 0.01 0.01 0.00 100.00 0.00 654 258.03 0.00 0.00 0.00 105.00 0.00 577 258.03 0.00 0.00 0.00 110.00 0.00 516 258.03 0.00 0.00 0.00 115.00 0.00 467 258.02 0.00 0.00 0.00 120.00 0.00 426 258.02 0.00 0.00 0.00 125.00 0.00 392 258.02 0.00 0.00 0.00 130.00 0.00 363 258.02 0.00 0.00 0.00 135.00 0.00 338 258.02 0.00 0.00 0.00 140.00 0.00 316 258.02 0.00 0.00 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 28 Summary for Pond 10P: Basin #21 Inflow Area = 38.396 ac, 0.00% Impervious, Inflow Depth = 3.72" for 10-yr event Inflow = 178.63 cfs @ 12.07 hrs, Volume= 11.902 of Outflow = 2.27 cfs @ 11.10 hrs, Volume= 11.867 af, Atten= 99%, Lag= 0.0 min Primary = 2.27 cfs @ 11.10 hrs, Volume= 11.867 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 259.94' @ 22.50 hrs Surf.Area= 78,815 sf Storage= 403,437 cf Plug -Flow detention time=1,721.0 min calculated for 11.867 of (100% of inflow) Center -of -Mass det. time= 1,719.2 min ( 2,527.0 - 807.9 ) Volume Invert Avail.Storage Storage Description #1 254.00' 573,851 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 254.00 57,382 0 0 256.00 64,310 121,692 121,692 257.00 67,882 66,096 187,788 258.00 71,527 69,705 257,493 259.00 75,245 73,386 330,879 260.00 79,035 77,140 408,019 261.00 82,898 80,967 488,985 262.00 86,833 84,866 573,851 Device Routing Invert Outlet Devices #1 Primary 254.00' 36.0" Round RCP -Round 36" L= 80.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 254.00' / 252.00' S= 0.0250 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 7.07 sf #2 Device 1 254.00' 1.134 cfs Constant Flow/Skimmer X 2.00 Phase -In= 0.01' #3 Device 1 260.00' 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 261.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=2.27 cfs @ 11.10 hrs HW=254.58' (Free Discharge) L1=RCP_Round 36" (Passes 2.27 cfs of 2.45 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 2.27 cfs) 3=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=254.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 29 Pond 10P: Basin #21 Hydrograph / T / 178.63 cfs I 7 i I I —F F — — — — — I I I I I I ac 200 180 ,---------L-1n_w,,��__rea / % +- -------- ___ - -+--4PeAkElleVzL5�94i 10 170 / / /, r - T-T- rt - -1 - - 1- - 1- - r --I -I-L-T-StorageF:403,43r7-Cf - t - -i - -1 - -1 -- - I- - r - - 160 150 / / / 140 130 / // / — 4- -4 1 I I -4 1 I I — w 120 110 / / , / // fi fi + v 3 100 / T 7 1 1 1 r T 1 1 1 F T c 90 u. 80 / / / / — — I — — — — I — — I— — I — I — I — —I — — I — — I— — 1 — 70 / / % _ - _I — — I — — I— — L — 1 — � — —I — — I — — I— — L — 60 50 / / / -1 —1 — — I — — I— — — — 4 — —1 — — I — — I— — — - 40 30 / / 2.27 afs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Lry Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 30 Hydrograph for Pond 10P: Basin #21 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 254.00 0.00 0.00 0.00 10.00 3.39 18,831 254.32 0.80 0.80 0.00 15.00 5.94 373,283 259.56 2.27 2.27 0.00 20.00 2.59 402,354 259.93 2.27 2.27 0.00 25.00 0.00 396,690 259.86 2.27 2.27 0.00 30.00 0.00 355,866 259.33 2.27 2.27 0.00 35.00 0.00 315,042 258.79 2.27 2.27 0.00 40.00 0.00 274,218 258.23 2.27 2.27 0.00 45.00 0.00 233,394 257.66 2.27 2.27 0.00 50.00 0.00 192,570 257.07 2.27 2.27 0.00 55.00 0.00 151,746 256.46 2.27 2.27 0.00 60.00 0.00 110,922 255.83 2.27 2.27 0.00 65.00 0.00 70,098 255.18 2.27 2.27 0.00 70.00 0.00 29,519 254.51 1.91 1.91 0.00 75.00 0.00 13,412 254.23 0.41 0.41 0.00 80.00 0.00 8,600 254.15 0.17 0.17 0.00 85.00 0.00 6,314 254.11 0.09 0.09 0.00 90.00 0.00 4,983 254.09 0.06 0.06 0.00 95.00 0.00 4,113 254.07 0.04 0.04 0.00 100.00 0.00 3,501 254.06 0.03 0.03 0.00 105.00 0.00 3,046 254.05 0.02 0.02 0.00 110.00 0.00 2,696 254.05 0.02 0.02 0.00 115.00 0.00 2,418 254.04 0.01 0.01 0.00 120.00 0.00 2,192 254.04 0.01 0.01 0.00 125.00 0.00 2,004 254.03 0.01 0.01 0.00 130.00 0.00 1,846 254.03 0.01 0.01 0.00 135.00 0.00 1,711 254.03 0.01 0.01 0.00 140.00 0.00 1,594 254.03 0.01 0.01 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 31 Summary for Pond 11 P: Basin #20 Inflow Area = 17.270 ac, 0.00% Impervious, Inflow Depth = 3.72" for 10-yr event Inflow = 89.78 cfs @ 12.03 hrs, Volume= 5.353 of Outflow = 3.98 cfs @ 13.67 hrs, Volume= 5.341 af, Atten= 96%, Lag= 98.3 min Primary = 3.98 cfs @ 13.67 hrs, Volume= 5.341 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 256.23' @ 13.67 hrs Surf.Area= 40,426 sf Storage= 149,737 cf Plug -Flow detention time=1,098.5 min calculated for 5.341 of (100% of inflow) Center -of -Mass det. time= 1,097.0 min ( 1,901.6 - 804.5 ) Volume Invert Avail.Storage Storage Description #1 252.00' 225,229 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 252.00 30,540 0 0 254.00 35,045 65,585 65,585 256.00 39,839 74,884 140,469 258.00 44,921 84,760 225,229 Device Routing Invert Outlet Devices #1 Primary 252.00' 18.0" Round RCP -Round 18" L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 252.00' / 248.00' S= 0.0800 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 252.00' 1.134 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 256.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 257.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=3.98 cfs @ 13.67 hrs HW=256.23' (Free Discharge) t-1=RCP_Round 18" (Passes 3.98 cfs of 15.87 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 1.13 cfs) 3=Orifice/G rate (Weir Controls 2.85 cfs @ 1.57 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=252.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 32 fl w 3 0 M Pond 11 P: Basin #20 Hydrograph cfs I L 1nf1iw T"=1-7 ac' 1 1 I I— I - - - -1- -I- - I- - - - -4Pe-Ak E11Evz�-256;2-3, — T — T — —1 — —1 — 1— — T — T— Sto I'g we 7 49,, 7-37 -cf —+ -4 1 I I + —-1 I I - - rt -1 1 I I r I I t — —1 I I r T I I I I I I I I 1 — I -i — —1 I I I — — I — — I— — L I I I I I I I — 1 — � — —1 — —1 — — 1— — L — 1 4- — -4 — —1 — — I — — I— — — — - — —1 — — I — — I— — — 4 1 1 1—-I--I--�—t—� I I — — I— —t 3-98 cfs 3.98 cfs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) LInflow wrydary Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 33 Hydrograph for Pond 11 P: Basin #20 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 252.00 0.00 0.00 0.00 10.00 1.58 8,596 252.28 0.41 0.41 0.00 15.00 2.64 147,649 256.18 3.08 3.08 0.00 20.00 1.15 142,336 256.05 1.39 1.39 0.00 25.00 0.00 136,502 255.90 1.13 1.13 0.00 30.00 0.00 116,090 255.38 1.13 1.13 0.00 35.00 0.00 95,678 254.83 1.13 1.13 0.00 40.00 0.00 75,266 254.27 1.13 1.13 0.00 45.00 0.00 54,854 253.69 1.13 1.13 0.00 50.00 0.00 34,442 253.08 1.13 1.13 0.00 55.00 0.00 14,066 252.45 1.03 1.03 0.00 60.00 0.00 5,886 252.19 0.20 0.20 0.00 65.00 0.00 3,666 252.12 0.08 0.08 0.00 70.00 0.00 2,652 252.09 0.04 0.04 0.00 75.00 0.00 2,074 252.07 0.03 0.03 0.00 80.00 0.00 1,702 252.06 0.02 0.02 0.00 85.00 0.00 1,442 252.05 0.01 0.01 0.00 90.00 0.00 1,251 252.04 0.01 0.01 0.00 95.00 0.00 1,104 252.04 0.01 0.01 0.00 100.00 0.00 988 252.03 0.01 0.01 0.00 105.00 0.00 894 252.03 0.00 0.00 0.00 110.00 0.00 816 252.03 0.00 0.00 0.00 115.00 0.00 751 252.02 0.00 0.00 0.00 120.00 0.00 695 252.02 0.00 0.00 0.00 125.00 0.00 647 252.02 0.00 0.00 0.00 130.00 0.00 606 252.02 0.00 0.00 0.00 135.00 0.00 569 252.02 0.00 0.00 0.00 140.00 0.00 536 252.02 0.00 0.00 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 34 Summary for Pond 12P: Basin #18 Inflow Area = 10.149 ac, 0.00% Impervious, Inflow Depth > 3.72" for 10-yr event Inflow = 62.50 cfs @ 11.97 hrs, Volume= 3.146 of Outflow = 1.20 cfs @ 15.94 hrs, Volume= 3.139 af, Atten= 98%, Lag= 238.5 min Primary = 1.20 cfs @ 15.94 hrs, Volume= 3.139 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 236.11' @ 15.94 hrs Surf.Area= 28,560 sf Storage= 99,070 cf Plug -Flow detention time=1,474.0 min calculated for 3.138 of (100% of inflow) Center -of -Mass det. time= 1,474.5 min ( 2,273.8 - 799.3 ) Volume Invert Avail.Storage Storage Description #1 232.00' 157,140 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 232.00 19,786 0 0 234.00 23,867 43,653 43,653 236.00 28,287 52,154 95,807 238.00 33,046 61,333 157,140 Device Routing Invert Outlet Devices #1 Primary 232.00' 12.0" Round RCP -Round 12" L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 232.00' / 230.00' S= 0.0400 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf #2 Device 1 232.00' 0.600 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 236.00' 18.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 237.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=1.20 cfs @ 15.94 hrs HW=236.11' (Free Discharge) t-1=RCP_Round 12" (Passes 1.20 cfs of 7.19 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 0.60 cfs) 3=Orifice/G rate (Weir Controls 0.60 cfs @ 1.11 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=232.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 35 Pond 12P: Basin #18 Hydrograph I I I I I I I I I I — —1 — — 1— — — t — — —1 62.50 cfs L L -1 1 1 L I IIflOw �A 4 1 aG LInflow wI ryI i I I _ —.. - dary 65 �A Q A L Pe� Etev�23S7.1 , 60 �A 1 1 1 ^^ 11 n 55 1 — — —I — — I— — — + — — —1 — — 1— — — 4 — - — —1 50 1 J 1 L 1 J 1 1 L L - 1 45 - — — — — — — — — — — — — — — — — - — — — — — — — — — w 40 —1 35 i � t F I 1 fi 1 fi M 30 25 20 15 10 1.20 ofs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 36 Hydrograph for Pond 12P: Basin #18 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 232.00 0.00 0.00 0.00 10.00 0.98 5,184 232.26 0.28 0.28 0.00 15.00 1.52 98,313 236.09 1.00 1.00 0.00 20.00 0.67 97,461 236.06 0.82 0.82 0.00 25.00 0.00 94,211 235.94 0.60 0.60 0.00 30.00 0.00 83,411 235.55 0.60 0.60 0.00 35.00 0.00 72,611 235.15 0.60 0.60 0.00 40.00 0.00 61,811 234.74 0.60 0.60 0.00 45.00 0.00 51,011 234.30 0.60 0.60 0.00 50.00 0.00 40,211 233.85 0.60 0.60 0.00 55.00 0.00 29,411 233.39 0.60 0.60 0.00 60.00 0.00 18,611 232.90 0.60 0.60 0.00 65.00 0.00 7,811 232.39 0.59 0.59 0.00 70.00 0.00 3,163 232.16 0.11 0.11 0.00 75.00 0.00 1,944 232.10 0.04 0.04 0.00 80.00 0.00 1,396 232.07 0.02 0.02 0.00 85.00 0.00 1,087 232.05 0.01 0.01 0.00 90.00 0.00 889 232.04 0.01 0.01 0.00 95.00 0.00 752 232.04 0.01 0.01 0.00 100.00 0.00 651 232.03 0.00 0.00 0.00 105.00 0.00 574 232.03 0.00 0.00 0.00 110.00 0.00 513 232.03 0.00 0.00 0.00 115.00 0.00 464 232.02 0.00 0.00 0.00 120.00 0.00 423 232.02 0.00 0.00 0.00 125.00 0.00 389 232.02 0.00 0.00 0.00 130.00 0.00 360 232.02 0.00 0.00 0.00 135.00 0.00 335 232.02 0.00 0.00 0.00 140.00 0.00 313 232.02 0.00 0.00 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 37 Summary for Pond 13P: Basin #19 Inflow Area = 23.838 ac, 0.00% Impervious, Inflow Depth > 3.72" for 10-yr event Inflow = 146.80 cfs @ 11.97 hrs, Volume= 7.389 of Outflow = 2.61 cfs @ 16.39 hrs, Volume= 7.349 af, Atten= 98%, Lag= 265.3 min Primary = 2.61 cfs @ 16.39 hrs, Volume= 7.349 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 254.15' @ 16.39 hrs Surf.Area= 65,758 sf Storage= 240,711 cf Plug -Flow detention time=1,810.2 min calculated for 7.346 of (99% of inflow) Center -of -Mass det. time= 1,808.6 min ( 2,608.0 - 799.3 ) Volume Invert Avail.Storage Storage Description #1 250.00' 369,111 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 250.00 50,446 0 0 252.00 57,667 108,113 108,113 254.00 65,177 122,844 230,957 256.00 72,977 138,154 369,111 Device Routing Invert Outlet Devices #1 Primary 250.00' 18.0" Round RCP -Round 18" L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 250.00' / 246.00' S= 0.0800 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 250.00' 1.134 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 254.00' 30.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 255.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=2.61 cfs @ 16.39 hrs HW=254.15' (Free Discharge) t-1=RCP_Round 18" (Passes 2.61 cfs of 15.69 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 1.13 cfs) 3=Orifice/G rate (Weir Controls 1.48 cfs @ 1.26 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=250.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCADO 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 38 Pond 13P: Basin #19 Hydrograph L _ L _ L _ _I _ _ 1 _ _ 1_ 146.80 cfs ;In I�Qw ►ref=2-" a_c 150 /// -1- -1- - ! - .83� 1 P�I� €lev�254.'I-5- 140 1 1 1 Stom_geF24� T1� cf 130 // / — — — — — — — — — — — — — — — — — — — — 120 110 / 100 N i / 90 / / i I I I I I I I c 80 /,// I I I I I I I I I I u 70 60 50 40 / /, I T--I--I--I--1—-T--7 I I—- 30 20 / 2slcfs / / 2.61 cfs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) Lry Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 39 Hydrograph for Pond 13P: Basin #19 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 250.00 0.00 0.00 0.00 10.00 2.30 13,247 250.26 0.36 0.36 0.00 15.00 3.58 237,716 254.10 1.99 1.99 0.00 20.00 1.56 237,458 254.10 1.94 1.94 0.00 25.00 0.00 230,368 253.99 1.13 1.13 0.00 30.00 0.00 209,956 253.67 1.13 1.13 0.00 35.00 0.00 189,544 253.35 1.13 1.13 0.00 40.00 0.00 169,132 253.02 1.13 1.13 0.00 45.00 0.00 148,720 252.69 1.13 1.13 0.00 50.00 0.00 128,308 252.35 1.13 1.13 0.00 55.00 0.00 107,896 252.00 1.13 1.13 0.00 60.00 0.00 87,484 251.64 1.13 1.13 0.00 65.00 0.00 67,072 251.27 1.13 1.13 0.00 70.00 0.00 46,660 250.90 1.13 1.13 0.00 75.00 0.00 26,248 250.51 1.13 1.13 0.00 80.00 0.00 13,646 250.27 0.38 0.38 0.00 85.00 0.00 9,068 250.18 0.17 0.17 0.00 90.00 0.00 6,759 250.13 0.10 0.10 0.00 95.00 0.00 5,376 250.11 0.06 0.06 0.00 100.00 0.00 4,458 250.09 0.04 0.04 0.00 105.00 0.00 3,806 250.08 0.03 0.03 0.00 110.00 0.00 3,319 250.07 0.02 0.02 0.00 115.00 0.00 2,941 250.06 0.02 0.02 0.00 120.00 0.00 2,640 250.05 0.02 0.02 0.00 125.00 0.00 2,395 250.05 0.01 0.01 0.00 130.00 0.00 2,191 250.04 0.01 0.01 0.00 135.00 0.00 2,019 250.04 0.01 0.01 0.00 140.00 0.00 1,872 250.04 0.01 0.01 0.00 Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 40 Summary for Pond 14P: Basin #17 Inflow Area = 15.571 ac, 0.00% Impervious, Inflow Depth > 3.72" for 10-yr event Inflow = 94.79 cfs @ 11.97 hrs, Volume= 4.827 of Outflow = 2.03 cfs @ 15.58 hrs, Volume= 4.814 af, Atten= 98%, Lag= 216.9 min Primary = 2.03 cfs @ 15.58 hrs, Volume= 4.814 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 5.00-144.00 hrs, dt= 0.05 hrs Peak Elev= 278.15' @ 15.58 hrs Surf.Area= 42,309 sf Storage= 147,692 cf Plug -Flow detention time=1,218.7 min calculated for 4.814 of (100% of inflow) Center -of -Mass det. time= 1,216.9 min ( 2,016.5 - 799.6 ) Volume Invert Avail.Storage Storage Description #1 274.00' 231,784 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 274.00 29,036 0 0 276.00 35,271 64,307 64,307 278.00 41,797 77,068 141,375 280.00 48,612 90,409 231,784 Device Routing Invert Outlet Devices #1 Primary 274.00' 12.0" Round RCP -Round 12" L= 80.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 274.00' / 272.00' S= 0.0250 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 0.79 sf #2 Device 1 274.00' 1.134 cfs Constant Flow/Skimmer Phase -In= 0.01' #3 Device 1 278.00' 18.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 279.00' 20.0' long x 14.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.64 2.67 2.70 2.65 2.64 2.65 2.65 2.63 Primary OutFlow Max=2.03 cfs @ 15.58 hrs HW=278.15' (Free Discharge) t-1=RCP_Round 12" (Passes 2.03 cfs of 7.23 cfs potential flow) L2=Constant Flow/Skimmer (Constant Controls 1.13 cfs) 3=Orifice/G rate (Weir Controls 0.90 cfs @ 1.27 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=274.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 41 Pond 14P: Basin #17 Hydrograph / t- - t - -t - -1 — — 1— — ,— — r- - T — - -i - - - - 1- - r - t / / 94.79 cfs / 1rTf10W-4Tea=t5.571 105 / / — — ac� 100 / // + PeakElev-278.15' 95 // T T 1 I F T- 90 / / / / - - - - - - - 1 I I I - Storager147,692 cf 85 // — 80 /// � 1 1 I T — — 75 / / / — + — � — —1 — — I — — I— — t — + —- 70 // —T — T T—T--7 1 _ 65 //// H 60 /// — — —— ——------ — — — — —— — — - 55 c50 / / / — + — -4 — —1 — — I — — I— — ♦- — + — -4 —- u. 45 // T T 1 I I r T T 1 1 — 40 //// 35 30 //// / / / - -1 1 1 1 L T � 1 1- 25 /// + - — —I-- ♦ —+--4 1 1 20 15 2.03 cfs / 10 / 2.03 cfs 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Time (hours) ary Charah Colon ESC Type 1124-hr 10-yr Rainfall=5.27" Prepared by HDR, Inc Printed 2/28/2021 HydroCAD® 10.00-25 s/n 11397 © 2019 HydroCAD Software Solutions LLC Page 42 Hydrograph for Pond 14P: Basin #17 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 5.00 0.00 0 274.00 0.00 0.00 0.00 10.00 1.50 8,291 274.28 0.33 0.33 0.00 15.00 2.34 147,315 278.14 1.95 1.95 0.00 20.00 1.02 143,751 278.06 1.34 1.34 0.00 25.00 0.00 136,363 277.88 1.13 1.13 0.00 30.00 0.00 115,951 277.38 1.13 1.13 0.00 35.00 0.00 95,539 276.85 1.13 1.13 0.00 40.00 0.00 75,127 276.30 1.13 1.13 0.00 45.00 0.00 54,715 275.72 1.13 1.13 0.00 50.00 0.00 34,303 275.11 1.13 1.13 0.00 55.00 0.00 14,221 274.48 0.87 0.87 0.00 60.00 0.00 6,475 274.22 0.21 0.21 0.00 65.00 0.00 4,091 274.14 0.08 0.08 0.00 70.00 0.00 2,971 274.10 0.05 0.05 0.00 75.00 0.00 2,326 274.08 0.03 0.03 0.00 80.00 0.00 1,908 274.07 0.02 0.02 0.00 85.00 0.00 1,617 274.06 0.01 0.01 0.00 90.00 0.00 1,402 274.05 0.01 0.01 0.00 95.00 0.00 1,237 274.04 0.01 0.01 0.00 100.00 0.00 1,106 274.04 0.01 0.01 0.00 105.00 0.00 1,001 274.03 0.01 0.01 0.00 110.00 0.00 913 274.03 0.00 0.00 0.00 115.00 0.00 840 274.03 0.00 0.00 0.00 120.00 0.00 777 274.03 0.00 0.00 0.00 125.00 0.00 723 274.02 0.00 0.00 0.00 130.00 0.00 676 274.02 0.00 0.00 0.00 135.00 0.00 635 274.02 0.00 0.00 0.00 140.00 0.00 599 274.02 0.00 0.00 0.00 PROJECT Charah Colon Mine ESC SUBJECT Outlet Protection Analysis - Rip Rap Aprons (Circular Pipe) Rip Rap Aprons: Outlet SHEET / JOB # DATE 2/24/2021 COMPUTED BY PDB CHECKED BY TMY Basin #17 Basin #18 Basin #19 Basin #20 Basin #21 Basin #22 Basin #23 Pipe Type: Concrete Concrete Concrete Concrete Concrete Concrete Concrete Manning's Coefficient: 0.011 0.011 0.011 0.011 0.011 0.011 0.011 Diameter (Do) (in) = 12 12 18 18 36 12 18 Slope (%) = 3.3 4.0 8.0 8.0 4.0 4.0 5.0 Design Discharge (cfs) = 5.9 5.7 12.3 13.0 44.4 5.9 12.4 Source of Discharge Data: HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr HydroCAD 10-Yr 24-Hr K = 0.241 0.210 0.109 0.115 0.088 0.218 0.139 0 (degrees) = 265 265 265 265 151 207 265 Flow Depth (d) (in) = 10.1 10.1 15.1 15.1 13.4 7.4 15.1 Flow Area (ft) = 0.7 0.7 1.6 1.6 2.4 0.5 1.6 Flow Velocity (v) (ft/sec) = 7.6 7.2 7.0 7.3 6.3 7.51 7.02 Froude Number = 1.46 1.39 1.09 1.15 1.05 1.69 1.10 Rip Rap Aprons Applicable? Yes Yes Yes Yes Yes Yes Yes Tailwater Condition (Low or High)*: Low Low Low Low Low Low Low d50 (ft)** = 0.25 0.25 0.40 0.40 0.60 0.25 0.40 dmax (ft) = 0.38 0.38 0.60 0.60 0.90 0.38 0.60 Apron Thickness (X) (ft): ----- ----- ----- ----- ----- ----- No Geotextile: 0.56 0.56 0.90 0.90 1.35 0.56 0.90 With Geotextile: 0.38 0.38 0.60 0.60 0.90 0.38 0.60 Apron Dimensions (ft): ----- ----- ----- ----- ----- ----- Length (La)** = 10 10 11 11 20 10 11 Width (W) = 11.0 11.0 12.5 12.5 23.0 11.0 12.5 *Tailwater Conditions: Low: Tw < 0.5Do; High: Tw > 0.5Do ** Value from Chart. Charah Colon Outlet Protection Low Tailwater.xls Page 1 DRAWINGS This page intentionally left blank. Owner/Permittee: Green Meadow, LLC Operator: Charah, Inc. Engineer of Record: HDR Engineering, Inc. of the Carolinas a tjric k47rry�8d '.Rd osl 011toe P =CT LOCATION U C ZE X �+. Sanford k a Rd Municipal �' r = Riddle Golf Course j nr Sources: Esri, DeLorme, NAVTEQ, USGS, NRCAN, METI, PC, TomTom Permit Drawings For Colon Mine Site INDEX OF DRAWINGS (,FnIFR01 OOG-01 COVER OOG-02 MINE MAP (EXISTING CONDITIONS) SITE WORK OOC-01 Mine Permit OOC-02 OOC-03 OOC-04 OOC-05 Mo ification OOC-06 Permit No. 53-05 Civil HDR Project No. 10021146 Sanford, North Carolina March 2021 Submitted to NCDEQ - DEMLR MINE DEVELOPMENT PLAN (1 OF 2) MINE DEVELOPMENT PLAN (2 OF 2) MINE RECLAMATION PLAN SITE CROSS SECTIONS MISCELLANEOUS DETAILS SEDIMENT BASIN DETAILS SEAL �! 1"137 � _;i of Y Pk, �....u� HDR Engineering, Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. F-0116 1 I � m n 6,I Tz I w� N A � awn Colytrawley Db.l2 ,Pg. 788 O Thomas W. Bk, 021, Pg. 80 Christopher Ross Chenco PC 5 PG 170 ' ay Bk. I 115, Pg. 59 I „� I William T Reaves, Jr. PC 9 Pg 238 Michael M. Reaves ✓ F— PC 9 Pg 238 Bk 102 Pg 157 Z Michael M. Reaves 0 Q PC 9 Pg 238 \ Bk 119 Pg GG4 = J m n LIJ— — — — — — — — — 4 LU d U ally D and Cullen R Rascoe, o, r � BK 3 12 Pg 875 3 Q " 04 Q -- — — — — ----- — — w o Life Es ate Emma C Re es z I Bk 1 19 P GG4 ichael M Reaves M I PC 8 Pg 87 00 r U 0 3 a "e Pq pi,"t Parcel A4) Gy Z INACTIVE \ \ °, MINING AREA L. �IRFVF(-,FTATr=n) POND �-1 M I 177 n 7�70PON of I 2 u, m Em I �m n - I �� m I I 300' RESIDENCE/GROUNDWATER WELL BUFFER (TYP.) o Marlyn Ber y Bk 707 Pg 119 Bk. 415, Pg. 335 FUTURE l� MINE AREA �( V O for od 't. � d 1 HDR Engineering, Inc of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 Kenneth M. Alexander Tract I PC 8 PG I GC Db, 530, Pg. 5G AdJoiner Fence Encroaches By I G.7 ?0 c 3 I Kenneth M. Alexander Kenneth M. Alexander Bk. 530, Pg, 5G Tract 3 / PC 8 PG I GC PC 8 PG I GC c / iroperty Line 610w5 the Centerlme / of5mall branch ordrtch. 0 III r FA /o r 0 John L. Riggs Bk. 1213, Pg. 558 PC 8 Pg I GD 5 0 7 I 8 N SCOPE: THE PURPOSE OF THESE DRAWINGS IS TO TRANSFER THE OWNERSHIP OF THE MINE AND UPDATE BOTH THE EXCAVATION PLAN AND RECLAMATION PLAN. NOTES: 1. TOPOGRAPHIC SURVEY PROVIDED BY AVIO IMAGE MAPPING SERVICES, INC. ALTA SURVEY COMPLETED BY LAWRENCE ASSOCIATES DATED AUGUST 14, 2014. CLEARWATER ENVIRONMENTAL PROVIDED WETLAND LOCATIONS TO LAWRENCE ASSOCIATES FOR INCLUSION INTO THEIR SURVEY. 2. PROPERTY BOUNDARY PROVIDED BY LAWRENCE ASSOCIATES DATED SEPTEMBER 5, 2014. 3. GROUNDWATER WELL LOCATIONS PROVIDED BY LAWRENCE ASSOCIATES DATED SEPTEMBER 5, 2014. 4. FLOODPLAIN LOCATION IS FROM LAWRENCE ASSOCIATES AS IDENTIFIED ON pnopert FLOOD INSURANCE RATE MAP FOR LEE COUNTY NORTH CAROLINA, COMMUNITY b �\ rq fo r d1 the Centerlme ofsmalrnanchondtch. PANEL NUMBER 3710965400J, DATED SEPTEMBER 6, 2006. LAWRENCE ASSOCIATES CERTIFIES THAT A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY THE FEDERAL EMERGENCY r MANAGEMENT AGENCY. /J 5 WETLANDS DELINEATED BY CLEARWATER ENVIRONMENTAL ON AUGUST 8 2014 Kathy Lynn Holland \ Bk. 703, Pg. 853 \ \ \ \ aertyLme fo/10915 the Centerline mall branch or ditch. i 6. THE WETLANDS AND STREAMS THAT ARE IMPACTED BY THIS PROJECT WILL BE PERMITTED THROUGH NC DIVISION OF WATER QUALITY AND MITIGATED AS REQUIRED PRIOR TO LAND DISTURBANCE. ESTIMATED IMPACTS INCLUDE: 7-1 O t • 2,040 LINEAR FEET OF STREAMS • 27,106 SQ. FT. (0.62 ACRES) OF WETLANDS 3?x0 ACCORDING TO LAWRENCE ASSOCIATES SURVEY, LEE COUNTY PUBLIC / WORKS PROVIDED THE ADDRESSES FOR DRINKING WATER WELL 0,0 r LOCATIONS AND WATER SERVICES TO ADJOINING PARCELS WITHIN 500 I 36x00 FEET OF THE PROPERTY LINE. LEE COUNTY PUBLIC WORKS PROVIDED 3gx�o PARCELS SERVED BY COUNTY WATER. PUBLIC WATER SUPPLY �40, / 0 E (WATERLINE) IS LOCATED ALONG COLON ROAD. 42'`00 OC'04 — — — — 7. THE PRIMARY SITE ENTRANCE IS FROM COLON ROAD. p 44�00 8. SOIL STOCKPILE AREAS TO BE DESIGNED AND PERMITTED AS NEEDED FOR OPERATIONS. GENERAL MINE INFORMATION THE COLON MINE (PERMIT NO. 53.05) IS LOCATED ON COLON ROAD ABOUT 3 MILES NORTH OF SANFORD, NC IN LEE COUNTY. CURRENTLY, 371 ACRES OF / LAND ARE WITHIN THE MINE PERMIT LIMITS WITH 314 ACRES OF LAND ALLOWED ITO BE DISTURBED. / THE EXISTING BASINS HAVE BEEN FORMED BY MINE EXCAVATION AND THE GI OUTLETS CONSIST OF BRICKBAT SECTIONS OR PIPE CULVERTS. HOWEVER, 30X00 C 01 \ SEVEN (7) BASINS HAVE NOT BEEN INSTALLED AT THIS TIME AND HAVE BEEN OC,O / i 6 =� REDESIGNED AS DRY DETENTION BASINS WITH SLOW DRAINAGE OUTLETS. AT 3?'`�0 4 o -:5_ _ _ _ _ _ THE MAJORITY OF THE DISTURBANCE AREAS, EXCAVATION EXTENDS BELOW 34�00/// \ Q J THE LOWEST LEVEL OF THE BRICKBAT OUTLET SECTION THAT IS PROVIDED FOR APPROXIMATE LIMITS / \ �\ 21" z THESE BASINS. THE WATER ACCUMULATED BELOW THE BASIN OUTLETS IS OF ACTIVE MINING ARF BASIN NO 11 / / Q DISCHARGED WITH AN IRRIGATION PUMP WITH A MAXIMUM CAPACITY OF 1500 BRICKBAT OUTLET FLOODPLAIN (SEE NOTE 4) INACTIVE ' MINING AREA . BRICKBAT 00 REVEGEGATED)C �r OUTLET (f �2, / BASIN NO. 13 _ i LEGEND 000,,�� / PL PROPERTY LINE 7 I�I i n / 11 �• � . ` 50' PROPERTY LINE BUFFER Ej / 50' WETLANDS/STREAM BUFFER BASIN NO. 12 300' RESIDENCE/GROUNDWATER BRICKBAT WELL BUFFER OUTLET 290 EXISTING TOPOGRAPHY r r r r r r r r r r r r EXISTING ROAD r r r IMPACTED WETLANDS/STREAMS ohe OVERHEAD ELECTRIC PARCEL BOUNDARIES RAILROAD PROJECT MANAGER M. PLUMMER, P.E. A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON CHECKED BY PROJECT NUMBER 10021146-014 \ GPM. WATER IS DISCHARGED TO AN ADJACENT MINE / BASIN AREA. POND Wdham H. ttcamp Bk4G5 77G \/ William H.Kottca I— Kenneth L Bk 4G5 Pg /\ Moore \ 7 I BkzG4P w LLI UNDISTURBED BUFFERS ARE 50-FT AND ARE PROVIDED ALONG ALL CREEKS. ALSO, 50-FT UNDISTURBED BUFFERS ARE PROVIDED ALONG ROADWAY AND / �/ / AIwnMReaves PcePga7 — U) i RAILROAD RIGHT-OF-WAYS. AT POWER LINES THE MINE EXCAVATION IS Q MAINTAINED AT LEAST 50-FT FROM THE POWER LINE SUPPORTS. O44 wBASINS 17 THROUGH 23 HAVE NOT YET BEEN INSTALLED. THESE BASINS WILL C` �� 0 Z BE INSTALLED BEFORE MINING IS CONDUCTED IN THE AREA OF THESE BASINS. G°\ e o J THESE BASINS WERE ORIGINALLY DESIGNED TO DISCHARGE AT BRICKBAT = OUTLET SECTIONS, BUT HAVE BEEN REDESIGNED AS DRY DETENTION BASINS. QJ��\0 p POND 4-3b3247 w �' 8h4P�kol 0 BASIN NO. 11 A H Q UPON COMPLETION OF MINING, IT IS ANTICIPATED THAT LAKES WILL BE FORMED r -- AT THE MINE EXCAVATIONS. THE BRICKBAT SECTIONS (WHEN PRESENT) WILL BE LEVELED WITH A BROAD OUTLET FORMED. THE BERMS WILL ALSO BE INACTIVE INACTIVE REMOVED. FOR THE DRY DETENTION BASINS, THE OUTLET STRUCTURES AND — o er 't MINING AREA MINING AREA BERMS WILL BE REMOVED WHEN THE UPSTREAM DRAINAGE AREAS HAVE BEEN 1' `' (REVEGETATED) a (REVEGETATED) STABILIZED WITH VEGETATION. ALL HAUL ROADS WILL BE LEFT IN -PLACE. e neBk P -�✓ , ROADWAYS ARE FLUSH WITH THE GROUND OR ARE ELEVATED ABOVE NATURAL FI / GROUND BY EMBANKMENT FILL. 1 \I POND I ' r Optic wala^dz n ( !i POND J \ WATER RECHARGE BASIN BASIN NO. 10 PLANIMETRICS OPEN WATER STORMWATER BASIN FROM PRIOR MINING ACTIVITIES FLOODPLAIN APPROXIMATE LIMITS OF ACTIVE MINING AREA J= r\VI\L✓ ki LI\ VLLV/ COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC MINE MAP (EXISTING CONDITIONS) 0 1" 2-, FILENAME OOG-02.dwg SCALE 1" = 300' SHEET OOG-02 C 1 7 fiber Optic Cable O C� 44 � O .e �po / POND POND WATER RECHARGE BASIN 2 I 3 4 5 16 a MATCH LINE A -A - SEE SHEET OOC-02 -------- — William T Reaves, Jr. PC 9 Pg 238 ti Michael M. Reaves PC 9 Pg 238 Bk 102 Pg 157 f/ r — — — — — — — — — ' c - 6 I Michael M. Reaves PC 9 Pg 238 � Bk 119 Pg 664 _ � � o Daisy D and Cullen R RasCCC i BK 3 12 Pg 875 / \\� 0_ I----- ________ \ / \ William H. Kottca I William H. Kottcamp !� Kenneth L Moore Bk 465 Pg 77 I O Life Estate ( � Emma C Reaves I Ichael M Reaves / Bk 465 Pg 776 — — Bk 1 19 P I PC 8 Pg 87 / / \ r Alvin M Reaves I °7 I i / I PC 8 Pg 87 66 0 'ND 0 1 o INACTIVE MINING AREA (REVEGETATED) 'Q C� J Oictp ictp e Sign HDR Engineering, Inc of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 0 BASIN NO. 11 kM--3247 3ha� k, I 84, Pq. 50 BASIN NO. 10 o 1 � BASIN NO. 11A INACTIVE MINING AREA (REVEGETATED) CULVERT Norfolk Souther 1001 RIW REMAINDER OF Pin 9654-36-3247-00 .15± ACRES (PER DEED) A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION INACTIVE 501 UNDISTURBED MINING AREA BUFFER (TYP.) (REVEGETATED) Access Rua POND �l o a d ( r— PROPOSED LIMITS OF MINING (TYP.) — o FUTURE i MINE AREA DIVERSION 1 BERM (TYP.) OOC-06 SLOPE GROUND ' TOWARDS BASIN NO. 14 V A=55 Road lii •,. /ram; .�,. ` t�� N —,� Aw r LEGEND PL PROPERTY LINE — 50' PROPERTY LINE BUFFER 50' WETLANDS/STREAM BUFFER LOD LIMITS OF DISTURBANCE 300' RESIDENCE/GROUNDWATER WELL BUFFER EXISTING TOPOGRAPHY EXISTING ROAD ohe OVERHEAD ELECTRIC PARCEL BOUNDARIES RAILROAD — — CELL BOUNDARIES PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON �•''� N C At? CHECKED BYOFESS.00�1,�' 2 ; QQ- SEA M__ �Y ` Gz 00 ,..�a�' PROJECT NUMBER 10021146-014 3 /3 � rya j PLANIMETRICS OPEN WATER r r r r r r r r r r r r r r r r r r STORMWATER BASIN FROM r PRIOR MINING ACTIVITIES FLOODPLAIN PROPOSED SEDIMENT BASIN — — > — — > — — > — PROPOSED DIVERSION BERM BASIN DRAINAGE LIMITS PROPOSED STORMWATER FLOW DIRECTION DURING MINING STOCKF 50' UNDISTURBED J BUFFER (TYP.) CULVERT BASIN NO. 12 BRICKBAT OUTLET > 0 m Q Q J LU LU Cn m m LU z_ J U Q I I COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC 1,,,fff,/''A 1127 4"e e POWER LINE RIGHT-OF-WAY FBI C 1. EXISTING SEDIMENT BASINS 14, 15, AND 16 SHALL USE EXISTING PONDED VOLUME TO TREAT STORMWATER FLOWS. A MAINTENANCE CONSIDERATIONS 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE SHOULD IT BE DONE LESS THAN ONCE WEEKLY. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT BASINS 14, 15, AND 16 WILL BE CLEANED OUT WHEN DISCHARGE CRITERIA CANNOT BE MET. MINE DEVELOPMENT PLAN (1 OF 2) 0 1" 2-, FILENAME 00C-01.dwg SCALE 1" = 200' SHEET OOC-01 1 1 6 7 LAND DISTURBANCE SEQUENCE 8 BASIN CONSTRUCTION NOTES N' AdJoiner Fence Encroaches By 16.7' • X—X—X—X—X- III Kenneth M. Alexander Tract I PC 8 PG I GC Db. 530, Pg. 5G 0x00 z 0 X 0 0I co �� c N O 0 O 0 0 a 3 3 / a U i.� al o ~ I 50' UNDISTURBED BUFFER (TYP.) 01 0 0 °he IJ I I I I I I I I I I I I I I I I Kenneth M, Alexander Kenneth M. Alexander I Bk. 530, Pg, 56 Tract 3 / PC 8 PG I GC / PC 8 PG 16C � / I / / I f Prolpertl Zme follows the Centerline l l of small branch or ditch, DISCHARGE INV. EL.=256.0 TOP OF BERM EL. 268.0 �/ Q o DISCHARGE INV. EL.=258.0 TOP OF BERM EL.=264.0 BASIN NO. 23 / BASIN NO. 22 MINIMUM BOTTOM / MINIMUM BOTTOM DISCHARGE INV. EL.=252.0 DIMENSIONS DIMENSIONS / p 125' X 250' 1 00'X 200' I� oo TOP OF BERM EL.=262.0 BASIN NO. 21 MINIMUM BOTTOM NoQO DIMENSIONS 170' X 340' 6x0 00 Mo a 1 DIVERSION a 8*010 OOC-05 BERM (TYP.) 10'`00 12x00 � N o 14'`00 O ce a Q 16* Road I / oo� 2? 00 N � / o / ' FUTURE MINE AREA 1 (SLOPE GROUND TOWARDS BASINS) � lv 1 � ✓oo �J DEngineering, Inc. - of the .. „1 S. Church St. Suite 1000 Charlotte, 28202-2075 704.338.6700 03/2021 ISSUED FOR APPROVAL DESCRIPTIONISSUE DATE John L. RIgM5 Bk. 1213, Pg. 558 PCBPg IGD 5 SEDIMENT BASIN OOC-06 SCHEDULE DISCHARGE INV. EL.=248.0 TOP OF BERM EL.=258.0 - BASIN NO. 20 MINIMUM BOTTOM DIMENSIONS 124' X 248' ~ f'ropertyLme follows the Centerline of small branch or ditch. \1 41r-4.N_ t�. 28'`00 3�S00,� 7 / PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON �.�',� �A C A R CHECKED BY=,p¢'OFESS',,' ` SEAT Y ,G EE,. PROJECT NUMBER 10021146-014 1. CONTINUE MINING UPSLOPE OF BASINS NO. 14, 15, 1. SITE PREPARATIONS - CLEAR, GRUB, AND STRIP AND 16. TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS, AND 2. INSTALL BASINS NO. 17 THROUGH 23 AS NEEDED. OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM IS 3. CONSTRUCT DIVERSION BERMS NEEDED TO COMPLETE AND THEN REMOVE BRUSH, TREES, DIVERT STORMWATER TO BASINS NO. 17 AND 23. AND OTHER OBJECTIONABLE MATERIALS TO REVEGETATE BERMS IMMEDIATELY OR NO LATER FACILITATE SEDIMENT CLEANOUT. STOCKPILE ALL THAN 7 DAYS AFTER EACH BERM SECTION IS TOPSOIL OR SOIL CONTAINING ORGANIC MATTER CONSTRUCTED. FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE ESTABLISHMENT. 4. AT INACTIVE REVEGETATED AREAS, VERIFY PLACE TEMPORARY SEDIMENT CONTROL D EROSION CONTROL STRUCTURES ARE IN -PLACE, MEASURES BELOW THE BASIN AS NEEDED. AND REPAIR AS NEEDED PRIOR TO REDISTURBING THESE AREAS. 2. CUT-OFF TRENCH - EXCAVATE A CUT-OFF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 N FT DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE Kathy Lynn Holland ELEVATION OF THE RISER CREST. MAKE THE \ Bk. 703, P 653 g• MINIMUM BOTTOM WIDTH WIDE ENOUGH TO \ PERMIT OPERATION OF EXCAVATION AND \ COMPACTION EQUIPMENT, BUT IN NO CASE LESS \ DISCHARGE THAN 2 FT. MAKE SIDE SLOPES OF THE TRENCH NO \ INV. EL.=230.0 STEEPER THAN 1:1. COMPACTION REQUIREMENTS \ ARE THE SAME AS THOSE FOR THE EMBANKMENT. \ TOP OF BERM KEEP THE TRENCH DRY DURING BACKFILLING AND \ EL. 238.0 frog rtyLarefol%wsthe Centerliae COMPACTION OPERATIONS. \ of sm //branch or ditch. BASIN NO. 18 \ MINIMUM BOTTOM 3. EMBANKMENT - FILL MATERIAL SHOULD BE CLEAN \ DIMENSION MINERAL SOIL, FREE OF ROOTS, WOODY \ \ 100' X 200' VEGETATION, ROCKS, AD OTHER OBJECTIONABLE r �Z` MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO �—� BE PLACED BEFORE PLACING FILL. COMPACT o SOILS TO MINIMUM 95% STANDARD PROCTOR MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D698. PLACE FILL MATERIAL IN 6" TO 8" TOP OF BERM EL.=256.0 CONTINUOUS LAYERS OVER THE ENTIRE LENGTH O OF THE FILL AREA AND COMPACT IT. COMPACTION BASIN NO. 19 MAY BE OBTAINED BY ROUTING THE MINIMUM BOTTOM CONSTRUCTION HAULING EQUIPMENT OVER THE C DIMENSIONS as / FILL SO THAT THE ENTIRE SURFACE OF EACH 160' X 320' LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR DISCHARGE TREAD TRACK OF HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE INV.oEL.=246.0 - EMBANKMENT TO AN ELEVATION 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 4. CONDUIT SPILLWAYS - EMBED RISER IN CONCRETE AS SHOWN ON DETAIL. SECURELY ATTACH THE O RISER TO THE BARREL TO MAKE A WATERTIGHT D STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS Q MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTI -SEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE O SPILLWAY IN 4 INCH LAYERS, AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE a SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE / FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A OF 2 FT LEGEND BA KFILL OVER HNIMUMDEEPIPE SSPIL WAOYF EFFORECTED 01 CROSSING IT WITH CONSTRUCTION EQUIPMENT. 38*00 Pl PROPERTY LINE ANCHOR THE RISER IN PLACE WITH CONCRETE OR B 50' PROPERTY LINE BUFFER OTHER SATISFACTORY MEANS TO PREVENT j OxOo �f FLOTATION. IN NO CASE SHOULD THE PIPE e 50' WETLANDS/STREAM BUFFER CONDUIT BE INSTALLED BY CUTTING A TRENCH / 00 00C 04 SOD LIMITS OF DISTURBANCE THROUGH COMPLE HTHE DAM AFTER THE EMBANKMENT IS 44,100 300' RESIDENCE/GROUNDWATER � I',, WELL BUFFER 5. INLETS -DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS 290 EXISTING TOPOGRAPHY WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL EXISTING ROAD AREA TO IMPROVE BASIN TRAP EFFICIENCY. ohe OVERHEAD ELECTRIC 6. EROSION CONTROL - CONSTRUCT THE STRUCTURE PARCEL BOUNDARIES SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE RAILROAD THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL — — CELL BOUNDARIES OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER PLANIMETRICS CONSTRUCTION. MAINTENANCE CONSIDERATIONS OPEN WATER INSPECT THE SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE — — — — — — — — r r r r r r r r r STORMWATER BASIN FROM SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL PRIOR MINING ACTIVITIES DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AN ,q FLOODPLAIN AREA WITH SEDIMENT CONTROLS. CHECK EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT a PROPOSED SEDIMENT BASIN FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND — — > — — > — — > — PROPOSED DIVERSION BERM OTHER DEBRIS FROM THE RISER AND POOL AREA. BASIN DRAINAGE LIMITS PROPOSED STORMWATER FLOW DIRECTION DURING MINING COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC MINE DEVELOPMENT PLAN (2 OF 2) 0 1" 2-, FILENAME OOC-02.dwg 00119 SCALE 1" = 200' SHEET OOC-02 HDR Engineering, Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON CHECKED BY PROJECT NUMBER 1 10021146-014 ti`r p s SEAL Y = Y PN COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC MINE RECLAMATION PLAN 0 1" 2-, FILENAME OOC-03.dwg 00119 SCALE 1 1" = 300' SHEET OOC-03 HDR Engineering, Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON CHECKED BY PROJECT NUMBER 1 10021146-014 COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC SITE CROSS SECTIONS 0 1" 2-, FILENAME I OOC-04.dwg SCALE I H: 1 "=150' V: 1 "=30' SHEET OOC-04 HDR Engineering, Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON CHECKED BY PROJECT NUMBER 1 10021146-014 SEAL y N •' COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC EROSION AND SEDIMENTATION CONTROL DETAILS 0 1" 2° FILENAME OOC-05.dwg SHEET c 00119 SCALE AS NOTED OO` -0`� HDR Engineering, Inc. of the Carolinas 440 S. Church St. Suite 1000 Charlotte, NC 28202-2075 704.338.6700 N.C.B.E.L.S. License Number F-0116 A 03/2021 ISSUED FOR APPROVAL ISSUE DATE DESCRIPTION PROJECT MANAGER M. PLUMMER, P.E. DESIGNED BY T. YANOSCHAK, P.E. DRAWN BY D. DIXON CHECKED BY PROJECT NUMBER 1 10021146-014 11 Oro rotor, op �N CgR0••" 00 SEAS COLON MINE SITE MINE PERMIT MODIFICATION SANFORD, NC SEDIMENT BASIN DETAILS 0 1" 2-, FILENAME OOC-06.dwg 00119 SCALE AS NOTED SHEET OOC-06