Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20220420_ESC_Calculations
CALCULATIONS FOR NEW LONDON QUARRY 317 W. GOLD STREET NEW LONDON, STANLEY CO., NC 28127 BY Denver Toler, PE 5917 Tillery Drive Charlotte, NC 28226 (704) 526-7994 denvertoler@gmail.com �Q �4cv: FNGIN� E R v�• O. EV'( .�a• R Time of Concentration Calculations based on SCS Equations PRE -DEVELOPMENT PROJECT: New L.n&nO-" SUMASIN ID: SBt 0.20 Acre. DIVERSION 1181 SHEET FLOW SEG#i SEG# MANNINGS'n' 0.2A0 2-YEAR, 24-FIR. RAIN FALL (IN) 3.12 3T2 FLOW LENGTH (FT) 300.00 ELEV UP (NGVD FT) ELEV DOWN(NGVD FT) 681.0 LAND SLOPE(FT/FT) 0.080 0.000IM m0 T IME OF CONCENTRATION (HRS) 0318 0.000 0.31]8 19.07 SHALLOW CONCENTRATED FLOW SEG#2 SEG# SURFACE DESCRIPTION(P OR U) USE V-br Paved FLOW LENGTH (FT) ELEVUP(NGVD FT) ELEV DOWN (NGVD FT) M WATERCOURSE SLOPE (FTIFT)AVERAGE VELOCITY (FTASEC) hrTIME OF CONCENTRATION(FIRS) 00D20� 0.14 RECTANGULAR CHANNEL CHANNELFLOW SEG# SEG# SEG# SEG# BOTTOM WIDTH (FT) 0.0 DEPTH (FT) 0.0 AREA (SO. FT) 0.00 0.00 0.00 0.00 WETTED PERIMETER (FT) 0.00 0.00 0.00 0.00 HYDRAULIC RADIUS (FT) 0.00 0.00 0.00 0,60 FLOW LENGTH (FT) 0.00 ELEV UP (NGVD FT) D.0 ELEV DOWN (NGVD FT) 0.0 CHANNEL SLOPE(FTIFT) 0.000 0.000 0.D00 0.000 MANNINGS'n' 0.000 AVERAGE VELOCITY (FTISEC) D.- D.nuo 0.000 0.000 hr TIME OF CONCENTRATION (FIRS) 0.000 0.000 0.000 0.000 TRIANGULAR CHANNEL CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NOV) FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS'n' AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) TRAPEZOIDAL CHANNEL CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (2H:1V) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NOVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FT/FT) OF CONCENTRATION (HRS) CIRCULAR CHANNEL CHANNEL FLOW SEG# PIPE DIAMETER (IN) AREA (SG. FT) 0.00 WETTED PERIMETER ITT) 0.00 HYDRAULIC RADIUS (FT) 0.00 FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE(FT/FT) 0." MANNINGS -n- AVERAGE VELOCITY(FT/SEC) 0. TIME OF CONCENTRATION(RES) 0. (Gravity Fla.) SEG# SEG# SEG# hr n O.000Om 0.00 0.wl 0.00 0. obw w O.Lo 0.w 0.00 0,00 0'" 0.O 0.006 0.000 O.00D 0.000 0000 0.000 0.000 TUTAL TIME OF CONCF NTRA110N RESJ 44/4 111 (MINI U . �..••4• +n 02LH4 Time of Concentration Calculations based on SCS Equations PRE -DEVELOPMENT PROJECT: New Lorton Q-" SU"ASIN ID. 1 15.M Acre. DIVERSION 2S131 SHEET FLOW MANNINGS'ri BEG at 0240 BEG 2-YEAR, 24- HR. RAIN FALL (IN) 3.121 3.12 FLOW LENGTH (FT) 300.00 ELEV UP (NGVD FT) J2e.4 ELEV DOWN (NGVD FT) ]00./ LAND SLOPE(FTrTT) 0.0]3 0.000 hr Inn TIME OF CONCENTRATION (HRS) 0.345 0.000 0.3450 20.]0 SHALLOW CONCENTRATED FLOW SEGA2 BEG SURFACE DESCRIPTION (P OR U) U USE Y'for Paved FLOW LENGTH (FT) 532 0 ELEV UP(NGVD FT) ELEV DOWN (NGVD FT) WATERCOURSE SLOPE (FTrFT) 0.053 0.000 AVERAGE VELOCITY (FTISEC) 9.]28 D.000 M m TIME OF CONCENTRATION (HRS) 0.040 0.000 0.039a 2.38 RECTANGULAR CHANNEL CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS'n' AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) TRIANGULAR CHANNEL CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA(SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NOVD FT) CHANNEL SLOPE (FTIFT) MAN NIN G'S'n' AVERAGE VELOCITY (FT/SEC) TIME DF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH IFTI DEPT"(FT) SIDE SLOPES QHA V) (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS'n" AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) TRAPEZOIDAL CHANNEL BEG IT BEG BEG IT SEC 0.01 0. 0.0000 CIRCULAR CHANNEL FLOW BEG PIPE DIAMETER (IN) AREA(SQ.FT) 0.00 WETTED PERIMETER (FT) 0.. HYDRAULIC RADIUS (FT) 0. FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE RJIFT) 0.000 MANNWG5-W AVERAGE VELOCITY (FTISEC) 0.000 TIME OF CONCENTRATION (HRS) 0.000 CHANNEL (G—iry BEG Flay) BEG BEG# 0.0000 m 0.00 0.00 0.00 0.w o. DAO 07 0.00 0.00 0.00 o. 0.000 0. o. .006 0-- o" 0. .000 O.00D TOTAL TIME OF CONCENTRATION (HRS) :i'� JS P/ IWNI I AG TIME iHRS I 6 35��] Time of Concentration Calculations based on SCS Equations PRE -DEVELOPMENT PROJECT: New Lorton Q." SUB -BASIN ID: 1 4.10 Acres DIVERSION 3882 SHEET FLOW SEC 01 SEG # MPRNINGS'n' 2-AR.24-HR.RAIN FALL(IN) 3.12 FLOW LENGTH (FT) A ELEV UP (NGVD FT) ELEV DOWN(NOW FT) LAND SLOPE(FTIFT) 0.non ml n TIME OF CONCENTRATION (HRS) 0.3BY 0.000 0.3666 21 W SHALLOW CONCENTRATED FLOW SEGR2 SEG# SURFACE DESCRIPTION IF OR U) U USE T'for Paved FLOW LENGTH (FT) 360 ELEV UP (NGVD FT) T0eS ELEV DOWN INGVD FT) 652.0 WATERCOURSE SLOPE(FTIFT) 0.161 0.000 AVERAGE VELOCITY FTISEC) 6.216 0.000 hr m TIME OF CONCENTRATION (HRS) 0.01 0.000 0.0166 1.01 RECTANGULAR CHANNEL CHANNELFLOW SEG# SEG# SEC SEG# CHANNEL FLOW BOTTOM WIDTH(FT) 0.0 BOTTOM WIDTH (FT) DEPTH (FT) 0.o DEPTH (FT) AREA(SQ. FT) 0.00 0.00 ON I,o) SIDE SLOPES(?H:1V)(FT) WETTED PERIMETER (FT) 0.00 0.00 0. 0o; AREA(SQ FT) HYDRAULIC RADIUS (FT) 0.00 0.00 0.. 0.00 WETTED PERIMETER (FT) FLOW LENGTH ITT) 0.00 HYDRAULIC RADUS(FT) ELEV UP(NGVD FT) 0.0 FLOW LENGTH (FT) ELEV DOWN(NGVD FT) 0A ELEV Up (NOW FT) CHANNEL SLOPE(FTIFT) 0.DD0 0.000 0.000 D.000 ELEV DOWN(NGVD FT) MANNING'S'n' 0,000 CHANNEL SLOPE(FTIFT) AVERAGE VELOCITY (FTISEC) 0000 0.000 0.000 0.000 hr MANNINGS Yi TIME OF CONCENTRATION( HRS) ."I 0.000 0.000 0.000 0.0000 AVERAGE VELOCITY(FTR TRIANGULAR CHANNEL CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS IF T) FLOW LENGTH (FT) ELEV UP (NOW FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S'n AVERAGE VELOCITY(FTSEC) TIME OF CONCENTRATION (HRS) TIME OF CONCENTRATION (HRS) TRAPEZOIDAL CHANNEL CIRCULAR CHANNEL FLOW SEG# ?IPE DIAMETER (IN) 4REA(SQ. FT) 0. WETTED PERIMETER(FT) 0. HYDRAULIC RADIUS (FT) 0.00 FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE(FTIFT) 0.- MANNINGS if AVERAGE VELOCITY( FT/SEC) 0.000 TIME OF CONCENTRATION (HRS) 0.000 CHANNEL (Gravity SEG# Flow) SEC if SEC In O.000D m D.03 0.00 D.00 0.00 0.. 0.00 0. 0.00 0.00 0. 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.' . IL -I. I D/��H � f..1��I:f 2F1 a4 (MINI 1 . 1.TIME IHRSI 4 Time of Concentratlon Calculations based on SCS Equations PRE -DEVELOPMENT PROJECT: New London Q-e SUB -BASIN ID: 8432 S.]U Acme DIVERSION"B2 SHEET FLOW MANNINGS'n' SEG 91 0.240 SEG# 2-YEAR, 24-NR..111 FAIL (IN) 3.121 3,12 FLOW LENGTH ITT) 300.00 ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) 08B.2 LAND SLOPE (FTIFT) 0.000 0.000 hr min TIME OF CONCENTRATgN (HRS) 0.321 0.000 D.320 10.24 SHALLOW CONCENTRATED FLOW SEGN2 SEG# SURFACE DESCRIPTION IF OR U) USE R' (or Paved FLOW LENGTH LET) E LEV Up (NGVD FT) ELEV DOWN (NGVD FT) M01B WATERCOURSE SLOPE (FTIFT)AVERAGE VELOCITY(FT15EC) mn hrTIMEOF CONCENTRATION(HRS) 0.0103 1.10 RECTANGULAR CHANNEL CHANNEL FLOW SEG# SEC SEG# SEG# BOTTOM WIDTH ITT) 0.0 DEPTH (FT) 0.0 AREA (SoFT) 0.. ON 0.00 0.00 WETTED PERIMETER(FT) 0,DO 0,N Odw 0.00 HYDRAULIC RADIUS (FT) 0.DO o. 0.00 0.00 FLOW LENGTH (FT) ow ELEV UP (NGVD FT) 0.0 ELEV DOWN (NGVO FT) 0.0 CHANNEL SLOPE (FTIFT) O.M 0.000 0.000 0,OW MANNINGS-W 0.000 AVERAGE VELOCITY IFT/SEC) O.OW 0.000 0,000 0,000 hr TIME OF CONCENTRATION(HRS) 0.000 0.000 D.000 0.000 TRIANGULAR CHANNEL CHANNELFLOW TOP WIDTH (FT) DEPTH (FT) AR EA(SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING'S'n' AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH(FT) SIDE SLOPES (?H:1V)(FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS'n' AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION INNS) TRAPEZOIDAL CHANNEL SEC BEG SEG# SEG# CIRCULAR CHANNEL (Gmviry Flay) CHANNELFLOW SEG# SEG# SEG# SEG# PIPE DIAMETER (IN) AREA (SO. FT) 0 (10 ow 0.00 0.00 WETTED PERIMETER (FT) ow 0. ow 0.00 HYDRAULIC RADIUS ITT) 0.00 0,00 0.00 0.00 FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) 0.000 0.ON 0.No 0.000 MANNINGS'n' AVERAGE VELOCITY (FTISEC) O'No oNO 0.000 0.000 hr m TIME OF CONCENTRATION (HRS) 0.00000 0.0 0.000 0.000 0.0000 0.00 IOIAIIIME OFCONCENTRATION'HRS� D3,:it�� I. ti 110 i.RSI OTIi1T Time of Concentration Calculations based an SCS Equations PRE -DEVELOPMENT PROJECT: Naw L.n nuem, SUB -BASIN ID: SB2 14 BO Acres DIVERSION 6SB2 SHEET FLOW MANNINGS "' SEG#1 SEGN 0.240 2- YEAR, 24 HR.RAIN FALL( IN) 312 3,12 FLOW LENGTH (FT) 300.00 ELEV UP (NGVD FT) ]256 ELEV DOWN (NGVD FT) 899.2 LAND SLOPE (FTIFT) 0.0a5 0.000 hr re TIME OF CONCENTRATION (HRS) 0.321 0.000 0.320] 19.24 SHALLOW CONCENTRATED FLOW SEG#2 SEG# SURFACE DESCRIPTION(P OR D) U USE T'br P.ve FLOW LENGTH (FT) .5 0 ELEV UP(NOVO FT) 999.2 ELEV DOWN INGVD FT) S]4.0 WATERCOURSE SLOPE (FTIFT) 0.083 0.000 AVERAGE VELOCITY (FTISEC) 4.03e 0.000 hr min TIME OF CONCENTRATION (HRS) 0.018 0.000 0.0193 1.10 RECTANGULAR CHANNEL CHANNELFLOW BEG SEGN SEG# SEG# BOTTOM WIDTH (FT) 0.0 DEPTH (FT) 0.0 ANEA(SO.FT) 0.00 0. U.00 0.00 WETTED PERIMETER (FT) Dmw 0.00 ono D.00 HYDRAULIC RADIUS (FT) ON 0.00 0.00 0.00 FLOW LENGTH (FT) D. ELEV Up (NGVD FT) 0.0 ELEV DOWN (NGVD FT) 0.0 CHANNEL SLOPS (FTIFT) 0.000 0.000 0.D00 0.M, MANNINGS T' 0.000 AVERAGE VE LCCITY (FT/SEC) D.000 0.0,000 000 0.000 hr TIME OF CONCENTRATION(HRS) o.000l 0.000 0.000 O.OW TRIANGULAR CHANNEL CHANNEL FLOW TOP WIDTH (FT) DEPTH (FT) AREA (80. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NOW FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS'W AVERAGE VELOCITY (FTSEC) TIME OF CONCENTRATION (HRS) TRAPEZOIDAL CHANNEL CHANNELFLOW BOTTOM WIDTH (FT) DEPTH (FT) SIDE SLOPES (?HAV) (FT) AREA (SO. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTTT) MANNWG5'n' AVERAGE VELOCITY (FTISEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW PIPE DIAMETER (IN) AREA(SQ. FT) NETTED PERIMETER ITT) HYDRAULIC RADIUS ITT) LOW LENGTH(FT) LLEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNINGS Yi AVERAGE VELOCITY(FTISEC) TIME OF CONCENTRATION (HRS) CIRCULAR CHANNEL SEG# (Gravity SEGN FI-) SEGN SEGN 0.00 0.00 0.00 0.000 0.0W hr 0.000 D.0000 m 0.00 0.00 0.00 0.00 0.00 0.00 0.on ON 0.00 0.00 0.000 O.DDO O.D00 0.000 0.OD0 O.000 0.000 0.000 0.000 0 d')4!: 15411MNI LAGTIME (HRS) 0 iF41 Time of Concentration Calculations based on SCS Equations PRE -DEVELOPMENT PROJECT: Naw L.M QVa SUS -BASIN ID: $83 3,20 Acres DIVERSION 1-SH3 SHEET FLOW MANN ING.'n' SEG41 SEGN IN FALL (IN) 3.12 FLOW LENGTHT)ELEVUP q2�R. (NGVD FT) ELEV DOWN(NGVD FT) LAND SLOPE TTIFT) 0."hr min TIME OF CONCENTRATON (HRS) 0.44] 0.000 0.dd]2 29.83 SHALLOW CONCENTRATED FLOW SEGN2 SEC SURFACE DESCRIPTION IF OR U) USE 9'for Pe,a FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN(NOVO FT) MOM WATERCOURSE SLOPE (FT*T)AVERAGE VELOCITY(FTSEC) hr m TIME OF CONCENTRATION (HRS) 0.D000 0.00 RECTANGULAR CHANNEL CHANNEL FLOW BOTTOM WIDTH (FT) DEPTH (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) MANNING.'"' AVERAGE VELOCITY (FTSEC) TIME OF CONCENTRATION (HRS) CHANNEL FLOW BOTTOM WIDTH ITT) DEPTH (FT) SIDE SLOPES (?HA V) (FT) AREA (SQ. FT) WETTED PERIMETER (FT) HYDRAULIC RACES (FT) FLOW LENGTH (FT) ELEV UP (NGVD FT) ELEV DOWN (NGVD FT) CHANNEL SLOPE (FTIFT) (AVERAGE VELOCITY (FTSEC) TIME OF CONCENTRATION (HIPS) TRAPEZOIDAL CHANNEL TRIANGULAR CHANNEL FLOW SEGN3 TOP WIDTH (FT) 4.6 DEPTH (FT) 1.OD AREA (SQ . FT) ZOO WETTED PERIMETER (FT) 447 HYDRAULIC RADIUS (FT) OAS FLOW LENGTH (FT) 666.00 ELEV UP (NGVD FT) aee.0 ELEV DOWN (NGVD FT) ae0.0 CHANNEL SLOPE (FTIFT) 0.014 MANNING.-,' 0.040 AVERAGE VELOCITY (FTSEC) 2.- TIME OF CONCENTRATION(HRS) 0.061 IOIAI (IMF OF CONCENTRATION IHR31 LAG TIME OIRS I CHANNEL SEGN SEGN SEGN CHANNEL FLOW PIPE DIAMETER (IN) AREA (SO. FT) PERIMETER (FT) HYDRAULIC RADIUS (FT) FLOW LENGTH (FT) ELEV UP(NGVDFT) ELEV DOWN(NGVD FT) CHANNEL SLOPE (FTIFT) MANNING.'ri AVERAGE VELOCITY (FT/SEC) hr TIME OF CONCENTRATION (HRS) 0.O60B 304NIL,10, CIRCULAR CHANNEL (Gravity Flow) SEGN SEC SEGN SEGN 0.00 ON 0.00 0.00 0.00 0.00 O.00 (LOD obw 0. D.00 0.oa 0.000 0.000 RM 0.000 0.000 0.000 0.000 OMhr " 0.000 0.000 0.000 0.D00 0,0000 m0. obw ONWETTED 0. D.00 0.00 0. D.00 0.00 = 0. 0.000 O.DOD 0. 0.000 0.000 D. 0.000 0.000 050Pti D 304H SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Deliver D. Toler, PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 1-SI32- C LOCATION: SB-2- J I/ RUNOFF: Q=C,CIA U tream Area, A i acre 9.2 Retum Period 1 25 Runoff Coefficient, C 0.3 Frequency Factor, C, 1 Time of Concentration, T,(min) 26.8 Intensity, I (in/hr) 454 RUNOFF, Clio (cfs) 12.5 STORM SEWER CAPACITY: Q=1.49/n A R S ' Pipe Diameter, D in 0 .Pipe Material RCP Cross Sectional Area, As (sgft) 0.0 Roughness Coefficient. n 1 0.012 Wetted Permiter, P (ill 0.00 Pipe Slope, SR (ft/ft) 0.005 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q,,p (cfs) 0.0 SWALE FLOW, Q-min(Q„y,Ql) (afs) 12.5 SWALE CAPACITY 0=1.49/n A R S Channel Slope, So (ft/ft) 0.009 Right Bank Slope, SR( H:V) 1.00 Left Bank Slope, SL (H:V) 1.00 Rou hness Coefficient, n 0.040 Reginnincl ❑ it 1.80 Depth Increment R 0.05 T SL d SR -1 DESIGN DISCHARGE: Flow Rate: 12.5 cis Depth (d): 2.05 ft 24.6 in Hyd. Radius (H): 0.72 It Area (A): 4.20 De of flow Cm- Sectional Hydraulic Discharge (ft) (ff) (ft) (it I-) 1.80 3.24 0.636 8.5 1.85 3.42 0.654 9.1 1.90 3.61 0.672 9.8 1.95 3.80 0.689 10.5 2.00 4.00 0.707 11.2 2.05 4.20 0.725 12.0 2.10 4.41 0.742 12.8 2.15 1 4.62 0.760 13.6 2.20 4.84 0.778 14.5 2.25 5.06 0.795 15.4 2.30 5.29 0.813 16.3 2.35 5.52 0.831 172 2.40 6.76 0.849 18.2 2.45 6.00 0.866 19.3 2.50 6.25 0.884 20.3 2.55 6.50 0.902 21.4 2.60 6.76 0.919 22.6 Veloci:: 3.0 " I I I I I. COMMENTS: Reference from State of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6") Retardance Class D = (Design to meet Vp) VR= 3.26 n= 0.0399 d, ft, sfl R n V(fps) Olds: COMMENTS: 2.10 4A1 0.74 0.040 2.90 12.80 V - Vp OK 0-Q1a OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11%24-) d[ft1 Alsf! R Vt(ips) VR= 'n V: ns• Q•,ds COMMENTS: 2.50 6.25 0.88 4.50 3.98 0.0618 2.11 13.16 oK 4.00 3.54 0.0705 1.85 11.54 Tao well, M deeper channel 3.00 2.65 0.0828 1.57 9.82 Too small, try deeper channel 2.00 1.77 0.1130 1.15 7.20 Too wall, try deeper anannal 'n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL? - 2 YEAR STORM Use'n' = 0.020 Bare Soil O2 = 8.97 cfs dft A-sf, R Olcfs] V(fps) COMMENTS: 1.42 2.02 0.50 8.98 4.45 V>2 fps?? N.M. Temporary liner (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM d ftA sf R 'n VjfpSQ2(CfS) ...T Shear Condition: 1.57 2.46 0.79 0.033 3.64 8.98 0.91 T < Td On '•Td= 1.45 Ib/ft2 Strawwith Net ee.T = yds = (64.4XdXs) = 4/1112022 SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Denver D. Toler, PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 2.68" 5 (7 LOCATION: SB 2 RUNOFF: Q=C,CtA Upstream Area, A: acre) 15.7 Retum Period 25 Runoff Coefficient, C 0.3 Frequency Factor, C, 1 Time of Concentration, T,(min) 28.8 Intensity, I (in/hr) 3.82 RUNOFF, Cho (cfs) 18.0 STORM SEWER CAPACITY: Q=1.49/n A R S' P' a Diameter, D in 0 Pipe Material RCP ectional Area, As(sgft) 0.0 Rou hness Coefficien n 0.012 Wettetl Penniter, P !fty 0.00 Pipe Slope, Sp (ftlft) 0.005 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, CI-(cfs) 0.0 SWALE FLOW, Q-min(Q�,Qi) (cfs) 18.0 SWALE CAPACITY Q=1.49/n A R ' S ' De of Cross Depths Hydraulic Discha e ay. flow Channel Slope, S.(ftlft) 0.018 Right Bank Slope, SR( H:V) 1.00 Left Bank Slope, SL (H:V 1.00 Roughness Coefficient, n 0.040 Be innin^ DecM Mft 1.80 Depth Increment Vl'. 0.05 T - 2.1 c\SL d�, SR 2.22 22 --�(I 2.2 e 22 DESIGN DISCHARGE: 2.4 Flow Rate: 18.0 cfs 2A Depth (d): 2.05 ft 24.6 In Hyd. Radius (H): 0.72 ft 2.° Area (A): 4.20 2.E Veloci, ,: 4.3 fps COMMENTS: 'Reference from State of North Carolina Erosion Control Design Manual Grass Lined channel: V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6-) Retardance Class D = (Design to meet Vp) VR= 3.26 n= 0.0399 d(ft) A sf) R n V s 0 cfs COMMENTS: 2.10 4.41 0.74 0.040 4.10 18.10 V < Vp OK O>010 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11--24-) d(ft) A st] R V1(fps) VR= "n Vrfpsl Qrcfsl COMMENTS: 2.50 6.25 0.88 4.50 3.98 0.0618 2.98 18.61 CM 4.00 3.54 0.0705 2.61 16.32 Too man, trydealm charnel 3.00 2.65 0.0828 2.22 13.89 Too small. try daapar channel 2.00 1.77 0.1130 1.63 10.18 Too email, try deeper d-r d "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil 02 = 12.87 cfs dlft} A1sf} + Qtcfs} Vifps] COMMENTS: 1.45 2.10 0.51 13.43 6.39 V>2fps?? Need. T-poraryunor (V=Q/A) DESIGN FOR TEMPORARY LINER -2 YEAR STORM tltft; Aisf- R 'n V{Nsy 02(cfs) •"'T Shear Condition: 1.60 2.56 0.80 0.033 5.22 13.35 1.85 T < Td Gr eeTd= 2 Ib/ft2 Synthetic Mat •••T = yds = (64.4Hdxs) = 4/11/2022 SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Denver D. Toler, PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 3-SB2 LOCATION: SB 2 RUNOFF: O=CrCIA Upstream Area, A I acre) 4.111 Return Period ( 25 Pipe Diameter, D in 0 Pipe Material RCP Roughness Coefficient, n 0.012 Pipe Slope, Sp (ftHt) 0.005 Cross Sectional Area, As (sgft) 0.0 Wettetl Permtter, P ft 0.00 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q„p (cfs) 0.0 SWALE FLOW, Q-min(Q�,Qf) (cfs) 5.2 SWALE CAPACITY 0=1.49/n A R S De of Cross mHiu Hydraulic Discha e l flow Channel Slope, S. (ft/ft) 0.01 R' htBankSlope,SR(H:V) 1.06 Leff Bank Slope, S, (H:V) 1.00 Roughness Coefficient, n 0.040 Beginning Depth ft 1.00 Depth Increment ft 0.05 e -�I DESIGN DISCHARGE: Flow Rate: 5.2 cfs Depth (d): 1.45 ft 17A in Hyd. Radius (H): 0.51 ft Area (A): 2.10 of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6-) Retardance Class D = (Design to meet Vp) V R= 2.31 n= 0.0435 d ft A sf R n V s 0 cfs] COMMENTS: 1.52 2.31 0.54 0.044 2.26 5.22 V <Vp OK 0 > 010 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11--24-) d(ft) A!sq R Vt(fps) _ VR= n V:Irs Q:cfs. COMMENTS: 1.95 3.80 0.69 4.50 3.10 0.0780 1.49 5.66 oK 4.00 2.76 0.0819 1.42 5.39 oK 3.00 2.07 0.0980 1.19 4.51 Too small. try deeper channel 2.00 1.38 0.1320 0.88 3.35 Teo small, try deeper d,araad "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil Oz = 3.71 cis t1 ci A(st) R O(cfsl V{ips) COMMENTS: 1.00 1.00 0.35 3.71 3.71 V-2 fps?? Needs Temporary Lk- (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM (Ip dlftl Al sf) R 'n VsI 02(cfs) """T Shear Condition: 1.12 1.25 0.56 0.033 3.06 3.84 0.72 T < Td uK ••Td= 1.45 Ib/ft2 Straw with Net •'•T = yds = (64AXd)(s) = 4/11/2022 Cross Sectional Area, As (sgft) 0.0 Wettetl Permtter, P ft 0.00 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q„p (cfs) 0.0 SWALE FLOW, Q-min(Q�,Qf) (cfs) 5.2 SWALE CAPACITY 0=1.49/n A R S De of Cross mHiu Hydraulic Discha e l flow Channel Slope, S. (ft/ft) 0.01 R' htBankSlope,SR(H:V) 1.06 Leff Bank Slope, S, (H:V) 1.00 Roughness Coefficient, n 0.040 Beginning Depth ft 1.00 Depth Increment ft 0.05 e -�I DESIGN DISCHARGE: Flow Rate: 5.2 cfs Depth (d): 1.45 ft 17A in Hyd. Radius (H): 0.51 ft Area (A): 2.10 of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6-) Retardance Class D = (Design to meet Vp) V R= 2.31 n= 0.0435 d ft A sf R n V s 0 cfs] COMMENTS: 1.52 2.31 0.54 0.044 2.26 5.22 V <Vp OK 0 > 010 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11--24-) d(ft) A!sq R Vt(fps) _ VR= n V:Irs Q:cfs. COMMENTS: 1.95 3.80 0.69 4.50 3.10 0.0780 1.49 5.66 oK 4.00 2.76 0.0819 1.42 5.39 oK 3.00 2.07 0.0980 1.19 4.51 Too small. try deeper channel 2.00 1.38 0.1320 0.88 3.35 Teo small, try deeper d,araad "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil Oz = 3.71 cis t1 ci A(st) R O(cfsl V{ips) COMMENTS: 1.00 1.00 0.35 3.71 3.71 V-2 fps?? Needs Temporary Lk- (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM (Ip dlftl Al sf) R 'n VsI 02(cfs) """T Shear Condition: 1.12 1.25 0.56 0.033 3.06 3.84 0.72 T < Td uK ••Td= 1.45 Ib/ft2 Straw with Net •'•T = yds = (64AXd)(s) = 4/11/2022 Channel Slope, S. (ft/ft) 0.01 R' htBankSlope,SR(H:V) 1.06 Leff Bank Slope, S, (H:V) 1.00 Roughness Coefficient, n 0.040 Beginning Depth ft 1.00 Depth Increment ft 0.05 e -�I DESIGN DISCHARGE: Flow Rate: 5.2 cfs Depth (d): 1.45 ft 17A in Hyd. Radius (H): 0.51 ft Area (A): 2.10 of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6-) Retardance Class D = (Design to meet Vp) V R= 2.31 n= 0.0435 d ft A sf R n V s 0 cfs] COMMENTS: 1.52 2.31 0.54 0.044 2.26 5.22 V <Vp OK 0 > 010 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11--24-) d(ft) A!sq R Vt(fps) _ VR= n V:Irs Q:cfs. COMMENTS: 1.95 3.80 0.69 4.50 3.10 0.0780 1.49 5.66 oK 4.00 2.76 0.0819 1.42 5.39 oK 3.00 2.07 0.0980 1.19 4.51 Too small. try deeper channel 2.00 1.38 0.1320 0.88 3.35 Teo small, try deeper d,araad "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil Oz = 3.71 cis t1 ci A(st) R O(cfsl V{ips) COMMENTS: 1.00 1.00 0.35 3.71 3.71 V-2 fps?? Needs Temporary Lk- (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM (Ip dlftl Al sf) R 'n VsI 02(cfs) """T Shear Condition: 1.12 1.25 0.56 0.033 3.06 3.84 0.72 T < Td uK ••Td= 1.45 Ib/ft2 Straw with Net •'•T = yds = (64AXd)(s) = 4/11/2022 e -�I DESIGN DISCHARGE: Flow Rate: 5.2 cfs Depth (d): 1.45 ft 17A in Hyd. Radius (H): 0.51 ft Area (A): 2.10 of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2--6-) Retardance Class D = (Design to meet Vp) V R= 2.31 n= 0.0435 d ft A sf R n V s 0 cfs] COMMENTS: 1.52 2.31 0.54 0.044 2.26 5.22 V <Vp OK 0 > 010 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11--24-) d(ft) A!sq R Vt(fps) _ VR= n V:Irs Q:cfs. COMMENTS: 1.95 3.80 0.69 4.50 3.10 0.0780 1.49 5.66 oK 4.00 2.76 0.0819 1.42 5.39 oK 3.00 2.07 0.0980 1.19 4.51 Too small. try deeper channel 2.00 1.38 0.1320 0.88 3.35 Teo small, try deeper d,araad "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil Oz = 3.71 cis t1 ci A(st) R O(cfsl V{ips) COMMENTS: 1.00 1.00 0.35 3.71 3.71 V-2 fps?? Needs Temporary Lk- (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM (Ip dlftl Al sf) R 'n VsI 02(cfs) """T Shear Condition: 1.12 1.25 0.56 0.033 3.06 3.84 0.72 T < Td uK ••Td= 1.45 Ib/ft2 Straw with Net •'•T = yds = (64AXd)(s) = 4/11/2022 "n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL?- 2 YEAR STORM Use'n' = 0.020 Bare Soil Oz = 3.71 cis t1 ci A(st) R O(cfsl V{ips) COMMENTS: 1.00 1.00 0.35 3.71 3.71 V-2 fps?? Needs Temporary Lk- (V=Q/A) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM (Ip dlftl Al sf) R 'n VsI 02(cfs) """T Shear Condition: 1.12 1.25 0.56 0.033 3.06 3.84 0.72 T < Td uK ••Td= 1.45 Ib/ft2 Straw with Net •'•T = yds = (64AXd)(s) = 4/11/2022 SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Denver D. TOlerr, PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 4-S132 LOCATION: S132 RUNOFF: Q=C,CIA Jupstream Area, A [acrel 6.Retum Period, W 1 25 Runoff Coefficient, C T 0.3 Frequency Factor, C, 1 Time of Concentration, Tc (min) 22.0. Intensity, I (in/hr) j 4.94 RUNOFF, Clio (cfs) 9.9 STORM SEWER CAPACITY: Q=1.49/n A R' S" Pie Diameter, D in 0 Pipe Material RCP Roughness Coefficient, n 0.012 Pipe Slope, Sp (flift) 0.005 Cross Sectional Area, As (sgft) 0.0 Wetted Penniter, P R1 0.00 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q� (cfs) 0.0 SWALE FLOW, G-min(Q,w,Qi) (cfs) 9.9 SWALE CAPACITY Q=1.49/n A W S " Depth of _ Cross nal Hydraulic >;aaiu� Discharge flow Channel Slope, So (fUft) 0.028 Right Bank Slope, SR( H:V) 1.00 Left Bank Slope, 3, (H:V) 1.00 Roughness Coefficient, n 0.040 B innirr Depthfftl 1.20 Depth Increment Ift 0.05 T `I iau e E 1.55 \SL d SR 1.60 1.65 70 1.70 e 1.75 DESIGN DISCHARGE: 1.80 Flow Rate: 9.9 cfs 1.85 Depth (d): 1.5 ft 18.0 in 1.90 Hyd. Radius (H): 0.53 ft 1.95 Area (A): 2.25 2.00 Velocin•: 4.4 lus COMMENTS: 'Reference from State of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2'-6-) Retardance Class D = (Design to meet Vp) V R= 2.39 n= 0.0435 d(ftl A(sf) R n V fs} Q[�_ COMM_E_NTS: _ 1.60 2.56 0.57 0.044 3.91 10.02 V < Vp ok 0>Qto OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11%24-) daft A,sf, R Vt(fps) VR= 'n Vrts Qlcis i COMMENTS: 2.00 4.00 0.71 4.50 3.18 0.0780 2.53 10.14 cnc 4.00 2.83 0.0810 2.44 9.76 Too small, ay daeper ch.nnd 3.00 2.12 0.0940 2.10 8.41 Too .mail.try deewchannel 2.00 1.41 0.1260 1.57 6.27 Too .mall, by deeps channel 'n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL? - 2 YEAR STORM Use'n' = 0.020 Bare Soil 02 = 7.10 cfs d(ft) A(sf) R 0[cfsl V(fpsl COMMENTS: 1.06 1.12 0.37 7.26 6.46 V>2 fps?? Need. Temp-y U- (V=Q/A) DESIGN FOR TEMPORARY LINER -2 YEAR STORM deft) A(sf) R 'n V(fps) Q2(Cfs) "'T Shear Condition: 1.10 1.21 0.55 0.025 6.68 8.08 1.98 T < Td ❑K "Td= 2 Ib/ft2 Synthetic Mat ...T = yds = (64.4XdXs) = 4/11/2022 SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Denver D. Toler, PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 5-S132 LOCATION: S132 RUNOFF: Q=C,CIA Upstream Area,A acre 14.8 Runoff Coefficient, C 0.3 Time of Concentration, Tc (min) 25.5 Re Period y ) 25 Frequency Factor, Ct 1 Intensity, I (inRv) 4.68 RUNOFF, Q10 (cfs) 20.8 STORM SEWER CAPACITY: Q=1.49/n A R S Pipe Diameter, D; in) 0 Pipe Material RCP Cross Sectional Area, As (sgft) 0.0 Rou hness Coefficient, in 0.012 Wetted Penniter, P ft 0.00 Pipe Slope, Sp (ftt) 0.005 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q� (cfs) 0.0 SWALE FLOW, Q-min(Q,,Qi) (cfs) 20.8 SWALE CAPACITY 0=1.49/n A R' S"' Goss Depth of Sectional Hydraulic Radices Discharge flow Channel Slope, S. (fVft) 0.035 Rght Bank Slope, Sn( H:V) 1.00 Left Bank Slope, SL (H:V) 1.00 Roughness Coefficient, n 0.040 B2gini%122 Depth ft 1.50 Depth Increment ft 0.05 �� �- T �I e -�I DESIGN DISCHARGE: Flow Rate: 20.8 cfs Depth (d): 1.95 ft 23.4 in Hyd. Radius (H): 0.69 it Area (A): 3.80 State of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Vp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2"-6") Retardance Class D = (Design to meet Vp) VR= 3.10 n= 0.0400 ftA sf R n V s Q cfs: COMMENTS: 1.96 3.84 0.69 0.040 5.45 20.94 V c Vp Too Fligr 0>Q10 OK DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11 "-24") dift'• A!sfi R Vt(fps) VR= 'n yilps:• Ql cfs) COMMENTS: 2.40 5.76 0.85 4.50 3.82 0.0687 3.63 20.94 c o 4.00 3.39 0.0730 3A2 19.70 Too amali, try deeper channel 3.00 2.55 0.0838 2.98 17.16 Too smali, try deeper channel 2.00 1.70 0.1190 2.10 12.09 Too email, try deeper channel 'n: Refer to Figure 8.05c, NCESC, Manning's n TEMPORARY LINER NEEDED FOR CHANNEL? - 2 YEAR STORM Use'n' = 0.020 Bare Soil Qz = 14.87 cis dtftl Aaf} R Q[cfsl V;bs:i COMMENTS: _ 1.35 1.82 0.48 15.48 8.49 V>2 fps?? Needa Temporary Liner (V=Q/A) DESIGN FOR TEMPORARY LINER -2 YEAR STORM dlft} A{sfl R "n Vtfps+ Q2(cfs) '"'T Shear Condition: 1.47 2.16 0.74 0.033 6.87 14.85 3.31 T - Td Adwal channel Dimension .."T& 3 Ib1f 2 Riprap-d50=9" .T = yds = (64AXdXs) = 4/11/2022 SWALE CAPACITY ANALYSIS: V-SHAPE Project Name: New London Quarry Denver D. Toler PE Project Location: New London, Cabarrus Co 5917 Tillery Dr Charlotte, NC 28226 Phone: 704.526.7994 SECTION: Diversion Swale 1 SB 3 LOCATION: Se 3 Exist. RUNOFF: Q=C,CIA U tream Area, A (acre i 3.2 Runoff Coefficient, C 0.25 Time of Concentration, T. (min) 10.0 Retum Period (yr7 25 Frequency Factor, C, 1 Intensity, I (inlhr) 6.83 RUNOFF, Qta (cfs) 5.5 STORM SEWER CAPACITY: 0=1.491n A R S Pi �e Diameter. D viol 0 Pipe Material RCP Roughness Coefficient n Pipe Slope, Sp (ft/ft) SWALE CAPACITY Channel Slope, Sa(fVft) 0.014 Right Bank Slope, SR( H:V) 2.00 Left Bank Slope, SL (H:V) 2.00 Roughness Coefficient, n 0.040 Beginning Depth ft 0.30 Depth Increment [ft 0.1 DESIGN DISCHARGE: Flow Rate: 5.5 cis Depth (d): 1 It 12.0 in Hyd. Radius (H): 0.45 ft Area (A): 2.00 Cmss Sectional Ala, As (sgft) 0.0 Wettetl PennRer, P ftl 0.00 Hydraulic Radius, R (ft) 0.00 PIPE CAPACITY, Q� (cfs) 0.0 SWALE FLOW, Q-min(Q_,QI) (cfs) 5.5 0=1.491n A Rm S Depth of Cross Sectbnel flow Hydraulic Discharge Radius 'Reference from State of North Carolina Erosion Control Design Manual Grass Lined channel : V-Shape VEGETATION: Tall Fescus, Yp= 4.50 fps (Max Allowable Design Velocities) DESIGN FOR LOW RETARDANCE(D): FESCUE, GOOD STAND, CUT (2"-6') Retartlance Class D = (Design to meet Vp) VR= 2.01 n= 0.0450 tl(tU A{sf} R n Al Ofcrsi COMMENTS: 0.90 1.62 0.40 0.025 3.83 6.21 V<Vp •ac Q>Qto ox DESIGN FOR HIGH RETARDANCE(B) FESCUE, GOOD STAND, (11"-24") dlftl Aish R Vt(fps) VR= 'n Vtfps; Q;cfs: COMMENTS: 7.40 3.92 0.63 4.50 2.82 0.0810 1.59 6.23 ot< 4.00 2.50 0.0838 1.54 6.03 ac 3.00 1.88 0.1070 1.20 4.72 Taoanae,aydaaparchannd 2.00 1.25 0.1380 0.93 3.66 70o smeu, try4aaper channel 'n: Refer to Figure 8.05c, NCESC, Monolog's n TEMPORARY LINER NEEDED FOR CHANNEL? - 2 YEAR STORM Use'n' = 0.020 Bare Soil Qz = 4.02 cfs di ft, A•: sf, R O:cfsi V!fG, COMMENTS: 0.71 1.01 0.32 4.12 4.09 V>2 fps?? � rteeasremporery t„er (V=0lA) DESIGN FOR TEMPORARY LINER - 2 YEAR STORM dffil. A(sf} R 'n Vifp-; Q2(cts) ...7 ShearCondition: 0.85 1.45 0.38 0.033 2.79 4.04 0.77 T < Td •• "Td= 1.45 Iblft2 Straw with Net 41121202.2 Sediment Basin #1 Project: New London Quarry Date: 4/1112022 Flow Disturbed Area (A)= 21.50 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (1) = 4.36 (25-Year Storm) Storrs year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: r (Q)= 28.12 cfs Drainage Area (A)= 21.5 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (1) = 4.36 (25-Year Storm) Storm year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: (Q)= 28.12 cfs Basin Volume Required Drainage Area 21.50 acres Slope = 2 adj. factor 1800 ft3/ac Riser to TOFB= 0.50 Volume Required: 38,700 ft3 71 DRAINAGE STORAGE VOL. STORAGE DIMS AT STORAGE DEPTH AREA DIMS AT TRAP BOTTOM AREA STORAGE VOL. AREA REQUIRED DEPTH length width 1 length width 2 PROVIDED (acres) (cf) (ft) (ft) R (sf) (ft) (ft) (sf) (cf) 21.50 38,700 6 154 80 12,320 130 56 7,280 58,800 Trap Efficiency : 12,250 = Required Surface Area at Peak Inflow Rate (sq. ft.) 12,320 = Provided Surface Area at Peak Inflow Rate (sq. ft.) Veloci O,o= 0 ft3/s Andfloatation Block AR = 0.00 ft2 Riser Heicli t & Diameter Riser Height (HR) 0.0 ft V = #DIV101 f /S (table 8.07b) Riser Diameter 0.0 ft cfs for drainage 0.0 lRequired Volume: ft3 Height (HR) ft (1.1 " riser height' (riser radius^2) pi 62.4)/(140 (unit weight of concrete)-62.4) Diameter (DR) in. Head at Top of Riser (h) ft Block Dimensions: Height Length Width Provided Volume (concrete) 0 W Actual LxW #DIV/01 (based on 1.5 ht.) Barrel Diameter & Length frcr 'Round up for Construction (per figure 8.07b) ' provided weight must exceed required weight cfs for drainage 0.0 ' block height minimum 0.8 to maximum 1.5 ft Length daylight Diameter (DB) in. Rig -Rao Outlet Protection (per figure 8.06a) Emergency Spillway cfs for drainage 0 (per table 8.07c) Outlet Width (W) ft d_= 0.00 Bottom Width (W) 25.0 ft Length (La) ft D = 0.00 Stage Feet 0.5 ft Inlet Width (3Do) 0 ft do= 0.00 d50 ft Dewaterin4 Perforate bottom 24" of riser above the first 3". 8 rows of 18 (1/2" holes spaced 3 inches apart) Sediment Basin #2 Project: New London Quarry Date: 4/11/2022 Flow Disturbed Area (A)= 22.30 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (I) = 4.28 (25-Year Storm) Stone year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: (Q)= 28.63 cfs Drainage Area (A)= 22.3 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (1) = 4.28 (25-Year Storm) Stone year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: r (Q)= 28.63 cfs Basin Volume Required Drainage Area 22.30 acres Slope = 2 adj. factor 1800 ft3/ac Riser to TOFB= 0.50 Volume Required: 40,140 ft3 DRAINAGE STORAGE VOL. STORAGE DIMS AT STORAGE DEPTH AREA DIMS AT TRAP BOTTOM AREA STORAGE VOL. AREA REQUIRED DEPTH length width 1 length width 2 PROVIDED (acres) (cf) (ft) (ft) (ft) (sf) ft (ft) (sf) (cf) 22.30 ' 40,140 6 156 80 12,480 132 56 7,392 59,616 Trap Efficiency : 12,473 = Required Surface Area at Peak Inflow Rate (sq. ft.) 12,480 = Provided Surface Area at Peak Inflow Rate (sq. ft.) Vetocf Q10 = ft3/s Antifloatation Block AR = 0.00 ft2 Riser Helyht & Diameter Riser Height (HR) 0.0 ft V = #VALUE[ ft/s (table 8.07b) Riser Diameter 0.0 ft cfs for drainage Required Volume: - ft3 Height (HR) ft (1.1 * riser height * (riser radius^2) * pi * 62.4)/(140 (unit weight of concrete)-62.4) Diameter (DR) in. Head at Top of Riser (h) ft Block Dimensions: Height Length Width Provided Volume (concrete) #VALUE! ft3 Actual LxW #VALUE! (based on 1.5 ht.) Barrel Diameter & Leap th irc *Round up for Construction (per figure 8.07b) * provided weight must exceed required weight cfs for drainage * block height minimum 0.8 to maximum 1.5 ft Length Diameter (De) in. Rip -Rap Outlet Protection (per figure 8.06a) Emergency Spillway cfs for drainage (per table 8.07c) Outlet Width (W) ft dmax= 0.00 Bottom Width (W) 25.0 ft Length (La) ft D = 0.00 Stage Feet 0.5 ft Inlet Width (313o) 0 ft do= 0.00 d50 ft Dewaterin❑ Perforate bottom 24" of riser above the first 3". 8 rows of 18 (1/2" holes spaced 3 inches apart) Sediment Basin #3 Project: New London Quarry Date: 4/11/2022 Flow Disturbed Area (A)= 3.20 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (1) = 4.83 (25-Year Storm) Storm year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: r (Q)= 4.64 cfs Drainage Area (A)= 3.2 acres Runoff Coefficient (C)= 0.30 Rainfall Intensity (1) = 4.83 (25-Year Storm) Storm year depends upon which method is chosen -See pgs 8.07.16 thru 8.07.26) Flow: (Q)= 4.64 cfs Basin Volume Reoulred Drainage Area 3.20 acres Slope = 2 adj. factor 1800 ft'/ac Riser to TOFB= 0.30 Volume Required: 5,760 ft' DRAINAGE STORAGE VOL. STORAGE DIMS AT STORAGE DEPTH AREA DIMS AT TRAP BOTTOM AREA STORAGE VOL. AREA REQUIRED DEPTH length width 1 length width 2 PROVIDED (acres) (cf) (ft) (ft) (ft) (so (ft) (ft) (sf) (cf) 3.20 5,760 6 80 40 3,200 56 16 896 12,288 Trap Efficiency: 2,020 = Required Surface Area at Peak Inflow Rate (sq. ft.) 3,200 = Provided Surface Area at Peak Inflow Rate (sq. ft.) Veloci Qio= 0 ft'/s Antifloatation Block AR = 0.00 ft2 Riser Height & Diameter Riser Height (HR) 0.0 ft V = #DIV/01 f /s (table 8.07b) Riser Diameter 0.0 ft cfs for drainage 0.0 Required Volume: - W Height (HR) ft (1.1 * riser height * (riser radiusA2) * pi * 62.4)/(140 {unit weight of concrete)-62.4) Diameter (DR) in. Head at Top of Riser (h) ft Block Dimensions: Height Length Width Provided Volume (concrete) 0 ft' Actual LxW #DIV/01 (based on 1.5 ht.) Barrel Diameter & Length ircp; *Round up for Construction (per figure 8.07b) * provided weight must exceed required weight cfs for drainage 0.0 * block height minimum 0.8 to maximum 1.5 ft Length daylight Diameter (DB) in. Rip -Rap Outlet Protection (per figure 8.06a) Emergency Spillway cfs for drainage 0 (per table 8.07c) Outlet Width (W) ft cl_= 0.00 Bottom Width (W) 10.0 ft Length (La) ft D= 0.00 Stage Feet 0.3 ft Inlet Width (313o) 0 ft do= 0.00 d50 ft Dewaterinu Perforate bottom 24" of riser above the first 3". 8 rows of 18 (1/2" holes spaced 3 inches apart) Solve for: Click to Calculate Initial Values Discharge v Discharge, Q: 29.760357 ft3/s (cfs) Head, h:�.5 ft Length, L: 25 ft © 2013 LMNO Research, and Software, Ltd. http://www.LMNOeng.com Engineering, Units in Cipoletti weir calculation: ft=foot, gal=US gallon, m=meter, min=minute, s=second. Cipoletti Weir: Solve for: j Click to Calculate Initial Values Discharge v Discharge, Q: 5.5325456 ft3/s (cfs) Head, h:.3 ft Length, L: 10 ft © 2013 LMNg, Engineering, Research, and Software, Ltd. http://www.LN4NOeng.com Engineering, Units in Cipoletti weir calculation: ft=foot, gal=US gallon, m=meter, min=minute, s=second. Cipoletti Weir: