Loading...
HomeMy WebLinkAbout34-02_3_Redactedt:wd: Re: Mining Complaint - VMC North Quarry, l=orsyth County] Subject: [Fwd: Re: Mining Complaint - VMC North Quarry, Forsyth County] Date: Thu, 02 May 2002 15:58:28 -0400 From: Matthew Gantt <Matt. Gantt@ncmail. net> Organization: NC DENR To: Judy Wehner <Judy. Wehner@ncmail. net>, Tracy Davis <Tracy.Davis@ncmail.net> -------- Original Message -------- subject: Re: Mining Complaint - VMC North Quarry, Forsyth County Date: Thu, 02 May 2002 15:21:31 -0400 From: Steve Booe <Steve.Booe@ncmail.net> Organization: NC DENR To: Matthew Gantt <Matt.Gantt@ncmail.net> References: <3CCFFB87.D2363D7B@ncmail.net> Matt, I inspected the complaint site today May 02, 2002. It appears to be a local program sediment site, but I am going to do further investigation to confirm this. Steve Matthew Gantt wrote: > Steve and Brooks, > I received a complaint from Lynn Peters (336-767-2085) in Forsyth > county. She said that VMC North Quarry has a waste site near her home. > VMC has built a dike to retain the sediment but it is not working > properly. So far, they have dumped about 500 loads of dirt. Some of > the runoff has entered a nearby stream. She has already called Jeff > Kopf with the Forsyth County Local Program. Jeff told her he will send > someone out to look at the site this afternoon. Can you guys look at > this? > Thanks, > Matt > > Matt Gantt > NC DENR Winston-Salem Regional Office > Land Quality > 585 Waughtown Street > Winston-Salem, NC 27107 > Voice: (336) 771-4608 ext 247 > FAX: (336) 771-4631 5l212002 4:13 PM Mining Complaint - VMC North (Marry, Forsyth County Subject: Mining Complaint - VMC North'Quarry, Forsyth County Date: Wed, 01 May 2002 10:28:23 -0400I From: Matthew Gantt <Matt.Gantt@ncmail.net> Organization: NC DENR To: Stcve Booc <Steve.Booe(a ncrnail.net>, Brooks Cole <Brooks.Cole[it ncmail.nei> CC: Judy Wehner <Judy.Wehner@a ncmail.net> Steve and Brooks, I received a complaint from Lynn Peters (336-767-2085) in Forsyth County. She said that VMC North Quarry has a waste site near her home. VMC has built a dike to retain the sediment but it is not working properly. So far, they have dumped about1500 loads of dirt. Some of the runoff has entered a nearby stream. She has already called Jeff Kopf with the Forsyth County Local Program. Jeff told her he will send someone out to look at the site this afternoon. Can you guys look at this? Thanks, Matt Matt Gantt NC DENR Winston-Salem Regional Office Land Quality 585 Waughtown Street Winston --Salem, NC 27107 Voice; (336) 771-4608 ext 247 FAX: (336) 771-4631 Rc�wd: Ilwd' Re: Mining Canpinmt- VMC Nonh Quony, Fomyih CcuntylI 34-02_ Subject: Re: lFwd: lFwd: Re: Mining Compt Date: He 03 May 2002 11:45:27.0400 From: Tracy Davis <tracy.davis@ncmail.net> Organization: NC DENR To: Matt Gantt <Matt.Gantt@ncmail.net>, Brooks Cole <Brooks.Cole@ncmail.ne CC: Tom Carroll <CatroilT@VMCMAIL.c Judy Weimer<Judy.Wehner@ncmail.n I spoke with Tim Knopf of VMC today and he ga' also agreed to call Brooks back and give him - this is not a vMC overburden disposal site boundary; - VMC has sold fines material to a landowner Snow is the landowner.); - the site is approx. 5-6 miles down a publi - vmc has delivered some of the material wit: different than delivering their products to o - the landowner has supposedly secured the n that were supposed to address S&E (the County for this site... however, it may not be instal - VMC feels that this is their customer's re. In light of the above, I concur that this a unapproved overburden disposal area outside contact you shortly... I have to run to a meeting... Thanks. TD Tracy Davis wrote: > Tom/Tim: > Can you guys shed any light on this site Par > Thanks. Tracy > Subject: [Fwd: Re: Mining Complaint - VMC No > Date; Thu, 02 May 2002 25:58:28 -0400 > From: Matthew Gantt <Matt.Gantt@ncmail.net> > Organization: NC DENR > To: Judy Wenner <Judy.Wehner@ncmail.net>, Tr >-------- Original Message -------- > Subject: Re: Mining Complaint - VMC North Qu > Date: Thu, 02 May 2002 15:21:31 -0400 > From: Steve Boost <Steve.Booe@ncmail.net> > Organization: NC DENR > To: Matthew Gantt <Matt. Gant[@ncmail. net> > References; <3CCFFB87.D2363D7Brncmail.net> > Matt, > 1 inspected the complaint site today May 02, NMC Nor[h.Querry,-Fersylb-C'onn-3 IL Booe <Steve.Booe@ncmail.net>, Tim Knopf <Knopfr@VMCMAIL.com>, me the following information (he same info directly): tside the approved mining permit o wants to level his land (Keith road from the VMC North Quarry; their trucks, but this is no :er customers; .essary local permits and approvals,, ay have issued an S&E plan approval d properly); Ponsibility under the SPCA us7 to be a SPCA project and not an permit. As I noted, Tim will Quarry, Forsyth County] Davis <Traey.Da ViS0nemail.net> Forsyth County 2002. It appears to be a of I 5n)'2W2126 PM �i ...:.............. Re:(Fwd: I1Wd: Re: Mining Complaint - VMC North Quarry, Forsyth CountylI local program sediment site, but I am going to do' confirm this. Steve Matthew Gantt wrote: further investigation to > Steve and Brooks, > I received a complaint from Lynn Peters (`336-767--2085) in Forsyth > County. She said that VMC North Quarry has a waste site near her home. > VMC has built a dike to retain the sediment but it is not working > properly. So far, they have dumped about 500 loads of dirt. Some of > the runoff has entered a nearby stream. She has already called Jeff > Kopf with the Forsyth County Local Program. Jeff told her he will send > someone out to look at the site this afternoon. Can you guys look at > this? > > Thanks, > Matt > > Matt Gantt > NC DENR Winston-Salem Regional office > Land Quality > 585 Waughtown Street > Winston-Salem, NC 27107 > Voice: (336) 771-4608 ext 247 > FAX: (336) 771-4631 Tracy E. Davis, P.E. <Tracy.Davis@ncmail.net> State Mining Specialist Division of Land Resources NC Dept. of Environment and Natural Resources Tracy E. Davis, P.E. State Mining Specialist Division of Land Resources NC Dept. of Environment and Natural Resources Land Quality Section 1612 Mail Service Center Raleigh NC 27699 USA Additional Information: Last Name -Davis, P.E. First Name Tracy E. Version 2.1 <Tracy.Davis@ncmail.net> Pager: 1-877-291-8503 Fax: 919-715-8801 Work: 919-733-4574 2 of 3 1 5/3/2002 1:26 i'M Rc:jFw& 11-wd: Re! Mining Complaint - VMC North Ouarry, Forwh Countyll Tracy E. Davis, P.E. <Trac .Davis ncmail.net> Slate Mining Specialist Division of Land Resources NC Dept. of Environment and Natural Resources 3 of 3 1 !/3/2002 1:26 I'M v.c _$ILL HOLMAN ,'.SECRETARY NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES December 19, 2000 Ms. Vicki D. Byrd Vulcan Construction Materials Company, LP P.O. Box 4239 Winston-Salem. North Carolina 27115 RE: Blasting Complaints North Quarry_ Permit No. 34-02 Forsyth County Dear Ms. Byrd. - The review has been completed on the shot records you previously submitted for the June 1 through June 29, 2000 blasts and the September 27 through October 3, 2000 blasts at the North Quarry. Your company has been found to be in compliance with the blasting requirements of your mining permit. I have already notified the complainant, Ms. Lisa Hill, of our findings. Based on the descriptions of the blasts you provided and on our review of the shot information, it appears that the adverse reaction to your blasting operation conducted on June 29, 2000 may be related to elevated airblast readings. While this reading is within the maximum limit specified in your permit, it is sufficiently high enough to produce "nuisance" complaints. I strongly recommend that carefully review the blasting procedures employed at this facility and make adjustments to reduce offsite airblast levels, such as avoiding blasting during rainy weather, The remaining records have also been evaluated and no apparent causes for the complaints were found Thank you for your continued cooperation. If you should have any questions on the above, please contact me at (919) 733-4574. Sincerely, 4 d Judith A. Wehner Assistant State Mining Specialist Land Quality Section cc: Mr, Matt Gantt, P.E. LAND OUALITY SECTION (919)733-4574 FAX 1733-2076 GEOLOGICAL SURVEY 54CT30K (919)733-2423 FAX {919)733.0900 1G12 MA1t SEAYICE CENTER, R.tL ESGN, NG 27699.1B1z I919)733-3833 FAX (919)715-8801 AN EQUAL OPPORTUNITY J AFFIRMATIVE ACTION EMPLOYER - 50 Yo RECYCLED / 10% POST -CONSUMER PAPER DENR TOLL FREE HOTLINE! 1-877-623-6748 0 Ai3;r`1 �t •- NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ❑iviSION OF LAND RESOURcrEs December 19, 2000 Ms. Lisa Hill 5255 Germanton Road Winston-Salem. North Carolina 27105 RE: Blasting �ot North Quarry Permit No. 34-02 Forsyth County Dear Ms, Hill: Our office has completed its review of Vulcan Construction Materials Company, LP's blasting information related to the June 1 through June 29, 2000 blasts and September 29 through October 3, 2000 blasts conducted at its North Quarry. It was found that Vulcan Construction Materials Company, LP was in compliance with the blasting requirements of its mining permit during the period in question, All peak particle velocities, a measurement of ground vibration with units in inches per second (ips), were well below the maximum allowable limit of 1.0 ips specified in Vulcan Construction Materials Company, LP's mining permit, More specifically, all recorded values were at or below 40 percent of the maximum limit of 1.0 ips. According to extensive research by the U.S. Bureau of Mines and others, particle velocities below 0.5 ips effectively eliminate the possibility of any structural damage. All airblast readings, a measurement of the atmospheric pressure wave (overpressure) with units in psi or dBL, were below the maximum allowable limit of 128 dBL specified in Vulcan Construction Materials Company, LP's mining permit and well below the U. S. Bureau of Mine's recognized level of 164 dBL for prevention of glass breakage. A key point worth noting is that glass breakage occurs at much lower levels of overpressure than structural damage, such as cracking plaster. LAND QUALITY SECTION (919)733-4574 PAX (919)733.2876 GEOLOGICAL.SURVLY SRCTION (9l9)733.2423 PAX 1919)733.0900 ' 1612 MAIL $ERVICC CCNYCR. RALEIGN, NC 27699-1612 (919)733r3833 •FAk(919)715-8801 AN EQUAL OPPORTUNITY ! AFFIRMATIVE ACTION EMPLOYER_- 5O% RECYCLED / 10 POST -CONSUMER PAPER OENR TOLL FREE HOTLlNE7.1-877.623.6748 f Ms. Hill Page Two However, we did note that there was a increase in the overpressure reading for a blast on June 29, 2000. We have brought this to Vulcan Construction Materials Company, LP's attention and have suggested that it adjust its blasting practices to further reduce noise and nuisance complaints from nearby landowners. Thank you for your interest and patience in this matter. Hopefully I have answered your concerns adequately. If you should have any additional questions or concern, please contact me at (919) 7334574. Sincerely, 4 "� Judith A. Wehner Assistant State Mining Specialist Land Quality Section JW cc Mr. Matt Gantt, P.E. y �t ri�8 8t's�i 117 - SO °J-'it QS11 l 5; s/ I 1L J LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.": 34.02 Permittee vcmc Mine Name': north quarry Blast Report No.*:x 0& Peak Particle Velocity Check: Date of Blast": 09/27/00 Time of Blast': 11:22 D = Distance to ctosest offsite occupied structure (ft): D' = 1150.00 W = Maximum pounds of explosives per delay (pounds): W* = 737.00 SD = Scaled Distance: SO = DIW10.5 SD = 42.36 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = 0.40 ('max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V' = 0.18 DS = Distance from blast to seismograph (ft): DS" = 1150.00 d = Distance from blast to second location (ft): d' = 1925.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV= 0.0831 Airblast (Overpressure) Check: P = Unconfined Alrblast/Overpressure (psi): P = 82 (DIW110.33)^-1.2 P = 0.237954 To convert (psi) to (dBL): (P/2.9 x 10"-9)lag x 20 P = 158.28 AB = Confined Airblast/Overpressure (dBL):� AS = P (dBL) - 35 dBL (for quarry situation) AS= 123.28 ('max. limit in mining permit is: AB = ! dBL) 6&W OJ6iuw-� ! Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 if a "blendislurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 16540.00 Total pounds of Explos. #2* = NIA Ratio between explosives = N/A. Average pounds of explosives used per hole (pounds)* = 703.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 16540.00 Explosive #2 = N/A SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = N/A HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 50.03 Explos. #2 = NIA Total explos. column height = 50.03 Stemming height used in shot (feet)* = 15.00 Total height of explosive column(s) and stemming in the hole = 65.03 Total depth of hole denoted on the blasting report for the shot in question* = 60.00 Analysis Completed 8y:-4a Date:�1 / d \J 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: vcmc Mine Name*: north quarry Blast Report No.*: 87 Date of Blast*: 10/02/00 Time of Blast*: 10.15 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1050.00 W = Maximum pounds of explosives per delay (pounds): W* = 836.00 SD = Scaled Distance: SD = D/W^0.5 SD = 36.32 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = 0.51 (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.16 DS = Distance from blast to seismograph (ft): DS* = 1050.00 d = Distance from blast to second location (ft): d* = 2075.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV= 0.0576 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W^0.33)^-1.2 P = 0.278985 To convert (psi) to (dBL): (P/2.9 x 10^-9)log x 20 P = 159.66 AB = Confined Airblast/Overpressure (dBL, AB = P (dBL) - 35 dBL (for quarry situation) AB= 124.66 (*max. limit in mining permit is: AB = &8 dBL) 0 • Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 14840.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)" = 836.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 14840.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)"2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 59.50 Explos. #2 = NIA Total explos. column height = 59.50 Stemming height used in shot (feet)* = 10.00 Total height of explosive column(s) and stemming in the hole = 69.50 Total depth of hole denoted on the blasting report for the shot in question* = 63.00 Analysis Completed By: Date: Q� • 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: VCmC Mine Name*: north quarry Blast Report No.*: 88 Date of Blast*: 10/03/00 Time of Blast*: 10:58 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1050.00 W = Maximum pounds of explosives per delay (pounds): W* = 756.00 SD = Scaled Distance: SD = D/W"0.5 SD = 38.19 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = 0.47 (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.18 DS = Distance from blast to seismograph (ft): DS* = 1060.00 d = Distance from blast to second location (ft): d* = 2000.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)"1.5 PPV= 0.0695 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (DNV,10.33)"-1.2 P = 0.268090 To convert (psi) to (dBL): (P/29 x 10"-9)log x 20 P = 159.32 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB= 124.32 ('max. limit in mining permit is: AB = dBL) . _O Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight' emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 11140.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 756.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 11140.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = N/A Explosive column height for each explosive (feet): Explos. #1 = 53.80 Explos. #2 = NIA Total'explos. column height = 53.80 Sterproing height used in shot (feet)* = 11.00 Total height of explosive column(s) and stemming in the hole = 64.80 Total dbpth of hole denoted on the blasting report for the shot in question* = 61.00 Analysis Completed gy:a� 61 _ "� Date: 1 (J • 0 VUI[an Materials Company October 13, 2000 Ms. Judith Wehner IUIIUI OCT , 7 2� Assistant State Mining Specialist Oemu Land Quality Section LgND pl)pLITY SECT D-EHNR P.O. Box 27687 Raleigh, NC 27611-7687 RE: Blasting Complaint— Lisa Hill North Quarry October 2, 2000 Dear Ms.: Wehner. Per your request, enclosed in duplicate are blasting and seismographs records for the complaint on October 2,,.2000 from Ms. Hill. 1 have included blasting records for one production shot conducted before and after the complaint shot date. If you need itional information, please feel free to call me at (336) 744-2014. Sin er icki D. Byrd Enclosures MIDEAST DIVISION/ P.O. BOX 4239 • WINSTON SALEM, NORTH CAROLINA 271154239 • TELEPHONE 910 767AMO UU11a • Materials Company Quarry lVa✓S Report No. r�— Date 11 Blasting Report y- g9-oo Type of Shot Ri.or d.'Y Exact Time yl: p Type of Material %'4e/.% Shot Grid f--��- 3 Distance -4 75' (Ft.) Direction IV Grid (To nearest occupied building neither owned or leased) /1 Seis. LocationNE ENTMWtt Dist, to Sets. J.$aj_Gnd KK1[:uR-9 a2 Seis. Location Dist. to Sets. Grid /3 Sets, Location Dist. to Seis. Grid Hole/Deck No. Delay Period Depth Slamming Total Pounds Pe* Holef0eck 3 i U rI 73C� 4 _ .?$ rO "G ,^,�'�L Maximum Number of Hales �r Type of Stemming G'7 lbs. Per Diameter (inches) 0 �✓ Face Height �O fDaloy v 03d� Spacing i5 Sub Drilling o20 Burden /� Number of Rows 3 Method of Firing ✓/Nf-tl Type of Circuit: Series Parallel Parallel Series Type of Delays: Downtime Ari SurlacoA/Z Trade Name ����✓U 9 7 G A fG „5 1 % roo I p xJ� r41 ab 10 f�/o r' - .O 91L r0 �'�� 10 /J3G ✓3' Epp _f 0 9fG r Z 10 916 Weather 73 clear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot E?`Warm ❑ Cold Wind From EJ N ❑ NE O East 0 SE — (check One) El/ S LIG SW ❑West ❑ NW O 7S� /9 -r'0� l9 L� _ —/- �� 19Z _ O 23G Fragmentation ❑ Excel ❑ V. Good ❑ Goad ❑ Fair ❑ Poor Backbreak El10 It. ❑ 20 ft. Q 30 1 El40 ft. ❑ 50 ft. or more S/ dr 10 (/ ?:� a'/� C+ Trade Name of Explosives Amount f r� / l Ix1'M �63a flu �./�✓ � o� Total j�(','j„%1 lbs.. Total Pountls /l J��Z PowderFactor >''� Gal of Oil 33 °b pit Co;Ww V N'1 men[ O • U/ Bench _e!Arir Grid Map Date r/-rZ-98 Scale Distance _5j L-3 Tons of Materials Produced Remarks: OR�GINA / n� , — J S pt. Sig �}�� Blaster Signature License or S.S. No.. M Typical Hole Show Primer\ Location ant Stemming Top of Bench Length (FL( of Hole Floor Level (Ft of Sub Drilling L. , --. pp . r t _ oA j9, (- Cis• _� _,L — �—. �.. ' jI �N ic9 3� ® � o C) O 3 dYve 0 M5Qp' Y � N o ✓• 6Y W � U � UL` O z J XQA- 5'ShI.LW0CA4PHS,U&4-Tel. 203-391-?466 VIBRATIONS ANALYSIS REPORT File name CIAn'WITMOAD FILES1EI-F,V7WJM4 =...mrrrf M etxsa: aux- r3usa rvxacx roa.:�.al NOMIS SIUS\IOGRAPHS Unit # :NS54001-2451 Date : 9/27/00 11:19:45 ANI Ctilstonier : VULCAN NORTH Location: NE ENTRANCE KKK-29 Company: T4451 Ivt3451 Operator: 3SB Dislaece (FQ: 1150 VIBRATIONS AmnliR.onnn 1 TdvoarM naSm/, Charge per delav (lbs): 737 v.-rtn, s,,,r r,.dd n iRR Channel Radial Transverse Vertical Velocity (ilds) 4<03.610M. 0.1 0.11. Frequency (Hz) .-29.#> __ .�,�33:7-a-.,_ _ �30F7x AccelerationO 0.038 0.017 0.038 Displacement (m) 0.0010 0.0005 0.0005 [:41uzTrigger (ins) * I30.3 140.6 13.2 Record time: 5.0 sec Sampling rote: 1024 EYs Number o(poinw5120 SculedDistance: 4236 ACOUSTIC .NnpliLcatiun - I Trigger (dB) , N Parameters Values S61ax Tugg Nr*))- Acoustic m psi O.00I1 243.2 mu 9causdNu dBN' 31i!6, -H_ Comments : ->SHOT OR1D: EEE-39-SHOT it86- AtMPLITUDE GRAPHS & FREQUENCY vs VELOCITY GRAPHIC Radial Turns. Vert. 6requencles(Hz) a�,a lan +++ NUM IS N3 5400 SERIES ++# • 27-SEP-OD 11:21:18 INSTRUMENT 2 NS540D1-2251 EVENT r 049 COPY 9 2 NOTES: + CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL ZZ-54 FEET 70 BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SETS TRIG (Ips): O.D3 SOUND 'TRIO (dB): N RECORD TIME: 5 RESULTS L T V PPV(in/s1 0.13 0.Id 0.16 FPd(HZ) 38.4 30.0 23.3 PeflkSound 108dBN 0.0007705i 344Z PD0n) O.00064 0.00050 0.00103 PPA(g) O.U17 0.03B 0.038 USUM/OSMRE REPORT FREQUENCY (HE) GRAPHICAL_ RECORD TIME= 1, 0:325 5Cc/in SOUND= 0.0028 psi/div L.I'.V = 0.25 Ips/dLv BLAST DATA CARD FOR QUARRIES Client: V U L C qN Operation: NORTH Client tl)k: V LA L Fjoz Date: 4 a7/0° Time: //:ad Shot: 86 Seismograph Loc.: Ynarr/a a..,' C P °E t '77 -S`i Blast Location: E C C •3 % - Distance: ) 5 75 Feet Max/Delay 7-17 velocity Frequmry RESULTS Longitudinal Transverse Vertical p.13 d /6 3r.1f I 71rj.lb ,3.3 Peak Maximum Air Blast Vibration i�o`�g'�Y Decibels o.! lWSM 3 V Hens 30.Hertz Seismograph Operator; SoHN'. 6AAc%)U< Seismograph Serial W. ;92i5I Transducer aa5 l Microphone anal Triggerlevels; o.v3 Comments: I 17 2000 OCTai DENR LAND QUALITY SECTION Wsec Henn e ### NDMIS NR 60L �GRIES 27-SEP-00 11:22:46 INSTRUMENT R N554C01-2362 EVENi n 070 COPY n 1 NOTES: # CUST'OMLR:VULCAN NORTH LOCATIOH:SOU'fHNEST CORNER FEET 10 BLAST: N L WDELAY: N OPFRATOR:JSO COMPANY: T2562 M2362 SEJS TRIG (iP>): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS ####Xk# MM-50 L T v PPV(In/5) 0.10 U.11 U.OS FnQ(HZ) 33.0 l4.A 16.5 ."PeakSeund 111dBN 0.001050bl 14HZ PD(In) 0.0004s O.{:)Oatl 0.0004n PPA(&) 0.02 U�fd62 U. 021 USBM/QSMRE REPORT FREQUENCY (HE) GRAPHICAL RECORD. TIME= 1 0326 SOWII)= 0.002a Psi/d 1J L,I.V = 0.25 tWdIv BLAST DATA CARD FOR QUARRIES Client V U L C RN Operation_ INo0.TH Client ID#: Date: v a'7°O Time: ItteU_ Shot: G C SeismographLoc.: Sov'THUEST CbriNLA corn-5o Blast Location: e c c - 3 % — Distance: 1925' Feet Max/Delay 73-Z_ Velocity Ffequamy RESULTS Longitudinal Transverse Vertical O • l A �O'"'/JI O.O S 33•o a4.4 16.5 Peak Sir Blast Dcdbcb / `i Hertz Maximum Vibration (O/SCC ar.v Hertz Seismograph Operator: SONN 8MCQU<: Seismograph Serial #.. a3 f�?. Transducer aL%, Microphone a ;a . Triggerlevels: 0.a3 — Comments: n uU OCT 17 2000 DENR LAND QUALITY SECTION ln/ c QS9! Uul[an . • Materials Company �� Blasting Report Quarry //Or-Fc Report No. R'/ Data rl - 9- 00 Type of Shot .>fe r S%V 0� Exact Time 1 o f ! Type of Material/a ✓• Bhot Grid rt r- 33 Distance _14Set (Ft.) Direction NE Grid elli (To nearest occupied building neither owned or leased) M1 Seis. Location NE WTAAKIl t. to Seis. 10511 Grid KiKii t2 Seis. Location Dist. to Seis. Grid +3 Seis. Location Dist to Sale. Grid Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck 63 /D t i.y 1 to _ /o 7 •� / /� 3S LS /O 835 'ro to 3 Maximum Number of Holes IS Type of Stemming /•.'/ lbs. Per Diameter (inches) 6 �'� Face Height 13 Delay Spacing Sub Drilling dv Burden /'f Number of Rows C;p Method of Firing ,Type of Circuit: Series Parallel Parallel Series Type of Delays: Down line fir/ / Surface / L g Trade Name �.✓5 'ten/ .'crud _ B 9 to 83.5 % /„t6 to 833 7G D &3G rt 5T to �36 /3 o G 83 ,t! /Y� /0 S3G /f /sw /G 8 ��,�.,,�� Weather ISclear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot Q�Warm ❑ Cold Wind From ❑ N ❑ NE ❑ East ❑ SE (check one) OS LYSW ❑ West ❑ NW rL /G/ /'/ /08 to &34. /8 ,95 (e3 D 83G Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 R. ❑ 30 ft. ❑ 40 h. ❑ 50 R. or more Trade Name of Explosives Amount YVAIr QKIeAld �s <tr /s. -I G3 Total /, j +�J lbs. Total Pounds eoj 'o a% Powder Factor Gal of Oil .9,3 %Oil Content Bench F/nor Grid Map Date z24-14 - �4 Scale Distance SQ.I Tons of Materials Produced ia�q� S- 6s Remarks: Distribution: Atlnist ��., n ��-2/r Pla t OIfL�hFui �l)ALITY SECTI Blaster Signalur _ i Sta -W Rep. License or S.S. No.: weovt<20 sev 2w2 Hole/Deck Delay Total No. Period Depth Stemming Pounds Per Hole/Dock Typical Hole (Show Primer Location and Stemming Top of Bench Length (FL) of Hole ocT i � Joao Floor Level DENR. LAND QUALITY SECTION Total Pounds _ (Ft) of Sub Drilling - Tons of Materials Produced - --- -- - NaVflS.5F-1S.W0GR.4PHS,US4 - Te2. 303-392-1466 VIBRATIONS ANALYSIS REPORT File nM,eCM'DOn OADF1aeSiFlmnm003.005 NOMIS SEISMOGRAPHS Tel:3J4, SS..D/55 Company'. T24?l A12451 Operator: JSB Distance (F¢' 1050 VIBRATIONS Amnfificalinml TriPPel'!Te 005 ink vecmr Snm 6n/cr n le 836 Channel Radial Tnusverse Vertical N%elecih' (iNs) 0.1 0.1 0.16 Fregwii" (11z) 22.9 17.3 46.1 Acceleration ( 0.017 0.062 0.14S Dis k•cernem(ur 0.0006 0.0007 0.0008 L*Nrcr?rigger (nq) * 154,3 6SA 136.3 I Radi. Record time: 50 sec Mabppddy e19L0.laCNALnW if''�1V3 Vvim'::,% Date : 2/10100 I0:14:07Anl Sampling role: 1024 Els Ntwtber o(points:5110 Scaled Disance : 36.31 ACOUSTIC Amplificaeon:I Tiigger(d6):N Parameters Yalues SMwTdager(*). Acousfic in psi 0,0022 1387.7 ins AcausllciudRF 117.6 -Hs Comments : ->SHGT GRIDEM38 SHGT487 AIVTPLI TUDE CTIAPHS dt FREQUENCY vs VELOCITY GRAPHIC 13 32 127 0 seconds 5.0 seconds Fmqueneies(Hz) Radial Trans. Vert. *** NOMIS NS 5400 SERIE 02-OCT-00 10:15:32 INSTRUMENT 4 NS54001-2251 I EVENT / 050 COPY 11 1 NOTES: M * CUSTOMER:VULCAN NORTH LOCATTGN:MATTHENS CHAPEL FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS TRIG (ips): 0.03 SOUND TRIG (CB): N RECORD TIME: 5 RESULTS tit z2-54 L T V PPV(i n/s ) 0.18 0.11 0.15 FPO(Hz) 51.4 21.3 48.8 Peek Sound 110dBN 0.00100psi 5511z PD(in) 0.00085 0.00061 0.0OU75 PPA(r) 0.188 0.01/ 0.145 USBM/OSMRE REPORT tRtR#xtxit *txR*t FREOUE.NCY (HZ) GRAPHICAL RECORD ********* ***"A TIME= 1.0325 Sec/in SOUND= 0.0028 psi/div L.'f,V = 0.25 ips/div BLAST DATA CARD FOR QUARRIES Client: V U L C AN Operation: woerH Client [DO: V u L rJ oz Date: !v oo Time: / a : /S Shot: & f ieismographLoc..* mArrn _'A ay(dt :-,-SI Blast Location: E E E- 3 1 Distance: 1650' Feet Maa/Delar d3 6 11 Vdu ity Frequrncy RESULTS Longitudinal Transverse Vertical 0.18 o•ff o•/ b 5f•4 a1.3 YB. f Peak Maximum Air Blast Vibration ' 1 Dedbcls El IwsecHertz Hertz Seismograph Operator: 3oHN' : 6A6ceQ< Seismograph Serial #: ;92. 5 ) Transducer 2a9L Microphone aasl Triggerlevels; 0.03 tin Hertz +## NOMIS NS 6400 SERIES 02-oCT-OD 10:16:58 INSTRUMENT G NS54001-2362 EVENT S 071 COPY 4 1 NOTES: # # CUSIOMER:VULCAN NORTH LOCATION:SOUIHWEST CORNER FEET 10 BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: I2362 M2382 SETS TRIG Ops): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS +++t++# MM-50 L T PPV(in/s) U.10 U.17 Fro(HzI 35�3 26.4 PeakSound 107aBN 0.00072PS1 PU(In) D. 00050 U,')UU63 PPA(gi 0,062 0.052 USBM/USMRE REPORT BLAST DATA CARD FOR QUARRIES Client: V U L C P Nj Operation: NOATH Client IDS:y U L Nos Date: (o/a /oi4 Time: (o � / 5 Shot: 87 Seismograph Lac.: SovTHvr<ST Blast Location: Cy YANER 61LA-5o EEE 3 8 Distance: a 07 51 Feet Max/Delay 83 to RESULTS Longitudinal Transverse Vertical v D.us veloi o.(q � C).la O.qS ItJxc 38,4 4Hz E"yueney 3S.3 Hertz 478.4 34.4 0.00040 0.041 Peak Maximum Air Blast Vibration 1 FREaur.NCY (Hz) GRAPHICAL RFCORO 'I IME- 1. U32'S se,V in SOUND= O.CU28 psi/div L T,V = 0 25 iPs/0 iv �-I Decibels 0 . 17 Idsee Hertz Hun Seismograph Operator: 3oHN 0 AA CQ r,G< Seismograph Serial # , a3 t a. Transducer 23N,a Microphone a3Ua Triggerlevels• UU11Un • 0 Materials Company // Blasting Report Quarry /Ya./// Report No. FS Date 1D - 3 - 00 Type of Shot � lN� Exact Time C: S / Type of Material �i6✓- 4 Shot Grid Distance !93o' (Ft.) Direction WE Grid fee- a (To nearest occupied building neither owned or leased) °1 Seis. Location Ni: fMAllil Dist. to Sets. tyR Grid SI 4 a2 Sets. Location Dist. to Sells. Grid •3 Sets. Location Dist. to Seis. Grid HolefDeck No. Delay Period Depth n Stemming Total Pounds Per Hole/Deck I p +per{/j rlkr f. /Jg! 2 ; o 3 3'f I/ e 5- eo �~ / 7S3_ Maximum Number of Holes Type of Stemming G? lbs. Per Diameter (inches) Face Height �� DI41Yy Spacing /9' Sub Drilling /'/ Burden IV Number of Rows �2 Method of Firing Vilaf..? Type of Circuit: Series , Parallel Parallel Series Type of Oelays: DownIllea l Surface . 2 /e7 Trade Name /✓ % • �� / % /o2 r 90 9 /3 // !%jG / G / //' q Weather Clear El Cloudy ❑ Rain 0 Snow (check two) ❑ Hot L'7 Warm ❑ Cold Wind From N 11NE ❑ East ❑ BE (check one) ❑ S L"J SW ] West ❑ NW Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 It. 0 30 0. ❑ 40 ft. ❑ 50 ft_ or more Trade Name at Explosives Amount a, enir� Total z'%a°33 Ibs. Total Pounds / / 333 � Or' Powder Factor /.3 Gal of Oil ->7? % Oil Co�ntent O/46 Bench f/��_G!I a /-/Z- 9? Scale Distance 5 Tons of Materials Produced /?OSCJ r.. Remarks. Stale Safety Rep. VMcx74 20 REV y92 License or S.S. No.: HolelDeck Delay Total No. Period Depth Stemming Pounds Per HolelDeck Total Pounds Tons of Materials Produced 1 tl + 1 Typical Hole Show Primer\ Location and/I Stemming of Bench 3th (Ft.) Ole 05W5 It wS Ir Level (FL) ob Drilling ' - NOUDEIS.kinvil0ONVI i FiN30 ooaa._. . I-. r• - -• 1 1 � L y , I _, . F T * � � i..._r r } I- , _ -j I� -J- -t � -- ` 1 �� ,wi � � -� •:- � t + ' i -I iL l1-4 Y�_ - 4 J 1-..•5�-r +• �'-7-r';" \ ^-FY-T'71; •�O v�-r T '�--� ��- J- I f 1 L. ..' ! � .;-i.T y .. I _L._:- I .'}_t i 1- �. L G-• 1 �i r ,-1 •,--� j jL i , ' _ � - - 1L � i tf i �.. I �J, 1 �-r f-1 1 _ r I ` t- i , t• i I t �-t -i { { {{{-� - I ��- I: rrL Jill l It�I T! .7 - 1 f L - if 1i { tI i - _ I r r - I { r TF 1 _ �_ _ 'i ?'• -}-�---fi_ [T 4-1 -( IL T1 _ L- i EL -t ' i 1. f. i- _ -r.1` ` �.� I-� -._�. }�t I�• - y1-•_-+-t- 1 I -I-� i f -' - I I.r f� , Fi t 1' �I-I } t � I • �I I I �-�i� 1 7 I - _ � �M�� .L•�-._i..T�l.. f ri- I 1 I -F I NOSJLS .SEl,91�OGR-7PHS.USf1 -Tel. . 105-592-2466 VIBRATIONS ANALYSIS REPORT File name C. I311-DOWVL0.4£i £ICES,EI-EYT"." NOMIS SEISMOGRAPHS ret:mxssaass Company: 7'245l M2451 Operator: JSB AmpGtication: l IN Dislance(FI)2 1050 VIBRATIONS Tnaam err n ns itik vpHn/ sll/n („✓,) fl IRR 736 Channel Radial Transverse Vertical Vuloclty(hds) 0.14 0.12 0.15 Frequency(Hz) 19.9 16.3 21.7 Accelnation ( ) 0.060 0.017 0.166 Displacement iin) 0.0009 0.0009 0.0011 femax Trigger ("14 196.3 132.5 103.5 .•..+ebpydd➢FdfM1AteG:'l. F�L\CYIIP-thb/w a'unor:.f.0) Date : 3/10100 10:56:31 A-M Record time: 5.O sec Sampling rate: 1024 E/s Number o(poims:5120 Scaled Dislance- 3S.18 ACOUSTIC Ainplitcatimr : I Trigger (dB) : N Pammeters Values SMac:Tneger(•): Acoustic in psi 0.0017 1035 ins Amuslk In dBF 115.4 -Hz Comments: ->SHOTGRM: DDD-38 SHOT488 AMPLITUDE GRAPHS & FREQUENCY vs VELOCITY GRAPHIC 10 0.1 0.03 • *x* NOMIS NS 5400 SERIES +xw 03-OCT-00 10:57:56 INSTRUMENT A NS54001-2251 EVENT # 051 COPY # 1 NOTES: CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL ZZ-54 FEET TO BLAST: N L.BS/DELAY: N OPERATOR:JSB COMPANY: 12251 M2251 SEIS 1RIG (ips): 0.03 SOUND 'rRLG (dB): N RECORD TIME: 5 RESULTS L T v PPV WS) 0.05 0.05 0.11 Frq(HL) 15.5 24.4 23,8 PeakSOUnd 109dON 0.00063psi SHz PD(In) 0.00059 O.UOU48 0.0005a 'PPA(B) 0.041 0. 041 0.041 USBM/OSMRE REPORT FREQUENCY (HZ) GRAPHICAL. RECORD *##+#*L** w#T**+ TIME= 1.0325 sec/in SOUND= 0. OL12U OSI/aiv L.T.V = 0.25 iOs/div ® ® BLAST DATA CART F� FOR QUARRIES Client: V U L C RN ENGINEERS, I N G. operation: N 4ECH.H Client ID#:VIA L_ N )a Date: (n Wri4o Time: lo:88 Shot: 9*9 _ SeismographLoc.: Yuk-7Ht\�'N cAAft:L- 51 Blast Location: 000 -1 A Distance: g130' Feet Max/Delay 756 velocity Flulumcy RESMTS Longitudinal Transverse Vertical O•eG D•o5 0.() IS.s a4.4 CO-f Peak Maximum Sir Blast Vibration `p9 DecibelsEl WSM 5 Hertz Hertz Seismograph Operator: ToNnr : 6 NP co u< Seismograph Serial W. ;926 51 Transducer 925i Microphone as t Triggerlevels: 0.03 — Comments: c LIUI OCT 17 2000 v DENR LAND OUALITY SECTION Intel Hertz +}* NOMIS NS 5460 SERIES 06-OCT-00 10:59cZZ-' INSTRUMENT C N354007-2362 EVENT A 072 COPY A 2 NOTES: } CUSTOMER:VULCAN NORTH LOCATION:SOUTHW[S! CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SETS TRIG O D6): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS }MRk}M} MM-50 L T PPV(in/s) 0.OR 0.D5 Frp(Hz) 3Z.0 28.4 PeAkSounu iOOBN 0.000H3psi PD(in) O.00043 U.DGO46 PPA(8) 0.041 0.041 USBM/nMRE REPORT }+4b Vkkk}A idb### �® BLAST DATA CARD FOR QUARRIES Client V U L C AN ENGINEERS, INC- Operation: N 131" Client HA V LAL rtlo7 Date: /143 0o Time: 14�58 Shot: 86 Seismograph Loc.:SouTHVEST 0o)ANLR mm-5o Blast Location 000 -29 Distance: 1�1oo FeeetMaax/Delay 5 t RESULTS V 0.04 Longitudinal Transverse Vertical 28. 4 Wsec 9Hz velocity O.O rn O.OS O,o`l O. DO034 Rau 0.02, Frequency 3a•� a a. a as. y peak maximum Air Blast Vibration FRFOUENCY (H[) GRAPHICAL RECORD ikb}AEA}h k%4*AA TIME= 1.0825 scc/rn SOUND= 0.0028 psi/div L.T.V = 0.25 ips/Uiv El DedbelsEl In/seeHertz Henn Seismograph Operator. So N N O AA CO a<.i , Seismograph Serial W. a3 U Transducer 23 r a Microphone a3 t•a . Trigger levels: 0.03 — . Comments: OCT 17 2000 UENR QUALITY NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ❑Iv1SION OF LAND RESOURCES October 3, 2000 Ms. Vicki Byrd Vulcan Construction Materials, L.P. P.O. Box 4239 Winston-Salem, North Carolina 27115 RE: Blasting Complaint North Quarry Permit No. 34-02 Forsyth County 1` Yadkin River Basin Dear Ms. Byrd: This office recently r ceived a complaint directed at blasting practices conducted at the above referenced quarry. According to the complainant, Ms. i rd, the vibrations produced from the blasts at North Quarry on June 29, and October 2, 2000 caused windows to shake and the power to the house go off. . As provided in the mining permit for this site, you are requested to provide to this office duplicate copies of all shot records related to the blasts conducted on June 29 and October 2, 2000, including any seismograph records made. Furthermore, please forward all shot information for one. production shot conducted immediately prior to and one production shot after the blasts in question for this office's review. I suggest you discuss this matter with Ms. Hill. Her address and telephone number are as follows, 5255 Germanton Road Winston-Salem, North Carolina 27105 (336) 767-1005 LAND QUALITY SECTION (9191 733-4574 PAX (919) 733-2876 GEOLOGICAL SURVEY SECTION (919) 733-2423 FAX (919) 733-0900 P.O. BOX 27687, RALEIGH, NORTH CAROLINA 2761 1 -7687 TELEPHONE (919) 733-3833 FAX (91 9) 71 5-8801 AN EQUAL 0PP4RTUN ITY/ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLE0/100/a POST -CONSUMER PAPER } • 0 Ms. Byrd Page Two I look forward to receiving the requested information in the near future. Your continued cooperation will be appreciated. Sincerely, 6j4l" Judith A. Wehner Assistant State Mining Specialist Land Quality Section cc: Mr. Matt Gantt, P.B. Ms, Lisa Hill MINE BLASTING COMPLAINT FORM NAME OF PERMITTEE: _I% M MINE NAME/MINING PERMIT NUMBER:(U&�4tj&mew COUNTY: COMPLAINAN75 NAME: _A. 2_llug _ :I- ''761 -IUDs ADDRESS: '50u S'5 C:7 _ & PHONE #: W � sv1 m A'�-j ail(K APPROX. DISTANCE OF COMPLAINANTS RESIDENCE TO MINE: DATES OF SEVERE BLASTS: WEATHER CONDITIONS DURING THE BLASTS IN QUESTION, IF KNOWN; NATURE OF COMPLAINT/COMMENTS: It Ia9wo S2�X&j AAaZ4 _r INVE5TIGATOR'S NAME: du) DATE COMPLAINT RECEIVED: J �T 247� C2S/L� 00P 0079![' 19 "" TO 4' ",I \)n�"4w�— ovo! �l� goyl Q9o7(`(��cL� g sic �1 is <—jvn �.ti ¢�i L.�a.�r �o✓ "� a/. I �4s�r S"G"l'� s'L"ice Qs�( �OOJp�b�i— 0! ' r1io' avp- g • � : .t. :,k.:<, , _ _..�`-; - '� �>� -. a •, . � . � r: •� "}, N. . ;.j � .. - - .,.T,.. - . . � . :.r � r �7• �. �._� .. '-[�--�� . L,, "i . .. , i:: .�•.... �5 5a /oob , ODE av a8 I b!1 lo_� `os �aa•3 (,r7)— aD1D ?ig..3 i .rasp 0.37 III /pqana_o_� i3s Ilya aa.a �!ss � �y iPf Ili l_G5�iSD5 Q /oSp �rOT 1: 111 rs 1 /voa i l_k4to I! ,oa J 1 I 4v ' a I 'I - I�1 Irl f'! 0F al li �Y �1 far Q T/ ;� i 1 cr • Is LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 48 Peak Particle Velocity Check: Date of Blast*: 06/01/00 Time of Blast*: 13:27 D = Distance to closest offsite occupied structure (ft): D* = 1000.00 W = Maximum pounds of explosives per delay (pounds): W = 529.00 SD = Scaled Distance: SD = D/W^0.5 SD = 43.48 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = �38- (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.26 DS = Distance from blast to seismograph (ft): DS* = 1000.00 d = Distance from blast to second location (ft): d* = 2250.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): Airblast (Overpressure) Check: PPV = V(DSId)"1.5 PPV= 0.0770 P = Unconfined Airblast/Overpressure (psi): P = 82 (DNVA0.33)"-1.2 P = 0.246776 To convert (psi) to (dBL): (P/2.9 x 10^-9)log x 20 P = 158.60 'R1-P4 r AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB= f123.60, (*max. limit in mining permit is: AB = /;2-e dBL) C",'- fla r 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1" = 2637.00 Total pounds of Explos. #2* = N/A Ratio between explosives = N/A Average pounds of explosives used per hole (pounds)" = 528.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 2637.00 Explosive #2 = N/A SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = N/A HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = N/A Explosive column height for each explosive (feet): Explos. #1 = 37.58 Explos. #2 = N/A Total explos. column height = 37.58 Stemming height used in shot (feet)* = 12.00 Total height of explosive column(s) and stemming in the hole = L498 Total depth of hole denoted on the blasting report for the shot in question* = r46`00 _� Analysis Completed By: Date: W • 0 e • LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 49 Date of Blast*: 06/05/00 Time of Blast*: 10:34 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1100.00 W = Maximum pounds of explosives per delay (pounds): W* = 296.00 SD = Scaled Distance: SD = D/W"0.5 SD = 63.94 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = 0I21? (*max. limit in mining permit is: V = 1.0 ips) ;- Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.15 DS = Distance from blast to seismograph (ft): DS* = 1100.00 d = Distance from blast to second location (ft): d* = 2175.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)"1.5 PPV= 0.0539 Airbiast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W^0.33)"-1.2 P = 0.174894 To convert (psi) to (dBL): (P/2.9 x 10"-9)log x 20 P = 155.61 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB=Z;7_12016�1 (*max. limit in mining permit is: AB dBL) Is Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 10860.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 296.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 10860.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 21.07 Explos. #2 = NIA Total explos. column height = 21.07 Stemming height used in shot (feet)* = 13.00 Total height of explosive column(s) and stemming in the hole =�'34.071' Total depth of hole denoted on the blasting report for the shot in question*- - 32.00t Analysis Completed By: Date: O LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 50 Peak Particle Velocity Check: Date of Blast*: 06/07/00 Time of Blast*: 11:25 D = Distance to closest offsite occupied structure (ft): D* = 1000.00 W = Maximum pounds of explosives per delay (pounds): W* = 536.00 SD = Scaled Distance: SD = D/W"0.5 SD = 43.19 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = 10 39-LI (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.34 DS = Distance from blast to seismograph (ft): DS* = 1000.00 d = Distance from blast to second location (ft): d* = 2150.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)ll.5 PPV= 0.1079 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W"0.33)"-1.2 P = 0.248064 To convert (psi) to (dBL): (P/2.9 x 10^-9)log x 20 P = 158.64 AB = Confined Airblast/Overpressure (dBL : AB = P (dBL) - 35 dBL (for quarry situation) AB= 123.64y1 (*max. limit in mining permit is: AB = dBL) C,Qu�✓ u/a.�✓ Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 12793.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 535.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 12793.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 38.07 Explos. #2 = NIA Total explos. column height = 38.07 Stemming height used in shot (feet)* = 13.00 Total height of explosive column(s) and stemming in the hole = `51r'07s" Total depth of hole denoted on the blasting report for the shot in question*=.�7.:004 Analysis Completed By: Date: 0 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 51 Peak Particle Velocity Check: Date of Blast*: 06/13/00 Time of Blast*: 11:25 D = Distance to closest offsite occupied structure (ft): D* = 1000.00 W = Maximum pounds of explosives per delay (pounds): W* = 487.00 SD = Scaled Distance: SD = D/W^0.5 SD = 45.31 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = cV36* (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.18 DS = Distance from blast to seismograph (ft): DS* = 1000.00 d = Distance from blast to second location (ft): d* = 2150.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV= 0.0571 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (DMI"0.33)"-1.2 P = 0,238823 To convert (psi) to (dBL): (P/2.9 x 10"-9)log x 20 P = 158.31 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB123:3.1 (*max. limit in raining permit is: AB = /��- - dBL) Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 10060.00 Total pounds of Explos. #2* = N/A Ratio between explosives = N/A Average pounds of explosives used per hole (pounds)* = 487.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 10060.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1* = 1.25 SPD for Explos. #2* = N/A HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)112 LD'for Explos. #1 = 14.05 LD for Explos. #2 = N/A Explosive column height for each explosive (feet): Explos. #1 = 34.66 Explos. #2 = N/A Total explos. column height = 34.66 Stemming height used in shot (feet)* = 13.00 Total height of explosive column(s) and stemming in the hole = •a47-66— Total depth of hole denoted on the blasting report for the shot in question* = >46:00— Analysis Completed By: Date: ! /5 0 • LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (' = denotes fields where input data is needed) Permit No.': 34-02 Permittee': 1.25 Mine Name`: NORTH QUARRY Blast Report No.": 52 Peak Particle Velocity Check: Date of Blast*: 06/13/00 Time of Blast": 11:19 D = Distance to closest offsite occupied structure (ft): D' = 1000.00 W = Maximum pounds of explosives per delay (pounds): W" = 363.00 SD = Scaled Distance: SD = D/W10.5 SD = 52.49 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V (`max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V' = 0.28 DS = Distance from blast to seismograph (ft): DS` = 1000.00 d = Distance from blast to second location (ft): d' = 2150.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)"1.5 PPV= 0.0888 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W^0.33)"-1.2 P = 0.212587 To convert (psi) to (dBL): (P/2.9 x 10"-9)log x 20 P = 157.30 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB=4122.30::� Cmax. limit in mining permit is: AB = �L ,8_ dBL) • E Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 10520.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 358.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 10520.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* T 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 25.48 Explos. #2 = NIA Total explos. column height = 25.48 Stemming height used in shot (feet)* = 14.00 Total height of explosive column(s) and stemming in the hole = 481 Total d6pth of hole denoted on the blasting report for the shot in question* = 36.00 Analysis Completed By: .r Date: 0 • LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name NORTH QUARRY Blast Report No.*: 53 Date of Blast*: 06/31/00 Time of Blast*: 09:08 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1025.00 W = Maximum pounds of explosives per delay (pounds): W* = 530.00 SD = Scaled Distance: SD = D/W"0.5 SD = 44.52 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = d Max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.40 DS = Distance from blast to seismograph (ft): DS* = 1025.00 d = Distance from blast to second location (ft): d* = 2250.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)41.5 PPV= 0.1230 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W"0,33)^-1.2 P = 0.239750 To convert (psi) to (dBL): (P/2.9 x 10"-9)log x 20 P = 158.35 AB = Confined Airblast/Overpressure (dBL)WdBL) B = P (dBL) - 35 dBL (for quarry situation) AB= 1233(*max. limit in mining permit is: AB = Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used, refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a'blend/slunry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1' = 9528.00 Total pounds of Explos. #2' = N/A Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)` = 529.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 9528.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1' = 1.25 SPD for Explos. #2" = NIA HD = Hole Diameter Used in Shot (inches): HD" = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)"2 LD for Explos. 91 = 14.05 LD for Explos.#2 = NIA Explosive column height for each explosive (feet): Explos.#1 = 37.65 Explos. #2 = NIA Total explos. column height = 37.65 Stemming height used in shot (feet)' = 13.00 Total height of explosive column(s) and stemming in the hole = pf1 50 isf Total depth of hole denoted on the blasting report for the shot In question" = t5:0 e0 Analysis Completed By: ��'v Date22" 4 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 54 Peak Particle Velocity Check: Date of Blast*: 06/21/00 Time of Blast*: 11:14 D = Distance to closest offsite occupied structure (ft): D* = 1050.00 W = Maximum pounds of explosives per delay (pounds): W* = 386.00 SD = Scaled Distance: SD = D/W10.5 SD = 53.44 II V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = h.0 28j (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.20 DS = Distance from blast to seismograph (ft): DS* = 1025.00 d = Distance from blast to second location (ft): d* = 2150.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV= 0.0658 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/W"0.33)1-1.2 P = 0.205435 To convert (psi) to (dBL): (P/2.9 x 10^-9)log x 20 P = 157.01 AB = Confined Airblast/Overpressure (dBL): jAB = P (dBL) - 35 dBL (for quarry situation) AB= 2210�1"y (*max. limit in mining permit is: AB = Q& dBL) Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used. use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 • = 11320.00 Total pounds of Explos. #2' = NIA Ratio between explosives = WA Average pounds of explosives used per hole (pounds)" = 385.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 11320.00 Explosive #2 = N/A SPD = Specific densities for each explosive: SPD for Explos. #1' = 1.25 SPD for Explos. #2' = N/A HD = Hole Diameter Used in Shot (inches): HD' = 5,75 LD = Loading Density (pounds per foot of column): LID = SPD(.34)(HD)^2 LD for Explos. 01 = 14.05 LID for Explos. 02 = N/A Explosive column height for each explosive (feet): Explos. #1 = 27.40 Explos. #2= N/A Total explos. column height = 27.40 Stemming height used in shot (feet)' = 14.00 Total height of explosive cmumn(s) and stemming in the hole=.t4L'90� Total depth of hole denoted on the blasting report forthe shot in question'=!41<00'` Analysis Completed By: I i f v Date LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 55 Peak Particle Velocity Check: Date of Blast*: 06/22/00 Time of Blast*: 10:08 D = Distance to closest offsite occupied structure (ft): D* = 1400.00 W = Maximum pounds of explosives per delay (pounds): W* = 343.00 SD = Scaled Distance: SD = D/W^0.5 SD = 75.59 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = T0.16 (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.10 DS = Distance from blast to seismograph (ft): DS* = 1400.00 d = Distance from blast to second location (ft): d* = 1850.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DSId)^1.5 PPV= 0.0658 Airblast (Overpressure) Check: P = Unconfined Airblast./Overpressure (psi): P = 82 (DIW^0.33)^-1.2 P = 0.138815 To convert (psi) to (dBL): (P/2.9 x 10"-9)log x 20 P = 153.60 AB = Confined Airblast/Overpressure (dBL)„ AB = P (dBL) - 35 dBL (for quarry situation) AB=-148:60� (*max. limit in mining permit is: AB = _j dBL) 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following.) Assumptions (per Ireco): If "straight' emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) _1.25 If "straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 10140.00 Total pounds of Explos. #2* = N/A Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 323.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 10140.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column). LD = SPD(.34)(HD)112 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 22.99 Explos. #2 = NIA Total explos. column height = 22.99 Stemming height used in shot (feet)* = 12.00 Total height of explosive column(s) and stemming in the hole = -34. . Total depth of hole denoted on the blasting rBFgrt for the shot in question* = 35.00 Analysis Completed By: Date: 0 L LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permiftee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 56 Peak Particle Velocity Check: Date of Blast*: 06/29/00 Time of Blast*: 09:34 D = Distance to closest offsite occupied structure (ft): D* = 1150.00 W = Maximum pounds of explosives per delay (pounds): W* = 486.00 SD = Scaled Distance: SD = D/W"0.5 SD = 52.17 V = Peak Particle Velocity (inches per second): V = 160 (SD)"-1.6 V = r::;0:29 o (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.21 DS = Distance from blast to seismograph (ft): DS* = 1150.00 d = Distance from blast to second location (ft): d* = 2250.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV= 0.0767 Airblast (Overpressure) Check: P = Unconfined Airbiast/Overpressure (psi): P = 82 (DIW"0.33)"-1.2 P = 0201783 To convert (psi) to (dBL): (P12.9 x 10^-9)log x 20 P = 156.85 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB�u12,1;.85-14 (*max. limit in mining permit is: AB = _ dBL) 10 • Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot: must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight' emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight' onto is used, use SPD (specific density) = 0.65 Ratio between explosives: Total pounds of Explos. #1' = 6960.00 Total pounds of Explos. #2' = N/A Ratio between explosives = N/A Average pounds of explosives used per hole (pounds)* = 470.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 6960.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. 01' = 1.25 SPD for Explos. #2' = NIA HD = Hole Diameter Used in Shot (inches): HD" = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)"2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 33.45 Explos. #2 = N/A Total explos. column height = 33A5 Stemming height used in shot (feet)' = 14.00 Total height of explosive column(s) and stemming in the hole =yr.4735--XL Total depth of hole denoted on the blasting report for the shot In question' = e45:00=4 Analysis Completed By: Date: s 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes Fields where input data is needed) Permit No.*: 34-02 Permittee*: 1.25 Mine Name*: NORTH QUARRY Blast Report No.*: 57 Peak Particle Velocity Check: Date of Blast*: 06/29/00 Time of Blast*: 13:59 D = Distance to closest offsite occupied structure (ft): D* = 1250.00 W = Maximum pounds of explosives per delay (pounds): W* = 880.00 SD = Scaled Distance: SD = DIW^0.5 SD = 42.14 V =Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = 0:40�- (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.15 DS = Distance from blast to seismograph (ft): DS* = 1250.00 d = Distance from blast to second location (ft): d* = 2050.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DSId)"1.5 PPV= 0.0714 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (DMA0.33)^-1.2 P = 0.230960 To convert (psi) to (dBL): (P12.9 x 10^-9)log x 20 P = 158.02 AB = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB�P-123.,02 (*max. limit in mining permit is: AB = dBL) Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight' emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 13020.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)" = 880.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 13020.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.25 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.75 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)"2 LD for Explos. #1 = 14.05 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 62.63 Explos. #2 = NIA Total explos. column height = 62.63 Stemming height used in shot (feet)* = 12.00 Total height of explosive column(s) and stemming in the hole = M6325' Total depth of hole denoted on the blasting report for the shot in question* = C:70"00 Analysis Completed By: Date: v(/ 0 0 Uul[un Materials Company June 30, 2000 Mr. Tony Sampler Assistant State Mining Specialist Land Quality Section D-EHNR P.O. Box 27687 Raleigh, NC 27611-7687 RE: Blasting Complaint — Lisa Hill North Quarry .tune 29, 2000 Dear Mr- Sampler: J I'� JL 2000 LAND DENR OUALI7Y Per your request, enclosed are blasting and seismographs records. These reports include the complaint date and two weeks prior. If you nepd'additional information, please feel free to call me at (336) 744-2014. ly, D. Byrd Enclosures MIDEAST DIVISION 1 P.O. e0K 4229 - WINSTON-SALEM, NORTH CAROLINA 27115-4239 - TELEPHONE 910 767,4600 Uukan • • Materials Company Blasting Report Quarry �Lo�//� Report No. S�8 Date _ra- //=O0 Type of Shot �/�4 F✓ Exact Time 13: d 7 Type of Malarial .yN��%< Shot Grid �'CC-35 Hole/Deck NO Delay Period Depth Stemming Total Pounds Per Hole/Deck Distance f BUJv (Ft.) Direction NE Grid PPP-@ (To nearest occupied building neither1owW9rned.or [eased) K1 Sells. Location 91E COR11tE0.Dis1. to Sea. Grid � Grid KK-J y��. °2 Seis. Location Dist. to Seis. Grid #3 Sets. Location Dist. to Seis. Grid 1 67 i 318 Z ./z AW "` a Sag 3 9 Q D 2P x �y���.n[� Maximum Number of Holes Type of Stemming d lbs. Per Diameter (inches) Face Height lO9 Delay. r 'VA Spacing /V� -�. Sub Drilling -3 n�' Burden lel Number of Rows Method of Firing 002f lS Type of Circuit: Series Parallel Parallel Series Type of Deisys: Doww�n®®lin�ece Y2 /-��// Surfa,% Trade Name FNJi Al GdY!/`JC� ai % ZS' 6 140 $2& 9 S9 S18 09 sz r3 11,7 ,y8 fI4, Z S d9 0 �d Weather IeCClear ❑ Cloudy ❑ Rain ❑ Snow (check two) Lw Hol ❑ Warm ❑ Cold ❑ N ❑ NE 1-1EastElSE Wind From ,�! (check one) ❑ S Lkl SW ❑West ❑ NW 4 9Z 628 /9 ' 28 8 mod' sag ( / 9 Je / S.Z!j dO ,8 ZQ Fragmentation ❑ Excel ❑ V. Good Q Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 ft. ❑ 40 a. D 50 ftor more .xtr ay-9 24 Trade Name of Explosives Amount ✓� nr� l�u�aar/ 57• Total 6iIP�G�,'� .O�nI , lbs. Total Pounds Powder Factor / '/% Gal of Oil d f % Oil Content ena I Bench bon Grid Map Date ,I-/Z-42 Scale Distance _4,3 Tons of Materials Produced y8'/ wi:5 Remarks: Distribution: Administrative Dept — ORIGINAL Plant Office File Si State Safety Rep, Blaster Signature-p License or S.S. Nn.: ViA M REV 392 n Total Hole/Deck Delay Depth Stemming Pounds Per No, Period HolelDeck Total Pounds Tons of Materials Produced I Typical Hole Show Primer\\ Location and Stemming Top of Bench - Length �_ (Ff.) �,.L. I _.. .. ..... of Hole 1 .. 4 Floor Level 3 (Ft.1 of Sub Drilling i... - +++ NOMIS NS 540 0 SERIES 01-JUN-00 13:28:22 INSTRUMENT t NS54001-2328 EVENT t C73 COPY p 1 NOTES: CUSTOMER:VULCAN NORTH LOCATION:NORTHEAST CORNER KKK-29 FEET TO BLAST; N LBS/DELAY; N OPERATOR:JSB COMPANY: T2328 M2328 SETS TRIG (ips); 0.03 SOUND TRIG. (0): N RECORD TIME: 5 RESULTS #++###+ L T V 'PV(In/s) 0.15 0.11 0.26 rq(HZ) 14.2 12.5 38.2 eakSOUnd 107d0F 0.00088psi 68Hz 0(In) D.Do12B 0.00096 0.00120 PA(9) 0.038 0.038 0.290 USBM/OSMRE REPORT FREOUENCY (HZ) GRAPHICAL RECORD TIME= 1.0325 sac/in SOUND= 0,0U28 psi/niv L,T.V = 0.5 ips/div ..__I_...,_ ).__ __Y—_... _,_.__, • BLAST DATA CARD FOR QUARRIES LaClient VUL c pn! ENGINEERS, INC. Operation: N o &TH ClientIDB: VULNp1 Date: 6 / N* Time: 3► 'a-1 Shot:_ SeismographLoc.• NE Coati Ea Blast Location_ C t t_-35 k i,1A0'0, 10 Distance: Feet Mas/Delay S a 9 ►-�- Fmquamy RESMLTS Longitudinal Transverse Vertical ,o';'Z. lw.9 12.5 ti/ 3t.2 Peak Air BIaSt G S Hertz maximum Vibration Ea w�He= Seismograph Operator. UbWf 6NOGo6K Seismograph Serial M. a3aL$ Transducer 2321Microphone a3 l Trigger levels: 0.03�- Comments: wrt NOM4S NS 5400 SERIES 01-JUN-OD 13:29:36 INSTRUMENT i NS54001-2362 EVENT % 030 COPY ! 1 NOTES: t t CUS T OMER: VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SEIS TRIO Cps): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS R RtwRwR r!t MM-50 L T V PPV(in/s) 0.03 0.03 0.02 Fr0(Hz) 28.4 28.4 73.1 PeakSOund 108dBF 0.00077pSi 3Hz PD(in) 0.00015 0.00017 0.00007 PPA(9) 0.062 0.062 0.062 USBM/OSMRE REPORT ttttRtl4kR R.At tii FREQUENCY (Hz) GRAPHICAL RECORD t RttRt 4+t ttttt! TIME= 1.0325 sec/in SOUND= 0.0026 psi/div L.T.V = 0.25 Ipe/div U L1 e IM ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client UULCINN Operation: NORM Client mN: V U L Nos Date: 6 If 1 oe Time: t3 ; 21 Shot: W_ Seismographlooc.• 5W GoRNER Blast Location: CCC.-35 Mr-gr7m � Distance: A'S ' Feet Maa/Delay $a EJ =0 Fmgnuwy " k 1 P*ak maximum Sir Blast Vibration Decibels H IrisesHertz Hertz Seismograph Operator: :TbEfK 6AOco6K Seismograph Serial #: 3 j r 9 Transducer 3362 Microphone 9340 Trigger levels: 1 o Comments: to/ssee **F NOMIS NS 5400 SERIES i** • 01-JUN-00 . 13:22'15 INSTRUMENT # NS54001-2251 EVENT # 003 COPY # 1 NOTES: + + CUSTOMER:VULCAN NORTH LOCATIDN:MATTHEWS CHAPEL ZZ-54 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SETS TRIG (ips): 0.03 SOUND TRIG (0): N RECORD TIME: 5 RESULTS L T V PPV(in/s) 0.04 0.06 0.03 Fr0(Hz) 57.0 20.0 45.5 PeakSound 111dBF 0.00110psi 4Hz PD(In) 0.00014 0.00025 0.00018 PPA(g) 0.062 0.052 C.082 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L.T.V = 0.25 IpS/div ULM � ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client WI. C 1w Operation: N CRTM Client ID#: VULrV% Date: C r ao •lime• /3: 91 Shot: qg_ SeismographIdoc.: ►71ATTHf cHAPLi Blast Location: CCC.-35 Distance: 14,ib"cfrfl Feet Max/Delay 5a1 a wie way;, Fmqumcy ix 1 o• 04 �0_0�6;,� 0•03 5"I•a C7a.a 9C-s Peak Sl[ Blast: Deabcb y Hertz Wax imam Vibration El �SeOHertz Seismograph Operator. 7WIr( BAGCOLK Seismograph Serial It 012s f Transducer aas, Microphone d@751 Trigger levels: o.o Comments: In/Sm I Blasters Safety Checklisto� no MeM M�enal CAN Nc AOre eowxr.ml �� // /J / Location /yr9 /�/"L/'� Blaster Dale l^/—QV Truck Number �Q Pre -Blast Checks Inspect blast site for hazards such as operating equipment, loose rock at lace, / stray current, Nghmall hazards, etc. Review Drillers Log / Review seismogram from previous blast in area Determine distance to closest non -company dwelling 9 rwT Method CPS Grid Tape Aerial Photo Mine CAD CUP DENSITY CHECKS (d PER DAY) Check holes for blockage _�� CHECK t 2 3 DENSITY Checkladjust depth of holes / // PRODUCT %EMULSION Profile front row holes for burden Method Tape 8 Polo BLEND Quarryman Laser Proofiler7 F REPUMP Loading Checks Establish blast site security / Determine neadfuEl¢e humans at free face / Adjust front row leading as needed / Adjust column heightlstem mirg based on drill log andor visual observations of color region Final inspectionof ce and hookup check for ginger C �/ nitiatian sequence and hookup G)/� Post Blast Checks Waft for post blast fumes to dear, / check for misfires Cheek she seism c datahazards Review seismic date p� Review video of shot ✓ DNP98 4 dd p d I LIZ—. 4 4 I d -i4 I I d P I -:-I- d I I F rrt. r D woo I r 4. — (D I Rep Li—;d 4 r I —14 L —d L r 4—� r d L L �2 r, rah 6.15r/. I z d k —d 1-4- 4— t=—TI + I r PIP'd p 41 14 f=,, ppp I P d I p ... L, d - - .. I . . . I I p d — I I 4 1 1 p itri 'llpl: 7---t7 i 7 I I I I ;j k p r d d k + 7� �7 d p k P I r �T p 4 1 7r- 44 k p k—� p UI[Un Materials Company Quarry Report No. y9 Date O Blasting Report Type of Shot Exact Time 0 3 Type of Materiel / _ Shot Grid Ifzl Distance 5au' (Ft.) Direction NE Grid PPP' Q (To nearest occupied building neither owned or leased( INra K 01 Seis. Location NE [.1391110C M1DIst. to Seis. /%oo Grid XX"r� •2 Seis. Location Dist. to Sets. Grid •3 Sets. Location Dist. to Sets. Grid Hole/Deck Delay Period Depth xx Stemming d0 Taal Pounds Per Hole/Deck No a9G 2 Q ,5 2 a9S O _ 3 a95 S /3 .795 M1aq Maximum Number of Holes � 14 Type of Stemming /-7 Ibs. Per P-' ` Delay Diameter (inches) N Face Height "Al �dae1./ �yun, Spacing /3 Sub Drilling 3 e.b Burden l3 Number of Rowa Method of Firing Yo/<-CYS� Type of Circuit: Series Parallel Parallel Series Type of Delays: Do/wnline ¢ / Surface Trade Name/��,T C71 •7 a /S a9S 8 3 a9S //.3 a9S o / a9S 3 a9S" iY g a9S x3 a9S" Weather ❑ Clear IE'Cloudy ❑ Rain ❑ Snow (check two) [R"Het ❑ Warm ❑ Cold Wind From ❑ N El NE ❑ East ❑ BE (check one) ❑ S LYSW ❑ West ❑ NW 14 / —/ /3 ep9.S 17 /,% 3M� iA /3 a9S / 9 a ao _ /3 a% Fragmentation ❑ Excel 0 V. Good ❑ Good ❑ Fair ❑ Poor- Backbreak ❑ 10 H. ❑ 20 ft. O 30 ft. ❑ 40 a. 0 50 ft. or more Trade Name of Explosives Amount a 3 -� 9/0 5d. ao � 5 13 yiG a9 13 ova 3D - l3 a9G 3l opz Total 093.,rpl tbs. Total Pounds r . Powder Factor /,6 Z Gal of Oil % Oil Co to ent od/ Bench r_laa Grid Map Date //- /9' -98 Scale Distance 81 Tons of Materials Produced / 4 986 Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Stale Safety Rep. _ Blaster Signature..��Zl�-` License or S.S. No.. VUG 7420 REV =Room ®�A®RSA Typical Hole Show Prier Location and /f Stemming Top of Bench Length of Hole Floor Level (Ft.) of Sub Drilling is �lir-I IF r, i u *** NOMIS NS 540D SERIES ww* 05--OUN-DO 10:33;53 INSTRUMENT a NS5400I-2328 EVENT 6 074 COPY W 1 NOTES: x * CUSTOMER:VULCAN NORTH LOCATION:NDRTHEAST CORNER K'NK-29 FEET TO BLAST: N LBS/DELAY: N OPERATOR:OSB COMPANY: T2326 M2328 SETS TRIG (ipS): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS L T V PPV(in/s) 0.10 0.10 0.15 Fro(Hz) 28.1 34,1 44.4 PeakSound 102dBF 0.00040psi 70Hz PD(in) 0.00060 0.00047 0.00042 'PA(9) 0.038 0.017 O.16S DSBM/OSMRe REPORT FREQUENCY (HZ) GRAPHICAL RECORD TIME= 1.0325 sea/in SOUND= O.OU28 psi/div L.T.V = 0.25 ips/div UL1 le IM ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client UULGIIM Operation: Noalit Client mif: V u" 1V o a Date: ra h5 oo Tittle: I o' 3 4 shot. y9_ Seismograph Loc. N f CAAN E R Blast Location: Frr-3ck u Distance: //;0 �, Feet Max/De Iay 24G Velocity Ftequalcy RESIULTS Longitudinal Transverse Vertical )af� o15,',. a8•t 34.t yY•Y Peak Wr Blast fl DeibehHertz Maximum Vibration lw El Hertz Seismograph Operator: 31341 BAOcocK Seismograph Serial lk a3 i + Transducer �378 Microphone a3a8 Trigger levels: e• c Comments: _ t Wsec w4 NOMIS N0-54%,SERIES 05-JUN-n0 10:37:05 INSTRUMENT II NS54001-2302 EVENT # 031 COPY 6 1 NOTES: w w CUSTOMER:VULCAN NORTH LOCATION:SUUTHkESi CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SEIS TRIG O ps): .03 SOUND TRIG (de): N RECORD TIME: 5 RESULTS xxx MM-50 L T V PPV(In/s) 0.03 U.US 0.02 Frp(Hz) 34.1 36.5 25.6 PeakSound 107dBF 0,00066psi 5Hz PD(in) O.00O25 0.00032 O.00016 PPA(g) O.U62 0.041 0.041 USBM/OSMRE REPORT 44w4#4#4## #4w+## FREOUENCY (Hz) GRAPHICAL RECORD ##4#444#k #4w 4+4 TIME- 1.0325 sec/in SOUND= 0.0020 psi/div L,T,V - 0.25 ipS/div on IIn e MIIIIMF ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: VULCft" Operation: N oRTI-I Client m#: V UL Ill V T Date: 6 /S Oro Ti.,: l at 34 Shot: 4_ SeismographLoc.• SW CORNER Blast Location: F Cr F • 34 (=, 7^ Distance: Lq f `%/Feet Mas/Delay ate_ 1. dw« - ,4 O.o3 a � P O0.02 3Y.1 3 6 a5• b Pear Maximum Sir Blast Vibration Efl hd= Decit+dsH Hertz Hertz Seismograph Operator. 3DF1K 6AGcotK Seismograph Serial W. 9342 Transducer j3 6') Microphone a3 62 Trigger levels: o .c Comments: L� ++>« NOMIS NS,rQO SERIES +++ • 05-JUN-00 10:34:56 INSTRUMENT r NS54001-2251 EVENT 4 005 COPY t 1 NOTES: + + CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL ZZ-54 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JS6 COMPANY: T2251 M2251 SETS TRIG'(Ipe): 0.03 SOUND TRIG (d8): N RECORD TIME: 5 RESULTS itrtri tt L T V PPV(in/s) GIGS 0.10 0.05 Frq(Hz) 20.0 27.0 16.0 PeakSqund 102dBF 0.00040PSi tOHz PD(in) 0,00643 0.00060 0.00040 PPA(6) 0.082 0.017 0.002 USSM/OSMRE REPORT FREQUENCY (RZ) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 I)Wdiv L,T,V = 0,25 I0s/div s e n 211 BLAST DATA CARD FOR QUARRIES Client vuL c ary ENGINEERS, I N C. Opemion. arOA TH Client11)9 VULfVpj Date: ra5 ov Time: 10:3Y Shot: Y9 Seismograph Lee.: ItMATrPfWS CHAtt:t. Blast Location: . FF F - 39 Distance: l;JP ;—. Feet Mas/Delap_�Q r valwXy F1equency RESULTS Longitudinal Transverse Vertical O.o(, o.pg /t;.o ftak Me Blast l 3 Danes ,. J9 1 o Hertz Maximum Vibration W= Ej Hertz Seismograph Operator: SOHK 8g0006K Seismograph Serial #: as S 1 Transducer aa51 Microphone a051 Trigger levels: a• o Comments: lwI Blast Safety Checklist Crna Ne M fedmcn4 Inc, Mi MmnwnW naY 011ry Nc Man rowel-urt Location /l/O e' l Blaster "f �TC�G,r✓� Date In —,J — G9Cn Truck Number Pre -Blast Checks Inspect blast site for hazards such as operating equipment, loose rack at face, stray current, Nghwall hazards, etc. Review Drill Log / Review seismogram from previous blast in area Determine distance to closest non -company dwelling Method GPs _ Grid Tape Aerial Photo Mine CAD Check holes for blockage Checkladjust depth of holes Profile front row holes for burden Method Tape & Polo Quarryman Laser ProNer CUP DENSITY CHECKS 13 PER DAY) CHECK 1 2 1 DENSITY PR00UCT %EMULSION BLEND REPUMP Loading Checks Establish blast site security Determine needful harrow at free race Adjust front row loading as needed Adjust column heightfstemmirg based on dial log anclar visual observations of col region Final inspection of blast to check for proper A/ initiation sequencer and hookup Post Blast Checks Wadfor post blast fumes to dear, check for misfires Check site for hazards ' Review seismic data / Review video of shot DNP 98 04 77 --.77-1 7 -A 7:- Ez 712 HAYS -T ............ 7 vt ;j I i 1 Lot; to 4, .99 1-4 44- PAR Kill 2 J71 j -14 1 Vi 2 Of 7., P-77 .0 Ain T -7- 00. .4 1---- -4-.; 4 ' j- J4- Q4Q 1- &.-J4-LA4--L- 44-i 4 L �4 TJ =771 T-4-y= p L + J --i 7 -4 44- T7 iq ta2j, Tj W._., -r_v .. , i_ _.. ..L�'� .�� ' . - t-H F7- Fyj Q-7 7 i7 7 c-Al 1 4-- t I 14 JFT x 4 o,I 444t- 11ToMY L-- 4-11 ;-T H. Vullan • • Materials Company Blasting Report ]uarry A/V r-.}3 Report Ni Date / - 7 - .2 000 Type of Shot jornryar_4 ion Exact Time I I' d.5 type of Material �i!'Qq �J< Shot Grid C' 3 Nstance 165V0 (Ft.) Direction NE Grid PPP- (To nearest occupied building neither owned or leased) 01 Seis. Location NE CoAN(Itlist. to Seis. I O�J• Grid KI<K- a9 r2 Sets. Location Dist. to Seis. Grid r3 Seis. Location Dist. to Seis. Grid Hole/Deck Delay Period Depth Stemming Total Pounds Per Hole/Deck No. 7 ~ 4t•�� /f3% v 3 'S ,S0 M 51@t � 7Maximum lumber of Holes Type of Stemming _t¢� lbs. Per t J ill Dcla"4'r„ )iamete! (inches) 5lI Face Height y � � 3y� 3pacirg /n/ Sub Drilling 3urden /y Number of Rows .3 ethod of Firingf ,ALO•✓��TyDe of Circuit: Series Parallel ereliefSeries Type of Delays: Downline :35 O Surface rrade Name .✓113 ffkkPordZ/1 J 8 00 ID qa 3 /S Weather I21�claar ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot Warm ❑ Cold Wind From 0 N ❑ NE ❑ Fast ❑ BE (check one) ❑ S ❑ SW O West ❑ NW ) /9 of O Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Pcor Sackbreak 0 10 h. ❑ 20 ft. ❑ S0 ft. ❑ 40 a. ❑ 50 h. or more a3 Trade Name of Explosives Amount ,r fi7rjj. Taal 8 /i I lbs. Total Pounds I 8 1 ' Powder Fa��ctoor�r,,,/. 37 Gal of Oil _013 %Oil Content • I Bench _tp�t�Grid Map Date // /.--R9 Seale Distance 1 Tons of Materials Produced /7. L31 Remarks: Distribulion: Administrative Dept. — ORIGINAL I/1 //JJ Plant Office File Supt. Sig. >i Blaster Signature Slate Safety Rep. License or .S. No vuwn. m Rev W Total Pounds Pounds Tons of Malerials Produced - �- 4 1 }I1_ Typical Hole t..l r I i (Show Primer I Location and Stemming ) Top of Bench I r._ 1. 7 i_. j 3l t+enm:S , I :- �7),.l tJ 1l. I ,II C Length 7 (Ff.) 9 ��.-.-- ' of Mole 14 I Ih t i 1 1 y go u+e� ;W r f !3 ,,. l itl r l TI. is O Floor Level . , —� (Ft.) of Sub Drilling I: *** NOMIS R� SERIES +++ 07-JUN-00 70:24:10 INSTRUMENT 9 NE54001-2328 EVENT # 075 COPY # 1 NOTES: * * CUSTOMER:VULCAN NORTH LOCATION: NORTHEAST CORNLS KKK-29 FEET TO BLAST: N LOWDELAY: N OPERATOR:JSB COMPANY: T2328 M2328 SEIS PRIG (IDS): 0.03 SOUND TRIG (d8): N RECORD TIME: 5 RESULTS • L T V PPV(in/S) 0.20 U.15 0.34 FrOW 10.0 35.3 22.0 PeakSound 107dBF 0.00072pSi B1Hz PDun) O.DO21U 0.00102 0.00153 PPA(S) 0.060 U.060 0.287 USBM/O:iMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sea/in SOUND= 0.0028 psi/div L.T.V = O.B ip5/div • nCmm �® ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client VUL C AN Operation: NOATN Client ION: VUL Al m Date: 6h cv Time• ryas Shop 59 SeismographLoc.• NE CJWW&A _ Blast Location: Distance: li000 a Feet Mar/Delay 53 C u a BESMTS Longitudinal Transverse Vertical lo, 0 35.3 9210 Peak Sir Blast a DecibelsHe= maximum Vibration taken 0.3y Raa,o Kau Seismograph Operator. 3OFfel 6AO GocK Seismograph Serial #: a3w Transducer 3-9 t Microphone �. 2�_ Trigger levels: 10'o3 . Comments: t lwd #ff NOMIS NS 5400 SERIES 07-JUN-00 10:27:22 INSTRUMENT 4 NS540CI_2362 EVENT 4 032 COPY 4 1 NOTES: CUSTOMER', VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSO COMPANY: T2352 M2362 SEIS TRIG 0T)S): .03 SOUND TRIG ((JB): N RECORD TIME: 5 RESULTS #4Y4H en ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client ut.lt_e.Ar4 Operation: NoRrI4 Clientm9k VUI.No.2 MM-SC Date: 6/7 0o Time: 102S Shot: So L T PPV(in/5) U.03 0.06 Fro(Hz) 42.7 34.1 PeakSound 108dBF 0.00008pri PD(in) O.00038 O.000'Id PPA(6) 0.08Y U.041 USRM/OSMRE REPORT FREQUENCY (HZ) Seismograph Lot.: Sk4 rUQA iU CA Blast Location: CC C - 35 '•1n Distance: of f $g' 7 Feet Max/Delay 5 3 6 RESULTS LOagitadmal Transmse Vertical V 0.03 O . V'S l ;i iT'+rh��-7, Oy03;"a! Wsec 0.09 51.2 Velocity Hertz 214z Frequa y 0.00012 0.041 leak Maximum Air Blast Vibration GRAPHICAL RECORD TIME, 1.032.5 boelin SOUND= u.0U28 psi/div i.,.T,V = 0.25 Ips/div ilp Decibels w 9': aHertz El IdSCe Hertz Seismograph Operator. 3bHr( BHOcot.K Seismograph Serial W. a) 6 A Transducer 236' Microphone a369 Trigger levels: o• o) Comments: *** NOMIS NO 5400 SERIES #*# 07-JUN-DC 10:25:13 INSTRUMENT S NS54001-2251 EVENT t Doe COPY 4 2 NOTES: x # CUSTOMER:VULCAN NORTH LOCATION:MATTHEMS CHAPEL ZZ_54 FEET TO BLAST: N L85/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS TRIG (IDS); 0.03 SOUND TRIG (d3): N IECORO TIME: 5 RESULTS WWrt}rtxrt L T V PV(in/s) 0.05 0.06 0.04 r0(HZ) 42.7 18.3 so I askSOUnd 113d8F 0.00132psi 41-fZ O(in) 0.00018 0.00047 0.00027 °A(5) 0.041 0.052 0.041 USSM/OSMRE REPORT W rtrt rt#W##rt# w##kW# .4 FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/di, L.T.V = 0.25 i0s/div e PLO ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client \JUL C fw Operation: NORTH Client Dili: VULU p,= Date: ra7 0 Time: /f�95 Shot: So Seismograph We.: 111AYTHE s CNAPA - Blast Location CC C- 3 -5 Distance: 1401z( Feet MaWDelay 53e Fmqumcy RESULTS Longitudinal Transverse Vertical eta. t 1 1r.3 peak Sir Blast 3 Deabets Fr; `1 Hertz WaxiZIOLUM WirbratloII L&SM El Hertz Seismograph Operator. a'bLln( AAOLocK Seismograph Serial Ft: as 5 l Transducer a a 5l Microphone a951 Trigger levels: o, c2)- Comments: wSm HMOs Blasters Safety Checklist ,aee.ww,r.. owac>nw LacatlonBlaaltt p Dale W-%-c?000 Truck Number Pre -Blast Checks Inspect bled site M hazards such as operating equipment, Icoss nick at face. cozy Covent higheall hazards, etc. Review Drillers Log / Ravle a seemogram from previous blast in arm L/ Datznrwn dntsns o closest noneempany dwelling ✓ Method Placement of wgm and safety cans erromld shot Pimbnent d markers of Comet Check hubs for blockage ChecF/adjust depth of holm Compare dd loge with norm or ltrehllgM Pmflk+ fresh cow holes For burden s//�_ MelMd 1 Loading Checks Determine neeMddize hamese M free face Density checks for blend products Adjust front row loading as nailed Adjust column heightlstemming based on tlrill log and/or visual observations of collar region Final inspection at West to check fin proper initiation sequence,Each connection physically chased by blaster and helper Post Blast Checks Waft for post blast genes to dear. check for misfires Check she for hands Review seismic date _ 4 Review video of shot �— DNP 98 T - - - - --_ - { - r _ ''t-I r L (+ + Uukun Materials Company s Blasting Report Quarry //O ✓vr ` Report No. O / Date 4en ,13 O0 Type of Shot A M A t / Exact Time %) 7 S // Type of Material 490' rZ✓• �' Shot Grid a ee - 3 Distance 17 SQ (Ft.) Direction N F Grid pf-? f (To nearest occupied building neitherownedor leased) •1 Sets. LocalionrllF rV CoALA Dist. to Sets. ZO�OH Grid KKK — It M2 Sets. Location Dist. to Seis. V" Grid •3 Sets. Location Dist. to Sets. Grid Hole/Deck Delay Period Depth Stemming Total Pounds Per Hole/Deck No. _,Y P` r,1) Al$(o z Ai •''" 4p '• g� 3 /O l3 H8G O 03 y8G / 2f �86 Maximum Number of Holes ✓ Type of Stemming / All�7 los. Per Diameter (inches) �46 /045 Face Heigh) �y0�, Spacing Sub Drilling .S Burden / Number of Rows -� Method of Firing YAe-z Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline// S dace Z dS _ Trade Name ✓ - / 77 3 �/87 $ /S% � 4 /3 /3 - /!g /6 /O 3 xy y' / qB,7 1 / 3 3 •/B'� r .J /3 y8�7 r�Y Weather ,/Clear 1-1Cloudy❑ Rain [I Snow (check two) 27 Hol ❑ Warm ❑ Cold ❑ N ❑ NE ❑ East ❑ SE Wind From ,—,/ (check one) ❑ S IA SW ❑ West ❑ NW y6 C2 /' 89 / dl 1 l3 H8� i9 e� /S H87 Fragmentation El Excel ❑ V. Good ❑Good ❑Fair ❑Poor Backbreak ❑ 10 0. ❑ 20 1t. ❑ 30 ft. ❑ 40 A. ❑ 50 f1. or more al as9 13 $/ Trade N e of Explosives 4.11 Amount iQt.O6'O`f. u i//s. . ;Vz , ✓a /e,o./ z Total ✓O ZZ Z lbs. Total Pounds O ZZZ -3 "��� Powder Factor /•: Gal of Oi rcn_ %Oil Content • O! / Bench /be) Grid Map Data _LLaL2_L_%L Scale Distance r/ Tons of Materials Produced ✓S �7.-iZ Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. State Safety Rep. Blaster Signature License or S.S. No.: CC�C� 0 Typical Hole - Show Prime' \ Location and Stemming Top of Bench Length 414(Ft.) of Hole B�Sk� Q skr f I� Floor Lew;l 3 lFt.) of Sub Drilling L 0 i ++ .NOMIS NS 5QG0 S RIES ++} 13-JUN-00 11:26:52 INSTRUMENT S NS50001-2251 EVENT S 009 COPY G 1 NOTES: ! M CUSTOMER:VULCAN NORTH LOCATION: MA 'THEWS CHAPEL ZZ-54 FEET TO BLAST: N L3S/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SETS TRIG (ios): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS L T V PPV(in/s) 0.06 0.06 0.07 Fr4(HZ) 13.1 27.0 22.3 PeekSOund 111dBF 0.00105PS7 3HZ P0(m) 0.00063 0.00044 0.00050 PPA(g) 0.062 C.077 0.062 USBM/OSMRE REPORT if+ff+f##4 i+iff+ FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0,0026 ps vain L.T.V 3 0,25 iWdly unj 31 e so ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: UU_ L C pw Operation: ivoR?H ClientID(f: JULW02 Date: 6 r7 uo Time. I1; a 5 shot: —L SeismographLoc.: rrkATTNEw'r CHA/6L Blast Location: C C C-3 y r'"_ . Distance: I. R Ql0„r/ Feet MarMelap Y P7 WOC4 Frequency RESULTS Longitudinal Transverse Vertical 0.0� 0.06 aodo•6 .toJ, �s.r at.o aa•s peak buximnm Air Blast Vibration El Dedbdsa W= Herd Herz Seismograph Operator. UbPfrll BA 0 r oLK SPismouTaph Serial W. - 9251 Transducer 2a51 Microphone 1251 Trigger levels: S •22 Comments: w� QZ 4NOMIS NS 5400 SERIES **# 13-JUN-00 11:25i51 INSTRUMENT r NS5400I-2328 EVENT 9 076 _. COPY r 1 NOTES: # # CUSTOMER:VULCAN NORTH LOCATIDN:NORTHEAST CORNER KKK-29 FEET TO BLAST: N LBS/OELAY: N OPERATOR:JSB COMPANY: T2328 M2326 SETS TRIG (ip5): 0.03 SOUND TRIG (d5): N RECORD TIME: 5 RESULTS ###f 4## BLAST DATA CARD U3&0 FOR QUARRIES Clientyu_ t_ c nty ENGINEERS, INC. Operation: "'A" Client mfk: VUL IUI ra )ate: ro/f3/av 99me: /1: a5 Shot: S/ eismograph Loc.: N E f "MANc E last Location C CC -3 4 r-r1'ss d�, istance: eet Max/Delay yS7 L T V PPV(in/s) 0. 13 0.10 0.1854.3 Frq(Hz) 57.0 39.4 elocity Peeksound 105dBF 0.00055Dsi 55HZ V, PD(in) 0.00058 0,000066 0.17 000180U LV� PPAW 0.060 USBM/OSMRE REPORI 444###4#44 444##f FREQUENCY (HZ) GRAPHICAL RECORD ####f tff# ff4iff TIME= 1.032E Sec/in SOUND= O.0025 Psi/div L,T.V = 0.25 ios/div B3MULTS Longitudinal Tmwtw= Vertical D•13 1 e.10 I GOB Pry 57.0 1 39.4 1 54.3 Peak Sir Blast p'LDedbeb 65 Hartz Maximum Vibration 0./f? Idsee S4.3 Hertz lmographOperator.. 3OFlrf BHOCDCK mograph Serial V. ... R30$_., ..... (sducer QLf Microphone j3a t gerlevels: o•a3 anents: imam Hartz ++a NOMIS NS 5400 SERIES 13-JUN-00 il:28:59 INSTRUMENT 4 NS54001-2362 EVENT r 035 COPY r 2 NOTES: CUSTOMER:VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SETS TRIG 000: .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS rr#+artrt +aw � • SrjL4 ENGINEERS, INC. MM-50 L T V PPV(1n/s) 0.06 D.U6 0.06 Frq(Hz) 27.0 20.6 11.6 PeakSOund 113dBF 0.0013809i 1Hz PD(in) 0.00034 0.00052 U.Do06o PPAW 0.062 0.041 0.062 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD aar####ar a+#+a+ TIME- 1.U325 sec/in SOUND= 0.0026 PSI/div L.T.V = 0.25 iPS/div BLAST DATA CARD FOR QUARRIES Client V U L C fin[ Operation: NORTH Client ED#! V Ut M va )ate: A)G Time: //• a S Shot: St Ietsmograph Loc.' S W C 13 Mast Location: C c L- 3 y t ifs tistance: a�1�3v,( Feet Ma8/D@1i311 48'f w Jtrr'.la^= R EL'SULTS Longitudinal Tmwvtrsc Vertical Peak maximum Sir Blast Vibration u�'3fi Decibelss Hr�s`Q Hertz Hertz :ismographOperator•. 7OtfK BNBGot.K :ismcxyraph -Serial $P . 531_2 ansducer 831*36 Microphone 23(4a igger levels: )mments: t Blasters Scfety Checklist , M >ur,r..asar P.MC.M. Location //dri� Blamer l.. �/ �A1Z-A✓l ... Date G - /S -O Q Truck Number C5) el �z Pre -Blast Checks Inspect blast site far haserds such as assuming eaulproent, looee fuck at face. Way cmeM, hlphwae harems, etc. R Waft Drilleas lap Review selemognam from previoua blest in area Determine defence to closest non -company chvWng�1T n LOO Mepcd PlscemeM of signs end aNalysaware mound shot i Placwnant of markem at treat Check holes M blockage CnecMeduel depth of holes Compare doll lops whh minor or BashfipM Pmltle frond row holes for bnnurden / MsOod ILC Loading Checks Determine ruedAAdi a hameas at bee lace Density checks far blend pmdtMs Adiusl front Fire loading as needed du Ithp Adlus c ran alp alemmlN based on dNl by endkr visual abservatlons of collar replan Final Inspection of Neel to duck for proper Felatlon sequence. Fechconnecbonphyelcamy chacked by Nester and helps Post Blast Checks Web for Post Nast fumes to dear, duck for misfires Check site for hazards / Review seismic data Review video of shot DNP 98 iT 11' Imo- 17 •- {f.Tt',i r - t :. ` Ate ii r T —r L r I/ .. �.: L7/�Y "{ , I �h/ !�.} jr+�'�+-}.�T�_I _ta-6��1 � 'j 1 EGA -r'} - r t-• I- i��! .., i , i- i--• u��� }--f' -{-+^"�'� ,.L..LL 1 r l V •_ I { � -� fi11r.�. `i-Mt 44 1 ,-•I L L p _ t L-1- r Uuka 1 ® • Materials Company Blasting Report Quarry Report No. 3 j Date Type of Shot We Exact Time il '/4 Type of Material l/4MZShot Gritl _ f- % — -39 Distance /750' (Ft.) Direction NE Grid -a (To nearest occupied building neither owned or leased) #1 Seis. Location rVl r.Xxil A Dist. to Seis. l la O GridKKK-&3 9 R2 Seis. Location Dist. to Seis. Grid 03 Seis. Location Dist. to Seis. Grid Hole/Deck No. Delay Period Depth Slemming Total Pounds Per Hole/Deck r //f Jo! leA4'/ 3 /7 Z //1/ 1 v � � Maximum Number of Holes 3r 0'1/'l Type of Stemming G/! lbs. Per Diameter (inches) h� i`t Face Height g Delay v �� k3,6_i7 Sub Drilling Spacing 9 Bum— Number of Row3 Method of Firing Il'QZSType of Circuit: Series Parallel Parallel Series Type of Delays: Downline'¢// Surface Trade Name F.✓1% s/ �.� >3 .7'/JI g — /af gyry / �// /3 S /S i,7G / 3 343 Weather ❑ Clear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm ❑ Cold Wind From ❑ N El NE ❑ East ❑ SE (check one) 71 S ❑ SW ❑ West ❑ NW /6 a+ /3 /7 /d% /3 / S S '3 /3 J as B /3 363 Fragmentation ❑ Excel ❑ V. Goad ❑ Good ❑ Fair ❑ Poor Backbreak ❑ to ft. ❑ 20 fl. ❑ 3011- ❑ 4011. ❑ 50 0. or more a?/ 3/O /3 392 .7.2 1 i-3 343 >3 a4i / 3 343 Trade Name of Explosives Amount /3 J9 aY3 rl 30 �G8 3L 13 ,��3 363 Total O "S�OVw� ies. Total Pounds id �J3C� f L Gal of Oil -Vn ok Oil Content Q. go/ Powder Factor A/00 Bench F/mO./ Grid Map Date j1-/2-96 Scale Distance 91 Tons of Materials Produced ✓8 A/6 Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. Blaster Signature State Safely Rep. License or S.S. No.: VMGMT4M nEV32 HolefDeck Delay Total No. Period Depth Stemming Pounds Per HolelDeck Total Pounds Tons of Materials Produced Typical Hole Show Primer Location and Stemming Top of Bench i3Gi� J /N Ii• L 7S/od r Length .o (Fl.) of Hole Floor Level x (Pt) of Sub Drilling i.. t y.. I. **+ ,NOMIS NS 5400 SERIES tw+ 13-JUN-00 11 : 1.5: 32 INSTRUMENT r NS54001-2328 EVENT r 077 COPY r 1 NOTES: t t CUSTOMER:VULCAN NORTH LOCATION:NORTHEAST CORNER KKK-29 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2328 M2328 SEIS TRIO (ips): 0.03 SOUND TRIG (do): N RECORD TIME: 5 RESULTS {w}#t}# L T V PPV(in/S) 0.17 0.15 0.28 Frq(HZ) 10.0 11.5 19.7 PeekSOUnd 111dBF 0.00105psi 67HZ PD(In) 0.00158 0.00136 0.00136 PPA(6) 0.060 0.060 0.311 USBM/OSMRE REPORT FREQUENCY (HZ) GRAPHICAL RECORD ******A** ****w* TIME= 1. U325 sec/in SOUND= 0.0028 psi/div L.T.V = 0.5 ipG/div F: LBLASTia DATA CARD U�FOR QUARRIES Client UUL a pH ENGINEERS, INC. °Pe"``°" "Oft7" Client [DO: VULM 61 Date: Time: I 1 : 14 Shot: Sc— Seismograph Loc.: N C co R/V Ea K K A a4 Blast Location: C E f 3 8 Distances 1{Oo� ' Feet Max/Del,r 3 6 3 tiT Velocity Fmquemy RESULTS Longitudinal Transverse Vertical o•rs /n•a lo.o II.S -vr v I4.7 Peak Air Blast Decibels 6 1 Hertz Maximum Vibration 0 • a 8 ���` Q, Hertz Seismograph Operator. 7WIrf 840 coCK Seismograph Serial * a3a4 Transducer aR Microphone 03�? 'rigger levels: o•d3 - Comments: Wsee HvU +ix .NOMIS NS '' SERIES 13-JUN-00 11:22:41 INSTRUMENT r NS54001-2.362 EVENT A 034 COPY a 2 NOTES: + + CUSTOMER:VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SELS [RIG (ins): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS +++++++ MM-50 L T V PPV(in/s) 0.05 0.06 0.02 Fro(HZ) 20.5 16.3 25.6 PeakSo0nd 105dBF 0,00055psi 2Hz PD(in) 0.00D45 0.00050 0.00022 PPA(g) 0.062 0,062 0,041 USBM/OSMRE REPORT •d+#+#+sx# 4kit++ FREQUENCY (HZ) GRAPHICAL RECORD x+F+++##+x #t#M+# TIME= 1.0325 sec/in SOUND= 0.0028 psi/div -,T.V = 0.25 ips/div en, �11 ORURO ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client•. VUL C Fw Operation: WAT /i ClieatlD6: VUt.n/oq Date: 6 ff 3/�4c Time: ! I : 19 Shot: 5a Seismograph Loc.: SW Csa Blast Location: E E E-3 $ A ' fir ' 3 63 Distance: a� rf 51V'.'l Feet Mas/Delay Velocity Frequency RESULTS Longitudinal TYaasverse Vertical ao.s N ' 18.3 a5. G peak Air Blast E�� �'t Decibels 2 Hertz Maximum Vibration WSW Ed Hertz Seismograph Operator: 3OHrjl 6A0Cot:K SeismographSerial $k 43 6 a. Transducer 13 r.1 Microphone 43 6 J Trigger levels: o • o5 Comments: lwSec Hertz +,rr NOMIS NS'7R00 SERIES 13-JUN-00 11:20:33 INSTRUMENT R N954001-2251 EVENT 11 008 COPY 0 1 NOTES: CUSTOMER:VULCAN NORTH LOCATIW MATTHEWS CHAPEL FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSS COMPANY: T2251 M2251 SETS TRIG (ip5): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS wrwwwww ZZ-54 U Lam1 e ENGINEERS, INC. L T V PPV(in/s) 0.03 0.05 0.03 Frq(Hz) 20.0 20.0 30.1 Peak SOUnd 107dBF 0.00055051 6Hz PDO M 0.00035 O.DD035 0.00032 PPA(G) 0.062 0.062 0.C62 USBM/OSMRE REPORT rrrwwr+wwr +wwrrr FREQUENCY (HZ) GRAPHICAL RECORD rrrwww r+. rrwrww TIME- 1.0325 sec/In SOUND= 0.0026 psi/d1V L.T,V = 0.25 ips/diV BLAST DATA CARD FOR QUARRIES Client vuLcPON Operation_ fV f) TH Client[D#- VULruoy 'ate: Time: I/ : /9 Shot: Sa usmographLoc.: MA77HFrwY cf1HP(cL ast Location: F. E fl 38 stance: ;G' PK.t. Feet Maz/Delay 3 -u %t001ty Xtuer y RE Qiw'j S Longitudinal Transverse Vertical ao.o �o.0 30.1 Peak im Mast Decibels El Hem maximum Vibration El IO/Sec Hertz mographOperator: TOHK BABc-ocK mograph Serial $k 925) sducer 8a51 Microphone @A51 Ier levels: o 0 31 - ments: wSm EM . +I1.- r lLI. ._+ T- r milt r L-1-E- t r'� '{' tJ�✓.J ITL�r' T� -1 �-i7 IJ �- _ -1 --/--• -Tt' i-- -I-I I -1,-- DIY J- 1 -1 'l -! I �-� L•J... I 1 i I J. r J-f IN _rIN + - r (I ! �' -4. 'k.'f-I 1 A T-4 'ice 61.i'-rIT-I-ININIt I 'F 1 P� I I�IL� 1 I ®- -IN � I _ + � - y 7lot ar +t i >Ob i—s �'.' '}(-}-' /?G�-S-I- ioSi f1_{._I. r 0, rz.Al /O; .��' "Tr ��;.� TTr"` 1 r� IN 4 i- t rt 7 TT r-I u8I.A93 a/a F f aH3 ats r J/ Fri r I —r---F r ®1 11 I + 1 Y I rl zl 11 -�; ri T+- I--r+-a I I I 1—G-1- r -I rr^'f— -A; �-�T�. rL�t- Y ft' L -- -_ I _ ♦} _+J�. '"T1,IT ti"r1i�J_i-7T`^' '1 -.: + _{ --� 4. r ~ 1 r �. {�_�-r� j- i 1i J.} �'_j`�.-fir r - P rt T E 1 - 'I UU11an Materials Company Blasting Report )uarry 4�rlk Report No. SS Date L - Z/ -00 "ype of Shot / rp('9/r Exact Time Y' O B 'ype of Material �ru Shot Grid �B' 3 listance /026" (Ft.) Direction IV.f_. Gritl - % (To nearest occupied building neither owned or leased) "1 Seis. Location tt_/,E��.LPDist. to Sets. /�n�15 Gritl KKK"Z9 '2 Sets. Location Dist to Seis. Grid r3 Seis. Location Dist. to Sets. Grid Hole/Deck No. Delay Period Depth 0rML Stemming Total Pounds Per HolelDeck 6% l '' a fi r, AN- 4 y,ec% Z dZ c� l3 3 � O /3 Z 9 S a5 /3 52l �' 1S z9 Maximum Dumber of Holes ) `8 z' Type of Stemming 4'7 Ibs_ Per Namater (inches) � Face Height 93 �DelayN i acin ..LL p g L� Sub Drilling a wr^�a iurden /V Number of Rows dethod of Firing y-09-4m-5 Type of Circuit: Series Parallel 'arallel Series Type of Delays: Downline 96j/ Surface Z /'7 trade Name CW5 -�fw apr i /p $ �? /3 a9 iL yp /3 519 i 3 / / 3 5-Co Weather ,(.,1 Clear L7 .�,� Cloudy ❑ Rain El snow (check two) 1' Hot 0 Warm ❑ Cold Wind From ❑ N ❑ NE ElEast ❑ BE —/ (check one) S (' Syw ❑ West ❑ NW /7 4/ 13 .6SO 'ragmentation 0 Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor 3ackbreak ❑ 10 0. ❑ 20 1t. ❑ 30 ft. ❑ 40 tl. ❑ 50 ft. or more Trade Name of Explosives ,,, „Amount Total 96'Z€ tbs. Total Pounds 95�� Powder Factor /''l y Gal of Oil /5 0/u Oil Content Bench S(yp_ Grid Map Date //-/Z-A Scale Distance Tons of Materials Produced Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supl. State Salary Rep. WGM7420 eeva Blaster Signature�iX.- License or S.S. No.: d`.6 • Hole/Deck Delay Total No. Period Depth Stemming Pounds Per Hole/Deck Total Pounds Tons of Materials Produced 1 Typical Hole , v Show Primer Location and• Stemmingt "' •. Top of Bench L - t C:! .i..l.. 1... Length (Ft.) of HolB 'I r fa. Floor Level '-" '_ f (Ft.) of Sub Drilling. r 1 -� '�•{ NOMIS NS Z4ZO`SERIES 21-JUN-OC 09:10:25 INSTRUMENT A N'654001-2362 EVENT a 036 COPY Y 2 NOTES: { # CUSTOMER:VULCAN NORTH LOCATION:SOUTHWEST CORNER. FEET TO BLAST': N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SEIS TRIG (ios): .03 SOUND TRIO (dB): N RECORD TIME: 5 RESULTS {#{#rar MM-50 L T V PPv(in/s) O.U3 U.03 0.02 Frq(HZ) 42.7 39.4 73.1 PeakSOund 107dBF 0.00066psi 2Hz PU(in) O.00017 O.00026 0.00004 PPA(g) 0.041 0. 041 0.041 USBM/USMHE REPORT FREQUENCY (HZ) GRAPHICAL RECORD #a{#{a{#{ {aaa#{ TIME- 1.0325 sec/in SOUND- 0.0028 psi/tliv L.T-.V = 0.25 ips/tliv U3 e LO ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: UUL C W Operation: Noh?H Client M#: V UL R/ to Date: b a r w Time: 9 0 8 Shot: 5_ Seismograph Loc.:— Su C�lINE0. Blast Location: 8138,o34 �y�V'an ✓1NH Distance 215� w Feet MaxfDelay 5 3 0 velocity Fnct=cy RESULTS Longitudinal Transverse Vertical 0•03 ttW! 0?i o3,n1 0•02 ifi.`T 3R,4 73.1 peak Air Blast DeabeLs 4�'°� I �/��7/" FY "� .. Hertz maximum Vibration El tdseeHertz Seismograph Operator: UbHK BNOCoCK Seismograph Serial f . a3 61 Transducer 13 61, Microphone 23 62 Trigger levels: c .O g Comments- lidsee Hartz L *** NOMIS NS SADIT-SERIES *** 21-JUN-00 09:07:20 INSTRUMENT 4 NS5400I-2328 EVENT A 079 COPY % 2 NOTES: CUSTOMER:VULCAN NORTH LOCATION:NORTHEAST CORNER KKK-29 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2328 M2328 SETS TRIG (IDS): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS L T V PPV(in/9) 0.20 0.16 0.4D Fnq(HZ) 22.2 32.7 37.0 PeakScund 109d5F 0.00083osi 45Hz P0(in) 0.0014M 0.00081 0.00173 PPA(8) 0.166 0.166 0.394 USBM/OSMRE REPURI t*!f 4*Y!4! #**#t# FREQUENCY (Hz) GRAPHICAL RECORD ********* *t#64* TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L,T,V = 0.5 IDS/dlv UI L! 390 ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client VUL c fkN Operation: NOR7L4 ClientIDa: VUL NCa Date: 6/arAo Time: t1 oB Shot: 53 3eismographLoc_: NE CoRNEK 31ast Location::' 6 4 R - 3`f 11( APA*f distance: Ilio'Ya5°>� Feet Max Delay 5 3 ra we I1 Velocity Frequawy k 1 1 aa.a aa.� 1-7 peak Sir Blast Efl Decibels Hertz Maximum Vibration 0.40 [dsee Hertz ieismographOperator: Sb4r( BAGmcoK )eismagraph Serial la384. rransducer.93a8' Microphone oa8 Rigger levels: o • 143 - 3ornments: tn/sec Hertz +rtrt NOMIS NS 5400 SERIE j21-JUN-00 09:08:19� INSTRUMENT A N35400I-2251 EVENT a 012 COPY 4 2 NOTES: t + CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS 1RIG (Ips): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS ZZ-54 L T V PPV(in/s) 0.04 0.06 0.05 Frq(HZ) 15.5 17.1 39.4 PeakSovnd 111dBF 0.00110psi 5HZ PD(in) 0.00035 0.00036 0.00037 PPA(s) 0.052 0.041 0,062 USSM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L,T,V = 0.25 iDS/div r, Li AST DATA CARD en, leB FOR QUARRIES Ghent: VuL G_ (t_w ENGINEERS, INC. era"N"TM Client fD#: V UL pl 01 Date: ro/910/oq 'l.,.- 9: t t Shot- 53 SeismographLoc.: MA7TAi6\.n r.uAPkL Blast Location: 1668 -3 N _ Distance. 2S. LM'7 Feet Max/Delay 53 o y „ Velocity Fraptmcy RESULTS L,ongitudivat Transverse Vertical 15.5 11.1 3q.�t peak maximum Sir Blast vibration R°i rt':;.tr DeabelsH la/sm E]5 Hem Hertz Seismograph Operator: MOHK BAAGotK Seismograph SociaM aril Transducer —La S1 Microphone aa5l Triggerlevels: Comments: wSec FIMM } �I.... , I ' -- [i iYa 1 -} ' t r i i-a�-*'-i i v �_?: r 1 -� 1 i L' F r''+ S• ACT f' 0 �'j , I -I-f- ilit1 �,I , 1f I + rl,_j 71 1-� �'.� 1Cr LI1 G I I - t i I �'. f.{ , Ta -{ T t rr1:1 }�{r i�r � {�� i L1 it1' T' ' rt t Li ,h TT �I} LG. , , y I r L4_ Vulcan Materials Company 0 Blasting Report Quarry Report No. .S"! Date 6 -Z/ -coo Type of Shot >�'� _ Exact Time Type of Malarial �i6 Shot Grid�e� - .3f3' Distance 17 Oor (Ft.) Direction NE. Grid Frp-qk (To nearest occupied building neither owned or leased) +r1 Sels. Location NE Ccf{/V EA Dist. to Seis. f OSO Grid Ji •2 Sala. Location Dist. to Seis. Grid 03 Seis. Location Dist. to Sale. Grid'S Hole/Deck No. Delay Period Depth Slamming Total Pounds Per Hole/Deck f /0,9 2 OS 3g> 3 JO r $SS .75 5 6 yY ,55� l,)' Maximum Number of Holes � Type of Stemming 4'7 his. Per n 1 Diameter (inches) '1'/// , If' Face Height -:�&aw Spacing /T sub Drilling / xF %w. -•.+• Rumen /T Number of Rows 3 Method of Firing y/a'r='Z�Type of Circuit: Series Parallel Parallel Series Type of Delays: DowNin �// Surface d5' Trade Name -.✓ ��.�' 8 _ 9 IQ I *T it 3S5" ,Z $ 395 /3 �-� Weather Clear QrCloudy ❑ Rain ❑ Snow (check two) j'Hot ❑ Warm ❑ Cold Wind From El N ❑ NE ❑ East ❑ SE (check one) ❑ S 2 Sw ❑ west ❑ NW /[ /•2� / 3p5' 355 19 � Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 h. ❑ 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 ft. or more a3 ay3 / 365 Trade Name of Explosives Amount �: � 3Z - as 38S —' - j jkitsss' 30 Total // S3 lbs. Total Pounds L7/ f-4 Powder Factor ,1. or Gal of Oil cP3 % Oil Content • 19/S � Bench �0.7 Grid Map Dale //-/t' 9Q Scale Distance Tons of Materials Producedow AIZ% Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Slate Safely Rep. Blaster Signature License or S.S. No.: VMCM74M nEVMW HolefDeck Delay Total No. Period Depth Stemming Pounds Per Hole/Deck Total Pounds Tons of Materials Produced I Typical Hole _ Show Primer ,.. Location and ( r j Stemming r Top of Bench -. : F:r t ly Length (Ft.) of Holedd .— r ... Floes Level :_-- .... t. • . (Ft) !! . LJ of Sub Drilling Blasters SAty Checklist Location lYn1N%r Blaster /le,lZ .✓.E C7," Dole />—,7/—OO Track Number 061 Pre-Blast Checks Impel blest site far haunds sud, as operating equlpmere, base redr at lace, stray current. hlyhwea herds. Mc. / Review Drillers Lop Review sebmogram from gomus daft in area Dstermfne dlslann to clwnt mrrarnpany daepng 1'iLJQ Mstho l Placement of oli m end Gately canes ensured shol Plen<menl of manners at crest Chock how* low blockage / Chick/rGusl depth of lone / Crnpre dril lops MIN minor or panhogM PMMhont row lobs for burden _� Meaw Loading Checks Delerwam medMilize henron At free lace { Dismay dmka far blend preclude Wy Aag sl frrd row feeding ea neadad Adjust CAM halpMhirrdng based an drift by / andlr visual observations of collar region Fool knpedlon of bled la check let Proper •,•ya Im"Hanapuence. EsM cormadlon physkalry checked by Neaten and helper ,e,e,•,,,e„w Post Blast Checks Waft for peel most lumee to dear, �— drock fen misfuea Cho* sib lr heardn / Rwlea eehmb data / Review video of shot DNP 98 !!� NOMIS NS 5400 SERIES !!! 21-JUN-00 11:T350V INSTRUMENT # N854001-2328 EVENT r OBO COPY # 2 NOTES: ! ! CUSTOMER:VULCAN NORTH LOCATION:NORTHEAST CORNER KKK-29 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JS8 COMPANY: T2328 M2328 SEIS TRIG (ipS): 0.00 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS r rrrrr! L T V PPV(in/s) 0.13 0.11 0.20 Frq(Hz) 48.8 16.0 89.7 PeakSOLnd 105d8F 0.00055pSi 62Hz PD(in) 0.00070 O.OUD6B 0.00091 PPA(s) 0.080 0.038 0.162 USBM/OSMRE REPORT R###4R##44 ###### FREQUENCY (HI) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L,T,V = 0.25 ips/div • ULLO ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client \JULGpNI Operauon: 11IOkT i Client IDk: V UL !Y,31 Date: %na/ Time: WN Shot: S'_ Seismograph Loc.: NE C c R At F K Blast Location: E E E- 3 8 1-p Iw" .hu;1 0 Distance: 05 Feet Max/Delay �_ �1r4',13dV ' Velpaty Frequrnry RESULTS Longitudinal Transverse Vortical N?. B l 8• 0 1 30,,7 Peak Ma#cimum Air Blast Vibration . WSMDedbes Hertz Hertz Seismograph Operator: 7UFaK 6gecor.K Seismograph Serial #R: 932R Wansducer a3ar Microphone-2Ja d 7' igger levels: o-0311 Comments: ws= m Ytt NOMIS NS 5400 SERIEI 21-JUN-00 11:16:5 INSTRUMENT # N554001-2362 EVENT # 037 COPY # 1 NOTES: t i COSTOMER:VULCAN NORTH LOCATIOW SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SEIS TRIG (ios): .03 SOUND [RIG (dB): N RECORD TIME: 5 RESULTS i VVVkVV tYY6 MM-50 L T V PPV(WS) 0.05 0.06 0.02 Fra(HZ) 20.0 16.3 25.6 Peak Sound 109dBF C.00088pSi 2Hz PU(in) 0.00D35 0.00043 0.00016 PPA(g) O.U62 0.O62 0.041 USBM/OSMRE REPORT k!#tVV#rtkrt <!tY}Y FREQUENCY (IIZ) GRAPHICAL RECORD k4iV Y}4Y! V#;t}t 'TIME= 1.0325 SEC/in SOUND= O.OU28 psi/div L.T,V = 0.25 iPS/div S'31 A ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client VUL Cftr4 Operation: NoA Thf Client IDd: V UL A/ og Date: er r lQQ Time: Iv t L shot: 511_ SeismographLoc.• Cw (,oAA1FA Blast Location: E rc E - 3 8 � Fk Distance: Lol-)9ob^,it/p, Feet MaxfDelay i velOC4 Frequency RESULTS Longitudinal Transverse Vertical ao. o /F. 3T7 as. c peak Sir Blast Decibeh EH Hera Maximum Vibration Eltdr«Hertz Seismograph Operator. UbFtK 8Ho GDr.K Seismograph Serial $k d3.6 a..... Transducer a3 ba Microphone a3 ba Trigger levels: a Comments: tdsca *** .NOHIS NS 5400 SERI.E 21-JUN-00 11:1 :4� 6 INSTRUMENT S NS54001-2251 EVENT $ 013 COPY e 2 NOTES: * CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS TRIG (ips): 0.03 SOUND TRIG (d8): N RECORD TIME: 5 RESULTS *****++ S RRR ZZ-54 ENGINEERS, INC. L T V PPV(in/s) C.00 0.12 0.06 . Fr0(HZ) 32.7 34.1 34.1 PeakSound 107dBF 0.00066pSi 3HZ PD(in) 0.00041. 0,00068 0.00047 PPA(g) O.O52 0.017 0.062 USBM/OSMRE REPORT FREQUENCY (HZ) GRAPHICAL RECORD R****R*** ***+*+ TIME= 1.0325 sec/i0 SOUND= 0.0028 psi/div L.T.V - 0.25 ips/div BLAST DATA CARD FOR QUARRIES Client•. Uu_ t_G AN Operation: rV r,) iTH Client mq' V UL N 09 Date: rod'/ w Time: Shot: S_ Seismograph Loc.: m /iT7ia 6. 5 L.a A07 Blast Location: C E E- 3 t Distance: 1' LLo°'L Feet Max/Delay 3 8 b Frequency RESULTS Longitudinal Transverse vertical O.q4 °' 3D.1 1 34.1 ]v.r Peak Maximum Air Blast Vibration Deabeh H WSW Hertz Hertz ieismographOperator: 3OHr( BAOcocK eeismo9r3lah SP1171131 #:... )a.5.l transducer L251 Microphone aa51 7ngger levels: o •03 :omments: irlsec tT I-L i -L-t -- ---- 77'+ 4- -4-'T'tl -j- J-A- 7 . . . . . ----- T 4T TV A 4- T� 7I 77-,rl- T-- r7 4 it, lit 4- T p LL 771 T Z, m p Vulion Materials Company Blasting Report Quarry / 6el<- Report No. 55 Date . ! - Z Z -� d Type of Shot -R% / Exam Time Type of Materiel �,nN. Shot Grid Distance aOOV (Ft.) Direction A4F Grid (To nearest occupied building neith`eqwned or leased) et Sets. LocationAl6 CORNEA Dist. to Seis. /.4:P]''�,{ Grid KKK— a2 Seis. Location Dial. to Sets.w Grid r3 Sets. Location Dist. to Sets. Grid Hole/Deck Delay Period Depth Stemming Total Pounds Per Hole/Deck No. 1 -C 8 z -7_5 g' G-•. 30 3 ij , �` )y"� •%_ y S' Yt s r 2 4/Z 6 ,Z 3xi2 Maximum Number of Holes .32 T Type of Stemming 6r7 lbs. Per ��� Delay Diameter (inches) _GL Face Height aS a n �13i Spacing Sub Drilling o I,w•µrw Burden ! Number of Rows .3 g ✓0*"r YPe of Circuit: Series Parallel Firing Method of Fi Parallel Series Type Surface'✓ yY Trade Name .� � Z OO rZ 8 ,� y2 e 9 ,5 z 35�! rG _ r / /Z f Z 3 3 x� - x p 3Ys i I �Z ro' 92 ,z Weather ,0,�, �Cllear L?loudy ❑ Rain ❑ Snow (check two) [Y Hot ❑ Warm ❑ Cold Wind From El N ❑ NE ❑ East ❑ BE (check one) ❑ S FAw ❑ West ❑ NW `. 117 r7 /Ve —it y 14it'7 ,Z 9 r f 4:21 Z Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ loft. ❑ 20 ft. ❑ 3o ft. ❑ 40 ft. ❑ 50 ft. or more �p3 a92 y2 3Y.3• Trade Name of Explosives Amount 109 iDive as L y3 4!s Y' o x 9 a� a3 t 3HS c as astJ 2 35 S r v 30 .3©9 Total 4a r ,Or3U2 lbs. Total Pounds _ Powder Factor / •G / Gal of Oil 19 116 Oil Conve`W'v ntrr 1_j,4, 0 144 Bench G..Pn Grid Map Date zZ7 Z-?5Scale Distance 107 Tons of Materials Produced Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Stale Safely Rep. _ Blaster Signature License or S.S. No.: YMC-33742D REV&W Total MolelDeck Delay Depth Stemming Pounds Per NO. Period Hole/Deck ' t , I 3z .ss9 as .z .3y .,. Typical Hale Primer (Show location and ) I .-� �.. .. ,. J • __-„ Stemming . Top of Bench i •, "t , -�' T.)', , 4 4- Length (Ft.) of Hale -.r4 ! i P;�_ I, Floor Level r Total Pounds (Ft.) of Sub Drilling Tons of Materials Produced -rr « 7- _ _�_ Blasters Safety Checklist • ow ec rrrw wanem � Location 4 L411 Mosier /1� ��t'✓.E cj.� .. �.1J fJ Data 4,-a22-00 Trwk Number �__... Pre -Blast Checks moped blest eke Im hazards each as opemOn aaulpmerd, boss rack at two. stray currerd, highwaa hazards, efc. Revlaw orders Log Ravkrx saluncgp m Ir m pravbus blast in was Dderwme distance Is closest nm- pany dwelling iGoe5 Method Z3 f4 Plwbnterd of eigna and aafaty cones anouM shot plwamant of nwkwe et meat Cheat hales far blockage / CheckledjuM depth of holes / Compare ddg logs writ minor or aaeh6gM / profile Iranl row hdu for leaden / Method a 4 Loading Checks Dalmnha nsedfcllaxe hameas a Tres race Denby checks for Nand products 1. 29 AdkM front row loadbg as needed Paqust cohrmn halghgeterrmd basedondrillog ^g andlavtsud aMeMllona of collar rogian Flnet Inspection of Nast to check for proper .�a,.. btahalbn aaquenn. Each camedlon physkaRy docked by Nasser and helper Post Blast Checks wokM Poet blast fumes to dear, / check for misfires Check ska lm haxerda — Review aehmlp data ✓ � Ray!" velm of shot DNP 98 • *** NOMIS NS 5544 "SERIES *** 22-JUN-00 10:07:02 INSTRUMENT r NS54COI-2328 EVENT 4 081 COPY 4 1 NOTES: * CUSTOMER:VULCAN NORTH LOCATION:NORTHEAST CORNER KKK-29 FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB ' COMPANY: T2328 M2328 SE18 TRIG (ips): 0.03 SOUND TRIO (dB): N RECORD TIME: 5 RESULTS #*rtwwrtw L T V PPV(In/s) 0.10 0.06 0.10 Pro(Hz) 9.6 12.0 13.8 PeakSound 102dBF 0.00040Psi I714z PO(In) 0.0008B 0.00100 D.D0092 PPA(S) 0.041 0.041 0.062 USBM/OSMRE REPORT i FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/dIv L.T.V = 0.25 ivs/dIv e lIl e oneLa ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client VUL G Rnf Operation: nlf o &7H CtientID(k: VUL14oy )ate: 6 8d oo ume I \):0 8 Shot: S9 ieisrnographLom: ME cQAA/bA Hast Location: 813 8 • V O i�Mry' )stan�/u4 eet MaxMelay_� 1. V � 4 Vdocity Frequency RFSMTS Longitudinal Transverse Vertical t M1t?s O. t 4: o Id. C) 1 13. a Peak Fir Blast Decibds f 7 Mau Maximum Vibration Ed(dsee Hertz Seismograph Operator. 3bHK BABGocK Seismogaaph.Serial it a)]8 Wansducer 33af Microphone 3)4& Triggerlevels: ooj Comments: Hertz ++% NOMIS NS a..,. 22-JUN-00 10'08:0I INSTRUMENT % NS54001-2251 EVENT $ 014 COPY S 2 NOTES: # CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL ZZ-54 FEET TO BLAST; N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS TRIG (ios); 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS L T V PPV(in/s) 0.08 O.C6 0.C7 Fr9(Hz) 11.8 17.1 14.0 PeekSound 110dBF 0.00094osi 4Hz P00n) 0.00108 0.00057 0,00175 PPA(S) 0.041 0.062 0.062 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L.T.V = 0.25 iOs/div S I Lm ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: UUL G RIY Operation: N.)A-7H Client ID#: V UL M" Date: b t�P Time: Iv:08 Shot 55 Seismograph Loc.: m ATrH F WY L HAOL(_ Blast Location: 9113b-11 v Distance: Feet Mas/Detay-313_ velocity Frequmey RESULTS 1"gltudmal Transverse vertical O. 66 O•<6 PO{ I/.6 /7•! 14• o Peale Maximum Air Blast Vibratioa EdDmbelsEd Indsm Hertz Hertz Seismograph Operator: U-WIrf BR O GDGK Seismograph Serial #: o?a 5 1 Transducer a a51 Microphone dd5 / Trigger levels: _D• o��- Comments: 1wSec ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: WL G prV Operation: n] oaTH Client ID#: IUD ✓V o1 Date: rad] w Time: 10:e8 Shot: Ste_ Seismograph Loc.: 5`f �n k En Blast Location Gail • `l 0 Distance: '`��:' Feet MarMetay 3Y3 �ybivl � Frequency RESULTS Longitudinal Transverse Vertical 3 Peak Air Btast Decibels El Hertz maximum Vibration El tdsee Hertz Seismograph Operator. 7'k'.)4r( 6AG cocK Seismograph Serial $k a3 6') Transducer a36a Microphone a3 Co7. Trigger levels: Ira, 403J Comments: tdsec lid LlJi1 ' 1f 1�y7.7J.� 1_[-I ~-7 I-P--- `� F t— ' -t•-Y .-�- }1 f '�,11 1^- 17 I , 1 IL �-i_i LT f - a£' _: i .. ���Yr�•��.-'1__i 'j"a _I� L �---�-P ' �'r'.{� ��-, !--'1-t-t- -_4E !�- ,'tF;T 1 F ,T�L' "y� _�. ��.:b`{ ' , r--- Zi ; r i _ G { f , I L'-T r �-%�• -j-r t 1 i r-S{ t _ G %��•'Tr _ . Z.s�_-, 1 ti �./p�__�..,_._; i A-� . Ta__ - , -_1"?t ��' T'"' �- r '6 i-'i , �r�.r-`- i-1 _ ._t y } -! •+•�., r,� t j �r 17 t-I--• {.:. 3 r, 1 Lt�_� 1 ' t ' �I _ ... , ._ .....4 Y ... . ,... i r _ ` - (- - t �-T_i , 1 i , i 1 1 fTJ-;- r- -) - -n-J -Y_I •� 1 Y 1 L '1--I -i �- I I 1 r 1--y- 1� 1• ' ' � 1 '�I � -5 L ~ -f • � , � ' L . .. _ r' _1 _ �� i ( _� _ • 4 T 1 �-i� � � +r-? 1 1 1 fir._�l ..1 ._} _� i I 1 � i I T �-r 1 i I 1 r1- Y-1 ' i— I - .--i f a_4` i-.. 1 Y y'� •! I a _ _� .. -_ ` ' _ ��_.w....�.-{.�.�-_r• ..:y-...e I �_ , , I � - 1 LIB I I I �-} L: ._i f ! 'i- , ,- i -1 t 1 I '- ;- 1 v^ r 1 (- ,•_i_I 'r 1 - 1 1 L,� --�. �'{_ - ♦. � J - h « P r -__'.� :__-_ _ _ -��_ �. =_-� .. �.. __-I-`-�-r-a :- � 1- � , .-L.-- - rr(,_r-` .II--' i ; +--1 �'-'-;��{ t T .-�.�.t�•T1 UUI[Un Materials Company // Blasting Report Duarry Nn �/< Report No. 56 Date i -7 -GO Type of Shot r Exact Time 4: 3 Y Type of Material Shot Grid bBB- 3 Distance 1N50 (Ft.) Direction NE Grid �- P (To nearest occupied building neither owned or [eased) P sw v. 91 Seis. LocationNE CoNlIIFA Dist to Seis. Grid XKK"2 r2 Sets. Location Dist. to Sets - Grid n3 Seis. Location Dist. to Sam. Grid HolidDeck Delay Period Depth A Stemming A Total Pounds Per Hole/Dock No. r r'7 r,2' _� 2 p ry 'S/SG 3 n !Z to OY,� 96^ / �' y4?6 1a6 / 3 9/ Maximum Number of Holes Type at Stemming G7 lbs. Per Diameter (inches) 63'9 Face Haight y3 Delay Spacing /`/� Sub Drilling z Burden / r Number of Rows b Method of Firing ytzE_:Z.7f Type of Circuit: Series Parallel Type of Delays: Downline �JY Parallel Series T Surface 0 P7 Trade Name /-✓.f�4n/ %C.�� �7 b x 3 j/')l 8 /O `% ! 3 H71 ro ''� y6G 9.3 y /L ,/g y /3 y 144 /�. 1 y�G 1; y5 yr� �,/ Weather El Clear ❑ Cloudy 11Rain ❑ Snow (chock two) ❑ Hot EKWarrh ❑ cold Wind From El N ❑ NE ❑ Fast ❑ SE (check one) ❑ S r9KSW ❑ west ❑ NW Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ loft. ❑ 201f. ❑ 3o 1L ❑ 40 ft. ❑ 50 ft. or more Trade Name of Explosives 1Amoum rrd Total 5fQSQ fin. Total Pounds Powder Factor r • 3 9 Gal of Oil B % Oil Content Bench =b Grid Map Dale 11-l7�9A Scale Distance S Tons of Materials Produced / / Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt, Sig. Stale Safety Rep. Blaster License or S.S. No.: Vuo3e74 20 aev sm! It 0 Hole/Deck Delay Total No. Period Depth Stemming Pounds Per HolelDeck Total Pounds Tons of Materials Produced i 1. ) Typical Hole /Sfww Primer ion and Locat\ Stemming t Top of Bench r P, -: •r Length yti (Ft.) of Hole _4 ...: ��..... r: • - • Floor Level '-- 3 (FL) ... of Sub Drilling ... .... . •en 1110 La ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: NULCpN Operation: NORTH Client [D#: V U L N o3 Date: 6 as Time:I3ti Shot: 5b Seismograph Loc.: N E CORN 6R Blast Location: Mjf -3`1 Distance: I I So —'Feet Max/Delay 4 s V Velocity Frequency RESULTS Longitudinal Transverse Vertical o•ao o.tB o:ai'! a3.3 I 2,c t a.t•I Peak Air Blast h ' Decibels 4 Hertz Maximum vibration Eo. a I Inset aa.l Hertz Seismograph Operator. MaHlY 8R8 CDCK Seismograph Serial M ??a 4 Transducer R3 Microphone a398 Trigger levels: a3 Comments: ScA46 QIS'DRrycEA 5a wsee t#+ NOMIS NS 5400 SERIE7 29-JUN-00 09:7z:30� INSTRUMENT A N654001-2251 EVENT S 015 COPY A 2 NOTES: t t CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 GEIS TRIG (Ips): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS ttttttt ZZ-54 L T V PPV(In/s) 0.02 0.03 0.02 Frq(Hz) 48.0 48.5 32.0 PeakSound 107dBF 0.00066osi 1OHZ PD(in) 0.00015 0.00020 0.00017 PPA(S) 0.062 C.062 0.062 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD tt#tt#t#t tM###t TIME= 1.0325 sec/in SOUND= 0.0028 psi/div L.T.V = 0.25 ips/diV aIN e Mesa AGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: UULGAM Operation: NQfx-rH Client IN: JUL N on ate: Co8 due 'lime: R :3y Shot: 56 asmographLoc.: MATTNt�j'5 g4AfE,. ast Location: 6 6 A - 3v istance: h1.9'00.++ Feet Max/Delay yam_ Velocity l qumey RESULTS Longitudinal Transverse Vertical o.oa ���oa3�?t e�oa Ll e. o 'i 6. 5 5 a. Peak Air Blast El Decibels Hertz Waximum Vibration O.Ol Idsec 4 6 5 Hertz ismograph Operator. UbHK 8A8 GotK ismograph Serial tt as S l msducer. a 9 5) Microphone 2 a 51 gger levels: o • 03 — mments: Sc.Ai,k a ArvcG! 86 hVSec W #}# NOMIS NS 54CO SERIES 29-JUN-00 09:34:34 INSTRUMENT # NS54001-2362 EVENT # 039 COPY # 2 NOTES: # # CUSTOMER:VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2362 SETS TRIG One): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS srj&aIda ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client•. UUt_CAN Operation: Ll ok-rN Client DX V UL nl !p1 MM-50 )ate: G l y co Time: 913 4 Shot: S Ca L T V PPV(in/5) 0.03 0.02 0.01 Frq(Hz) 10.2 20.0 341.3 PeakSound. 104dBF 0.00050psi 61Mz PO(in) 0.00034 0.00020 0.00005 PPA(6) 0.041 0.041 0.041 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 see/In SOUND- 0.0028 Csi/aiv L.T.V = 0.25 Ips/dlv eismographLoc.: SavruwEST cokNER last Location: t3 B B - 34 listance: ra ry5�� Feet Max/Delay Ybe y. v Velocity 4requency RESULTS Longitudinal Transverse Vertical �114ryai� t7<�Ol3i o . 0 8 o: o ( Y• #fir.. Peak Maximum Air Blast Vibration El DecibelsEl wsecHertz Hertz eismographOperator: 7W[rf 6R0GocK eismograph Serial #: a ransducer 23 ea Microphone a3 62 rigger levels: r, •�3�— 'ornments: 5CAL Ir DISTRNCF �Oo� Wsec Hertz T 7 L J, L j i r'i 1 ' �, .:.•.E I : �••�t}+i,.-l..Ou., ,i. i 1 _t��' .{ , .•,f ; '�~v� - „ .t r ? I , Ilk 1 4' J J i-A &I Tf_.. I ..j L-4 A-1--jq+ - r Ia. i Ad - + tj 144- I- t 4-1 . . . . . . . . . . . L i 4-1 - -T-7 1 1 14. UU11 n • • Materials Company Blasting Report Ouarry Report No, b % Date _/ -a?9 -oo Type of Shot 1_lo&AC,� Ezact Time / Type of Material g4 , Shot Grid ='V� - ; Distance (3Oov (Ft.) Direction S$ Grid M1 / (To nearest occupied building neither owned or leased) w1 Seis. Location -% u [oANLifiD'Isi. to Seis. i�i • Grid rnm-s'ct 92 Sell Location Dist, to Seis. -' Grid a3 Sets. Location Dist. to Seis Grid Hole/Deck Delay Period Depth Slamming Total Pounds Per HolelDeck NM / ls,`-_7 dl(2) 860 . - W/ Z ago 3/ dU /Z 8 ry- -!3 - / 2 $619 .670 17. 990 G /Y 8EU Maximum Number of Holes /.,W Type of Stemming &7 lbs. Per Diameler (Inches) Face Height :44 'CDelay6�h 11 Spacing /S �r V� Sub Driving �O _ , Burden /3 Number of Rows d Method of Firing ✓� -� Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline 0// Surface'/A /� �, Trade Name •� O go r2 B 1,7 /L 9 yL /L 880 o „2 z so 12, /'/Z /3 yl7 /2 80 S :04 I SSO Weather F] Clear ❑ Cloudy [[ORain ❑ Snow (check two) ❑ Hot Q�Warm ❑ Cold Wind From N '0 NE ❑ East O SE (check one) ❑ s 19'sw ❑ West ❑ NW Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 ft. ❑ 40 R. ❑ 50 ft. or more Trade Name of Explosives Amount iSc Total iO0 lbs. Total Pounds Y yL/ Powder Factor f.9% Gal of Oil "20 W6 Oil Content Bench dg;W Grid Map Date //'/Z-'Xr Scale Distance ya Tans of Materials Produced Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig, Slate Safety Rep. Blaster License or S.S. No.: VMGN]<A REV Wi do Deck Delay Total No Pericd Depth Stemming Pounds Per Hole/Deck Total Pounds Tons of Materials Produced i C Typical Hole Show Primer Location and Slamming W Top of Bench Length 10 _(Ft.) of Hole s� lit 40, Floor Level '0— (Ft.) of Sub Drilling *X, NOMIS NS 5400 SERIES 29-JUN-00 13:59.39 INSTRUMENT # NS5400I-2362 EVENT # 040 COPY # 1 NOTES: i CUSTOMER:VULCAN NORTH LOCATION:SOUTHWEST CORNER FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2362 M2352 SETS IRIS (ips): .03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS w,wwww« MM-50 L T V PPV(in/s) 0.10 0.15 0.06 Frq(Hz) 22.3 9.1 8.8 PeekSOund 126dBF O.OD558psi 3Hz PO(m) O.0012u 0.00337 0.00084 PPA(g) 0.062 U.002 0. 062 USBM/OSMRE REPORT FREQUENCY (Hz) GRAPHICAL RECORD TIME= 1.0325 sec/in SOUND= 0.028 psi/Oiv L. 'f.V = 0.29 ips/dlv BLAST DATA CARD FOR QUARRIES Client: VUL CpN Operation: N VA7u _ Client ID#: VUL N Q1 late: ra/a9 (a Time: I3:5Cl Shot: 57 eismograph Loc.: Sw C oR N EA wtm -5n last Location: W w -3 Li listance: 185d Feet Max/Delay 8So Velocity -requency RESULTS Longitudinal Transverse Vertical o.oC Peak Air Blast El Decibels Hertz Maximum Vibration E9.1 15 lwsec Hertz eismograph Operator: UbHK 6AOCocK eismograph Serial #: a 3 t, a ransducer 23 Ca Microphone a3 VD rigger levels: 0• a 31- :omments: Sr-KE 0757 AN Lf a L49 FMOM Hertz +++ NOMIS NS 540� 0 SERIE: 29-JUN-00 13:57:36 INSTRUMENT # NS54001-2251 EVENT # 016 COPY * 1 NOTES: + CUSTOMER:VULCAN NORTH LOCATION:MATTHEWS CHAPEL . FEET TO BLAST: N LBS/DELAY: N OPERATOR:JSB COMPANY: T2251 M2251 SEIS TRIG (ips): 0.03 SOUND TRIG (dB): N RECORD TIME: 5 RESULTS MRO NGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: MULCAN Operation: TV (3 KrH ClientID#: JUL Woe 2Z-54 tte: 6 91 00 Time: )3:59 Shot: 57 ismographLoc.: rnATTHEwIs CHA9E1. Ist Location: taw -34 N13 oy ;lance: 11 Feet Max/Delay. S 8 v _ L T V PPV(In/e) 0.06 0.10 0.06 Velocity Frq(Hz) 30.1 20.5 12.0 PeakSound 119dBF 0.00260Psi 9Hz xlumcy PO(In) 0. 00090 0.00067 0.00061 PPA(g) 0.017 0.041 0.002 USBM70SMRE REPORT ..E, Lem] FREQUENCY (HZ) GRAPHICAL RECORD TIME= 1.U325 sec/in SOUND= 0.0028 psi/d9V L.T.V = 0.25 ips/dIV y_ ._71-1-1-1 RESULTS Longitudinal Transverse Vertical 1. O.06 17 D.o6 310.1 2o.5 la.� Peak Sir Blast Decihefs ii Hertz Maximum Vibration tn/sec ao. S Hertz smograph Operator: UW111 8A13 GoGK imograph Serial #: aaS I nsducer aa5) Microphone a a 5 ) Iger levels: ° 'W " nments: ScaL% =)"IAfVL(t �Y wSec Hertz yen 4, 1® e LAM ENGINEERS, INC. BLAST DATA CARD FOR QUARRIES Client: UULCAN Operation: NORTH ClientIDtk: VULn(p.1 Date: ro/99/oo Time: 13:51 Shot: 57 Seismograph Loc.: rw L C oA N t,A K KX -a 4 Blast Location: uw-34 Distance: 205vr Feet Max/Delay 88c velocity Frequency RESULTS Longitudinal Transverse Vertical �0.03°;��:3:, IV <0.03 Peak Maximum Air Blast Vibration rp_0^3 Decibels Co.o Wscc E]Hertz — Hertz Seismograph Operator: 7WHR' BAOcoc.K Seismograph Serial ti: a3aa Transducer a d o Microphone 3 a 9 Trigger levels: o.0 3 Comments: S ca4 rc o2%7%Ar.I [C G 4 wsee Hertz Blasters SaRty Checklist awxcn.w Location //O�'�� elaaler C.� /,L-"`/L"✓'Ey". Data cis '�`/"O® Truck Number ___... Pre -Blast Checks Inspect blast ads for hazards such as operating equipment, loose rock at lace, / Wsy cunent, hlghwell hazards, etc. ✓ Rsvlwv Dnibns Lag / li seismogram from previous brand In eras Determine distance to ckeast noncanpony deell it /eeb .ErT lFW- MWmd placement of signs and safrly cone wound stlol _ � Pbcameto/mwkentlerest Check Was for dockage / ChecWedjust depth of holes Compare drip lugs luau, mina a ffasMphl Profile rem rase holes for Made f Method P� b /A21 z . Loading Checks Determine needMYive harness tl free We Density checks for bland products Adjust fraM rase kadbg as needed —� Pdjual column helyht/slemmtrg based on drill andlor viaud observations of collar region Final inspection of blest to check for proper j sr+,.swr Inflation sequence. Each connection pbyskaly / checked by blaster end helper Post Blast Checks Wed for post blast fumes to clear, check for misfires Check site far hazards ReNew seismic data Revim vase of shot DNP 98 ' t r, I L tlt r .at IFS 4 I +1 'td-�+; 1 rl�. 1'b ��'_ _• H'r. ,I 1 77 1+I i-J-� -$ � J } tt 1 -r I.:I.I 1 f ry{..��. TRH{r. 4�1 1 { t L ���h�rt- rl r 7 .�,� j' +,�-I i _ `I I i I'.i� t �rl�i iii� T I'i. 1 �- + �i l Y107 i� Hill i LJI t{. fll�l-iti �� i ft I�{{� :+ CIitI 11 tONt�liu YOp _ !-�i 7 }?ii y t't I, I tj i zIl 'IL i Fr — I T ,.il —}Ill �—A{F{ J•i ,; j I J i l i i l r k I. i-a- I 1-v-i I�� �_l 7 i r" I- i 11�j r�1i. y +_ -r1 1 a.. i '� I l j l J -+ J L �` Z ILLr! 11 J C] 1 , L I rT+1 1 , ._,ram, {a.-f �A;1-, '�liIl i't1.tl ,I jj1, it l-�.1 I Iji +11` {i++'I'�{ _ 11 ` {fi 1-II a 11lL i ' r ...' .-.. !. -1 -mllm I .I 1 + ... 1 .. a 90a,..n Pk 0 LOtro �� W 5 Z 7/1'0 lr Ui I k NORTH CAROLINA DEPARTMENT OF _ ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES • January 1, 2000 Mr. Ronald G. McAbee � JAMES S. HUNTJR. �' President Mideast Division i GOVERNOR:'': Vulcan Construction Materials, LP ' P.O. Box 4239 Winston Salem, North Carolina 27115 1• WAYNE NICDEVlTT,�' " f SECRETARY RE: Corporate Name Change on All Mining Permits yi ,;.•n yl.. , r Dear Mr. McAbee: r, "• ,- ram:` �o��+i�' I CHAR Les H: GARONERZ,�'d P.G., P.E.,DIRECTO Your request to have all mining permits issued to Vulcan Materials AND STATE GEZOLOR' GE9T;'' `, • Company (see attached list) transferred in their entirety to Vulcan 'w + �'' la` ...., Construction Materials LP has been a pproved. As we have received the required surety in an amount sufficient to cover the present operations, ' w'�' •,: `., g Vulcan Materials Company is hereby released from further responsibility for ,•` ,_.;,,,w � •_ n these sites with respect to The Mining Act. ,k Please attach each of the enclosed Mining Permit Cover Pages to each of the corresponding mining permit documents already in your " f ` company's possession. I ! Thank you for your cooperation in this matter- If you should have any is questions, please contact me at (919) 733-4574. Sincerely, x rt •K,� Tracy E. avis, P.E. State Mining Specialist Land Quality Section TEDftls Enclosures cc; Land Quality Section Regional Engineers Ms. Barbara Rote-WRC, w/enclosures ,1 : - " • ° ' N Mr. Bradley Bennett-DWQ, wlenclosures '�`._ .... , ;- "', ��s.�-p�`41k,)✓/ LAND QUALITY SECTION f9191 733-4574 FAX {91 91 733-2676 GEOLOGICAL SURVEY SECTION (919) 733-2423 FAX {9t9V 733-0900 . }-•', .✓' P.O. Box 27987, RALEIGH, NORTH CAROLINA 2761 1-76R7 TELEPHONE �919) 733-3B3.i FAX f 919) 71 S-Q901 AN EQUAL OPPtl RTULAITY AFFIRMATIVE ACTION EMPLOYER - 509'o RECYG LEA/10 o POST -CONSUMER PAPER Thursday, December 09, 1999 ANSWER Page 1 Permit No. Kline Name Cou Region Expiration Date River Basin 100-24 TOE RIVER QUARRY YANCE 1.00 9/92008 FRENCH BROAD 11-03 ENKAQUARRY BUNCO 1.00111132002 FRENCH BROAD 12-02 MORGANTON QUARRY BURKE 1.00 8i712002 CATAWBA 13-04 GOLD HILL QUARRY CABAR 3,00 10/302002 YADKIN 13-27 CABARRUS QUARRY CABAR 3.00 5132006 YADKIN 14-01 LENIOR QUARRY CALDW 1.00 1/192004 CATAWBA 17-01 SHELTON QUARRY CASWE 4.00 2/182002 ROANOKE 30-03 SMITH GROVE QUARRY DAVIE 4.0012202001 YADKIN 34-01 421 QUARRY FORSY 4.00 9252002 YADKIN 34-02 NORTH QUARRY FORSY 4.00 817=02 YADKIN 34-04 SOUTH FORK QUARRY FORSY 4.00 1/192003 YADKIN 34-05 EAST FORSYTH QUARRY FORSY 4.00 11292000 YADKW 36-24 GASTON QUARRY GASTO 3.00 3/160000 CATAWBA 41-08 STOKESDALE QUARRY GUILF 4.00 6/302002 CAPE FEAR 41-20 GREENSBORO QUARRY GUILF 4.00 5/15/2006 YADKIN 45-01 HENDERSONVILLE QUARRY HENDE 1.004/192000 FRENCH BROAD 60-05 PINEVILLE QUARRY MECKL 3.0011242002 CATAWBA 60-11 CLEAR CREEK QUARRY MECKL 3.00 10/18/2001 CATAWBA 61-13 SPRUCE PINE QUARRY MITCH 1.00 3/92C FRENCH BROAD 77.01 ROCKINGHAM QUARRY IRICHM 6.00 12/62001 YADKIN 79-09 STONEVILLE QUARRY ROCK] 4.00 6182002 ROANOKE 85-03 PILOT MOUNTAIN QUARRY STOKE 4.00 2/162003 ROANOKE 85-04 SANDY RIDGE QUARRY STOKE 4,00 413/2001 ROANOKE 86-03 ELKIN QUARRY SORRY 4.00 11/t22001 YADKIN PEE DEE 91-01 GREYSTONE QUARRY VANCE 5,00 7/172002 NEUSE 95-01 BOONE QUARRY WATAU 4.00 6=004 WATAUGA 97-02 115OUARRY WILKE IYADKI 4.00 3WO02 YADKIN 99-01 CYCLE QUARRY YADKI 4.00 1/82003 YADKIN PEE DEE 99-06 YADKIN QUARRY 4.00 12/6199 YADKIN PEE DEE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES LAND QUALITY SECTION PERMIT for the operation of a mining activity In accordance with the provisions of G.S. 74-46 through 68, "The Mining Act of 1971," Mining Permit Rule 15A NCAC 5 B, and other applicable laws, rules and regulations Permission is hereby granted to: Vulcan Construction Materials, LP North Quarry Forsyth County - Permit No. 34-02 for the operation of a Crushed Stone Quarry which shall provide that the usefulness, productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. MINING PERMIT EXPIRATION QATE: August 7. 2002 z... NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES June 2. 1999 Mr. Mike Poplin Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115 RE: Permit No. 34-02 North Quarry Forsyth County Yadkin River Basin Dear Mr. Poplin: Your recent request to have the above referenced mining permit modified has been approved. The modification is to reduce the storage capacities of Basin No. 1 and Basin No. 2 to approximately 25 per cent of the original design capacity as indicated in your letter and supplemental information dated April 26, 1999. Please attach this approval letter to your existing mining permit for future reference. The expiration date, mine name and permit number on the permit document shall remain the same as before this modification. The issuance of a mining permit and/or any modification to it does not supersede local zoning regulations. The responsibility of compliance with any applicable zoning regulations lies with you. As a reminder, your permitted acreage at this site is 322 acres and the amount of land you are approved to disturb is 179 acres. LANP GVALITY SECTION r919) 733.4374 rAx 18191 733-2E7r. GEOLOGICAL SURVEY SECTION 19191733-2423 EAC IS DJ 733-ON00 PO. BOX 27687, RALnOR, NOPTM CA MOLINA 27611-7697 TELEPHONE (9191733.3033 PAX(9191 715-6801 AN 64VAL OPMATVMITY/ A PP I AMAVVE A CTION C"U"C' 50% 1 ECYCLEd 10% PO.ST.mrvfu n ER RAPER 0 • Mr. Poplin Page Two Please advise this office at (919) 733-4574 should you have any questions concerning this matter. Sincerely, Charles H. Gardner, P.G., P.E. CHG/jw cc: Mr. Matthew Gantt, P.E. Ms. Barbara Rote-WRC Mr. Bradley Bennett-DWQ State of North CU iino Department of Environment, Health and Natural Resources Division of Land Resources _ James B. Hunt, Governor ID FEE N FR Jonathan B. Howes, Secretary Charles Gardner, P.G., P.E. Director and State Geologist October 21, 1993 Mr. J.R. Bryson Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115-4239 -RE: Permit No. 34-02 North Quarry Forsyth County Dear Mr. Bryson: Your application for modification of the above referenced permit has been approved. The modification involves the addition of 39.0 acres north of Mill. Creek and the construction of berms and related erosion/sedimentation control devices as indicated on the Future Plant Area Plan, Erosion & Sedimentation Control & Reclamation Map (Y930053) dated August 9, 1993. A copy of the - modified permit is enclosed. The conditions in the permit modification were based primarily upon the initial application. Modifications were made as indicated by the modification request and as required to insure compliance with The Mining Act of 1971. The permit number, mine name and expiration date shall remain the same as before the modification. As a reminder, the permitted acreage for this site is 322 acres, while the acreage you are approved to affect is 179 acres. Please review the modified permit and advise this office at (919) 733-4574 should you have any questions concerning this matter. ' Sinc rely.'/�.�f"��""%%� T^Cv E tU�T- Mining Specialist Land Quality Section - TED/tls Enclosure cc: Mr. Doug Miller Geological Survey Section Land Quality Section Geodetic Survey Section (919)733-2423 (919)733-4574 (919)733-3836 FAX:(919)733-0900 FAX: 733-2876 FAX: 7334407 P.O. Box 27687. Raleigh. North Carolina 27611-7687 Telephone 919-733.3833 FAX919-733.4407 An Equal Oppodun4y Affirmative Action Employer 50%recycled/ 10%pail-consumer pap6e DEPARTMENT O IF ENV 2 RONMENT HEALTH AND NATURAL RESOURCE S ' D =V = S = ON OF LAND RESOURCES LAND QUA=..2TY SECTION P 'E R M = T for the operation of a mining activity in accordance with the provisions of G.S. 74-46 through 68, "The Mining Act of 1971," Mining Permit,Rule 15A NCAC 5 B, and other applicable laws, rules and regulations Permission is hereby granted to: Vulcan Materials Company North Quarry Forsyth County - Permit No. 34-42 for the operation of a Crushed Stone Quarry which shall provide that the usefulness, productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. MINING PERMIT EXPIRATION DATE: AUGUST 7. 2002 Page 2 of 11 In accordance with the application for this mining permit, which is hereby approved by the Department of Environment, Health and Natural Resources hereinafter referred to as the Department, and'in conformity with the approved Reclamation Plan attached to and incorporated as part of this permit, provisions must be made for the protection of the surrounding environment and for reclamation of the land and water affected by the permitted mining operation. This permit is expressly conditioned upon compliance with all the requirements of the approved Reclamation Plan. However, completed performance of the approved Reclamation Plan is a separable obligation, secured by the bond or other security on file with the Department, and may survive the expiration, revocation or suspension of this permit. This permit is not transferable by the permittee with the following exception: If another operator succeeds to. -the --interest of the permittee in the permitted mining operation, by virtue of a sale, lease, assignment or otherwise, the Department may release the permittee from the duties imposed upon him by the conditions of his permit and by the Mining Act with reference to the permitted operation, and transfer the permit to the successor operator, provided that both operators have complied with the requirements of the Mining Act and that the successor operator agrees to assume the duties of the permittee with reference to reclamation of the affected land and posts a suitable bond or other security. In the event that the Department determines that the permittee or permittee's successor is not complying with the Reclamation Plan or other terms and conditions of this permit, or is failing to achieve the purposes and requirements of the Mining Act, the Department may give the operator written notice of its intent to modify, revoke or suspend the permit, or its intent to modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a hearing at a designated time and place on any proposed modification, revocation or suspension by the Department. Alternatively and in addition to the above, the Department may institute other enforcement procedures authorized by law. Qefinitions wherever used or referred to in this permit, unless the context clearly indicates otherwise, terms shall have the same meaning as supplied by the Mining Act, N.C.G.S. 74-49. Modifications August 7. 1992: This permit has been modified to include the 2.84 acre Graham Enterprises tract and the 27.0 acre Graham Enterprises tract as undisturbed buffer land, as indicated on the Mine Map dated September 1991 and received by the Land Quality Section on June 8, 1992. • Page 3 of 11 September_16, 1993: This permit has been modified to allow the Contractor Staging Area (approximately .5 acres) as indicated on the Mine Map (8.5"x 1411) dated September 9, 1993. October 21, 1993: This permit has been modified to include 39.0 acres of additional land located north of Mill Creek and to allow the construction of berms and related erosion/sedimentation control devices as indicated on the Future Plant Area Plan, Erosion & Sedimentation Control & Reclamation Map (Y930053) dated August 9, 1993. Expiration Date This permit shall be effective from the date of its issuance until August 7, 2002. Conditions This Permit shall be subject to the provisions of the Mining Act, N.C.G.S. 74-46, et. seq., and to the following conditions and limitations: OPERATING CONDITIONS: 1. Wastewater and Quagry Dewate in A. Any wastewater processing or mine dewatering shall be in accordance with the permitting requirements and rules promulgated by the N.C. Environmental Management Commission. B. Any stormwater runoff from the affected areas at the site shall be in accordance with any applicable permit requirements and regulations promulgated by the Environmental Protection Agency and enforced by the N.C. Environmental Management Commission. It shall be the permittee's responsibility to contact the Water Quality Section, Division of Environmental Management, to secure any necessary stormwater permits or other approval documents. 2. Ai.r4uality and Dust Control A. Any mining related process producing air contaminant emissions including fugitive dust shall -be subject to the requirements and rules promulgated by the N.C. Environmental Management Commission. B. During quarry operation, water trucks or other means that may be necessary shall be utilized to prevent dust from leaving the permitted area. Page 4 of 11 Buffer Zones A. Any mining activity affecting wetlands shall be in accordance with the requirements and regulations promulgated by the U.S. Army Corps of Engineers. B. Sufficient buffer shall be maintained between any affected land and any adjoining waterway to prevent sedimentation of that waterway from erosion of the affected land and to preserve the integrity of the natural watercourse. The buffer zones shown on the Mine Map dated September 1991 and received by the Land Quality Section on June 8, 1992 shall be maintained to prevent caving of any adjoining property and to allow grading of the -side slopes to the required angle. These buffer zones, with the exception of the installation of required sediment control measures and earthen berms, shall remain undisturbed. The buffer zones indicated on the Future Plant Area Plan, Erosion & Sedimentation Control & Reclamation Map (Y930053) dated August 9, 1993 for the 39 acre modification north of Mill Creek shall be maintained to prevent sedimentation of Mill Creek. 4. Erosion and Sediment Control A. Adequate mechanical barriers including, but not limited to diversions, earthen dikes, silt check dams, silt retarding structures, rip rap pits, or ditches shall be provided in the initial stages of any land disturbance and maintained to prevent sediment from discharging onto adjacent surface areas or into any lake or natural watercourse in proximity to the affected land. Sediment and erosion control measures shall be installed and maintained as indicated on the Mine Map dated September 1991 and received on June S. 1992 by the Land Quality Section. Sediment and erosion control measures shall be installed and maintained as indicated on the Future Plant Area Plan, Erosion & Sedimentation. Control & Reclamation Map (Y930053) dated August 9, 1993 for the 39.0 acre modification north of Mill Creek. Page 5 of 11 E. An erosion and sediment control plan(s) shall be submitted to the Department for approval prior to any land disturbing activities not indicatedonthe revised erosion control plan or mine maps submitted with the approved application for renewal of this mining permit and any approved revisions to it. Suchareas include, but are not limited to, expansion outside of the initial pit area, plant relocation, creek crossings, or expansion of overburden disposal areas. Groundwater Protection A. Observation wells shall be installed in the locations indicated on the Mine Map dated September 1991 and received by the Land Quality Section on June 8, 1992. These wells shall be monitored as deemed appropriate by the N.C. Division of Environmental Management, Groundwater Section. X B! The necessary permits to construct these wells shall be obtained from the N.C. Division of Environmental Management, Groundwater Section. A. The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control measure, structure, or device. In any event, exposed slopes or any excavated channels, the erosion of which may cause offsite damage because of siltation, shall be planted or otherwise provided with groundcover, devices or structures sufficient to restrain such erosion. B. Overburden cut slopes along -the perimeter of any pit wall disturbance created after August 7, 1992 shall be graded to a minimum 2 horizontal to 1 vertical or flatter and shall be stabilized within 60 days of completion. Furthermore, a minimum ten (10) foot wide horizontal safety bench shall be provided at the top of the rock and at the toe of the overburden slope for any pit walls disturbed after August 7, 1992. 7. Surface Drainaae The affected land shall be graded so as to prevent collection of ., pools of water that are, or likely to become, noxious or foul. Necessary structures such as drainage ditches or conduits shall be constructed or installed when required to prevent such conditions. i i 8. Blasting Page 6 of 11 The operator shall provide to the Department a copy'of the findings of any seismic studies conducted at this facility. The operator shall make every reasonable effort to incorporate the studies' recommendations into the production blasting program. The following blasting conditions shall be observed by the operator to prevent hazard to persons and adjacent property from thrown rock or vibrations: A. In all blasting operations, except as hereinafter otherwise provided, the maximum peak particle velocity of any component of ground motion shall not exceed I inch per second at the immediate location.of any building outside of the permitted area regularly occupied by human beings such as dwelling house, church, school, public building, or commercial or institutional building outside of the permitted area. The operator shall monitor each blast with a seismograph. B. Airblast overpressure shall not exceed 128 decibels linear (DBL) as measured at the immediate location of any regularly occupied building such as any dwelling house, church, school, public building, or commercial or institutional building. C. The operator shall take all reasonable precautions to insure that flyrock is not thrown beyond areas where the access is temporarily or permanently guarded by the operator. Should flyrock occur beyond the guarded area or the levels in Items A and B above are exceeded, the operator shall report the incident to the Department immediately and further use of explosive at the site shall be immediately suspended until the following actions have been taken: 1. A thorough investigation as to the cause(s) of the incident shall be conducted. 2. A satisfactory report detailing the investigation shall be provided to the Department within 10 days of the incident. Said report shall, at a minimum, document the cause(s) of the incident along with technical�and- management actions that will be taken to prevent further incidents. The report shall meet with the approval of the Department before blasting may resume at the site. Failure to take corrective measures to prevent flyrock and repeated instances of flyrock shall be considered a violation of this permit. Page 7 of 11 D. The operator shall maintain records on each individual blast describing: the total number of holes; pattern of holes and delay of intervals; depth and size of holes; type and total pounds of explosives; maximum pounds per delay interval; amount of stemming and burden for each hole; and blast location. Records shall be maintained at the permittee's mine office and copies shall be provided to the Department upon request. .E. The operator shall, when requested by the Department, give 24 hour advance notice to the Land Quality Section prior to any blast during a period for which notice is requested. 9. High Wall Barrier A physical barrier consisting of large boulders placed end -to -end or fencing shall be maintained at all times around the perimeter of any highwall to prevent inadvertent public access. In addition, a minimum ten (10) foot wide horizontal safety bench shall be provided at the junction between the top of rock and the toe of the overburden out slope for any pit walls disturbed after August 7, 1992. 10. Visual Screening A. Existing vegetation shall be maintained between the mine and public thoroughfares to screen the operation from the public. Additional screening methods, such as constructing earthen berms, shall be employed as deemed appropriate by the Department. B. Berms shall be Inca d and constructed as shown on the Mine Map dated�September 1991) and received by the Land Quality Section on June 8, 1999 In addition to grasses, loblolly and/or Virginia pines shall be planted as deemed appropriate }} by the Department to improve visual and noise buffering. �¢. Berms for the 39.0 acre modification north of Mill creek /\ shall be located and constructed as shown on the Future Plant Area Plan, Erosion & Sedimentation control & Reclamation Map (Y930053) dated August 9, 1993. 11. Plan Modification - .w The operator shall notify the Department in writing of the desire to.delete, modify or otherwise change any part of the mining, reclamation, or erosion/sediment control plan contained in the approved application for a mining permit and any approved revisions to it. Approval to implement such changes must be obtained from the Department prior to on -site implementation of the revisions. Page 8 of 11 12. Refuse Disposal A. No on -site disposal of refuse or other solid waste that are generated outside of the mining permit area shall be allowed within the boundaries of the mining permit area unless authorization to conduct said disposal has first been obtained from both the Division of Solid Waste Management and the Land Quality Section, Department Of Environment, Health and Natural Resources. The method of disposal shall be consistent with the approved reclamation plan. B. Mining refuse as defined by G.S. 74-49 (14) of The Mining Act of 1971 generated on -site and directly associated with the mining activity may be disposed of in a designated refuse area. All other waste productsmustbe disposed of in a disposal facility approved by the Division of Solid Waste Management. No petroleum products, acids, solvents or their storage containers or any other material that maybe considered hazardous shall be disposed of within the permitted area. MMENYMMM-Mra An Annual Reclamation Report shall be submitted on a form supplied by the Department by February 1 of each year until reclamation is completed and approved. 4. Bonding The security which was posted pursuant to N.0_G.S. 74-54 in the form of a $25,000.00 Blanket Bond is sufficient to cover the operation as indicated on the approved application. This security must remain in force for this permit to be valid. The total affected land shall not exceed the bonded acreage. Authorized representatives of the Division of Archives and History shall be granted access to the site to determine the presence of significant archaeological resources. 0 Page 9 of 11 APPROVED RECLAMATION PLAN The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition on the continuing validity of that Mining Permit. Additionally, the Reclamation Plan is a separable obligation of the permittee, which continues beyond the terms of the Mining Permit. The approved plan provides: Minimum Standards As Provided By G.S. 74-53. 1. The final slopes in all excavations in soil, sand, gravel and other unconsolidated materials shall be at such an angle as to minimize the possibility of slides and be consistent with the future use of the land. 2. Provisions for safety to persons and to adjoining property must be provided in all excavations in rock. 3. All overburden and spoil shall be left in a configuration which is in accordance with accepted conservation practices and which is suitable for the proposed subsequent use of the land. 4. No small pools of water shall be allowed to collect or remain on the mined area that are, likely to become noxious, odious or foul. 5. The revegetation plan shall conform to accepted and recommended agronomic and reforestation practices as established by the North Carolina Agricultural Experiment Station and the North Carolina Forest Service. 6. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein incorporated. These activities shall be conducted according to the time schedule included in the plan, which shall to the extent feasible provide reclamation simultaneous with mining operations and in any event, provide reclamation at the earliest practicable time after completion or termination of mining on any segment of the permit area and shall be completed within two years after completion or termination of mining. RECLAMATION CONDITIONS: 1. Provided further, and subject to the Reclamation Schedule, the planned reclamation shall be to allow the quarry excavation to fill with water, provide a permanent barricade (fence) along the top of any highwall, and grade and revegetate any areas in unconsolidated material. 0 Page 10 of 11 2. The specifications for surface gradient restoration to a surface suitable for the planned future use are as follows: A. All areas of unconsolidated material such as overburden or waste piles shall be graded to a 2 horizontal to 1 vertical or flatter slope and terraced as necessary to insure slope stability. B. The pit walls shall be reclaimed in accordance with the Proposed Reclamation Cross -Sections dated September 1991. C. Any settling ponds and sediment control basins shall be backfilled, graded, and stabilized or cleaned out and made into acceptable lake areas. D. The processing, stockpile, and other disturbed areas neighboring the mine excavation shall be leveled and smoothed. E. Compacted surfaces shall be disced, subsoiled or otherwise prepared before revegetation. F. No contaminants shall be permanently disposed of at the mine site. On -site disposal of waste shall be in accordance with Operating Condition 12A and B. G. The affected land shall be graded to prevent the collection of noxious or foul water. 3. Revegetation Plan: Disturbed areas shall be permanently revegetated according to the Revegetation Plan prepared by Mr. Michael Washington, District Conservationist with the Soil Conservation Service, dated April 29, 1991 and revised October 14, 1991 to incorporate the seeding recommendations of the Wildlife Resources Commission. I r� Page 11 of 11 4. Reclamation Plan: Reclamation shall be conducted simultaneously with mining to the extent feasible. In any event, reclamation shall be initiated as soon as feasible after completion or termination of mining of any mine segment under permit. Prior to final reclamation, a detailed reclamation plan shall be submitted to and approved by the Department. Final reclamation, including revegetation, shall be completed within two years of completion or termination of mining. This permit, issued $eptember 12, 1972, renewed September 27, 1982, renewed and modified August 7, 1992 and modified September 16, 1993, is hereby modified this 21st day of October, 1993 pursuant to G.S. 74-52. By: _� Charles H. Gardner, Director Division of hand Resources By Authority of the Secretary of the Department of Environment, Health and Natural Resources RONALD G. MCABEE PRESIDENT +aweAST DIVISION November 15. 1999 Tmcy E. Davis Suite Mining Specialist Land Quality Section Department of Environment and Natural Resources Post Office Box 27687 Raleigh- North Carolina 27611 uukun Materials Company RECEIVED rl�1D�� EHN��RR'yy� N+fY I 9 I'JTJ LAND QUALITY SECTION 6l �1Q 1,.0 30' .wnsrows•Lb,wRinca a: ns4= rEFPIRONE1t5:87-4Wp Re: Transfer of ownership from Vulcan Materials Company to Vulcan Construction Materials. LP Mine Permit Listing Attached— 26 Locations Dear Mr. Davis: Vulcan Materials Company currently holds mining permits for the sites referenced above. Effective January 1, 2WO, Vulcan will transfer the above referenced locations to its wholly owned affiliate, Vulcan Construction Materials, LP ("VCM"). Accordingly, Vulcan requests that the above -referenced permits be amended to reflect VCM as the pernritlec c0ectivc January 1, 2000. After the transfer is effective. VCM will continue to operate the referenced facilities under the terms and conditions of the current permits. The telephone numbers and contact information currently on file with your o1Ttce will remain the same. Enclosed is a check in the amount of S1.2500), representing the processing fee for our twenty-five (25) permits. Under separate cover, Vulcan is sending to you the original Copy of a blanket surety bond and power of attorney for Vulcan Construction Materials, I.P. Should you have any questions or need further information. please call Mike Poplin at (336) 767. Current Pennittee,,,� //1 Vulcan MM�ateriaalls Company By 1n,�GnC `obttl Its President, Mideast Division Proposed New Permittee, Vulcan Construction Materials, LP By Vulcan Materials Company Its General Partner Its President, Mideast Division C: Frederic Smith, Bradley Arant Rose & White, LLP Mike Poplin TRANSFER OF OWNERSHIP FROM VULCAN MATERIALS COMPANY TO VULCAN CONSTRUCTION MATERIALS, LP LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 197 L We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S. 74-59. LANDOWNER: Current Permittee, Vulcan Materials Company By Its President, Mideast Division Ronald G. McAbee Vulcan Materials Company P.O. Box 4239 Winston-Salem, NC 27105 (336) 744 - 4600 APPLICANT: Proposed New Permittee, Vulcan Construction Materials, LP By Vulcan Materials Company Its General Partner By 4,- Its President, Mideast Division Ronald G. McAbee Vulcan Materials Company MIKE POPLIN P.O. sox.asv SENIORS q()NMENTAL ENOnNfEER I_I }l(TON$ALt]N. NOnrXGAN'.MR ?�:tS+tb MI[F,IRT OIV151QY 'IIIIUIIfr_,IIIIU\III rtLErnOAX tad , <.p, 7Gb.Iem NOV 2 9 1999 a By_._ _ November 24, 1999 Mr. Tony Sample Assistant Mining Specialist Land Quality Section P. O. Box 27687 Raleigh, NC 27611 Re: Corrected Listing of Mine Permits Reqested Transfer of Ownership 29-Locations Dear Mr. Sample Thank you very much for noting the discrepancies in the earlier correspondence. Please find enclosed a corrected permit listing and a check in the amount of $200.00 for the additional processing fee. I apologize for any confusion and inconvenience. Should you have any questions or require additional information in this matter, please contact me. Thank you again. Sincerely, 2 ike Poplin 'Enmionmental Engineer manmechange 11-24-" NORTH CAROLINA MINE PERMITS MINE NAME PERMIT NUMBER BOON E 95-01 CABARRUS 13-27 CLEAR CREEK 60-1 1 CYCLE 99-01 EAST FORSYT14 34-05 ELKIN 86-03 ENKA 1 1-03 421 QUARRY 34-01 GASTON 36-24 GOLD HILL 13-04 GREENSBORO 41-20 GREYSTONE 91-01 HENDERSONVILLE 45-01 LENOI R 14-01 MORGANTON 12-02 NORTH 34-02 115 QUARRY 97-02 PILOT MOUNTAIN 85-03 PINEVILLE 60-05 ROCKI NGHAM 77-01 SANDY RIDGE 85-04 SHELTON 17-01 SMITH GROVE 30-03 SOUTH FORK 34-04 SPRUCE PINE 61-13 STOKESDALE 41-08 STONEVILLE 79-09 TOE RIVER 100-24 YA DKIN 99-06 REVISM 11-24.99 e i0ooD E 11000 II nor, E 1200c U 'Y t,f D U �.: FUTURE PLANT AREA ,SAF,..m j �J/.Lle � , RECE IV ou.wi: iUA a x urea YARD AREA �!I L STOIC PILE AND I N\ EQUIPMENT AR A \l SIC N � � o �� f � a � NORTH QUARRY w�eor� £OPSYTH COUNTY E 9000 E 10000 E 11000 - -D -£ 0 _ _ l C � — \ 4 1 ' \ san��n w w FUTURE PLANT AREA ECE o >m o „ , ouu9, roN IARD AREA / I �� ST AR A PILE �� �,• AND �,.. :GALhe.,®,rururmrn N EQUIPMENT �a o k I � WAM 4' E da. Co c a, °` 10E NORTR QUARRY NC®ENR14 i LAMES B. HUNT JR. 4"A iOVERNOR Y� 'NAYNE MCDCVITT _ SECRETARY _�"� . 4 •� �_'HARLES H. GARDNE_R'.'' '?G., P.E. DIRECTOR , ' r.,j %ND STATE GEOLOGIST. +..-. e •• rk iu 41 r �_ 7 0 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OR LAND RESOURCES August 12, 1999 Mr. Mike Poplin Vulcan Materials Company Mideast Division P.O. Box 4239 Winston-Salem, North Carolina 27115 RE: Permit No. 34-02 ,Nbrth-Quarry Forsyth -County Yadkirti_River Basin Dear Mr. Poplin: This purpose of this letter is to confirm receipt of your June 18, 1999 letter and revised maps. It is my understanding that you wish to clarify the ultimate pit limit and ten year pit limit at your company's North Quarry. These limits were inadvertently left off of the last modification request maps prepared in 1992. We acknowledge these pit limits and have retained a copy of the revised maps for our files for future reference. We appreciate your diligence in bringing this matter to our attention. As a reminder, your permitted acreage at this site remains 322 acres and the amount of land you are approved to disturb is 179 acres. LAND QUALITY SECTION (919) 733-4$74 FAX (919) 733-2676 GEOLOGICAL SURVEY SECTION (9191733.2423 FAX (919)733-0900 P.O. BOX 27687, RALEIGH, NORTH CAROLINA 2761 1 -7687 TELEP"ONE (91 9) 733-3833 FAX (919) 71 S.88O1 AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLE0110% POST -CONSUMER PAPER 0 Page 2 Please advise this office at (919) 733-4574 should you have any questions concerning this matter. Sincerely, V Tracy Ecy a State Mining Specialist Land Quality Section TEDlw cc: Mr. Matthew Gantt, P.E. • E Date: 08/05/1999 8:50 AM Sender: "Matthew Gantt" <MATT_ GANTT@wsro.enr.state.nc.us> Subject: (Fwd) 7/8/99 North Quarry (34-02) Permit Modification Reques _______ Forwarded Message Follows ------- From: "Chris Hite" <CHRIS_HITE@wsro.enr.state.nc.us> Organization: NC DENR Winston Salem To: "Matthew Gantt" <MATT_GANTT@wsro.enr.state.nc.us> Date sent: Thu, 5 Aug 1999 08:47:11 +0500 Subject: 7/8/99 North Quarry (34-02) Permit Modification Request Send reply to: Chris_Hite@WSRO.ENR.State.NC.US Priority: normal Matt. Please review and forward. ******************************************* Hey Judy. I have completed my review of the referenced permit modification proposal, and I have no comment to the requested modification. This office recommends approval of the referenced permit modification proposal. Chris ---------------------------------------------- Chris Hite CHRIS_HITE@WSRO.ENR.State.NC.US NC DENR Land Quality Environmental Technician V 585 Waughtown Street Winston-Salem, NC 27107 voice (336) 771-4608 ext 243 FAX (336) 771-4631 �• DATE TO ASSI LAGGED IN _ DATE TO SUO p�NENING CHECKLIST FOR ROUTING Company V /( L �P�r�o�j'ec`t Name i IaA �i U;l rfw Permit No.. 3")r/a� County 4/hAU+ .J Date Received k as � 4//y/9' Reviewer ( W ) IL4r u , ` Please make copies of check to include with Central Office and Field Office files and log in checks. + ❑ New ❑ Renewal ❑ Modification ❑ Transfer ❑ Release �❑� Additional Information ❑ Fee Needed ❑ Fee Received: Amount Please route to: /❑� WIhV- 71_I��ZM Field Office Date Routed I ❑ Wildlife Resources Commission Date Routed • ❑ Archives and History Date Routed ❑ Other: Date Routed suspense Date for Comments: 4SI,�I94 (Date received +30 days, not on weekend) l /❑, Please note the following: - •SUSAN: Please make file and return Checklist and file to Reviewer White Copy to Field Office Yellow and Pink Copies to File Goldenrod Copy to Susan bullan Materials Company MIKE POPLIN SENIOR ENVIRONMENTAI. ENGINEER MIDEAST DIVISION Junc Is., 1999 Ms, Jude Weluter Assistant Mining; Specialist Land Quality Section P. O. Box 27687 Ralclgh, NC 27611 Rc: Clarification of Pit Limits Permit No. 34-02 North Quarry Dear Ms. Weiner: 0 P.O. BOX 4M VVINSTON•SALEM. NUHIIi CAROLINA 21115-423D TELEPHONE 336 767.4600 FAX 336 744.2019 During the recent review and approval of the reduction in size of several sediment basins, we became aware of an potential confusing item on our nine snaps submitted and approved several rears ago. The 1991 renewal and modification map correctly depicted the ultimate pit limit that would include areas now occupied by shop. employee and Central Services buildings, It also depicted the I0-year quarry expansion area, A copy of this map is enclosed with the two limits highlighted. During the subscgent permitting in 1992 of the new plant site, north of Mill Creek, the ultimate pit limit was inadvertently omitted and the I 0-year quarry expansion area was not shown with the correct. revised acreage of 37.58. To hopefully resolve any future confusion or questions that may arise and to update your office. find enclosed a sectional map of North_ it shows the majority of the site, with the current pit expansion extending into the old plant area: soil overburden will be temporarily stockpiled and sold. The map also shoes the ultimate pit limit. Should you have any questions or require further clarification. please contact Tim Knopf or Inc. Thank you for vour attention to this matter.. Sincerely. Mike Poplin Enviroil lnenlaI Engineer cc: Roger Bullins Tim Knopf 101 north basin �hpacky 4-99 • J Date: 05/17/1999 8:12 AM Sender: "Matthew Gantt" <MATT_GANTT@wsro.enr.state. nc.us> To: Judy Wehner Priority: Normal Subject: Fwd North Quarry - Forsyth - 34-02 Permit Modification ------- Forwarded Message Follows ------- From: "Chris Hite" <CHRIS_HITE@wsro.enr.state.nc.us> Organization: NC DENR Winston Salem To: "Matthew Gantt" <N1LQ402@NROAR04> Date sent: Fri, 14 May 1999 17:18:56 +0500 Subject: North Quarry - Forsyth - 34-02 Permit Modification Send reply to: Chris_Hite@WSRO.ENR.State.NC.US Priority: normal Matt, please review/revise and forward these comments to Judy Wenner. I have reviewed the permit modification request for the referenced mine. I also inspected the portion of the site pertinent to this permit modification on 5/14/99. I see no reason to disapprove this request to reduce the sizes of sediment basins 1 and 2. Basin 1 receives runoff from a disturbed area of 5-7 acres (compared to the 30 acres of disturbed area in 1993). Basin 2 no longer receives runoff from any disturbed area, due to stabilization of its drainage area. Chris Hite ---------------------------------------------- Chris Hite CHRIS HITE@WSRO.ENR.State.NC.US NC DENR Land Quality Environmental Technician V 585 Waughtown Street Winston-Salem, NC 27107 voice (336) 771-460B ext 243 FAX (336) 771-4631 Avwk K' r'Jf.l u-nj•!j,j nMA`F �Ayvr•.eMttnW'bnu.�^.NTM%+y"�'^!PT^^`9'y'u!+'^M".'.. ni+.' -. .� -�.M1..,.. �...«. �.. `v.a +m Y'4'^�i, (LTO DATE ASSISTANT DATE TO *SAN LAGGED IN i NfEgNG CHECKLIST FOR ROUTWG Company ` 'y�� n/ V��IL•/ Project 11 Name `'I 6Vl /, OUCWwli Permit No. 3V-O a County IDeu Date Received ✓ � Reviewer /��/ _,_ r .-h/ Please make copies of check to include with Central Office and Field Office files and log in checks. * ❑ New El Renewalsi Modification Transfer / / Release ❑ Additional Information ❑ Fee Needed ❑ Fee Received: Amount Please route to: ibl - YA� Field Office Date Routed ❑ Wildlife Resources Commission Date Routed * ❑ Archives and History Date Routed ❑ Other: Date Routed Suspense Date for Comments: Jr IdL (Date received +3o days, not on weekend) / ETPlease note the following: *SUSAN: Please make file and return Checklist and file to Reviewer White Copy to Field Office Yellow and Pink Copies to File Goldenrod Copy to Susan IYYffe TSYT Dar W ILE Y M Time ERE UT of Phone AMER CODE NUMBER EX7ENEON TELEPHONED PLEASE CAL Messag ���. Signed CALLED TO SEE VOU WILL CALL AGAIN WANTS TO SEE VOU URGENT RETURNED YOUR CALL N.C. De pl. of Environment. Health, and Natural Resources Pnn��mPeuy[iM Npe� APR-26-1999 17:07 Al f MATERIALS COMPANY 336 744 2019 P.01/00 DATE: TO: FROM: uuIllun Materlale Company FAX 4-2(�-gg l Q el wo FAX: q iq 733 2P96 PHONE: %;44-aoi? FAX: (336) 744.2019 NUMBER OF PAGES G THIS PAG q MESSAGE: APR-26-1999 17:07 MIKE POPLIN SENIOR FNVMONMEMPL INOwaeR MIDEAST OIVMON VIA FACSIMILE April 26, 1999 Ms. Judy Weller Assistant Mining Specialist Land Quality Section P. 0. Boot 27687 Raleigh, NC 27611 Re: Permit No. 34-02 North Quarry Dear Ms. Wehner: L.ULCAN MATERIALS COMPANY • Vulcan Materials Company 336 744 2019 P.02/08 I1 U P.O. a0x 4229 W INSTONdMEM, NORM GROLINA a7110.4"9 TIUe CNE di07a,-rGp P.at 3W ve.SNO 1 spoke with you recently regarding our need to reduce the original design capacity of two sediment basins. Find enclosed the design calculations that were submitted and approved in 1993 for the new plant site located north of Mill Creek. Site development and plant construction are entering the final phases and should be complete by early summer. Because operational area is very limited and the majority of the formally disturbed area is or will soon be stabilized, we believe it is prudent and reasonable to reduce the storage capacity. Presently the site is approximately 60 percent stabllzed, with the berms revegetated, ditches riprapped and the constructioNplant area stabiized with crusher run. I estimate within 60 days, the site will be 100 percent stabilzed with all areas provided with an erosion -resister[ ground cover (vegetation or stone). I propose to reduce the capacity of the two sediment basins to approximately 25 percent of the original design. For Basin No 1, the approximate duneneions would be 50 x 100 x 5' deep and for Basin No. 20 the approximate dimeesions would be 25 x 75 x 2.5' deep. The basins would continue 10 be cleaned- t when they reach half. capacity. Should you have any questions m require additional information in the above, please contact me. Your earliest response would be welcomed and enable us to proceed with site development, hopefully utilizing the critically needed, additional surface area for operational purposes. Thank you for you consideration and input. $incerel , ikeP ' Environmental Engineer ce: Phil Dotson Roger Bullins 101bdn®pecry 4A9 0 m r W �l 4 m N.. 1 S,A. - r''"00 NO. 1 CMP "Ire �.ot cw — — � n 2 h 30C i I - )Arl W � a INV. 810.oc CHANNEL NO. 3 6EL I IvNNLrt DN) CHANNEL NO. A PIPE OUTLET INV. 806.0i ` Pco�gcd% SEDIMENT BASIN NO. I 14` — �'CK. _ 1REF. DETAIL) Y Bn' r L.612 PROPOSED ACCESS ROAD °L806 EL.805.5 E1.806 20ffi CU I I COno ha / 1 APR-26-1999 17=08 VULCAN MATERIALS COMPANY 336 744 2019 P.04i08 • 0 SKELLYArjo L0Y iNc. TEL 717 232 0593 ENGINEERS -CONSULTANTS 800 892 6532 2601 NORTH FRONT STREET HARRISBURG PENNSYLVANIA 17110 FAX 717 232 1799 February 19, 1993 Mr. Russ Willard Vulcan Materials Company 4401 North Patterson Avenue Post Office Box 4239 Winston-Salem, North Carolina 27115-4239 Re: North Quarry Modifications Dear Russ: Please find enclosed the following revised items: • Drawing No. 1: Mine Map; • Drawing No. 2: Cross Sections; • Drawing No. 3: Plans and Details; • Drawing No. 4: Sight Line from Farm; • Drawing No. 5: Erosion and Sedimentation Control Map; and • Erosion and Sedimentation Control Plan Narrative. Revisions were made based upon the property boundary corrections faxed to Skelly and Loy on February 15, 1993. Please note that the latest versions are all dated February 18, 1993, and it is recommended that you carefully discard earlier versions to avoid confusion. If you have any questions, do not hesitate to call. Sincerely yours, SKELLY and LOY, Inc. A-\,a ` Michael E. Wasilco Mining Engineer MEW/veb Enclosures cc: Y930003 ENVIRONMENTAL CIVIL WASTE MANAGEMENT ENGINEERING PLANNING ENERGY/MINING RESEARCH APR-26-1999 17:08 VULCAN MATERIALS COMPANY 336 744 2019 P.05i08 EROSION AND SEDIMENTATION CONTROL PLAN PREPARED FOR: VULCAN MATERIALS COMPANY NORTH QUARRY -FUTURE PLANT AREA FORSYTH COUNTY POST OFFICE BOX 4239 WINSTON-SALEM, NORTH CAROLINA 27115-4239 PREPARED BY: SKELLY AND LOY, INC. ENGINEERS -CONSULTANTS 2601 NORTH FRONT STREET HARRISBURG, PENNSYLVANIA 17110 MODIFIED FEBRUARY 18, 1993 APR-26-1999 17:09 VULCAN MATERIALS COMPANY 4 336 744 2019 • P.06/06 VULCAN MATERIALS COMPANY EROSION AND SEDIMENTATION CONTROL PLAN NORTH QUARRY FORSYTH COUNTY MODIFIED FEBRUARY, 1993 TABLE OF CONTENTS PAGE PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES ..... 1 GENERAL CONSTRUCTION SEQUENCE .......................... 4 GENERAL MAINTENANCE PLAN . . .............................. 5 VEGETATION PLAN .......................................... 6 STORMWATER CONVEYANCE ................................. 7 SEDIMENT BASIN DE;yIGN.................................... 19 CULVERT DESIGN ......................................... 25 CONSTRUCTION SPECIFICATIONS .............................. 27 APR-26-1999 17 09 VU16N MATERIALS COMPANY 336 744 2019 P.07/08 SEDIMENT BASIN NO. 1 DESIGN Step 1. Determine Peak Runoff: The majority of runoff from the future plant area will enter the basin. Determine the peak flows of the 25-year, 24-hour storm Q,,,z,, Rational Method: © = CiA A = 30 acres C = 0.65 (Table 8.03a) 6,24 = 7.2" (Figure 8.03d) Q = (0.65)(7.2)(30) = 140.4 cfs Step 2. Determine Basin Volume = 1,800 W/acre (Std. & Spec.; 6.61) V = 0,800 tt3/acre)(30 acres) = 54,000 ff Step 3. Determine shape of basin: By examining contours on site map before channel installation or other modification: STORAGE CUMULATIVE ELEVATION AREA DEPTH VOLUME VOLUME (ft) (fe) (n) (ft') (fe) 806 25,000 0 0 0 806.5 26,381 0.5 12,845 12,845 007 27,775 1.0 13,539 26,389 807.5 29,181 1.5 14,239 40,623 808 30,600 2.0 14,945 55,568 Elevation 808 ft yields 55,568 ft3 of storage for sediment -- meets design requirements_ Remove sediment when sediment level reaches approximately the 807-foot level. Step 4. Design Principal Spillway: a. Minimum Capacity = 0.2 cfs/acre (Std_ & Spec. 6.61) QmM = (30 acres)(0.2) = 6.00 Cfs b. Set principal spillway crest at top of required sediment pool, elevation 808 ft C. Pipe flow is determined for water at the crest of the emergency spillway one foot above the riser inlet. From Table 8.07a H = 3.4 ft (605 barrel outlet invert) Barrel Length = 50 feet 15" diameter CMP Qpo, = (6.40 cfs) (1.14) = 7.30 cfs Qpip, = 7.30 cfs > 6.00 cfs - 19 - APR-26-1999 17:09 VN MATERIALS COMPANY 336 744 2019 P.OB/08 SEDIMENT BASIN NO. 2 DESIGN Step 1. Determine Peak Runoff: Runoff from channel No. 3, No. 6, and 12" TSD. Determine the peak flows of the 25-year, 24-hour storm Q,,.,, Rational Method: Q = CiA A=5acres C = 0.45'(Table 8.03a) ip5,24 = 7.2" (Figure 8.03d) Q = (0.45)(7.2)(5) = 16.2 cfs Step 2. Determine Basin Volume = 1,800 W/acre (Std. & Spec.; 6.61) V = (1,800 felacre)(5 acres) = 9,000 W Step 3. Determine shape of basin: By examining contours on site map before channel installation or other modification: STORAGE CUMULATIVE ELEVATION AREA DEPTH VOLUME VOLUME (it) ( 00 (te) (W) 810 2,044 0 0 0 810.5 2,750 0.5 1,194 1,194 811 3,469 1.0 1,531 2,725 811.5 4,200 1.5 1,862 4,687 812 4.944 2.0 2,190 6,777 812.5 5,700 2.5 2,520 9,297 Elevation 812.5 ft yields 9,297 fe of storage for sediment -- meets design requirements. Remove sediment when sediment level reaches approximately the 811.5-foot level. Step 4. Design Principal Spillway: a. Minimum Capacity ;-- 0.2 cfs/acre (Std. & Spec. 6.61) Q,,,,,, = (5 acres)(0.2) = 1.0 cis b. Set principal spillway crest at top of required sediment pool, elevation 812.5 ft C. Pipe flow is determined for water at the crest of the emergency spillway one foot above the riser inlet. From Table 8.07a H = 3.5 ft (809.5 barrel outlet invert) Barrel Length = 60 feet 12" diameter CMP Qpq, = (3.75 cfs)(1.07) = 4.01 cfs Qpip, = 4.01 cis > 1.0 cfs - 22 - TOTAL P.ee State of North Carolina z. ...£� Department of Environment, Health and Natural Resources d a 0 Division of Land Resources .lames B, Hunt, Jr., Governor Jonathan B. Howes, Secretary Charles Gardner, P.G., P,E. Director and State Geologist January 4, 1996 Mr. Truman Chidsey Manager, Safety and Health Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115 RE: High Airblast Reading of December 13, 1995 North Quarry Mining Permit No. 34-02 Forsyth County Dear Mr. Chidsey: This letter is in response to your investigation report dated December 20, 1995. The investigation report contained information regarding the high air blast recording associated with the blast conducted at the quarry on December 13-1 1995. An overpressure measurement of 130 dBl was measured by your company's seismograph at approximately 900 feet from the blast. This office has completed its review of your investigation report. It appears that the excessive airblast reading for this shot was related to the severing of the non -electric surface line by electric cap detonation of explosive product. I concur with the remediation measures outlined in your report. Primarily, the remediation measures are as follows: 1) Explosives shall be handled with care and respect at all times. 2) A pre -blast survey of the shot area shall be conducted after loading each shot to identify any spilled explosive products. All such materials shall be removed from the blast area prior to blast initiation. In order to reduce excessive airblast readings in the future at this facility, the above remedial measures proposed by your company will be considered part of the blasting procedures outlined in Mining Permit No. 34-02. Please attach a copy of this letter to your mining permit for this site for future reference. Geological Survey section Land Quality Section Geodetic Survey section (919)733-2423 (919)733-4574 (919)733-3836 FAX: (919) 733-0900 FAX: 733-2876 FAX: 733-4407 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-3833 FAX 919-733-4407 An Equal Opportunity Affirmative Action Employer W%recyclod/ 10%post-consurner paper Page 6 of 11 as 8. s The operator shall provide to the Department a copy'of the findings of any seismic studies conducted at this facility. The operator shall make every reasonable effort to incorporate the studies' recommendations into the production blasting program. The following blasting conditions shall be observed by the operator to prevent hazard to persons and adjacent property from thrown rock or vibrations: A. In all blasting operations, except as hereinafter otherwise provided, the maximum peak particle velocity of any component of ground motion shall not exceed 1 inch per second at the immediate location of any building outside of the permitted area regularly occupied by human beings such as dwelling house, church, school, public building, or commercial or institutional building outside of the permitted area. The operator shall monitor each blast with a seismograph. B. Airblast overpressure shall not exceed 128 decibels linear (DBL) as measured at the immediate location of any regularly occupied building such as any dwelling house, church, school, public building, or commercial or institutional building. The operator shall take all reasonable precautions to insure that flyrock is not thrown beyond areas where the access is temporarily or permanently guarded by the operator. Should flyrock occur beyond the guarded area or the levels in Items A and B above are exceeded, the operator shall report the incident to the Department immediately and further use of explosive at the site shall be immediately suspended until the following actions have been taken: A thorough investigation as to the cause(s) of the incident shall be conducted. A satisfactory report detailing the investigation shall be provided to the Department within 10 days of the incident. Said report shall, at a minimum, document the cause(s) of the incident along with technical and management actions that will be taken to prevent further incidents. The report shall meet with the approval of the Department before blasting may resume at the site. Failure to take corrective measures to prevent flyrock and repeated instances of flyrock shall be considered a violation of this permit. Page 7 of 11 The operator shall maintain records on each individual blast describing: the total number of holes; pattern of holes and delay of intervals; depth and size of holes; type and total pounds of explosives; maximum pounds per delay interval; amount of stemming and burden for each hole; and blast location. Records shall be maintained at the permittee's mine office and copies shall be provided to the Department upon request. The operator shall, when requested by the Department, give 24 hour advance notice to the Land Quality Section prior to any blast during a period for which notice is requested. 9. High Wall Barrier A physical barrier consisting of large boulders placed end -to -end or fencing shall be maintained at all times around the perimeter of any highwall to prevent inadvertent public access. In addition, a minimum ten (10) foot wide horizontal safety bench shall be provided at the junction between the top of rock and the toe of the overburden cut slope for any pit walls disturbed after August 7, 1992. 10. visual screening A. Existing vegetation shall be maintained between the mine and public thoroughfares to screen the operation from the public. Additional screening methods, such as constructing earthen berms, shall be employed as deemed appropriate by the Department. Berms shall be located and constructed as shown on the Mine Map dated September 1991 and received by the Land Quality Section on June 8, 1992. In addition to grasses, loblolly and/or Virginia pines shall be planted as deemed appropriate by the Department to improve visual and noise buffering. Berms for the 39.0 acre modification north of Mill Creek shall be located and constructed as shown on the Future Plant Area Plan, Erosion & Sedimentation Control & Reclamation Map (Y930053) dated August 9, 1993. The operator shall notify the Department in writing of the desire to delete, modify or otherwise change any part of the mining, reclamation, or erosion/sediment control plan contained in the approved application for a mining permit and any approved revisions to it. Approval to implement such changes must be obtained from the Department prior to on -site implementation of the revisions. NORTH�CAVOLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION! OF LAND RESOURCES May 26, 1999 Ms. Lisa Hill 5255 Germanton Road Winston-Salem, North Carolina 27105 RE: . Blasting Complaint North Quarry Permit No. 34-02 Forsyth County Dear Ms. Hill: Our office has completed its review of Vulcan Material Company's shot records related to the September 11 and 18, 1997 blasts at their North Quarry. It was found that Vulcan Material Company was within the blasting requirements of their mining permit. All peak particle velocities, a measurement of ground vibration with units in inches per second (ips), were well below the maximum allowable limit of 1.0 ips specified in Vulcan Material Company's mining permit. More specifically, all recorded values were at or below 36 per cent of the maximum limit of 1.0 ips. According to extensive research by the U.S. Bureau of Mines and others, particle velocities below 0.5 ips effectively eliminate the possibility of any structural damage. All airblast readings, a measurement of the atmospheric pressure wave (overpressure) with units in psi or dBL, were below the maximum allowable limit of 128 dBL specified in Vulcan Material Company's mining permit and well below the U. S. Bureau of Mine's recognized level of 164 dBL (0-5 psis for prevention of glass breakage. A key point worth noting is that glass breakage occurs at much lower levels of overpressure than structural damage, such as cracking plaster. However, we did note that it appeared the complaints may be driven by elevated air blast readings. We have brought this to Vulcan Material Company's attention and have suggested that they adjust their blasting practices . LAND QUALITY SECTION (919) 733-4S74 FAX (9191 733,2876 GEOLOGICAL SURVEY SECTION (919) 733-2423 FAX (919) 733.0900 P,O. Box 27687, RALEIGH, NORTH CAROLINA 27611 .7687 TELEPHONE (91 9) 733-3833 FAX (9191 716.680f AN EQUAL. OPPORTUNITY / AF IRMAT[VE ACTION EMPLOYER - SO% RECYCL£DII O% POST -CONSUMER PAPER Ms. Hill Page Two Thank you for your interest and patience in this matter. Hopefully we have answered your concerns adequately. If you should have any additional questions or concerns please advise at (919) 733-4574. Sincerely, L)p Judith A. Wehner Assistant State Mining Specialist Land Quality Section jw cc: Mr. Matt Gantt, P.E. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF LAND RESOURCES May 26, 1999 Ms. Vicki Byrd Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115 RE: Blasting Complaint North Quarry Permit No. 34-02 Forsyth County Yadkin River Basin Dear Ms. Byrd, The review has been completed on the shot records you previously submitted for the September 11 and September 18, 1997 blasts at the North Quarry. Your company has been found to be in compliance with the blasting requirements of your mining permit. I have already notified the complainant, Ms. Lisa Hill, of our findings. Based on the descriptions of the blasts you provided and on our review of the shot records it appears that adverse reaction to your blasting operations may be related to elevated airblast readings. Predicted reading were at 128 dBL. While the actual readings are below the maximum limit specified in your permit they are sufficiently high enough to produce "nuisance" complaints. I strongly recommend that Vulcan Materials Company carefully review the blasting procedures employed at this facility and make adjustments to reduce offsite airblast levels. LAND QUALITY SECTION (919) 733-4574 FAX (919'; 733-2876 GEOLOGICAL SURVEY SECTION (919) 733-2423 FAX 18191 733.0900 P.O. $OX 27687, RALEfGH, NORTH CAROLINA 2761 1-74307 TELEPHONE (91 9I 733-3933 FAX l919) 71 5-680I AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER • 5O% RECYCLPD/TO% POST -CONSUMER PAPER ,x••+.-' ,fir, . r •°/1 �I��- �•eq Ms. Byrd Page Two Thank you for your continued cooperation. Sincerely, h A. W Judit hner e Assistant State Mining Specialist Land Quality Section JW cc: Mr. Matt Gantt, P.E. LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET C = denotes fields where input data is needed) Permit No.': 34-02 Permidee": vulcan materials company Mine Name•: north quarry Blast Report No': 93 Date of Blast*: 09/18/97 Time of Blast*: 11:17 Peak Particle Velocity Check: D = Distance to closest offs to occupied slmcture (it): D' = 650.00 W = Maximum pounds of explosives per delay (pounds): W = 446.00 SO = Scaled Distance: SD = D/WA0.5 SO = 30.78 V = Peak Particle Velocity (inches per second): V = 160 (SD)A-1.6 V = 0.67 ('max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph lips): V' = 0.36 DS = Distance from blast to seismograph (it): OS' = 650.00 d = Distance from blast to second location (it): d' = 650.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure lips): PPV = V(DS/d)A1.5 PPV= 0.3600 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (D/WA0.33)A-1.2 P = 0.386771 To convert (psi) to (dBL): (P/2.9 x 10A-9)log x 20 P = 162.50 AB = Confined Airblast/Overpressure (dBL): AS = P (dBL) - 35 dBL (for quarry situation) AB= 127.50 ('max. limit in mining permit is: AB = _QZL dBL) v 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1,20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1 * = 11092.00 Total pounds of Explos. #2* = NIA Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 398.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 11092.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.20 SPD for Explos. #2* = NIA HD = Hale Diameter Used in Shot (inches). HD* = 5.50 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 12.34 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 32.25 Explos. #2 = NIA Total explos. column height = 32.25 Stemming height used in shut (feet)* = 10.00 Total height of explosive column(s) and stemming in the hole = 42.25 ; Total depth of hole denoted on the blasting report for the shot in question* = 44.00 Analysis Completed By: lam' Date: �J� G E 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: vulcan materials company Mine Name*: north quarry Blast Report No.*: 91 Date of Blast*: 09/11/97 Time of Blast*: 13:43 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 650.00 W = Maximum pounds of explosives per delay (pounds): W* = 456.00 SD = Scaled Distance: SD = D/W"0.5 SD = 30.44 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = 0.66 (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.34 DS = Distance from blast to seismograph (ft): DS* = 650.00 d = Distance from blast to second location (ft): d* = 650,00 PPV = Theoretical peals particle velocity at the closest offsite occupied structure (ips): Airbiast (Overpressure) Check: PPV = V(DSId)1*1.5 PPV= 0.3400 P = Unconfined Airblast/Overpressure (psi): P = 82 (D1VV"0.33)"-1.2 P = 0.390183 To convert (psi) to (dBL): (Pl2.9 x 10"-9)log x 20 P = 162.58 AB = Confined AirblastfOverpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB= 127.58 (*max. limit in mining permit is: AB = dBL) 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per Ireco): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 4943.00 Total pounds of Explos. #2* = N/A Ratio between explosives = N/A Average pounds of explosives used per hole (pounds)* = 451.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 4943.00 Explosive #2 = N/A SPD : Specific densities for each explosive: SPD for Explos. #1 * = 1.20 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.50 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)^2 LD for Explos. #1 = 12.34 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 36.54 Explos. #2 = NIA Total explos. column height = 36.544 Stemming height used in shot (feet)* = 10.00 Total height of explosive column(s) and stemming in the hole = 46.54 Total depth of hole denoted on the blasting report for the shot in question* = 46.00 Analysis Completed By: LILIAALO Date: a 0 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (* = denotes fields where input data is needed) Permit No.*: 34-02 Permittee*: vulcan materials company Mine Name*: north quarry Blast Report No.*: 92 Peak Particle Velocity Check: Date of Blast*: 09/11/97 Time of Blast*: 13:50 D = Distance to closest offsite occupied structure (ft): D* = 850.00 W = Maximum pounds of explosives per delay (pounds): W* = 454.00 SD = Scaled Distance: SD = D/W"0.5 SD = 39.89 V = Peak Particle Velocity (inches per second): V = 160 (SD)^-1.6 V = 0.44 (*max. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be estimated at the second location as follows: V = Particle velocity measured by the seismograph (ips): V* = 0.17 DS = Distance from blast to seismograph (ft): DS* = 850.00 d = Distance from blast to second location (ft): d* = 850.00 PPV = Theoretical peak particle velocity at the closest offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV= 0.1706 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi): P = 82 (DM 10.33)"-1.2 P = 0.282296 To convert (psi) to (dBL): (P/2.9 x 10^-9)log x 20 P = 159.77 AS = Confined Airblast/Overpressure (dBL): AB = P (dBL) - 35 dBL (for quarry situation) AB= 124.77 {*max. limit in mining permit is: AB =� dBL) t 0 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must consider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions (per IreGO): If "straight" emulsion is used, use SPD (specific density) = 1.20 If a "blend/slurry" is used, use SPD (specific density) = 1.25 If "straight" anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. #1* = 9497.00 Total pounds of Explos. #2* = N/A Ratio between explosives = NIA Average pounds of explosives used per hole (pounds)* = 454.00 Breakdown of average pounds of explosives per hole due to ratio: Explosive #1 = 9497.00 Explosive #2 = NIA SPD = Specific densities for each explosive: SPD for Explos. #1 * = 1.20 SPD for Explos. #2* = NIA HD = Hole Diameter Used in Shot (inches): HD* = 5.50 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)42 LD for Explos. #1 = 12.34 LD for Explos. #2 = NIA Explosive column height for each explosive (feet): Explos. #1 = 36.78 Explos. #2 = NIA Total explos. column height = 36.78 Stemming height used in shot (feet)*= 10.00 Total height of explosive column(s) and stemming in the hole = 46.78 Total depth of hole denoted on the blasting report for the shot in question* = 46.00 Analysis Completed By: Date: 2 , 5EP-22-1997 i 09:21 VULCRN MATERIALS ENG 910 744 2015 P,01/19 A Vuli on Materials Company Via. fax September 22, 1997 Mrs. Judith A- Wehner Assistant State Mining Specialist Land Quality Section D-EHNR P.O. Box 27687 Raleigh, NC 27611-7687 RE: Blasting Complaint— Lisa Hill North Quarry Dear Mrs. Wehner; I received a telephone call from Mel Nelvins on September 18, 1997_ Mr. Nelvins was calling to inform Vulcan of a blasting complaint he received from Lisa Hill. Enclosed in duplicate are blasting and seismograph records for the shot conducted on September 18, 1997 and two shots prior to this date- There has not been a shot conducted after September 18, 1997. If you need records for a future shot, please let me know. If I can be of further assistance, please give me a call at (910) 744-2014 Sincere , Vicki D. 7ones�. Enclosures 1 Ilr it MIDEAST DNISION ! P.O. SOX 4238 • WINSTON-SALEM. NORTH CAROLINA 271154239 1 TELEPHONE 910 7674600 SEP-22-1997 09:21 VILLCAN MATERIALS ENG �10 744 2015 P.02/19 Vulcon 1* 9 Materials Company Blasting Report Guarry �IodlL — Report No. 42? Date dp,-/S �7�7 Type of Shot 2&jfe Exact Time z/. J� Type Of Maier . I Shot Geld W-d22 Distance 46�R (Ft.) Direction 600 I . (To nearest occupied building neither awrand or lapped) 01 Sets, Location Dist to Sets Grid #2 Sets Location Dist. to Seis. Grid 03 Sets. Location _C9ix&r_4_ Dist. to, Sales, �IC4 GrjdW- HolelDeck Delay Period Depth Stemming Total Pounds Per HoWDeck No. 07 3 �q 01? 5?q sa J� �J?41 % Maximum Number ofj Holes a< Type of Stemming A07 Its. Per Diameter liners if'lt 00 Face Height Aq. 4// Delay Spacing /C Sub Drilling. JT Burden /_Y Number of Rows -3 Method of Firing ilmen Type of arcuit: Series Parallel parallel series —Type of Delays: Surface ,,::nline Oil Trade Name XI 17 /ff J4 9 Arlit J� AAq is� 1 0.23 41 0 it jul 5kr Wsswhvr_�Cleal C1 C" 0 Rain C3 Snow (check MO) : EJ Hot 20Warm 1:1 cold Wind Front �E] N El NE [I East L1 BE (check one) Ll S [�rSW 11 West 0 NW I Awp.�W j'7 A0d) V�- .722 to AOC AW �W T �A lot liq 9A alv& � �A' Fragmentation 0 Excel El V. Good El Good 11 Fair C1 Poor Backbreak Z io ft, Cl 20 ft. ID 30 it. 0 40 it 0 50 If. or more Trade Narne of Explosives I �Mc u I A* 4;,7 �Fjll VIC 1275 1:16 Total zll-e�v ba, Total Pounds /z/450V Powder Factor f2 Gal of oil 6�ai7 %oil content /j, c73`0' Bench 4A� Grid Map Date Scale Distance _�X� Tons of Materials Produced — Remarks: 11 Distribution! Adrinihistrative Dept. - ORIGINAL Plant offm File Supt. Sig. State So" Rep. L Mc4Urri N AEV 2012 Blaster Signature License or S.S. Nol: Total Pounds Tons of Materials Produced Typical Hole Show Primer Location and Stemming lei Top of Bench Length (Ft.) of Holo P.,,. Arr Floor Level 3 (Ft.) of Sub Drilling I sEP-22-1997 09:23 QULCAN MATERIRLS ENG 910 744 2015 P.04/19 ink F r t ie --- ------- - -- r . _I I I + ........ ... ............ ............ .. ------------ -- ---- =-11- p .. ... . . .. . . . .. . . . . . . . . L - - - - - - - - - - . . . . . . . . . . . -F 7' . . . . . . . . . . . . . . .. . . . . 7- . . . . . . . . . . . . . . . . . . . p- I . .. . . . . . . . . - - - - - - - - - - . .. . ....... SEP-22-1997 09:24 WLCPN MATERIPLS ENG ._ .__..-. .0 ♦16101gb ** SAFEGUARD SEISMIC UNIT 20001)K M* SN'2039 Thursday. 9/18/97 11:17:14 Event: 093 Client: VULCAN MATERIALS CO. i Operation: NORTH ! SSU Locations CHURCH Distance to Blast' 650 Operator: R S Comments: N 10400 E 11500 Trigger Levels: 0.02 in/seG 112 db Record Time: 10 secs Range: Auto 5 ips USSM/OSMRE Report 9:."1 i j!. � 7K lF � )K �1 :sir ... 10B Frequency (hz) 910 744 2015 P.05/19 e M Frequency (hx) 09:24 VULCRN MATERIALS ENO A.. ....� 910 744 2015 P.06/19 • W k y 10 Freauenry (hz) Frequencv Chz) VIBRATION & SOUND TIME HISTORY Time Scale: 0.2 Csac/Eiv) Data Scale (seismic).' 0.64 (inisec) Data Scale W r): 0.009 (nsi) 910 744 2015 P.07/19 is SUMMARY L T U PPU (in/sec) 0,32 0.36 0.32 PD (0.001 in) 2.91 3.18 3.45 PPA (s) 0.22 0.20 8.24 FREQ (hz) ,RESULTANT 35.7 27.7 14.7 PPV: (in/seU 0.48 PEAK AIR PRESSURE: (db) 122 (c I) 0.08348 Thursdavp 9/18/97 11:17:14 DYNAMIC CALIBRATION CHECK L T U S �T SHAKETABLE CALIBRATED: B/19/97 By SeaSonicz> Inc. Box 779. Warrendale, PA 15095 TEL. 412-934-2980 SEP-22-1997 09;24 VULCAN MATERIALS ENS 910 744 2015 P.0Ei19 Ve1�ICompany L11 Blasting Report Quarry 1J044k Q.c. 12'4__Report No. y( Date q-(1"4-% Type of Shot Pr08.r4 :ON Exact Time s. 3: -K N TYpv of Material Gtx1N14C Shot Grid I6UW E Ilfnd�b Distance (<050r (Ft.) Direction 5/W GridNilW e It100 (To nearest occupied building neither owned or leased) Sues. Location C kwEC-F` Dist. to Sets. t�50 Gnd990o E If lm 02 Sets. Location Dist. to Sets. Grid r3 Sale. Location Dist. to Seis. Grid ){ole/Deek No. Delay Period Depth Stemming Total Pounds lPer HoWDeck 6 YG I e6 NS(. CPT x/S if 3 q6 y 71- /60 _ Maximum Number of Hales Type of Stemming 40 lbs. Per Diameter Cinches) 1 117 Face Height �4 g Delay Spacing Sub Drilling s Burden IZ: Number of Rows Method of Firing Arpn1 c I Type of Circuit: Series Parallel Parallel Series I� r Delays: Downllne �56 Surface Type of Del Trade Name, ENS-0 f �J e 4't� 'I 156 '175M C940 S^/ i a7Sb Weather C Gear Cloudy ❑ Rain ❑ Snow (check two)- ❑ Hot 3'1Q'larm ❑ Cold Wind From C] N ❑ NE ❑ East ❑ BE (check one) 0 S CAW ❑ West ❑ NW Fragmentation ❑ Excel 0 V. Good ❑ Good ❑ Fair ❑ Poor Backbreak C] 10 IL ❑ 20 N. C 30 ft. ❑ 40 ft. ❑ so ft. or more 'Trade Name of Explosives o t ufl( er4�17 8 3/44"' 500-4.e s Total 49TC/(w lbs. Total Pounds LfQ±Ote Powder Factor 1 .34 Gal of Oil cRQ�_ %Oil Content . 03 Bencrl kilt Grid Map Date 4-1°C'�f y/ Scale Distance O Tons of Materials Produced Ramarks: T.' Distribution: Administrant" Dept. — ORIGINAL Plant Office File Supt. so. /,, Blaster Signature •'State Safety Rep. License or S.S. No.: Woxt4 m u aoa ! 0► �;:' u �: ,. x.. �;; � . s.,. rc:_ , SEP-22-1997 09:P5 VULCAN MATERIALS ENG 910 744 2015 P.09/19 Total Hola/Deck Dale--___...,..:. i_�.:_. y No. Period Depth Stemming Pounds Per Typical Hole - .- r/Show Primer 1 Ltamm!n andJ ,m Stemming ' TOP of Bench Length `�' f (Ft.) .... .............. or Hole ..__._..__. ... _.__.._._. . ._. .. Floor Level 4$ ._.__. ...-_.___—... Total Pounds 3 _ -- ' ' of Sub Drilling ----- - -- - � Tons of Materials Produced .. ..'.. ..... SEP-22-1997 09:26 VLLCPN MATERIALS ENG l iNit=K HU11VE, 9/11/013143:45 :rw SAFEGUARD SEISMIC UNIT 2000DK x SNl2039 Thursdav, 9/11/97 13:44!41 Event: 091 Client! H Operations NORTH 'SSU Locations CHURCH { Distance to Blast: 650 0 111 Operators OD B Comments::110400 E-114CZ) Trisser Levels! 0.02 in/sec, No db Record Time: 10 secs Ranse: Auto 5 ips USSM/OSMRE Report LONGITUDINAL i UE Mi3Y3E ME 1 10 100 erevuencv %nz� TRANSVERSE 910 744 2015 P.11/19 • :�, Fre9uencr Cnx3 SEP-22-1997 09:26 VULeCAN MRTERIRLS 910 744 2015 P.12/19 • Frcauencv (hz) Freveenc5 (hz> VIBRATION & SOUND TIME HISTORY Time Scale: 0.2 (sec/diV) Data Scale (seismic): 0.64 (in/sec) Data Scale (air): 0.009 (psi) SEP-22-1997 09:26 �i I MATERIALS ENG SUMMARY L T V PPV Gin/sec) 0,2S 0.34 0.32 PD (0.031 in) 2.35 2.45 1.79 PPA (9) 0.24 0.22 0.35 FREQ (hz) 41.6 31.2 62.5 RESULTANT PPV: (in/sac) 0.48 PEAK AIR PRESSURE: (db) 120 (psi) 0.00290 Thursday, 9/1167 13144141 DYNAMIC CALIBRATION CHECK L T U S K� SHAKETABLE CALIBRATED: 8/19/97 By G"Sonies. Inc. Box 779e Warrendale, PA 15095 TELL 412-934-2900 uritin9 file to disk ... 0 910 744 2015 P.13/19 SEP-22-1997 09r:26vul H Materials ULLOAN MRTERIRLS ENG 910 744 2015 P.14/19 Blasting Report Quarry A&PA Ow"IC/ Report No. 9112- Date f-//-97 Type of Shot fa Exact Time HolelDeck Delay Period Depth Stemming Total Pounds Per HolelDeck H Type of Material rn(AN.'-% Shot Grid W B OFO0 Distance d950 (Ft.) Direction 540 Grid400 tbtdD (To nearest occupied building neither owned or leased) N E 01 Seis. Location C6.rd IN Dist. to Sea. 95 O Grid 4Gde Moo 02 Saint. Location Dist. to Said. Oro � 03 Sets. Location DISL to Seis. Grid No. .CIS yG /U o/ O .3 y dSD ear- rwa /PT /5° Maximum Number of Holes 2/ Type of Stemming 61 Ihs. Per Diameter (inches) S'/L Face Height Y3 ysy Spacing /s'' Sub Drilling 3 Burden Number of Rows a Method of Fdng 1#844 Type of Circuit: Series Parallel sarallei Series^' Type of Delays: Downtime 350 Surface 5.�r'/L trade Name d1 8 k7T g /yW /d d /} /3 �V,7 / d.+y /s are 11 Weather' Clear 906oudy ❑ Rain ❑ Snow (check two) ❑ Hot .}'GJarm ❑ Cold Wind From ❑ N ❑ NE El East ❑ BE (check one) ❑ S M�B4y LI West ❑ NW ad 'ragmentation ❑ Excel ❑ V. Good El Good ❑ Fair ❑ Poor 3ackbreak ❑ to ft. ❑ 20 fL ❑ 3o ft. [3 40 R. ❑ 50 h. or more Trade Name of Explosives unt C% /emd 3/y" /po5fr3 c � Total yf,3 Ibs.l Total Pounds x%s.3y 'owder Factor /.5'7 Gal of Oil —1-0 % Oil Content OS% fench ;F60l14M Grid Map Date 9 /f-90 Scale Distance S/OJ Tons of Materiels Produced Remarks: Naldbution: Administrative Dept. — OPoGINAL Plant Office File Supt. State Safety Rep. _ e Signature 'y� License oS.S. No,: „e(TJ_9G3a7 neon+m Rsv sez SEP-22-1997 09:27 UULCPN MRTERIPLS ENG ammad' Total Pounds Tone of Materials Produced 44 ® O �.5� 'n �'✓.1 r'�� 1 F, �[� {1:' �. „' .�... ?5 '� , '�':r; '�.'i�.e'` . r. r SEP-22-1997 09:27 TRIGGER ACTIVE. UU.CAN MATERIALS ENG M 1i97 13147: 29 *s'SAFEOUARD SEISMIC UNIT 20001)K o.k SNt 2039 TAursdar, 9VIV97 13140932 Event+ 092 Client: H Operation: NORTH SSU Locationt CHURCH Distance to Slastt *m"g jO Operator: OD 0 Comments: MW N-k -00 - 2 - io4Cu 7risser Levels: 0,02 ivsec, No db Record Tien: 10 secs Range: Auto 5 ips LONGITUDINAL USWOSMRE Report Fre9uencv (ni) 910 744 2015 P.IWIi • SEP-22-1999 09:28 VULCAN MATERIALS ENG 910 744 2015 P.18/19 Fre9uencv (hz) Freauenca Chz) VIBRATION & SOUND TIME HISTORY Time Scale: 0.2 (sec/dial Data Scale (seismic): 0.32 (inset) Data Scale (air): 0.009 (psi) SEP-22-1997 09:28 VULCAN MATERIALS ENG 910 744 2015 P.19/19 i SUMMARY L T V PPV (in/sec> 0.17 0.14 0.14 PD (0.001 in) 1.85 1.96 1.65 PPA (9) 0.11 6.09 6.10 FREO Chz) 31.2 35.7 3S.7 RESULTANT PPV: (in/See) 8.21 PEAK AIR PRESSURE: (dh) 119 (osi) 0.00261 Thursday, 9/lleW 13:48:32 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 8/19i97 By Goosoni cs. Inc. Box 779, Warrendale. PA 15M TOTAL P.19 IMPORTANT Time-140 156 WHILE Vq W6itE pU7J Ga/� TELEPHONED PLEASE CALL CALLED TO SEE YOU WILL CALL AGAIN WANTS TO SEE YOUI I URGENT RETURNED YOUR CALL Signed N.G. DepE of Environment. Health, and Natural Resources �D P,FW M lbvyclimll O O N.C. Department of Environment, tie a It h, and fiat oral Resources Di% ision of Land Resources, Land Quality Section ��� Telephone LogVatc shoti-L-of i Ttmc 11; NO Q am ❑ pm Call: Plated 7 Reccived ($ Resumed ❑ 1. ProjectlJA,11 t ( ( n County. 2. Convcrsai on . Ih .s X Telephone (fka 6.Y12 — 9 J. Affiliation'. cc: Filed by: ' 0e 2 II 3y" eeoSonics Inc. PO Box 779 • Warrendale. Pennsylvania 15095 • Phone 412-934-2900 • Fax 412-934 2999 May 19, 1997 Gerald Bracey VULCAN MATERIALS COMPANY North Quarry P.O. Box 4239 Winston-Salem, NC 27115-4239 Dear Mr. Bracey: WE 111 r'UN 41997 ay._ I have reviewed the sasmograms that you submitted to GeoSonics for Shot No. 10, January 27, 1997. The seismogram from SSU 2039 did not include any calibration pulses. Although the seismogram does not indicate any apparrnt signs of a malfunction occurring, a valid calibration pulse is a necessity to the certification of the three ground channel readings. A calibration pulse associated with the sound channel verifies that the microphone was plugged into the seismograph and the electronic connections were intact. However, the fact that a waveform does exist on this record is a clear indication that the microphone was connected and sent data to the seismograph for processing. (If the microphone had not been properly connected, the sound channel waveform would have been 'flat.') The peak airblast waveform was measured. The reading was found to he 0,00293 psi/120dB. This represents 40.7% of the North Carolina limit of 0.0072 psi/126dB. The record of GPS unit 1079 (1127/979 10:04 AM) was reviewed by Thomas W. Novotny of Vibra-Tech Engineer. Mr. Novotny does not believe this to be a blast recording. Possible scenarios include electronic malfunction, electronic interference, and/or operator error. Respectfully submitted, Geosomcs Inc. Janice L. Reid Area Manager g r7::r.1::'Ts1,, , vibration S Sound Consulting; Blasting Seismology.and Instrument Manufacturing ^�d� ii vtiG-ll —C_"g-� cda SIS, A Y,4A�LL�.�� L�A4tmvgr.; 4,L� 44,�- 4� oe� �� . i lil .. I �. II l State of North CAND Department of Environment, Health and Natural Resources Division of Land Resources James B. Hunt, Jr., Governor Jonathan B: Howes, Secretary Charles H. Gardner, P.G., P.E. Director and State Geologist May 22, i997 Ms. Lisa Hill 5255 Germanton Road Winston-Salem, North Carolina 27105 RE: Blasting Complaint North Quarry Permit No. 34-02 Forsyth County Dear Ms..Hill- Our office has completed its review of Vulcan Materials Company's shot records related to the October 25 and 29, 1996 blasts and January and February, 1997 blasts at their North Quarry. It was found that Vulcan Materials. Company (VMC) was within the blasting requirements of their mining permit except for Shot No. 10 on January 27, 1997 A reading of 157 was recorded on a second seismograph monitoring the blast. -- ... As you are aware, a letter was sent to VMC on May 7, 1997 requiring VMC to provide this office with a detailed analysis of this reading. A response was received by this office from VMC on May 13, 1997.. The report from both the blasting contractor and plant manager noted that there was a problem with the particular seismograph.. Since the wave form of the record from this seismograph is not like a typical shot wave form, this office agrees with VMC's findings. All... peak particle velocities of the remaining recordings, a measurement of ground vibration with units in inches per second lips), were well below the maximum allowable limit of.._1.O ips specified in VMC's mining permit. More specifically, all recorded values were at or below 53 per cent of the maximum limit of 1.0 ips. According to extensive research by the U.S. Bureau of Mines and others, particle velocities below 0.5 ips effectively eliminate the possibility of any structural damage. Geological Survey Section (919)733-2423 FAX: (919) 733-0900 Land Quality Section Geodetic Survey Section (919)733-4574 (919)733-3836 FAX: 733-2876 _ FAX: 733-4407 P.O. Box 27687. Raleigh, North Carolina 27611-7687 Telephone 919-733-3833 FAX 919-733.4407 An Equal OpWunity Afrmarive Action Employer W%recycled/ 10%pass-consumer paper Ms. Hill Page Two All airblast readings of the remaining records, a measurement of the atmospheric pressure wave (overpressure) with units in psi or dBL, were below the maximum allowable limit of 128 dBL specified in VMC's mining permit and well below the U. S. Bureau of Mine's recognized level of 154 dBL (0.5 psi) for prevention of glass breakage. A key point worth noting is that glass breakage.occurs at much lower levels of overpressure than structural damage, such as cracking plaster. Thank you for your interest and patience in this matter. Hopefully we have answered your concerns adequately. If you should have any additional questions or concerns please advise at (919) 733-4574. Sincerely, udith A: Wehner State Mining Specialist Land Quality Section JW cc: Mr. Matthew Gant,.P.E. State of North Ca&a Department of Environment, Health and Natural Resources Division of Land Resources James B. Hunt, Jr.. Governor Jonathan B. Howes, Secretary Charles H. Gardner. P.G., P.E. Director and State Geologist May 22, 1997. Ms. Vicki Jones Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115-4239 RE: Blasting Complaint North Quarry Permit No.34-02 Forsyth County Dear Ms; Jones: 4.0 IF The review has been completed on the analysis of Shot No. 10 submitted for the January 27, 1997 blast at the North Quarry. This office agrees with your findings that a malfunction of the seismograph caused the unusually high reading. I have already notified the complainant, Ms. Lisa Hill, of our findings. Thank you for your continued cooperation. Sincerely, q";o - t( Judith A. Wehner Assistant State Mining Specialist Land Quality Section M cc: Mr. Matthew Gant, P.E- Geological Survey Section Land Quality Section Geodetic Survey Section (919)733-2423 (919)733.4574 (919)733-3836 FAk(919) 733.0900 FAX: 733-2676 FAX: 733.4407 P.O. Box 27687. Raleigh. North Carolina 27611-7687 Telephone 919-733-3833 FAX 919-733.4407 An Equal appodunily AM4mative Action Employer 50%recycled/ 10%post-conarmer paper May 21, 1997 All records submitted were checked and ran through Blast II Program. No violations were found except for the Blast No. 10. A letter was sent to VMC on May 7, 1997 requesting a detailed analysis. A response was received by this office on May 13, 1997. Mr. James C. Henline, Jr. of VMC believes the high readings were a result of a faulty machine. This office agrees with his findings as the wave forms are not typical. Letters will be sent to the permittee and complainant confirming the findings. JW iawe 9z a000 �aoa //ate z— D /. I 111 9�a 900 III�uR �/99 III L96D 130 ,-?z 9 �/00� i�Qa Ab. Lts g0lX7 �44D Il l qoD 9rn, I i O as , Iliac i� /a= ood /ooa a A Cav aDo lead lOvd 7__71 l� zu 9-s' /Ong Ae daD �vnd Amo e12 II 9do g� II /oo 1W 06' 3 f I III Z is y 9m 900 III4ov m lil - I I I May 13, 1997 Mrs. Lisa Hill 5255 Gerrnanton Road Winston-Salem, NC 27105 Dear Mrs. Hill: You recently received a copy of a letter addressed to Vulcan Materials Company from Judith Wehner with the State of North Carolina, Department of Land Quality Section, referencing her review and findings of several shot records. In this letter, she mentioned that one Shot #10 included a seismograph recording that revealed an unusually high airblast reading of 154 db. This notice prompted Vulcan to respond to the State's findings. I have attached a copy of a letter that was sent to the State by a representative of the company that conducts blasting activities for me , As noted, we had been experiencing some problems with this particular seismograph. The unit had been serviced and was being tested the day of the high reading against a more sophisticated unit. That unit, which is periodically calibrated, revealed an airblast reading of 120 db which is well within our permit limit of 128 db. Again, as mentioned in my letter to you of March 11, 1997,1 sincerely hope you and Mr. Hill accept my invitation to visit our quarry in the near future. If you have any questions, you my contact me at any time at (910)744-2941. I look forward to vour visit. Sincerely, Roger Sullins LBy i 3 t997Plant Manager Attachment MIDEASr DIVISION I P.O. BOX 4239 • WINSTCN-SALEM, NORTH CAROLINA 2711S4239 • TELEPHONE 910 7674600 James C. Henline, Jr. Piedmont Explosives, Inc. 259 Moss Wood Road Olin, NC 28660 May 9, 1997 1 Ms, Judith A. Wehner 1�) .,v 13 19g L Assistant State Mining Specialist State of Quality Section North Carolina D-EHNR U, " Land Q\ gy✓' Raleigh, NC 27611-7687 Re: Vulcan's Blast #10 January 27, 1997 Dear Ms. Wehner. When shot #10 was pulled January 27", Vulcan had two seismographs placed side -by - side. Seismograph number three is a SSU2000DK manufactured by GeoSonics, Inc., Warrendale, PA. Seismograph number two is a small GPS-3 manufactured by Environmental Technologies, which is no longer in business. During the latter part of 1996, Vulcan was experiencing problems with the GPS-3. Vulcan located a company named OZA Inspections in Lewiston, NY which would work on the GPS-3. The GPS-3 was sent to them for repairs.. Vulcan had just received the GPS-3 back from OZA in early January 1997, The 2000DK is sent yearly to GeoSonics where it is checked thoroughly and calibrated. Having no prior experience with OZA Inspections, the accuracy of the machine was still in question by Vulcan. Therefore, prior to using this unit as a stand alone, Vulcan, knowing that the 2000DK is a very accurate and dependable seismograph, placed the two seismographs side -by -side to test the accuracy of the repairs. The GPS-3 recorded an airblast of 157db. The 2000DK reading was 120db. During the shot, the Plant Manager and I watched and saw no unusual movement occurring that would have caused a high reading. 1 believe that if the shot had truly produced an air blast reading of 157db, there would have been several complaints from the neighbors. There were no complaints on that day. James C. Henline, Jr. Piedmont Explosives May 9, 1997 Page 2 Vulcan and I would welcome any monitoring the state would like to do, including placing some of their own seismographs out in the area. I feel this would show that Vulcan does maintain compliance with all limits of blasting. A copy of the certificate of calibration is attached for your information. Please contact me if you have any questions or if I can be of any assistance. My office number with Piedmont Explosives is 1-800-421-181 1, ext. 120. My home phone number is 704-871-8569 and pager number is (704)838-5488. Sincerely, James C. Henline, Jr. 9 Attachments cc; Vulcan Materials Company CERTIFICATE OF CALIBRATION ITEM: Portable Seismograph MODEL: SSU 2000DK SERIALWUMBER: 2039 MANUFACTURER: CeoSonics Inc. CALIBRATION DATE: 5/10/96 OWNER: Vulcan Materials Co. AMBIANT CONDITIONS: TEMP: 740P RELATIVE HUMIDITY: 66% ITEM RETURNED: Within Manufacturer's Specifications. STATEMENT OF N.I.,S,T. TRACEABILITY This is to certify that the above identified item has been calibrated by CeoSonics Inc., according to the manufacturers specifications by comparison to standards with accuracies that are traceable to the National Institute of Standards and Technology (formerly the National Bureau of Standards). .STANDARDS USED IN TIIIS CALIBRATION ITEM: MODEL: SERIAL NUMBER: MANUFACTURER: Shaketable System ST-3T 0807-4 Dallas Instruments Sound Level Calibrator 1562-A 25560 General Radio Co. Calibration Certificates far Starulards used during instrument calibration, on file at: CeoSonics Inc., 359 Norlhgale Drive, Warrendale, PA 15086t Calibrated By: -' Certified By; /) far GPO. OafCS, III Hnk:Ia%Se rn ad Subscribed Joyy L. Grii:is tJa • Poblic ore me thin the /O eoSonics Marslmll Dcp, Allo he DyaJ,199�! My CnmmisSlon Eroires 24myy9 411le • t State of North Carol11�6my Department of Environment, Health and Natural Resources 1 Division of Land Resources James B. B. H Governor ID ■ ^ , Jonathan B. Howes, es, Secretary r 1 c V Charles H. Gardner, P.G., P.E. Director and State Geologist May 7, 1997 Ms. Vicki Jones Vulcan Materials Company P.O. Box 4239 Winston-Salem, North Carolina 27115-4239 RE: Blasting Complaint - - North Quarry Permit No. 34-02 - - Forsyth County _ Dear Ms. Jones: ..The review has been completed on the shot records you previously submitted for the October 25 and 29, 1996 blasts and the January and February, 1996 blasts at the North Quarry. The blasting records for Shot No. 10 included a seismograph recording that indicated an unusually high airblast of 154 dBl. Pleasefindenclosed.a.copy of the record. Because this is above the 128 dBl limit established in Vulcan materials Company's mining permit, please provide this office with a detailed analysis of this reading, including recommendations that will prevent future readings such as this from occurring. In regards to the remaining records submitted, your company has been found to be in compliance with the blasting requirements of your mining permit. I look forward to your response concerning this matter. If you have any questions, please contact me at (919) 733-4574. Thank you for your continued cooperation. Sincerely, iu. (fit, L�Le rR/ dith A. Wehner Assistant State Mining Specialist Land Quality Section JW Enclosure cc: Mr. Matt Gant, P.E. Mrs. Lisa Hill 5a55 ,PAL .., n. Pam/, k14ne .- �l (_ a7/oa Geological Survey Section Land Quality Section Geodefic Survey Section (919)733-2423 (919)733-4574 (919)733-3836 FAX: (919) 733-0900 FAX 733-2876 FAX: 733.4407 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-3833 FAX 919-733-4407 An Equal Opportunity Affirmative Action Employer 50%recycled/10%post-consumer paper : 10112719i 10:05:03 Cal Date : 01/03/57Se[ H�ae[ i013951_:Af iO6OJOa[s Paaka 9109913 T: 4:JIGe 9 0.2533 T: O.OaIOa f ws : 1.065 [aface Blast site Hio900 =0,000 STIO1 110 aelamameter at SWIM ON[ 5x119QS R= 49900 99500, 1000 FT. AYAY +0.21 f AIR -0.21. +.'.00 LONG 00 OC TRANS 1.00 .01 __.00 0.01 3H: N -ss n seer._: . in iac. fsec 'If '""'"• Is_ Co[ ' cn1sec , cm/sec 1 pa: 09q vrp ".•_, a_c. U.S.B.M. APPENDIX B ____________________ '_____________________ �'I 1 i i r ' __r' - _-__ ___________ __ _________ T--_r -______ ________ _ _; _______ _________ ____'__ ___ T______ ____T,_ T_ -_____ T -_____ _________ I r r 1 r r ! 1 1 1 1 1 I I �________�_ 1 1 I_I-I 1 1 I 11___ I _:_I r T-T YP T -1 T _ __._ _I __I__:_ : -T i.- T __ - T T T r I III II__ _ II I___ __I r- - T -� __I I 7 - -T _ I I I I I I 1 I I 1 I I I I' 1 I I r ' ! 1 I I ___11_ _1_1-_ G_LJ1_ 1_1_1_1_111 ------ y________ _ L _1 _! 1 1 �1 ! 1 1 a1 Y11 _1 J 1 1111 I r r r i I I________ 1__ I__1 I I Ili I_ ___ ________ ___ _ _ 'T'Tr 'T T 'T __ T'T-T'r -T -T __I _____ ______ T-T-T TiTT -T r i 1 ♦ I I r I r I r : I I I_ I 1 I I! ' ________ _____ -f -T -T __ _ ____ t-T-i -T T r r I I:I I 1 1 I 11 I I I I! 1 - .: Y_!_Y jai! .: I I 1 1 1 I 1-___7_— ___1___3____J_111_______________ I I I I: I 11 ! I 1 I I I I I I I I I 1 1 I I 6H_ ^ - 30142 OH_ 6H_ 9H_ 30H_ 3H: 6H_ 9H: 30H_ Longitudinal Transverse Vertical • 0 LAND QUALITY SECTION BLASTING ANALYSIS WORZSHEET (tw Denotes fields -where input data is needed) Permit Humber: -> 34-02 Permitte .: vmc Mine Name: north Blast Reportj: 1 Date of Blast: 01/06/97 Time of Blast 11,01:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Dt = 900 W = maximum pounds of explosive.per delay (pounds): Wt = 421 SD = Scaled Distance : SD = D/W .O.5 SD = 43.86 .V = Peak Particle Velocity (inches per second), V=160 (SD)'-1.6 V = 0.38 (*max. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follm, V = Particle velocity measured by seismograph (ips): Vt = 0.04 DS = Distance from blast to seismograph (ft# DSt = 900 d = Distance from blast to second location (ft): di = 900 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)�1.5 PPV =- 0.0400 Airblast (overpressure) Check: P = Unconfined Airblast/overpressure (psi) P = 82 (D/'d'-0.33)'-1.2 P = 0.255822 To convert (psi) to (dbl): (P/2.9 x 10"-9)loq x 20 P = 158.91 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 123.91 (tmax. limit in mining permit is: AB=40BL) C� 4D Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and zanufacturer of the explosive products used in the shot; east condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry, is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) 0.85 Ratio between explosives: Total pounds of Explos. 11* = 7540 Total pounds of Explos. 12 (use 10.1' here if only have one explos. )* _ Ratio between explosives = D Average pounds of explosives used per hole (pounds)* = 421 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 421 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. fl* = MOO SPD for Explos. 12 (use 10.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches): HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)1,2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. #1 = 34.11117 Explos. J2 = 0.00000 Total Explos. column height = 34.11 Stemming height used in shot (feet)* = 9 Total height of explosive coiuien(s) and stemming in the hole = 43.11_ Total depth of hole denoted on the blasting report for the shot in question* = 42 Analysis Completed By: ILA Date:____ !1 W@ QUALITY SECTION BIASTING ANALYSIS WORKSHEET (i= Denotes fields where input data is needed) Permit Xt sber: -> 34-02 Pernitte : vmc Rine Name: north Blast Reports: 2 Date of Blast: Di/07/97 Time of Blast 10:28:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D' = 1300 W = Maximum pounds of explosive per delay (pounds): Wt = 00 SD = Scaled Distance : SD = D/W"0.5 SD = 65.00 V = Peak Particle Velocity (inches per second): V-160 (SD)"-1.6 V = 0.20 (*lax. limit in mining permit is: V = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setisated at the second location as follows: V = Particle velocity measured by seismograph (ips): Vi = 0.01 DS = Distance from blast to seismograph (ft) DS* = 1900 d = Distance from blast to second location (ft): dt = 1300 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV W V(DS/d)Al .5 PPV =- 0.0177 Airblast (Overpressure) Check: P = unconfined Airblast/Overpressure (psi) P = 82 (D/W^0.33)^-1.2 P = D.161249 To convert (psi) to (dbl): (P/2.9 x 10"-9)loq x 20 P = 154.90 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (far quarry situation AB = 119.90 (flax. limit in mining permit is: AB =_Zjb DBL) 0 O Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11t = 4846 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 348 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 346 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use 10.1' here if only have one explosive.)' = 6 HD = Hole Diameter Used in Shot (inches); HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)"2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 28.19640 Explos. 12 = 0.00000 Total Explos. column height = 28.20 Stemming height used in shot (feet)t = 13 Total height of explosive column(s) and stemming in the hole = 41.20 Total depth of hole denoted on the blasting report for the shot in question* _ .43 Analysis Completed By Date: 0 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET it= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : vmc Hine Name: north Blast Reportl: 3 Date of Blast: 01/07/97 Time of Blast 13:42M Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Dt = 1000 W = Maximum pounds of explosive per delay (pounds): W+ = 323 SD = Scaled Distance : SD = D/W1,0.5 SD = 55.64 V = Peak Particle Velocity (inches per second): V=160 (SD)^-1.6 V = 0.26 (fmax. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): vt = 0.12 DS = Distance from blast to seismograph (ft) DSO = 1000 d = Distance from blast to second location (ft): df = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV = 0.1200 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure f psi) P = 82 (D/W10.33)^-1.2 P = 0,202982 To convert (psi) to (dbl): (P/2.9 x 10"-9)loq x 20 P = 156.50 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 121.90 (t ax. limit in mining permit is: AB =, jjDBL) 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions. If 'straight' emulsion is used, use SPD (specific density) = 1.70 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 if 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. fl* = 6094 Total pounds of Explos. 12 (use'0.1' here if only have one explos.)* = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 323 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 323 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use 10.1' here if only have one explosive.)* = 0 HD = Hole Diameter Used in Shot (inches): V = 5.5 LD = Goading Density (pounds per foot of column): LD = SPD(.34){HD)A2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 26.17080 Explos. 12 = 0.0000 Total Explos. column height = 26.17 Stemming height used in shot (feet)* = 9 Total height of explosive column(s) and stemming in the hole = 35.17 Total depth of hole denoted on the blasting report for the shot in question* = 43 Analysis Completed By Date: �! g� 0 O LAND QUALITY SECTION BLASTING ANALYSES WORKSHEET (*= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : vmc Mine Nave: north Blast Reports: 4 Date of Blast: 01/13/97 Time of Blast 10:15:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 2000 W = Kaximun pounds of explosive per delay (pounds): W} = 482 SD = Scaled Distance : SD = D/W"0.5 SD = 91.10 V = Peak Particle Velocity (inches per second): V=160 (SD)"-1.6 V = 0.12— (}max, limit in pining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): V' = MO US = Distance froa blast to seismograph (ft) DS+ = 2000 d = Distance from blast to second location (ft): dt = 2000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (1ps): PPV = V(DS/d)"1.5 PPV = 0.1000 Airblast (overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W1.33)1-1.2 P = 0.103530 To convert (psi) to (dbl): (P/2.9 x 10"-9)log x 20 P = 151.05 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (far quarry situation A8 = 116.05 (*max. limit its mining permit is: AB DBL) L Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) W 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.95 Ratio between explosives: Total pounds of Explos. 11* = 6240 Total pounds of Explos, 12 (use'0.1' here if only have one explos.)* = 0 Ratio between explosives = 0 Average pounds of explosives used per hole fpounds)* = 482 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 482 Explosive 12 = D SPD = Specific densities for each explosive: SPD for Explos. 11* = 1,200 SPD for Explos. 12 (use 10.1' here if only have one explosive,)* = 0 HD = Hole Diameter Used in Shot (inches): HD* = 5.5 LD = loading Density (pounds per foot of column), LD = SPD(.34)(HD)"2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 39.05364 Explos. 12 = 0,00000 Total Explos. column height = 39.05 Steming height used in shot (feet)* = I1 Total height of explosive colunn(s) and stemming in the hole = 50.05 Total depth of hole denoted on the blasting report for the shot in question* = 44 Analysis Completed By: 41dll� Date: �� • • LAND QUALITY SECTION BIMNG ANALYSIS 14MHM (*= Denotes fields where input data is needed) Permit Humber: -> 34-02 Permitte : vmc Mine Name: north Blast Report{: 5 Date of Blast: 01/13/97 Time of Blast 13:15:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Of ; 900 W = Maxim pounds of explosive per delay (pounds): Wt = 403 SD = Scaled Distance : SD c D/W'0.5 SO = 44.83 V = Peak Particle Velocity (inches per second): V=160 (SD)"-1.6 V = 0.36 (*max. limit in mining permit is: v = 1,0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity neasured by seismograph (ips): V* = 0.06 DS = Distance from blast to seismograph (ft) DSO = 900 d = Distance from blast to second location (ft): dt = 900 PPV = Theoretical pmk particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)AI .5 PPV = 0.0600" Airblast (overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W'0.33)'-1.2 P = 0.251434 To convert (psi) to (dbl): (P/2.9 x 10'-9)log x 20 P = 158.76 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AS = 123.76' (max. limit in mininq permit is: AB =' DBL) 0 E Explosives column Check; (this is a very approximate method based upon auaerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' eaulsion is used, use SPD (specific density) = 1.20 (per Ireco) if a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11* = 7212 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 403 Breakdown of average pounds of explosives per hole due to ratio; Explosive it = 403 Explosive 12 = 0 SPD = specific densities for each explosive: SPD for Explos. tl* = 1.200 SPD for Explos. 12 (use 10.1' here if only have one explosive.)* = 0 HD = Hole Diameter Used in Shot (inches); HD* = 5.5 LD = Loading Density (pounds per foot of column): La = SPD(.34)(HD)"2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos, fl = 32.65273 Explos. 12 = 0.00000 Total Explos, column height = 32.65 Stemming height used in shot (feet)* = 10 Total height of explosive column(s) and stemming in the hole = 42.65 Total depth of hole denoted on the blasting report for the shot in question* = 43 Analysis Completed By: 6L Date, f l E u LAND QUALITY SECTION BLASTING ANALYSIS WORKSNEET (*= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : VK Nine Name: north Blast Reportl: 6 Date of Blast: 01/20/97 Time of Blast 11,15,00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Dt = 1D00 W = Maximum pounds of explosive per delay (pounds). Wt = 427 SD = Scaled Distance : SD = 01.5 SD = 48.19 V = Peak Particle Velocity (inches per second): V=160 (SD)^-1.6 V = 0.32 (*max. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setiaated at the second location as follows: V = Particle velocity measured by seismograph (ips): V* = 0.05 DS = Distance from blast to seismograph (ft) DS' = 1000 d = Distance from blast to second location (ft): d3 = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV = 0.0500 Airblast (overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W11M3)1-1.2 P = 0.226706 To convert (psi) to (dbl): (P/2.9 x IV-9)log x 20 P = 157.86 AB = Confined Airblast/Overpressure (dbl): AB ; P (dbl) - 35 dbl (for quarry situation AB = 122.86 (+max. limit in mining permit is: AB ,. &DBL) • 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities nay vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handlx ok for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfe is used, use SPD f specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11* = 5952 Total pounds of Explos. 12 (use 10.1' here if only have one explos,)' _ Ratio between explosives .= 0 Average pounds of explosives used per hole (pounds)* = 427 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 427 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use 10.1' here if only have one explosive,)* _ HD = Hole Diameter Used in shot (inches): HD* = 5.5 LD = Goading Density (pounds per foot of column): LD = SPD(.34)(HD)A2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos, 11 = 34.59731 Explos. 12 = 0.00000 Total Explos. column height = 34.60 Stemming height used in shot (feet)* = 10 Total height of explosive column(s) and stemming in the hole = 44.60 Total depth of hole denoted on the blasting report for the shot in question* = 42 Analysis Completed By: Date: 10 LAND QUAETY SECTION BLASTING ANALYSIS h'NSH ET (*= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : vmc Hine flame: north Blast Report(: 7 Date of Blast: 01/20/97 Tine of Blast 13:05:00 Peak Particle velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 800 N = Maximum pounds of explosive per delay (pounds): Wt = 481 SD = Scaled Distance : SD = D/W10.5 SD = 36.48 v = Peak Particle velocity (inches per second): V=160 (SD)"-1.6 v = (*max. limit in mining permit is: v = 1.0 ips) 0.51 Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: v = Particle velocity measured by seismograph (ips): V* = 0.25 DS = Distance from blast to seismograph (ft) DSO = 800 d = Distance from blast to second location (ft): d* = B00 PPv = Theoretical peak particle velocity at the closet offsite occupied structure (ips): Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) To convert (psi) to (dbl): PPv = V(DS/d)^1.5 PPV 0.2500 P = 82 (D/Wf0.33)1.-1.2 P = 0.310624 (P/2.9 x 10'-9)log x 20 P = 160.60 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 125:60 ' (*max. limit in mining permit is: AB = aDBL) s Explosives Colum Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following-,) Assumptions: If 'straight' etulsion is used, use SPD (specific density) - 1.20 (per ireco) if a 'blend/slurry' is used, use SPD (specific density) = 1.25 It 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. j1* = 6706 Total pounds of Explos. 12 (use 10.1' here if only have one explas,)* _ Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 481 Breakdom of average pounds of explosives per hole due to ratio: Explosive 11 = 481 Explosive 12 = 0 SPD = Specific densities for each -explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use '0.1' here if only have one explosive.)* = RD = Hole Diameter Used in Shot (inches); HDt = 5.5 LD = Loading Density (pounds per foot of column): 1O = SPD(.34)(1D)"2 LD for Explos. 11 = 12,3420000 LD for Explos, 12 0.0000 Explosive column height for each explosive (feet): Explos, 11 = 3B.97261 Explos. 12 = 0,00000 Total Explos. column height = 38.97 Stemming height used in shot (feet)t = 9 Total height of explosive column(s) and steming in the hole = 47.97 'total depth of hole denoted on the blasting report for the shot in question' = 44 Analysis Completed By: Date; N E 0 LANK �KI ITV SKTION BLASTING ANKYSIS ra0aMFET (+= Denotes fields vhere input data is needed) Permit Humber: -> 34-02 Pernitte : vmc Hine flame: north Blast Reporti. 8 Date of Blast: O1/22/47 Time of Blast.10:35:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1800 W = Haxinun pounds of explosive per delay (pounds): Wt = 475 SO = Scaled Distance : SD = D/W1.5 SD = 82.59 V = Peak Particle Velocity (inches per second): V=160 (SD)1-1.6 V = 0.14 (#max. limit in mining permit is: v = 1.0 ips) Based on kin distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity neasured by seismograph (ips), V+ = 0.01 DS = Distance from blast to seismograph (ft) DSO = 1800 d = Distance fron blast to second location (ft): dt = 700 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV = 0.0412 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W"0.33)1-1.2 P = 0.116804 To convert (psi) to (dbl): (P/2.9 x 101-9)loq x 20 P = 152.10 AB = Confined Airblast/Overpressure (dbl); AB = P f dbl) - 35 dbl ( for quarry situation AB = 111..i0;- (+tax. licit in fining permit is: AB =! DBL) Explosives Calm Check: (this is a very approximate method based upon nuaerous assueptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must candider each explosive used; refer to Dupont Handbook for actual SPD, otherwise me the following:) Assuptions: If 'straight' emulsion is used, use SPD (specific density) =1.20 (per Irew) If a 'blend/slurry' is wed, we SPD (specific density) ° 1.25 If 'straight' anfo is used, we SPD (specific density) = 0.05 Ratio betwen explosives: Total pounds of Expire. lie = 6820 Total pounds of 8xplos. 12 (me'0.1' here if only have one expim.)t = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (own&)' = 380 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 380 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Epics. W = 1.20o SPD for Rxplw. 12 (use %11 here if only have one explosive.)+ ® = Bole DiamteT Bad in Shot (inches): Hat = 5.5 Ill - Loading Density (pounds per feet of wlumn): ID = SPD(.34)(HD)'2 ID for Explw. h = 12.3420000 LD for Explos. 12 = 0.0000 Explosive calm height for each explosive (feet): Explos. 11 = 30.78918 Explas. 12 = 0.00030 Total Explos. colwn height = 30.79 Stewing height used in shot (feet)t = 11 Total height of explosive wlum(s) and staining in the hole = 41.79 Total depth of hole denoted on the blasting report for the shot in� question' = 43 Analysis Cmpleted By:V I Dater/ I lr/,� LAND Q1iALITY SECTION BLASTING ANALYSIS WORKSHEET (*= Denotes fields where input data is needed) Permit Number: -) 34-02 Permitte : vnc Nine Name: north Blast Reports: 9 Date of Blast: 01/22/97 Time of Blast 11:45:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Dt = 1000 W = Haxinua pounds of explosive per delay (pounds): W* = 471 SD = Scaled Distance : SD = D/W10.5 SD = 45.98 V = Peak Particle Velocity (inches per second): V=160 (SD)'-1.6 V = 0.35 (*max, limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seissograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity treasured by seisnograph (ips): Vt = 0.37 DS = Distance from blast to seisaograph (ft) DS* = 11000 d = Distance frofl blast to second location (ft): d* = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)11.5 PPV = 13.4987 Airblast (overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/1"0.33)1-1.2 P w 0.236080 To convert (psi) to (dbl): (P/2.9 x 10"-9)loq x 20 P w 158.21 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 123.21 (*flax. limit in wining permit is: AB /,e,DBL) • Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Item) If a 'blend slurry' is used, use SPD (specific density) =1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11* = 6595 Total pounds of Explos. 12 (use '0.1' here if only have one explos.)* = 0 Ratio between explosives = D Average pounds of explosives used per hole (pounds)* = 473 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 473 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use 10.1' here if only have one explosive.)* _ HD = Hole Diameter Hsi in Shot ( inches): HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)112 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 010000 Explosive column height for each explosive (feet): Explos. ►I = 38.32442 Explos. 12 = 0.00000 Total Explos. column height = 38.32 Stemming height used in shot (feet)* = 9 Total height of explosive columns) and stemming in the hole = 47.32 Total depth of hole denoted on the blasting report for the shot in question* = 41 Analysis Completed By: Date: 0 0 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (*= Denotes fields where input data is needed) Permit Number: -> 34-GZ Permitte : vac Mine Nacre: north Blast Reports: 10 Date of Blast: 01/27/97 Time of Blast 10:03:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1000 W = Maximum pounds of explosive per delay (pounds): W! = 453 SD = Scaled Distance : SD = D/W10.5 SD = 46.98 V = Peak Particle Velocity (inches per second): V=I60 (SD)1-1.6 V = 0.34 (*max. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): V* = 0.04 DS = Distance from blast to seismograph (ft) DS* = 1000 d = Distance from blast to second location (ft): d* = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips); PPV = V(DS/d)"•1.5 PPV = 0.0400 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W^0.33)^-1.2 P = 0.232075 To convert (psi) to (dbl): (P/2.9 x 101-91loq x 20 P = 158.06 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 123.06 (*max. limit in mining permit is: AB =, DBL) • u Explosives Column check: (this is a very approximate nethod based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurryl is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos, 11* = 5415 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* _ Ratio between explosives = 0 Average pounds of explosives used per hale (pounds)* = 453 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 453 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos, 12 (use '0.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches): HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)112 LD for Explos. 11 = 12.3420000 LD for Explos, 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 36.70394 Explos. 12 = 0.00000 Total Explos. column height = 36.70 Stemming height used in shot (feet)* = 10 Total height of explosive column(s) and steming in the hole = 46.70 Total depth of hole denoted on the blasting report for the shot in question* = 41_ Analysis Conpleted By: ag---l_ Date: A 0 LAND QUALITY SECTION BLASTING ANALYSIS 4I RKSHEET (*= Denotes fields mere input data is needed) Permit Humor: -> 34-02 Permitte : vmc Hine Nane: north Blast P.eporti: 11 Date of Blast: 01/27/97 Time of Blast 13,13,00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* - 1000 W = P.aximun pounds of explosive per delay (pounds): W* = 430 SD = Scaled Distance : SD = D/WI.0.5 SD = 47.79 V = Peak Particle Velocity (inches per second): V=160 (SD)"-1.6 V = 0.33 (max., limit in mining Permit is: v = 1.0 ips) Based on kwdn distances from the blast to the seismograph and.any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): Vk = 0.15 DS = Distance from blast to seismograph f ft) DS+ = 1000 d = Distance frog blast to second location (ft): d' = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): -PPV = V(DS/d)11.5 PPV = 0.1500 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 92 (D/W"0.33)^-1,2 P = 0.229001 To convert (psi) to (dbl): (P/2.9 x 101-9)lcq x 20 P = 157.95 AB = Confined Airblast/Overpressure (dbl): AB = P (011 - 35 dbl (for quarry situation AB = 122.95 ('max. limit in mining permit is: AB =DBL) • 11 Explosives Column Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and ranufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dapant Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per ireco) if a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11* = 9555 Total pounds of Explos. 12 (use 10.1' here if only have one explos. )* _ Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 417 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 417 Explosive 12 = O SAD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use '0.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches): HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(RD)'`2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 33.78707 Explos. 12 = 0.00000 Total Explos. column height = 33.79 Stemming height used in shot (feet)* = 10 Total height of explosive column(s) and stemming in the hole = 43.79 Total depth of hole denoted on the blasting report for the shot in question* = 43 Analysis Completed ey Date: �1 7 s 0 LAND QUALITY SECTION BLASTING ANALYSIS WOPXSHEET (t= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : vmc Mine Name: north Blast Regard: 12 Date of Blast: 01/30/97 Tiae of Blast 10:48:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1000 W = Maximum pounds of explosive per delay (pounds): Wt = 488 SD = Scaled Distance : SD = D/Wr-0.5 SD = 45.27 V = Peak Particle Velocity (inches per second): V=160 (SD)"-1.6 V - 0.36. (fmax. limit in mining permit is: v - 1.0 ips) Based on knm distances from the blast to the seismoraph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity zeasured by seismograph (ips): V' = 0.16 DS = Distance from blast to seismograph (ft) DSO = 1000 d = Distance from blast to second location (ft): dt = 1000 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV = . 0.1600 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W^0.33)1-1.2 P = 0.239017 To convert (psi) to (dbl): (P/2.9 x 10"-9)log x 20 P = 159.32 AB = Confined Airblast/Overpressure (dbl): AS = P (dbl) - 35 dbl (for quarry situation AB = "123,32 (tux. limit in mining permit is: AB =DBL) 0 0 Explosives Column Check: (this is a very approximate method based upon numerous assumptions, specific densities nay vary greatly depending upon the type and aanufacturer of the explosive products used in the shot, must condider each explosive used, refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions, If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. Pt = 13120 Total pounds of Explos. 12 (use 10.1' here if only have one explos.) * = Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 486 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 488 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 fuse 10.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches), HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPDf .34)fHD)'`2 LD for Explos, 11 = 12.3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 39.53978 Explos. 12 = 0.00000 Total Explos. column height = 39.54 Steaming height used in shot (feet)* = 4 Total height of explosive columnfs) and stemming in the hole = .48.54_ Total depth of hole denoted on the blasting report for the shot in question* = 43 Analysis Completed By: Date: ,q LAND QUALITY SECTION BLASTING ANALYSIS WOAKSAEE'T (*= Denotes fields where input data is needed) Permit Nuaber: -> 34-02 Pernitte : vac Mine Name: north Blast Report): 13 Date of Blast: 02/05/97 Time of Blast 11:20:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 900 W = Maximum pounds of explosive per delay (pounds): W* = 459 SD = Scaled Distance : SD = D/W^0.5 SD = 42.01 V = Peak Particle Velocity (inches per second): V=IbO (SD}"-1.5 V = 0.40 (*max. limit in mininq permit is: v = 1.0 ipsI Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): Vt = 0.13 DS = Distance froa blast to seismograph (ft) DS+ = 900 d = Distance fron blast to second location (ft): d+ = 1400 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV = 0.0670 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W^0.33)"-1.2 P = 0.264729 To convert (psi) to (dbl): (P/2.9 x 10'-9)loq x 20 P = 159.21 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 124.21 (*mx. limit In mining permit is: AB = ,,DBL) i Explosives Column Check: (this is a very approximate aethod based upon numerous assumptions; specific densities Bay vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following.,) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireeo) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anto is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. It* = 13702 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)t _ Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 459 Breakdown of average pounds of explosives per hole due to ratio: Explosive It = 459 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. ¢1f = 1,200 SPD for Explos. 12 (use 10.1' here if only have one explosive.)* RD = Hole Diameter Used in Shot ( inches) : RD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.14)(HD)1-2 LD for Explos. 11 = 12,3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 37.19008 Explos, 12 = 0.00000 Total Explos. column height = 37.19 Stemminq height used in shot (feet)* = 10 Total height of explosive colum(s) and steiminq in the hole = 47.19 Total depth of hole denoted on the blasting report for the shot in question+ = 43 Analysis Completed By: a11414i,, Date: LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (*= Denotes 'fields la'here input data is needed) Permit Number: -> 34-02 Permitte : vEc Mine Name: north Blast Reports: 14 Date of Blast: 02/07197 Tiie of Blast 11:03:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 1100 W = PaxiEum pounds of explosive per delay (pounds): Wt = 378 SD = Scaled Distance : SD = D/W'0,5 SD = 56.58 V = Peak Particle Velocity (inches per second): V=160 (SD)1-1.6 V = 0.25' (faax. licit in aininq permit is: v = 1.0 ips) Based on known distances from the blast to the seiswraph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph lips): Vt = 0.14 DS = Distance from blast to seismograph (ft) DSO = 1100 d = Distance from blast to second location (ft): dt = 1100 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)^1.5 PPV = 0.1400 Airblast (overpressure) Check: P = Unconfined kirblast/Overpressure (psi) P = 82 (D/W^0.77)"-1.2 P = 0.192677 To convert (psi) to (dbl): (P/2.9 x lo'-9)ioq x 20 P = 156.45 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 75 dbl (for quarry situation AB = 121.45 Nax. licit in Bininq permit is: AB DBL) Explosives Column check: (this is a very approxiaate method based upon neaerous assueptions: specific densities my vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the fallowing:) tssaptiuns: If 'straight' mulsion is used, use Sib (specific density) = 1.20 (per Ireco) If a 'blendlslurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.a5 Ratio between explosives: Total pounds of R%los. Its = 6765 Total pounds of ttplos. 12 (use 10.1' hue if only have one explms. )a = 0 Ratio between explosives = 0 Average ponds of explosives used per hole ipounds)a = 370 Breakdon of average pounds of explosives per hole due to ratio: Duplosive Il = 370 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Eaples. 11u = 1.200 SRO for Was. 12 fuse'0.1' hue if only have one explosive.)s = hD = Hole Disinter Ned in Shot (inches): HDe = 5.5 ID = Lading Density (pounds per foot of column): ID = SPD(.34)(I®)"2 ID for Explos. 112 12.3420000 LD for Won. li = 0.0000 Explosive column height for each explosive (feet): Explos. Il = 30.62713 Explos. 12 = MOMS Total Expire. WIM height = 30.63 Stemirxg height used in shot (feetjt = 10 Total height of exclusive calar(s) and stunning in the hole = 40.63 Total depth of hole reacted ' onn the /la.blasting report for the shot in questions = 40 Analysis Completed Hy/ i A%,dINW,. Dater 9 0 LAND QUALITY SECTION BLASTING ANALYSIS WORRSHEET (*= Denotes fields where input data is needed) Permit Number: -� 34-02 Permitte : vac Hine Nime: north Blast Reportj: 15 Date of Blast: 02/07/97 Time of Blast 11*32:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = 900 W = Naximum pounds of explosive per delay (pounds): W* = 365 SD = Scaled Distance : SD = D/W1,0.5 SD = 47.11 V = Peak Particle Velocity (inches per second): V=160 (5D)'-l.b V = 0.34 (*max. limit in lirinq permit is: v = 1.0 ips) Based on known distances from the blast to the seismgraph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph ( ips) : V+ = 0.05 DS = Distance from blast to seismograph (ftj DS* = 900 d = Distance from blast to second location (ft): d} = 900 PPV = Theoretical peak particle velocity, at the closet offsite occupied structure fips): PPV T V(DS/d)11.5 PPV = O.0500 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W1-GJ3)1-1.2 P = 0.241764 To convert (psi) to (dbl): (P/2.9 x 101-9)loq x 20 P = 158.42 AB =Confined Rirblast/Overpressure (dbl): AB = P (dhl) - 35 dbl {for quarry situation AB = 121.42 (imax. limit in mining permit is: AB =DBL) 0 • Explosives Cohn Check: (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condid+er each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per lreco) 1f a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. Ilk = 5275 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)' = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 353 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 353 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. Ilk = 1.200 SPD for Explos. ¢2 (use '0.1' here if only have one explosive. )+ = 0 HD = Hole Diameter Used in Shot (inches); HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)11 LD for Explos. 11 = 12,3420000 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 28.60152 Explos. 12 = 0.00000 Total Explos. column height = 28.60 Stemming height used in shot {feet)* = 10 Total height of explosive colmm(s) and steming in the hole = 32.60 Total depth of hole denoted on the blasting report for the shot in question* = 40 Analysis Completed B �� 1. ,� Date: LAND QUALITY SECTION BLASTING ANALYSIS WOMHEET (f- Denotes fields Where input data is needed) Permit Number: -} 34-02 Permitte : vmc Nine Name: north Blast Reportf: 16 Date of Blast: 02/12/97 Time of Blast 11:09:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D' = 900 W=14axinun pounds of explosive per delay (pounds): Wt = 477 SD = Sealed Distance : SD = D/W'0.5 SO = 41.21 V = Peal: Particle Velocity (inches per second): V=160 (SD)'-1.6 V = 0.42- (Anax. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V u Particle velocity neasured by seismograph f ips): V* = D.11 DS u Distance from blast to seismograph (ft) DS* = 900 d = Distance from blast to second location (ft): d+ = 901 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV u V(DS/d)11.5 PPV = 0.1100 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (D/W'0.33)"-1.2 P w 0.269792 To convert (psi) to (dbl): (P/2.9 x 101-9)log x 20 P = 159.34 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 db1 (for quarry situation AB = 124,34 (inax. limit in mining permit is: AB zZ4DBL) s 0 Explosives Colman check: (this is a very approxivate uethod based upon numerous assuuptions, specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 I€ 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. )lt = 12345 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 476 Breakdown of average pounds of explosives per hole due to ratio: Explosive ¢1 = 476 Explosive 42 a 0 SPD = Specific densities for each explosive: SPD for Explos. Ilt = 1.200 SPD for Explos. J2 (use 10.11 here if only have one explosive.)i = 0 HD = Hole Diameter Used in Shot (inches); HD* = 5.5 LD = Loading Density (pounds per foot of column): LD = SPD(.34)(HD)'2 LD for Explos. 11 = 12.3420000 LD for Explos. 12 = 0.0000 Exxplosive column height for each explosive (feet): Ekpios. 11 = 38.56749 Explos. 12 = 0.00000 Total Explos. column height = 38.57 Stemming height used in shot f feet)t = 9 Total height of explosive coluun(s) and steEaing in the hole = 47.57 Total depth of hole denoted on the blasting report for the shot in question* = 43 Analysis Coupleted By i Date: LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET (t; Denotes fields where input data is needed) Permit Humber: -> 34-02 Permitte : vmc Hine Name: north Blast Reportt: 17 Date of Blast: 02/18/97 Time of Blast 10:37:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): Dt = 850 W = Haximum pounds of explosive per delay (pounds): Wt = 435 SD = Scaled Distance : SD = D/W10.5 SD = 40.75 V = Peak Particle Velocity (inches per second): V=160 (SD)-`-1.6 V = 0'.42 (tmax. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: V - Particle velocity measured by seismograph (ips): Vt = 0.07 DS = Distance from blast to seismograph (ft) DSt = 850 d = Distance from blast to second location (ft): dt = 850 PPV =Theoretical peak particle velocity at the closet offslte occupied structure (ips): PPP = V(DS/d) l.5 PPV = 0.0700 Airblast (Overpressure) Check: P = Unconfined Airblast/overpressure (psi) P = 82 (D/W1-0.33)1-1.2 P = 0.277557 To convert (psi) to (dbl): (P/2.9 x 10'-9)loq x 20 P = 159.62 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 124.62 (*max. limit in mining permit is: AB =j4_DBL) 0 i Explosives Column check: (this is a very approximate method based upon numerous assumptions; specific densities aay vary greatly depending upon the type and aanufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' mision is used, use SPD (specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. Ilk = 10780 Total pounds of Explos. ¢2 (use 10.1' here if only have one explos.)t = Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 433 Breakdown of average pounds of explosives per hole due to ratio: Explosive ¢1 = 433 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. ilk = 1.200 SPD for Explos. 12 (use'0.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches), HP = 5.5 LD = Loadiaq Density (pounds per foot- of column): LD = SPD(.34)(HD)"2 LD for Explos. 11 = 12.3420000 LD for Explos. $2 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 35.08345 Explos. 12 = 0.00000 Total Explos. column height = 35.08 Steaming height used in shot (feet)} = 9 Total height of explosive colunn(s) and stemming in the hole = -44.08 Total depth of hale dented on the blastinq report for the shot in question} = 41 Analysis Completed By: - r 1"✓ Date, 0 0 IMO QUALITY SECTION BWTIMG ARALYSIS WORRSRRET (*= Denotes fields where input data is needed) Permit Nuaber: -> 34.02 Permitte : vac mine #aae: north Blast RepottV IS Date -of Blast: 02/21/97 Time of Blast 10:43:00 Peak Particle Velocity Check: D = Distance to closest offsite occupied structure (ft): D* = aaa W = Maxitsun pounds of explosive per delay (pounds): Wt = 442 SD = Scaled Distance : SD = DY0.5 SD = 38.05 V = Peak Particle Velocity (inches per second): V=160 (SD)'-l.b V = 4.47— (kmax. limit in miniaq permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location{ the expected vibration level can be setimated at the second location as follows: V = Particle velocity zeasured by seisWaph (ips): Vi = 0.08 DS = Distance from blast to seismograph (ft) Ds* = 800 d = Distance frog blast to second location (ft). d' = 860 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV = V(DS/d)1.5 PPV = 0,0800 Airblast (Overpressure) Check: P = Unconfined Airblast/Overpressure (psi) P = 82 (➢/WI.33)"-1.2 P = 0.300395 To convert (psi) to (dbl): (P/2,9 x IF-9)loq x 20 P = 160.31 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 125.31. (tnax. iinit in aininq permit is: AB/,�d_DBL) 0 0 Explosives Coluun Check: (this is a very approxibate method based upon numerous assumptions; specific densities nay vary qreatly depending upon the type and tanufacturer of the explosive products used in the shot; oust condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' muulsion is used, use SPD (specific density) = 1.20 (per Ireco) If a %lend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = US Ratio between explosives: Total pounds of Explos. ¢lx = 10557 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)+ = 0 Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* = 442 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 442 Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.200 SPD for Explos. 12 (use '0.1' here if only have one explosive.)* = 0 ED = Hole Diameter Used in Shot (inches): HN = 5.5 LD = Loadinq Density (pounds per foot of column): LD = SPD(.34)(HD)'-2 LD for Explos. 11 = 12, 3420000 LD for Explos. 12 = 0.0000 Explosive colum height for each explosive (feet): Explos. 11 = 35.81267 Explos. 12 = 0.00000 Total Explos. colum height = 35.81 Stemming height used in shot (feet)t = 10 Total height of explosive colum(s) and steminq in the hole = 45".81` Total depth of hole denoted on the blasting report for the shot in question* = 42 Analysis Completed By: Date: 9 z j it i O. v 0 • Uu1inn Materials Company February 25, 1997 Ms. Judith A. Wehner Assistant State Mining Specialist O Land Quality Section D-EHNR P.O. Box 27687 19 r Raleigh, NC 27611-7687 8 9 91 RE: Blasting Complaint North Quarry Dear Ms. Wehner: In reference to Lisa Hill's complaint, blasting and seismograph reports are enclosed in duplicate for the months January and February. All shots conducted during this period reveal that the peak air pressure Ievels were well below the limits of North's mining permit. Please give me a call if additional information is needed. Sincerely` - Vi ' D. Jones Attachment MIDEAST DIVISION / P.O. BOX 4239 • WINSTON-SALEM, NORTH CAROLINA 27115-4239 6 TELEPHONE 910 767-4600 Vulcan • Materials Company / Quarry of i`��� Report No. y o� � FEa z t99� a ju Date 9 ting Report Type of Shot to • .v A / Exact Time a / Type of Material CE/aN, >4- Shot Grid - D z- 9 o Distance 9e0 (Ft.) Direction 61<-' Gridd- (To nearest occupied building neither owned or leased) •1 Sale. Location Dist. to Seis. Grid +2 Sale. Location Dist. to Seis. Grid •3 Sets. Location Gli)61 xeZ, Dist. to Sets. H'DO Grid •5�,E-�� HoleMec '0S a Period Depth Stemming Total Pounds Per Hole/Deck No. S HL / 1 - 3 I I '/ �=- t 3 to Maximum Number of Holes /B Type of Stemming G%sfe.✓.= Its. Per Diameter (inches) S Face Height .Z9 Delay d=/ Spacing / 7 Sub Drilling .R Burden /'� Number of Rows 3 Method of Firing .'.7i5 Type of Circuit: Series Parallel i- A Parallel Series Type of Delays: Downli �%/' �// surface dP Trade Name � % 8 /,] g o i � /d 2v5 1 Weather ❑ Gear 0 Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm ❑ Cold Wind From ❑ N ❑ NE ❑ East ❑ BE (check one) El S ❑ SW ❑ West ❑ NW -� Fragmentation ❑ Excel ❑ V. Good D Good ❑ Fair ❑ Poor Sackbreak ❑ 10 it. ❑ 20 ft. ❑ 30 ff. ❑ 40 ft. ❑ 50 ft. or more Trade Name of Explosives Amount 5 U �Gs vxi;� If / Total p$ q, Its, Total Pounds t7S7L Powder Factor /, B Gal of Oil Oil Content . u79 Bench - 10 Grid Mop Date Scale Distance Tons of Materials Produced /'te Remarks' Distribution: Administrative Dept. — ORIGINAL Plant Office File Sum. Sig. I Blaster Signature Stale Safety Rep. License or S.S. No.: VW14W REV vox ;' III � � ill' I II I� I -,I 11!, I I.� I I I'IILy !illlil i-{ [lII'rj1 I�i' } G!Ii�Lj-f_ II i itom( ' 1'I I `;�-� 11 II i i'I t I' !! IIII I III �I I I I i i I� f F 1 „ � 11 IG9{ �'I 'If 1 �V1 iI FIB II;#I l !1; � I \ \EI { II il' L 'I Il.scIll I i„II - 'I Il�il'I iilll, '� I I •Ili I., i li iI; i �'11��i'�E{!I� {� III , �IfIE I�'I ii ,�'� � I ill illili�iillll�!'I illl�illl � { �I I 1 I ! I :.- I , ` i . I _i : LLLi. rl I� !7•i I'�I I, 1 i II ill I *e SAFEGUARD SEISMIC LIN02000DK ** SH: 2039 Mondav, 1/06/97 11:81:57 1. Event: 801 Client: UULCAN Operation: NORTH SSU Location: N 9900 E 9500 Distance to Blast: 900 Operator: R S Comments: N 10800 E 9900 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs Range: Auto $ ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 Czec/dio) Data Scale (seismic): 0.32 (i Nsec) Data Scale (air): 0.009 (psi) SUMMARY L T U PPU (in/sec) 0.03 0.04 0.03 PD (0.001 in) 0.50 0.84 0.57 PPA (g) 0.05 a.05 0.05 FREO (hz) 35.7 13.5 12.5 RESULTANT PPU: (in/sec) 0.05 PEAK AIR PRESSURE: (db) 116 (psi) 0.00174 Monday, 1/06/97 11:01:57 DYNAMIC CALIBRATION CHECK L T U S SHAKETABLE CALIBRATED1 5/1V96 By GeaSonics, Inc. Box 779, Warrendale, PA 15095 TEL% 412-934-2900 writing file to disk ... Quarry Vulcan . • Materials Company Blasting Report Report No. Date Type of Shot ✓ Exact Time 9 // Type of Material K w �'/f Shot Grid - //tea 6- "oo Distance 13400 (Ft.) Direction �" Grid=-/1';l (To nearest occupied building neither owned or leased) at Sets. Location Dist. to Sala. Grid #2 Sets. Location Dist. to Sets. Grid a3 Seis. Location ! ' n: od r Dist. to Seis. r 9Oo —Grid .4-deuOZ-IS "- Hola/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck i r 0 V60 y a,- 3 5p ti GY} 6 iN6 Maximum Number of Holes Type of Stemming 49.c/Wc Ibs. Per Diameter (inches) 6%a Face Height -50 Delay Spacing /'� Sub Drilling Burden /.l Number of Rows a Method of Firing ✓YE-9P5 Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline 4f 1 r Sur/ace Trade Name g 9R td rA.Z it v Aj Weather Clear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm Cold Wind From N ❑ NE ❑ East ❑ BE (Check one) ❑ S ❑ SW ❑ West 2 NW Fragmentation i] Excel 7 V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ to ft. C 20 tt. ❑ Go ft, ❑ 40 h. ❑ 50 ft. or more Trade Name of Explosives Amount /8G Total 9 Ibs. Total Pounds -Sde Powder Factor i 6-1 Gal of Oil r9t % Oil Content Bench T Grid ,r", Date 2 'r4-9r/ Scale Distance d Tons of Materials Produced -73G� Remarks: Distribution: Administrative Dept. — CRfGINAL Plant Office File Supt. State Safety Rep. Blaster Signature Il. G' }Y, 6 License or S.S. No.: �-7s-[G5.G5- VMFY]<N REV M2 1� ill I Ili li ��!. i illll I lr !� It-! il' IIII�!�1 I-l+I 1 Ii II {11 Ill tli H) II I I I Ij' li.t I i:l III I 'II lil lill ili' j !,! I '.I jt II'Il ,I liI I ,il 1111 Ilil i+i: I� !�II�II II i+ ��jjll I li I:'. Illit�illl1 it I I f It I'6 Ii I�t, I , i1'I ' i' I• }I;i'1 I •:; �i�illl}.lil Ill: I: I' 1 i i'III II 1 Iil I IIi�I', �4l lilrii I I i I i� Iljl , I r/ti t l i^I I I j--l1 i TRIGGER ACTIVE, 1/07/97 10:tn:4: 414 BAT: 13.7 SN:2039 V2.65 1/07/97 10:33 RECORD < 5> GRAPH < 2 in> COPIES <1> OSM CHARTS <DISABLED> DISK COPIES <0 EVENT HOLD <DISABLED> ALARM <DISABLED> TRIGGERS: SEIS <0.10> SOUND < 112 db> COMMAND: DY140MIC CALIBRATION CHECK L T V S SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 COMMAND: BAT: 14.3 SN:2039 V2.65 1/07/97 13:07 RECORD < 5> GRAPH < 2 in> COPIES <1> OSM CHARTS <DISABLED> DISK COPIES <1> EVENT HOLD <DISABLED> ALARM <DISABLED> TRIGGERS: SEIS <0.10> SOUND < 112 db> COMMAND: Uukan • • Materials Company �� Blasting Report ouarry /Ver/ Ik L Report No. Y Date / - 7 " S'Y Type of Shot In / Exact Time Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck Type of Material�o ram.✓• c Shot Grid zf -le9Y Distance /aao (Ft.) Direction •cx9 Grid -5f&Z 11AV (To nearest occupied building neither owned or leased) al Sets. Location Dist. to Sets. Grid a2 Sets. Location ,, Dist. to Sets. Grid w3 Sets. Location! Dist. to Sets. /COD Gri -KV/?-1•1% IL O 'T' p - 3J:1 3 p-p '� i e /4 9L Maximum Number of Holes 147 Type of Stemming 47 lbs. Per Diameter (inches) Face Height Delay 2a3 Spacing Sub Drilling 3 Burden Number of Rows 3 Method of Firing V�>s Type of Circuit: Series Parallel Parallel Series Type of Delays: Downlin�¢�i'-'d// Surface Trade Name -JS��,�J ,c.0 d "x S qr y /o /d J2 PI-7 / /5 9 Weather R�CMar ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm Cold Wind From N ❑ NE ❑ East ❑ SE (check one) ❑ S ❑ SW ❑West t4 NW JL 5- /b aS9 I Fragmentation Cl Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 it. ❑ 20 h. ❑ 30 ft. El 40 ft. ❑ 50 a. or more Trade Name of Explosives Amount / 8eo /<1. 3-5 ax P /S kLleorrAl c of 3 Total X lbs.- Total Pounds Powder Factor f.9� Gal of Oil .?/ % Oil Content eel Bench o Grid M]p Dale S'/L/-SS/ Scale Distance Tons of Materials Produced Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. 0 Blaster Signature Slate Safety Rep. License or S.S. No.: WC48/420 FIVIM Walln THT K it! 1 1 10 F }`##il Ilj+i _ }i1'� I��I= ���ii t;� !��li,, if U-1 t J ' _.;._I t !_l.. l l `_ I i.l j i j €. E �_ ! i I I � � € � { i � I - + (� ' '--� -- I �-. � i i. 1{ �- �- - I i -� I I I i i ��{ � � I � I ;- � � i�� VL I J.- MY illin: 1 ! 1, ti :77: 1 j wl n LJ i * SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Tuesday. 1/07/97 13s42:59 Event: 003 Client: VULCAN Operation: NORTH SSU Lo ntion: N 9900 E 11100 Distance to Blast: 1000 Operator: R S Comments: N 10900 E 10900 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic). 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPV (in/sec) 0.12 0.10 0.05 PD (0.001 in) 0.65 0.62 0.63 PPA (9) 0.10 0.07 0.05 FREQ (hz) 39.4 35.7 33.3 RESULTANT PPU: (in/sea) 0.14 PEAK AIR PRESSURE: (db) 117 (psi) 0.00203 Tuesday, 1/07/97 13:42:59 DYNAMIC CALIBRATION CHECK L T V S SHAKETABLE CALIBRATED: 5/10/96 By 6eoSonics. Inc. Box 779, Warrendale. PA 15095 TEL: 412-934-2900 UUI18n • • Mai Company Blasting Report Quarry A4r/l1 _Report No. '/ Dale j-13-97 Type of Shot P% �'% rExact Time lio: r7 T Type of Material �iir 114 Shot Grid a9 E- p Distance .n&96 (Ft.) Direction .5 Grid - - (To nearest occupied building neither owned or [eased) •1 Sale. Location Dist. to Sets. Grid k2 Sets. Location Dist. to Sets. Grid •3 Sais. Location 0is1. to Sets. - eo GridA/ Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck i - 620 0 �8g 104 y� Number of Holes 13 Type of Stemming /=7 Maximum Per Diameter (inches) 5YA Face Height Delay Spacing /S Sub Drilling 3 Burden /3 Number of Rows 2 Method of Frin g Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline'�N.��/ Surface Trade Name 07d7 9 9 fD r�L xG7 r3 -1 Weather Clear ❑ Chanty ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm 2Cold Wind From N ❑ NE ❑ East ❑l BE (check one) ❑ S 0 SW ❑ West 3'NW Fragmentation 0 Excel 0 V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 It. ❑ 40 H. ❑ 50 ft, or more race Name of plosives Amount 59 i0 X IS - Total , lbs. Total Pounds Powder Factor `�/ Gal of Oil rP % Oil Content , d5 Bench g� Grid M❑ Data r r/ p ='- y- `� Scale Distance I Tons of Materials / Producetl S83`�' Remarks: Dis(nbulicn: Plant Office Dept. — ORIGINAL g Za.�, � g Plant OHice File 3u 1. Si �+-- Blaster Signature Slate Safely Rep. License or S.S. No.: VMCJ 74 M REV WZ m I , i1 ' 1- I Ie it II lii i 1 i , Iii I� jllllj�l+ Iltf�� Ijli-F�I{III�I�I�j��Il!I. I I, i',Ili I'I i;�i : II IIIIi,,I; 'I , , 1II1 I:�I I IIIi�III �! II,!I'Il � ,:. I'IIII { IIj L Iil I ; }IlI1'IjI I I• :I"Il{I ,Fil 141'i �',j II �,Ij I I I b"�I �k+�I�G9���1��T6 �I��il IIII I,I h ✓-III 'I II I I I �i I�I�i III �j l� ,'ill Ill I�Illi��rl�}i'I lil«r IIIlrlos''1} �E,I s� ,� ooi ,I ', I tl t "} �lli•_ II IIIII,Illlli �� I I ill I II �j I j��IFi� Cj.lj� I,l a!'II�I, 1,Ij� �il 1'I l�l li, 'Ili L I 'liil+, ili�llli �l i it l,:r iljil,I Llllli,,l �.l i� II1111 I �I Ili I� I'.'il '11;II1i1 l ,I, �ji Iil � III II{' III ".1 I �•� i. i , , j JI I' I, _LI , I ,. .LI I-i I} �•i ,1 I;;• II' jj }I,, III !j,fjrlll �lijflill i illlrl I !ji} III, �I I' ,il I ll} li IIII�{j �I�i II I�ri IGIII�I I il'Ill!I jl� {lr jtil���I}II I¢ r 1 + !T7r�kf'i; f1 III 1 �I lll;lrl!II� I_� �Ill�r'� Il�iil ;�j17 l TRIGGER ACTIVE. • 1/13/97 18:14:33 • aM SAFEGUARD SEISMIC UNIT 2000DK •t SN:2039 _�• Mondav, 1/13/97 10:15:27 Event: 004 Client: VULCAN Operation: NORTH SSU Location: N 11500 E 13500 Distance to Blast: 2000 Operator: R S Comments: H 11600 E 11300 Trigger Levels: 0.10 in/sec, 112 do Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/dio) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPV (in/sec) 0.01 0.01 0.01 PD (0.001 in) 0.23 0,27 0.36 PPR (a) 0.05 0.05 0.05 FREO (hz) 45.4 25.0 250.0 RESULTANT PPV: (inset) 0.02 PEAK AIR PRESSURE: (db) 116 (psi) 0.00174 Mondav, 1/13/97 10:15:27 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale. PA 15095 TEL: 412-934-2900 Vulcan Materials Company Quarry Blasting Report Report No. a Dale i- /3 -90 Type of Shot / %&t 4/ L/ Exact Time '/3- / Type of Material ✓R//• /< Shot Grid - Lb .F O Distance HOO (Ft.) Direction 4, ,J Grid-fftE'-f o (To nearest occupied building neither owned or leased) e/ Sets. Location Dist. to Sets. Grid s2 Sets. Location Dist. to Sets. Grid 23 Sets. Location Dist. to Sets. Gri - ` 9 Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck I 0 93 s/aL 0 9' 3 a / 06 s /oo L Aar Maximum Number of Holes 2B Type of Stemming G"I lbs. Per Diameter (inches) 02 Face Height s/O Delay Spacing r0 Sub Grilling s o3 Burden /.1 Number of Rows 3 Method of Firing ✓49-2%7 Type of Circuit: Series Parallel � v - Parallel Series Type of Delays: Downline /_ "// Surface r '✓L Trade Name V%ate 9 '/SO q 5 sz fD /1'7 HD9 Apz /2 4 9L / /SP /5 r8 Weather ZClear ❑ Cloudy ❑ Rain ❑ Snow (check two) Cl Hot ❑ Warm I'Cold Wind From ❑ N 0 NE ❑ East ❑ BE (check one) ❑ S 13 SW ❑ West IZ NW i8 r0 y03 Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ to ft. ❑ 20 ft ❑ 30 ft. ❑ 40 ff. ❑ 50 ft. or more Trade Name of Ex losives Amount ✓ Yic 3S Total lbs. Total Pounds /X s/V Powder Factor ®.D/ Gal of Oil ./O %Oil Content •O•S Bench mi-/>a, •- Grid M� x4>xp Date Scale Distance Tons of Materials Produced � /eZ5_ Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. State Safety Rep. Blaster Signature License or S.S. No.: VMe374A REV"2 I I 1 1 I i i I I 'Illi 'I) 11 III I Ili 1 It s FTII�I r! I iil{ir � �il l -it' r 1 II 1 � 1 1 '11i iI�I�! 1 �1�I !iI' Ilrilr f III Ijll j j;ll I it FI Ijl 1 IIII I Itlllll'1 II i!Il_: 11 IIII iIl it Illl.' I. II illlil I 1 I I ��IL!j �Iill!I11 � I� ill!Ilt�ii.-I rl ;. !!,jii! l lill� [l Ii lllj II ` I �!!ll I) Illll I II11I� tlll IIII I1III . gill:-.-Ali-_�.I�Ifl;ti-I llil!IIII�!�ilil� $ yiI I IIII IIII !1 -�I1 Ifl;lli� I sr-, 11-j!II I ill I jjl t-11t1('I�I ��-IIti l-h I II :{ III !I 11 II� 311'I11 p'� I.f! 1 1 I'' I I�,' 1 1 Il.t IIII. I.r 1 �I I (- I Fl i t I I 11,-f ! III ili i IIII � i !il IIIIIIII� I I I! I'Ilil Ill rll I 1'. I ; .I ;lllilll IIII tl.ji, j..11 tl j II 1'I Il I!I I II'I I IIlj� Ifl ILLiU1!.l l ** SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Monday, 1/13/97 13:15:53 Event: 025 Client: VULCAN Operation: NORTH .. SSU Location: N 9900 E 9500 Distance to Blast: 900 .. Operator: R S Comments: N 10800 E 10000 Trisser Levels: 0.10 in/secs 112 db Record Time: 5 secs Ranee: Auto 5 ips VIBRATION C, SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sac) Data Scale (air): 0.009 (psi) SUMMARY L T V PPU (in/sec) 0.65 0.06 0.04 PD (0.001 in) 0.64 0.89 0.47 PPP (a) 0.05 0.05 0.05 FREQ (hz) 25.0 23.8 18.5 RESULTANT PPU: (in/sec) 0.08 PEAK AIR PRESSURE: (db) lie (psi) 0.20232 Mondav, 1/13/97 13:15153 DYNAMIC CALIBRATION CHECK L T V S SHAKETABLE CALIBRATED: 5/10/96 By GeoSonicss Inc. Box 779s Warrendaler PA 15095 TEL+ 412-934-2900 Uluka 10 0 Materials Company Blasting Report Quarry &�4 Report No. l Type of Shot. rr Exact Time :I= Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck Type of Material✓✓✓.✓% Shot Grid -i f- /D CdO Distance /0/i (Ft.) Direction .SSA/ Gri - (To nearest occupied building neither owned or leased) W Sale. Location Dist, to Sets. Grid M2 Seis. Location Dist. to Seis. Grid #3 Seis. Location oe�u� 4 Dist. to Seis. Grids✓-9W + O Z Maximum Number of Holes Type of Stemming GIts, Per Diameter (inches) 5%2 Face Height 39 Delay Seating Sub Drilling s z� Burden i Number of Rows 3 Method of Firing -' 7?5 Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline"% 1"� Surface d Trade Name g 14/z s /�/-7 /D l 8 ,/,7 �p 7 Weather Clear ❑ Cloudy❑ Rain ❑ Snow (check two) ❑ Hat ❑ Warm . 'Cold Wind From O N �❑ NNE El East ❑ BE (check one) ❑ S LI SW ❑ West ❑ NW Fragmentation ❑ Excel ❑ V, Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 it. ❑ 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 ft, or more Trade Name of Explosives Amount eA,✓ �c / a9Z Total Its. Total Pounds '> 99G Powder Factor I.93 Gal of Oil 39 9b Oil Content � Bench Grid kf-.p Date � Scale Distance Tons of Materials Produced /1d, Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Sul Sig. /' eT ^GL.. Blaster Signature — State Safely Rep. License or S.S. No.: VMGM7420 aav=2 i TRIGGER ACTIVE, 1/20/97 11:14:39 e e •* SAFEGUARD SEISMIC UNIT 2000DK *a SN:2039 Mondav, 1/20/97 11:15:09 Event: 006 Client: VULCAN Operation: NORTH -' SSU Location: N 9900 E 9500 Distance to Blast: 1000 Operator: R S Comments: N 10800 E 10000 Trisser Levels: 0.10 in/secs 112 db Record Time: 5 secs Ranse: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPU (in/sec) 0.05 0.03 0.03 PD (0.001 in) 0.66 0,85 0.59 PPA <9) 0.05 0.05 0.05 FREQ (hz) 31.2 17.8 13.5 RESULTANT PPU: (in/sec) 0.05 PEAK AIR PRESSURE: Cdb) 119 (Psi) 0.00261 Mondays 1/20/97 11:15:09 DYNAMIC CALIBRATION CHECK L T V S SHAKETABLE CALIBRATED: 5/10/96 B9 Geosonics, Inc. Box 779s Warrendale, PA 15095 TEL: 412-934-2900 Uul[un Materials Company Quarry Report No. Date Type of Shot '4Zfez / Exact Time 1•"°� Type of Material 7/,f2 Shot Grid .✓-/G1lAY if - 14 ooO Distance Poo (Ft.) Direction -- Grid ✓-95DDC (To nearest occupied building neither owned or leased) #1 Seis. Location Dist. to Seis. Grid #2 Seis. Location Dist. to Seis. Grid #3 Seis. Location 6LIel Dist. to Seis. ^BOO Grid Number of Holes Type of Stemming lbs.l Perm Diameter (inches) �z Face Height Delay Spacing Sub Drilling Burden Number of Rows Method of Firing Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline '/� Su ace Trade Name e Blasting Report i —,;w `T ",7 Hole/Deck Delay Total No. Period Depth Stemming Pounds Per Hole/Deck r7 9� G /1 ,o /s � yffcv /-/, 134 -? I /y' � q ; I y&-' Weather 2-Clear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot PNarm ❑ Cold ❑ N El NE ❑ East El SE Wind From ,�� (check one) ❑ S .b 5W ❑ West ❑ NW I Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 ft. or more . Trade Name of Explosives Amount to D Total lbs. Total Pounds Powder Factor Gal of Oil % Oil Content 1,9 -69'711 Bench Grid V-p Date Scale Distance Tons of Materials Produced Remarks: Distribution: Administrative Dept. --- ORIGINAL Plant Office File Supt. Sig/ —Eel Blaster Signature State Safety Rep. License or S.S. No.: VMC-3874 20 REV 3192 I-T 41 It L1 I i 'r E }` f i i i i I� � ! � I j r` I+ l i l i.l jJ 1 f .r ?� { '! � i�} I I -{'�� r Ii t;�r# , r{I�j t rj I�iI(�.(1 ,i',�� € ,�� ijj}{I -1 j.o { ,� { � , k l S .� � � I 1 -,j I I .. , i r 1 i { i � ; i 1 I�l , � � � pq�'.� �.; �.� ? };i_� � �-{ J-� {.t{�[ � {.� ;'�I it �.�, ! I ,a3� �. i r. • 0 *+ SAFEGUARD SEISMIC UNIT 2000DK *+k SN12039 Monday, 1/20/97 13:06:36 Event: 007 Client: VULCAN Operation: NORTH SSU Location: N 9900 E 11100 Distance to Blast: 000 Operator: D B Comments: N 10600 E 11000 Trigger Levels: 0.10 inset, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (secldiv) Data Scale (seismi D: 0.32 (inset) Data Scale (air): 0.009 (Psi) SUMMARY L T V PPV (in/sec) 0.25 0.09 0.10 PD (0.001 in) 1.39 0.99 0.67 PPA (9) 0.15 0.07 0.07 FRED (hz) 29.4 26.3 29.4 RESULTANT PPU: (in✓sec) 0,26 PEAK AIR PRESSURE: (db) 124 (psi) 0.00435 Monday, 1/20/97 13:06.36 DYNAMIC CALIBRATION LHELI( SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 .,., 4: ns s: i., to disk ... !lnitan• Materials Company / Blasting Report Quarry 2 fA Report No. Date pip-V'7 Type of Shot Exact lime.$6� Hole/Deck Na. Delay Period Depth Stemming Total Pounds Per Hole/Deck A Type of Material [D �UAi Shot Grid -/ -// Distance /rfCO (Ft.) Direction F_ Grid (To nearest oca//gpred ��building neither owned or leased) e1 Seis. Location /7=o, ist. to Seis. -70J Grid Lai Ad- 02 Seis. Location Dist. to Seis. Grid e3 Sais. Location C.§ n / od5 Dist. to Seis. i.fiy Grid ' /4CO£ / I AO H l p �J J dl — Maximum Number of Holes /8 Type of Stemming Lbs. Per Diameter (inches) Face Height NO Delay Spacing Sub Drilling 3 g Burden i3 Number of Rows .� Method of Firing 146// Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline WV , Su/rf—ace Trade Name is: `L Joi - 9 'i.2S 8 i6o o� Bo0 �� 9 / V R N% / .147 Weather E3 Gear 14 Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot Warm ❑ Cold Wind From N 0 NE ❑ East ❑ SE (check one) ❑ S 1GYSW ❑ West ❑ NW l/ y� ao' aoo Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 3o it. ❑ 40 ft. ❑ s0 ft. or more Trade Name of Explosly s Amount %0 6SE0 ;her, 8 / � Total ,f lbs. Total Pounds lel8 Powder Factor !. (e5 Gel of Oil 37 % Oil Content Bench � Grid M.7p Date 9-/9-94 Seale Distance X Tons of Materials Produced / T.3%S Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. L� Blaster Signature State Safety Rep. License or S.S. No.: VMG914A pay WE • 11 �� � �► �it l a i r, � kll, 17- �III I I ) III11 I I 11 � ' 1 I I 'al II 1 II' ; I I) .IIII JI J rr fi�I IIlil�ii I r I���2lll�l!�� I+I111.'`jli4lil1�ll� it r '44 + - I' �1�IsIi1I-�� it Ili If I a �Ifil I I r ,I li I IITjr��1i11111�T:I I' ;, II'I II IIII „it�IIIt11 tll )�IIIlll I FF�-{{ 411, 1 I�I ll IIFIIIII.Izf� f•I III G'�I"�- !II , Illli f- I IIII 1 1 �� �� i � I { ri/PII 1t1t-i.�J t�l��-t'r�.Ili-I ii'11JTI I t li"�-���I`F 92 � }'i'�FI�IiOl�ll�r y� CFI I•�IIII _ I � � � ,,F-..,(�I T yI�rII -IIII r 1 � f Illi �I �i IIL'; IIIIL , ��• If Il�if I I I{Il���li ��� I � I� 'FI-� I�I{I III'i) II ll;;-iIIII 1� _LI�I''I I�L I IIII 1 I I I I { I I 1 1 I .I I l i ; II 11�1 IIII IIII I III- I IIIFf 1 IIII -- III Wednesday, 1/22/97 10:57:00 Event: '608, • Client: VVLCAN • Operation: NORTH SSU Locations N 11500 E 13500 Distance to Blast: 1800 Operator: D B Comments: N 11900 E 11400 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs i Range: Auto 5 ips VIBRATION 8 SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (ia:sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPV (in/set) 0.01 0.01 0.01 PD (0.001 in) 0.30 0.39 0.23 PPA (g) 0.05 0.05 0.05 FREQ (bz) 9.4 29.4 7.0 RESULTANT PPV: (in/sec) 0.02 PEAK AIR PRESSURE: (db) 112 (psi) 0.00116 Wednesday, 1/22/97 10:37:00 DYNAMIC CALIBRATION CHECK L T U S SHAKETABLE CALIBRATEDa 5/10/96 By OeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 writing file to disk ... serial xnmeer : logo went : 0D1 ente : /99 Time : 10:35:10 cal Data : oln0/9t Peae6 : A: 10B.BOB 0 0.6423 L. a.x g n.2995 T: 0.2npn 0 o.uga v: o.supa .zgnn Pon : 0.599 is/sec a D.206 s cell : WLCAN MATERIALS NORTH WARRY Blast site : N11900 E11000 SHI 09 Baldmometer at : AT f1WER BED AT BACK GATE N12200 E121DD, 700M AWAY +0.01 r AIR _ -0.01 I I I a- 0.75 LJHG yas�w.-•~. -0. 75 +0.T5 TRANS -0 . T- L +O.T5 VERT -0.15 111 I— F 1 1.0 Y. Aria in seconds Y Axis in inch/sec for ground, psi for air. 1 inch/sac -2.50 cm/sec 1 pei - 6.6907 Kpa U.S.B.M. APPENDIX B 00 0.10 0.01 3Hz 6Hz 9Hz 3DHz 3Hz 6Hz 9Hz 30Hz 3Hz 6Hz 9Hz 3CHz Longitudinal Transverse Vertical Environaental Technology. Inc. i�T-T-rTTT I T -T T I I I I I I t I tTT I I I I T I I A 't -T- I I 1 _1 T-T-T Z'TTT T T T 1 I I I I I 1 I I I ---------- _1_1_11111 _1 J I I I I If 1 I 1 I I I 1 I I 11 1 I I 1 I 1 : I 1 I I I I I I I I I I I I I I I I I I I I I I I 1 I I I 11 I 1 I I I I I I I I I 1 I 1 I I I I I I I I 1 1 1 TIT 1 1 1 1 I __+-T-T-Yr+Y_ 4_ 4_ T-l_ T_ T-_T-_TTTTT__ T -_l_ T_ _ -----__ T-l_-T_ __T-_T_TTTTT --- _ _ _-_T_-_T'_T_T_T_Tl___ --- - PTiTTa T -T T TTTTtTT T T -T T-TTTTT t T T 1 1:: It I I I I I I 1 1 I I I I I I I I 1 1 _1 _J 1 --1-1_11111 1 L_1_1_LLll _1 1 11111 I I I I 1 I I I I I I I 1 1 I I I I I I I 1 I 1 I11______1_ I I 1 I I I_____ I__ I_ I_ I 1 I I 1 �T _ TTTTT T T� _ T T TTTTT -T 'T -T _I ______ __ _ _ - T-l'TrTT1 -T -T I IIII I IIIIIII II III I II I_I II11 I I I IIIIII I 1 I I I IIII I I I __I T T I I I 1 t 1 1 1 1 I I I I I T111,_____y_ 1 1 i 1 1 I I 11 I 1 I 1 I I I li i i i 1 i 1 i i i i i i i i i i 1 I111 I 1 I i I �1_ 1_, ,1------ ,--- 1__1_ 1-1_11L11L-1_3AL11 Lll ___1_ _J 1 : 1 I :I______ I_ I_ I I:_ I I 14 I_____ I__ 1_ I_ _ _ -i _ 'TTTTT -T 'T _ -�-i-TTTTT-T _: T i TTT -T -1 'T I I I I II I I I I_I_I it I I 1 1 I I I I II I 1I_ T T l T I I I I I I I I 1 I 1 I I I I I I I 1 I 1 1 -1-4— _Y1�„a , J 1 I I I I I 1 I I 1 I I I I I 1 1 I 1 I I I I I I I 1 I I I 1 I I I I I I I I I I I I _L_1_1J_LI I _� _1 I II I 11 I I I I I 1 I I I I I I I I 1 1 I I I I 1 1 I I I I I I I I I I I I I I I I 1 I I Vukan• • Materials Company Blasting Report Quarry Al siL Report No. 9 Date /-1W'S'/ Type 01 Sh01 Exact Time S �( Type of Material lr�iWA- c Shot Grid - - / Distance /C6O (Ft.) Direction < Grid (To nearest occupied building neither Owned or leased) •1 Seis. Location Dist. to Seis. Gri0 +2 Seis. Location ,,� Dist. to Seis. Grid w3 Seis. Location jf l e Dist. to Seis. ,6 Grid-IRYK-1r/00 elD HolNoD Delay Period Depth Stemming Total Pounds Per Hole/Deck '0 %3 Maximum Number of Holes rd Type of Stemming _n9 lbs. Per Diameter (inches) 6-112 Face Height 38 Delay Spacing /'% Sub Drilling s h67S Burden /3 Number of Rowe -R Method of Firing 1/A/1'z 'type of Circuit: Series Parallel _ Parallel Series Type of Delays: Do nlines/// X/t Surface us-yt Trade Name%� %/So g yz 9 G'/ 0 5V / i3 kb% Weather Clear 2`61oudy ❑ Rain ❑ Snow (check two) ❑ Hot [TWarm ❑ Cold Wind From 17 N ❑ NE ❑ East ❑ BE (check one) S &Sw ❑ West ❑ NW Fragmentation ❑ Excel ❑ v. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 fL ❑ 20 h. ❑ 30 ft. ❑ 40 f. ❑ 50 ft. or more Trade Name of Explosives Amount a S� Total 5' lbs. Total Pountls ! l 9 ----// Powder Factor r. y1 Gal of of � % Oil Content 4�1 Bench Grid NI1p Date 9-/9-& Scale Distance '/lo Tons of Materials Produced Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. / ✓-TV"'^ Blaster Signature State Safety Rep. License or S.S. No.: VM04Mn4 w REV 312 i TRIGGER ACTIVE, 1/22/97 11:44:32 . s * SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Uednesday, 1/22/97 11:45:08 `1 Event: 009 Client: VULCAN Operation: NORTH SSU Location: N 9900 E 11100 Distance to Blast: 1080 Operator: D B Comments: N 10600 E 11000 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) L T V S _ SUMMARY L T V PPV (in/sec) 0.11 0.09 0.09 PD (0.001 in) 0.82 0.67 0.71 PPA (9) 0.10 0.07 0.10 FREO (hz) 35.7 25.0 38.4 RESULTANT PPU: (in/sec) 0.14 PEAK AIR PRESSURE: (db) 124 (psi) 0.00464 Wednesday, 1/22/97 11:45:08 DYNAMIC L CALIBRATION T CHECK V S • SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 serial ngmbot loan event : DDx n Sim.: 11:@@:51 cal rate : 0111o!9i Peaks A: 106AB P 0.036e Late . 311p p O.x615 S: o.3olpa P O.S69e v: o.50Iva Pvs : 0.661 in/sec @ 0.265 s crospanY : WI M HASEPIMA NORTH MARRY @last site : 4I0600 E 11000 SHOT @ D9 seismometer at : 57.14M1TIMERS CHARI M99DO =2100, 1000 1T. MAY lr A9 Ir -0.01 }D.95 LONG -0. 75 +0.15 TRANS �\ -0.15 +0. 5 r VERT -_ 7rlrL�"^^_'�--_/^ -D.5 I 1 H w1s in seconds Y Axis in inch/sec for ground, psi for air. 1 3 1_ch!sec 2.54 cm!sec i psi - 6.6997 Kpa U.S.B.M. APPENDIX B I.Do 0.10 0.01 3Hz 6Hz 9Hz 30Hz 3Hz 6Hz 9Hz 30Hz 3Hr 6Hz 9HE 30Hz Longitudinal Transverse Vertical Environmental Technology, xnc. r T T -T T I I I -T-T-TTTT T -T I -T -T-T-TTTTT -T I I I 1 i I I 1 I I I I I I I I I 11 1 I 1 I i I 1 � IIIIII I I I I 11 1 I I I I I I I I I I I I I I I _1 11 _1 _1_1_11111 1 _1 _L _IIIII 1 _J 1 1 I I 1 I I I I I I I I I I I i I I I I 1 I I I I I I I I I I I I I 1 1 I I I 1 1 1 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I I I I I 1 I I I I I I I I I I I 1 I I I I I I I I I I I 1 I 1 I I I I I I 1 ___ T_ _-_T_:-__T_r_T_TT___ - _ - TTTTT T'TTtTT -e-4-T-hHi -#-4-#-f#i4 -+ 4 4- '-+-Y-+-Fi4i : I I I I I-1 I _1 IIII 1 _1 I 11 I I I I I I 1 I I I I I 11 1 1 I T I-i TTTTT�1___1_ I 1 1_ -Ti-TITT -T- T T -T T -T 111 I11 11 1 I11 I I I I � �1 II 1 I 1 .IIII 1 1 1 I IIII 1 I I I I I I I I I I I I I I 1 I I I I I I I I I I 1 I I I I I I I I I I I I I I 1 I I I I I I I 1 I I I I I I I I I I I I I I 1 I 1111 I I I I I I I 1 I I I I I I11 1 I I lii______1___1__ — 1a_iiii______a_ _ _-I- - __ia=111______1___a__; ______a__ III _____ __ fTTi -i -'I __I T _ _ I III______ T TTYTTT __ I_ I 'T -T -T-T�rTtTY Y - T -T - T-T-tYYtT -T -Y -Y T�T-TTTTT -Y -T T I I I I I I I I I I I I I I I I I I I I I I I I I I I I! 1 I I I I I I I I I I I 1 I I 11 I I I I I I I 11 1 1 1 I 1 1 I I111 I 11 1 I I I I 11 1 1 I I I I I I 1 I I I I I I I I I I I I 1 I 11 I 1 1 ; I I I I I I I I I I I I I I I I 1 Vulcan Materials Company Quarry Blasting Report Report No. /4 Date ✓-?O'90 Type of Shot 0 ' e.I/ Exact Time ,a T Type of Material a..�. r<e Shot Grid - Obao r.'- O Distance /Odc (Ft.) Direction _'.5 Grid•✓- 37�_e4 (To nearest occupied building neither owned or leased) H1 Saisj Location Dist. to Sale. Grid u R2 Sels. Location MA Dist, to Seis. /OOO Grid - a3 Sets. Location L2A�l Dist. to Seis. itrcc Grid.✓-%£ Hole/Deck Delay Period Depth Stemming Total Pounds Par Hole/Deck No. I O All /53 12 096 1175 7 Maximum Number of Holes /-2 Type of Stemming 60 lbs. Per Diameter (inches) 5-h Face Height 3E Delay Spacing r/• Sub Drilling -3 Burden 13 Number of Rows 13 Method of Firing ✓.+xx'-»+Type of Circuit: Series Parallel as->s Parallel Series Type of Delays: Dcvmlme /'�/-' Surface _� z Trade Name F,✓ .' .'< 9 70 / a �! Weather Clear "61oudy ❑-,, Rain ❑ Snow (check two) ❑ Hot ❑ Warm 9.1501d Wind From N ❑ NE ❑ East El SE (check one) ❑ S ElSW ❑ West LlSNW Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair 0 Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 3o ft. ❑ 40 ft. ❑ 50 ft. or more Trade Name of Explosives Amount d v� S Total ,3� lbs. Total Pounds 6�3G Powder Factor /• 5 Gal of Oil ay� % Oil Content Bench Grid V-;: Dale Scats Distance Tons of Materials Produced Rx go Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. State Safety Rep. _ Blaster Signature License or S.S. No.: VMC.M14 n REV 3612 1 I I ! t I III III 11 iltl I,il 4 j I 4 j f I 1 i , II ! Illilii!t ilil;jllli II� II ! 1� Ii;' III ' I, LIj L II'�'i'1i� I li +I' 'I tl III i,j III J J-Lt-i-4 IF�! 11 III a r� �I �t i'! lI��I�tljl�fl�lll; !II1� 111 'i' � l�' �II I' II iso asol II+ l+I L 4 �' I 1i11 t + l l i, I -�- �''I I I ,II I ,' rr 'I I I II I I ! (+ I t Ilf-111 j11�ift , I TRIGGER ACTIVE. • 1/27/97 10:03:12 ** SAFEGUARD SEISMIC UNIT 2000DK ** SH:2039 Monday 1/27/97 10:03:40 Event: 010 Client: VULCAN Operation: NORTH SSU Location: N 9900 E 9500 Distance to Blast: 1000 Operator: R S Comments: N 10800 E 10000 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec> Data Scale (air): 0.009 (psi) n> DISK ALARM SOUND Power down ... BAT: 13.0 SN:2039 v2.65 1/27/97 10:08 RECORD < 5> GRAPH < 2 in> COPIES <1> OSM CHARTS <DISABLED> DISK COPIES <1> EVENT HOLD <DISABLED> ALARM <DISABLED> TRIGGERS: SEIS <0.10> SOUND < 112 db> COMMAND: SUMMARY TABLE EV DATE TIME L T U d6 10 1/27 10:03 PPU: 0.04 0.04 0.02 0 9 1/22 11:45 PPU: 0.11 0.09 0.09 HZ: 35.7 25.0 38.4 124 8 1/22 10:37 PPV: 0.01 0.01 0.01 HZ: 9.4 29.4 7.0 112 7 1/20 13:06 PPV: 0.25 0.09 0.10 HZ! 29,4 26.3 29.4 124 6 1/20 11:15 PPU: 0.05 0.03 0.03 HZ! 31.2 17.8 13.5 119 "1MMAND: .. 0 Nueher : 1079 LoeAt ool wa : al 3 Tlea : III CAI Dace : m/al/9a A: bLJO @ f.l6a L: O.B110e @ 3.901s T: 0.53Ip3 9 0.2533 V: O.1i @ : 1i 065 in/aeC @ 0.251 a WLCAN its 1 N108W e10.0011 SHM 110 star at : 9TSIOE W S IT NOMAD N9900 C9500, 1000 R. AWAY AIR -0.21 +1.00 LONG -1.00 T1.00 19.Y:gI.. -1.00 -1.00 VERT -1.00 0.10 0.01 3Hs 1.0 2.0 3.0 410 5.0 610 % Mis in seconds : Y Axis in inehisec for ground, pal for air. 1 ineh/sec - 2.54 cm/eee : 1 pal - 6.9947 JAN U.S.B.M. APPENDIX B 11 I 1 I I I I 1 1 II I I I I 1 I I I I I I I I 1 I_ T T-TTT T T 'T 'T _ ______1___ __ _ -TT-TTTTT t T T __ ___ ______ __ _ T ?TTTT Y -Y -t +-i-+-I _+ y -I Aoi l I oil I I I I 1 111 I I I I 1 II i II _L 1 _11J1 _1 _1 _ 1_111L _ 1 _1 _1_1_11111_ YiII1 __1-T-TTTT _--T __-_T__ T-T- —T - T -_-_Y1YT+II + -1_+ -i -1 -� -i _t i 1 IiI I II L11J 1 _J I I t 1 1 I I t I Al1i I. 1 1 1 t I t$ T-TTTTTI -T -1 -1 T-7Z 1-71 -T — T T - T�T TT�TI------ T -T—T I I I I I I I I 1 I 1 L I I I I I I I I I I I I I I I 11 1 I I I I I I I I 11 I I 1 I 1 I I I I I I I I I I I 1 111111 11 1 I 1 1 I11 I I I 1 11111111 1 1 I i li 1 1 I i I 1 li Ii iili I 1 I 1 I I I 1 i l i i i Iii11 1 1 1 I I I I I I I I I I I I I 1 _1_11 11 I 11 J _1 ___-� _J J_ _ —1_J_11111 _1 J _J y_ 11 1 _J _1 __1-111111 _1 J _1 --I_1_I Ilil_____ T T TTTT? -T I___1_ I_ T -T __ 1_-----1__ 1_ I_ T-T-T TTT T 'T -T _I_I T1 I11_____ I__ T T-TTTT -T -T T_ _+ --- + _+ -T+ _+--- .1 _+ -Y-TTTtt —+-I-+rt++ I__1_ - TYr-rltT T -T -Y -J____ ____ -T-Y t -T T _ -PT-TrlT _____ -Y T T 1_ I I I A I 1 1. I I I I I I 1 I I A I 1 I I I I 1 I I 1 1 1 1 1 Y I yy -I'tI +I -I y _1 _1 L_1 ���II -I TII 1 I 1 I I I I I I I I I I 1 I I IIII; I I I I i i i i; i 1 i till 1 III I I I I I I 1I1 I I I I III 6Hz 9H2 30Hz 3Hz 6Hx 9Hz falls 311z 6Hx 9Hs 30Hz Longitudinal Transverse Vertical Vulian • Materials Company Quarry Report No. Date • Blasting Report Type of Shot y ! Exact Time: // Type of Material /�. o.✓. fC Shot Grid -/D'./�d k //04 l Distance / (Ft.) Direction 5 Grida/_95wE'///jam (To nearest occupied building neither owned or leased) 41 Sets. Location Dist. to Seis. Grid w24c� ocation Z414(rC4, Dist. to Seis. Gritl - V /A •3 Seis. Location iC Dist. to Seis :doo Grid - Hole/Deck No. Delay Period Depth Stemming Total Pounds Per HolelDeck 1 0 41.3 16,H37 3 y •J �7 G 47 Nab Maximum Number of Holes 4'3 Type of Stemming Gf Ice. Per Diameter (inches) 45-A Delay Face Height � Spacing At. Sub Drilling .3 Burden 19, Number of Rows =0 Method of Firing/ 3 Type of Circuit: Series Parallel Parallel Series Type of Delays: Downline // 's Surfac Trade Name ?13dlaD Leo � /$d 13� 16 /a /9 JS /> //'1 Weather ❑ Clear Q'Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot 11 Warm 0'th­1d From ❑ N ❑ NE ❑ East ❑ SE (check (check one) S ❑ SW ❑ West Z-NW iG /W i0 /G'/ 19,7 l9 aD Fragmentation ❑ Excel ❑ V. Good LJ Good ❑f- Backbreak ❑ 101. ❑ 20 ft. ❑ 30 ft. ❑ 4ft. � as a5z 23 3r H3 Y Trade Name of Explosives TotalV? q lbs. Total Pounds 95 FS Powder Factor I. G 9 Gal of Oil _7�1 % Oil Content 0,9aZ7 Bench Grid Mv.p Dale 9-:9-94 Scale Distance .7 Tons of Materials _ Produced 16,A6b Remarks: Distribution: Administrative Dept —ORIGINAL Plant Office File Sum. State Safety Rep. _ Blaster Signature License or S.S. No.: VMCnX74i REV 71 T it i L L J J-1 .lA 1-1 LI .al lv6l Will I TRIGGER ACTIVE. • 1/27/97 13:13:22 ** SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Mondav, 1/27/97 13:13:49 Event: Oil Client: VULCAN Operation: NORTH SSU Location: N 9900 E 11100 Distance to Blast: 1000 Operator: R S Comments: N 10700 E 11000 Trigger Levels: 0.10 in/sec. 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPU (in/sec) 0.15 0.08 0.06 PD (0.001 in) 0.84 0.76 0.48 PPA (9) 0.10 0.05 0.07 FREQ (nz) 22.7 21.7 45.4 RESULTANT PPU: (in/sec) 0.16 PEAK AIR PRESSURE: (db) 124 (psi) 0.00435 Mondavp 1/27/97 13:13:49 DYNAMIC CALIBRATION CHECK 40 SHAKETABLE CALIBRATED: 5/10/96 By GeoSOnlcs• Inc. Box 779, Warrendale, PA 15095 serial Number : 1079 Event 002 Oaca O1, ] TLe : 13:1::30 Cal date OS /03/9T Peaks A: il]. ee p 0.t46S 1: 0. I41ps 0.2A sa SI 0.311pa P O.z4As v: g4ttpa @ 0..xi BVS : 0.210 ialsec P 0.401 a company I VOLCAN Blanc Site NI0700 E11000 SHOT f 11 seiamametei at : ST.NATTHEWS CHURCH N9900 £11100. 2000 FT. AWAY +0.01 f AIR -0.01 +0.25 LONG -0.25 10.25 TRANS -0.15 +0.25 VERT -0.25 1.00 0.10 0.01 3Hz 2.0 V. Anis in seconds : Y Aris in inch/sec for ground, pet for air. 1 Sncb!ssc � 2.54 cm/sec : 1 psi Is 6.8947 Kpe U.S.B.M. APPENDIX B l l 11 1 -T-rT_{___T__ I I I l I I r 11 1 _____ _T_�7___T-Tr___. _r_rTTTI - I l I I r r I i I I I I I r I I I I I I I 1 l r i I I r I 1 1 1 1 I 1 1 1 1 1 1 I I r I 1 I I I r I 1 1 1 1 _1 _ I I I I 111 1 I I I I I I I 11 I11I II11 1 �I I I I Iti I I I I i I I 11 1 I I 1 1 1 1 I __7_'_T-rT+-______ ___T__T_ __T_T-T+TTT______ ___y__T_ _T_ __r-+-T—TTT______ ____--- -r-+-i-rTTT -T -T T-TTT711 i — l -T - i-T-T-rTTT T -T F+## _y_ + r 1 1 1 _.1 _1 r r r _1 _1 _1 1 r r r r r _1_1_L1Y 1 J I I I I I I _1 I Y_1_1_LL11 I 1 J _1 I I 1 1 _j _1 11 I I 111 I I 1 11 I I I I I -T-T TTiTI_____ -TI -7-7-T TTTITI_____ -I TI TI TI_____ -T 11 11 r I I I I I I I I I I I I I I I 11 I I 1 I I I 1 I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I _ 1_1_1_Lyy 1 1_1 _L_1_111lu _1 _ 1 - Lit _1 1 -L-1 -1-+II_____ I__''J 1_1111J _3 1 11______I_- I11_____ I__ 1_ I_ T-T-TT TTT _ -+ _ _ -F-TTTrTT _ _ _ -T -T _ -r-TT-rITT T -T -T rVr__-_ i r 1 _; iaall 1 I r 1 1 1 1 I 1 I 1 1 1 - } }1----+---i--+- --1_1_111++--- --+---1--+- --}--111------+---i--+- 1 i 1 I I 1111 1 I I I I I I I 1 1 I I l l l I I I I I I I I I I � 1 I 11 1 1 1 I I I 1 I 1 1 I I 1 1 I 1 1 I I I 1 1 11 1 I 6Hz 9Hz 30Hz 3Hz 6Hz 9Hz 39Hz 3Hz 6Hz 9Hz 30Hz Longitudinal Transverse Vertical Vukun • • Materials Company � Blasting Report Quarry iL0//� Report No. i.0 Date i-3o -97 Type of Shot Exact Time B HolelDeck No. Delay Period Depth Stemming —� Total Pounds Per Hole/Deck �� y� Type of Material Shot Grid - / - /�o° Distance /Oc0 (FL) Direction • S Grid -Sty jYOO (To nearest occupied building neither owned or leased) e1 Sg9is. Location Dist. to Sets. Grid l %`/. Sets. Location N//G% Dist. to Seis. /OOC Grid v5�t-d/� a3 Seis. Location 'rN fk Dist. to Seis. i0o O Gntl V-i c iOcO c 467 .y 3 •✓ 5d G L Maximum Number of Holes.v7 Type of Stemming 4'7 Its. Per Diameter (inches) 5% Face Height -10 Delay Spacing // Sub Drilling Burden /7 Number of Rows Method of Firing [////.[-,7?S Type of Circuit: Series Parallel _ Parallel Series Type of Delays: Downll e'�i/'Ie urface � -tee Trade Name A •. - • � 9 vo9 5 i3s! if VAS I /3 ��! j s xs Weather EI Clear Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑ Warm 0 Coltl El N ❑ N . ❑ East O SE Wind Fromr9 (check am) ❑ S SW 0 well ❑ NW /G /O �l AF 9 Afd� a77 Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Sackbreak O 10 ft. ❑ 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 hu or more a/ �9 a* �/ Trade Name of Explosives Amount Pell 47g 77 le. '.X r� a7 Ci�i✓ luG Total / ? `7 IbS. ! �G Total Pounds 7 ""� Powder Factor / sG Gal of Oil _aL % Oil Content O % Bench �/ w Grid Mop Date 9-r5-9G Scale Distance 6 Tons of Materials Produced -7c 5G3 Remarks:—.f./d/ '!: r e41 Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. �� Blaster Signature State Safety Rep. License or S.S. No.:'.�S- VMWBi20 neV 1az 4 it .. II�T it TT if It '-iJl 1111Tf �`,-i�-i-f •f I�11 i'I I II'I1 ,, ..iI I l _- IJ i' �li , III � Ji ill, Ili � I1 1J �l � 1 1 1 , •,� li , ', ( iI i _ �I,ii {i1��t1� 111 ,I�I'i I {I I ,ijlii`1 I li ili{II i. I1 III Ili jj1 I I' ii I I I, I+1L 11 1l �SyIJ �i jrr�3�iL1 I VSII i i5/ Jll ' Lil M►--{- i {i��,l �Elftit� l I �i���i I i 111 illtti l{ 1 LF,��,ll ' II I l NP i 1 - � II ill hill II rh1 iJ .f,. Jj {IA l�l.l �I li;-I I'Il1 I11 I tI I I„ aG8 1 v+N3, a s aGo j7 -j j I�� l 1 1 I Ir �' ,• 1 I 1. ,fl t I I 1 1 , l• I I � II , I lll,tr� 1 r �. , i I 1. I i l IIpppp TRIGGER ACTIVE •1/30/97 10:47:57 * SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 . Thursday. 1/30/97 10:48:47 - Event: 012 Client: UULCAN Operation: NORTH SSU Location: N 9900 E 11100 - Distance to Blast: 1000 Operator: R S ! Comments: N 10800 E 11000 Trigger Levels: 0.10 in/sec. 112 db . Record Time: 5 seas Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUM14ARY L T V PPU (in/sec) 0.16 0.14 0.06 PD (0.001 in) 0.80 0.97 0,64 PPA (g) 0.10 0.07 0.07 FREO (hz) 31.2 31.2 41.6 RESULTANT PPV: (in/sec) 0.18 PEAK AIR PRESSURE: (db) 124 1 (psi) 0.00435 Thursday, 1/30/97 10:49947 DYNAMIC L CALIBRATION T CHECK U S SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. serial m er : 1019 Event 00, Date 9 9T Time : 1o:n:2k rl Dace : 0110 1 Peak$ : A: 111.06 9 0. S34S L. O.lilp 0.3T1e T! 0.15Ipe @ 0.529a V: U.IIlp9 0 OW, ?Vs : 0. 110 in/sec @ 0.299 s Company : VO m . Blast Site M109OO E11000 SNVf 11: Selmdllter at ST.M TNIFYS CNORCH 09900 E11100. loan M. AMAY +0.01 r AIR 1 -0.01 I F +0. 25 LUNG Ivll�lnlvVuvy uV V•W �I�jVn.`. .n n/� n./-"v✓3'^.-^" 25 -0._5 -O.n5 ~ +0.25 VERT rIJ V�I I1.e v V l�" V 1/ "V " v ✓' `l �y _ _a\ -0t15 i 1.0 X Axis in a ord$ Y Axis in inch/sec for ground, psi for air. 1 Smchlsec 2.54 cm/sec : 1 psi = 6.0947 Kpe U.S.B.M. APPENDIX B 00 0.10 0.01 3Hz SHE 9Hz 30HE 3Hz 6Hz 9Hz 30Hz 3Hz 6Mz 9Hc 30Mz Longitudinal Transverse Vertical Environmental TecSnoloat Inc. I I I I I I I I I I I I I I I I I I I 1 I I I I I 77______ T--T--T- —r-T-rT rrT______T___T__T_TTT___ __r___T_ I I I I I I I I I I 1 1 -1 ! I II I I II I I _t_31111 1 _J L_1_1111 _1 1 1 _L 11 1 11 11 11 I II I I I I I I 1 1 I 111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I - T rY Y Y T _ T_ rr_T_T____T_ __T-Y ____ __ ........ __T-rrrTT__rrrrT-_ -T-Y-�M.iiY J _Y Y +-i-+-F+YY _i _4 + _i-i-Y -h F+4 _♦ _♦ i i it_+ I I I I I I I I I 1_1 �1 _1 L111_ 1 J 1 L1_;_L 111 -1 _J _1 _1_1_LL111 1 J _1 I I I I I I I I I I I I I I I I 1 I I I I I I 1 1 ! 1 I I I I I I I I I I I I I I 1 1 I T -TTTTT -T-TT-r TTT — -T-T-TY TTT -T - l -T I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I 1 I II l-t-Y-rT I I I I I I I I I I I I I I I I I I I I II III I I IIIIII I IIII I I I I I 11 I I I I I I I 11 11 1y I -} y y y } y y1 y1 y1 y ______-CC___3_ __L 1_1111J ______1____1_1_LL111_____ 1 1_1_1_L111 _1 1 1 _1_1_1_LL11 _ 1 _ '-T-�1-T TTTi - 1 'T —T-T-T TTT � T -T -T T TTT1 - T -T -T 4-Y-1 -H+iJ Y i _+-i-i-Y++i _ Y +_ + + I 11 I _TT-fTTTT T T TTTYTTY - T -Y -T I I I I 1 I 1 I I I I I I I I I 1 I I I I I11 I I � I I I I I I 1 I I I I I I I I I 1 I I I I I I 1 y1___ 11 I I I I 1 I I I I I I III 11 1 1 I 1 111 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Vu1ion • Materials Company Quarry �II Report No. /3 Date 0 BlastingReport Report Type of Shot / t'i Exact Time il : Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck A" Type of Material �.'o�� Slwt Gritl -/o' - /%ooC Distance 9GC/ (FL) Direction Sh%. Grid -f9 A= 9 ib (To nearest occupied building neither owned or leased) 41 Sea Location / Dist. to Sets, Grid a2 t6ner Location ��/�{•����/����� �Dist to Seis. /s/Gp Grid.✓- 94tnE /// 03 Sets. Location&ZQLV / r ist. to Seis. 9LICt GridA✓-ffV'i 0 a aj %/s & ,2 -1vy 4 i ' AM Number of Holes 30 Type of Stemming G% los l Pern Diameter (inches) �js Face Height ile Delay Spacing Sub Drilling aurden Number of Rows Method of Firing d✓/i.Z'ls Type of Circuit: Series Parallel Parallel Sense T a r' ype of Delays: Downline % SudaceM�'•s'� Trade Name �^%s% / '�"� 8 Epp 950 _ /3/ 300 Are Weather PClear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot Warm ❑ ColdWin ec From ❑ N ❑ NE ❑ East O BE (Check one) El S PalW ❑West ❑ NW ✓L jV6 -f5-9 /9 y �yy aG 7 Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreek ❑ 10 ft. ❑ 20 ft. ❑ 30 It. ❑ 40 0. ❑ 50 ft. or more / /7 a3 C Trade Name of Explosives Amount ,G7 i.3? .( of&oa/y 3 vl,7 a 4e as �� u� so as z Total 3 i63 lbs. Total Pounds % ?SS Powder Factor � /.LG Gal of Oil 77 % Oil Content 'fie Bench _gaatte�Grid NI^p Date 9-/9-96 Scale Distance -✓,H Tons of Materials Produced _ .VV 89f Remarks: - JAI 'leAdL.'d.5 Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt. Sig. Blaster Signature State Safety Rep. License or S.S. Ne.: V1100,3117420 REV M r h lY 1 II Li I L_ I+I 1 4I ill 11 t I.'I I,I1 P ,. h -i�- �'I-I'�,�-t t..�l_� - � -i-�-_�hi�.•�-�IJ �t_I-�_iJ_���.!-� T11 �� _i'!'��F -ri-�n. 1 1}IiI�H{- L.h111f'I�' rr 1'I �„ �, I r I;;�;i ,t,k tt -� �hlllt F�r I I I I I � i I r I„ •� l� II III IIII�t ,i;l {i �Ili�ll' 171 f lia!;JI ill!{i,l �i''i +! } = II i 'l f I I 0 TRIGGER ACT 2/05/97 11120: 2e • *► SAFEGUARD SEISMIC UNIT 2000DK xs SN:2039 I Wednesday, 2/05/97 11:20:54 Event: 013 Client: VULCAN I Operation: NORTH SSU Location: N 9900 E 9500 Distance to Blast: 900 Operator: R S Comments: N 10700 E 11000 Trigger Levels: 0.10 in/see, 112 db Record Time: 5 secs I' Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) L T V PPU (in/sec) 0.11 0.13 0.88 PD (0.001 in) 0.72 0.93 0.49 PPA (g) 0.13 a 07 007 FREO (hz) 35.7 33.3 ES RESULTANT PPU: (in/serf 0.15 PEAK AIR PRESSURE: (db) 117 (psi) 0.00203 Wednesday, 2/05/97 11:20:54 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By GBoSCnicz, Inc. Box 779, Warrendale, PA 15095 Vukan. Materials Company Blasting, Report Quarry /✓e/f/� Report No. Date �"F' Type of Shot `�M ��✓ Exact Time 3 Hole/Deck No. Delay Period Depth Stemming Pounds Total Per HolelDeck Type of Material �ial Shot Grid -/o9"o -- / Distance //Oo (Ft.) Direction <e % Grld V- I (To nearest occupied building neither owned or leased) e1 Sets. Location Dist. to Sais. Grid 0`W9 a2-6as. Location �// �� Dist. to Sais. //00 Grid -✓'Sft� y3 Sais. CapB.f/nS.nn.< Location oDim. to Sets. //moo Grids r O rt 10 /77 ) 3 4e s' /no_ /1S Maximum Number of Holes / 9' Type of Stemming /-� the. Per Diameter (inches) Sia Face Height 39 Delay Spacing /s Sub Drilling Burden /3 Number of Rows -? I Method of Firing ✓/P/ 42i Type of Circuit: Series Parallel >r Parallel Series Type of Delays: Downtime V// Surface! "dZ Trade Name �.Kflts✓ % w I 'W y W95 3,)S /90 92 1/9 /P //2 / /9i IQ Clear ❑ Cloud El Rain ❑ Snow Weather �y (check two) El Hot ,VI / Warm ❑ Cold Wind From ❑ N ❑ /N� ❑ East ❑ BE (check one) ❑ S SW (] West ❑ NW /G �Z /9 ,�7 /Sj a9Z ,O 13 _ Fragmentation ❑ Excel ❑ V. Goad ❑ Good ❑ Fair O, Paolrr Backbreak ❑ 10 ft. ❑ 20 fl. ❑ 30 ft. ❑ 40 It. ❑ 50 ft. �.-' Ior more Trade Name of Explosives Amount H2O .merit 3/✓//u / / I /Z ''//9Xrsr Total 7477 lbs. Total Pounds er Powder Factor 1.G2 Gal of Oil ��_ % Oil Content / Bench �l!ro�. Grid Mnp Date 9'/g'SG Scale Distance Tons of Materials Produced IOW Remarks: I Distribution: Administrative Dept. — ORIGINAL Plant Office File SupL Sig. State Safety Rep. _ Blaster Signature_/�d,�_ License or S.S. No.: vmc.ur020 REV sat • r 7171 r F I f I f I II � I�!i II(! fl IIII l,`Cl iillll'll {1II --; �I I!�. �- II l �I •II!I r !I;�i ! I I� � ' it �1 i I �(, II F h �I�;�:i!`i � ,I IIII Ili �1- _ I'i:.= �,���-��.. •'�fll' Ill ! I IiI rr f i _ I�IIrI �; II'I�j!!I'I i, III O iQ`j II r! toy EII' 10`i�- f I"' IH F I 11i:, ! I I In 4JfjII I! F''r ��t Ilg �I) :✓6 I I..11.��'1 6;,EII i�IjIII,iI I}� IIII I'I 1111i4�- I�fG Ia;Irliili _��; �i' I IIIII .11 Mill, ;ILI!; ! '- ii�Ir_{a I,I{I�IEI (!f: 'II I,Ifll�ir II{1i il{ li I Fi '�- ;r, ill I, ill i' ti ''ji illr IIII- iI III I TRIGGER ACTIVE, O 2/07/97 llt02:53 • ■a SAFEGUARD SEISMIC UNIT 2000DK •�k SN:2039 ') Fridav, 2/07/97 11:03: I7 Event: 014 - Client: VULCAN Operation: NORTH SSU Locations N 9900 E 9500 - Distance to Blasts 1100 Operator: R S Comments N 10900 E 10100 Trigger Levels: 0.10 in/sec. 112 db - Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) L T U S SUMMARY L T V PPV (in/sec) 0.03 0.04 0.03 PD (0.001 in) 0.53 0.86 0.60 PPA (g) 0.05 0.05 0.05 FREO (hz) 41.6 7.1 1616 RESULTANT PPU: (in/sec) 0. 05 - PEAK AIR PRESSURE: (db) 120 I (psi) 0.00290 Fridav, 2/07/97 11:03:17 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 serial Number : 1079 Event : Vw pate : /91 Tuna 1 11:01:41 cal Data 1 01193/s. Paaaa A: 110.E8 f 1.3093 1: 0.017prib 0.361a T: 0.14Ips P 0.249s V: 0.131p3 9 PV6 0.187 Sn/fac P 0.240 a Company : 11KCAN Blast Site : F10900 E10100 SHON 14 solamvete+ at : BESIDE MF SIDMIT AD. 89900 E9500, 1100PT AWy. AIR -0.01 +0.25 LONG -0.25 +0.25 TRANS -0.25 +0.25 VERT -0.25 1.00 0:10 0.01 3Hz 1.0 Y. Axis in seconds : f Axis in Inch/sec for around, psi for air. inch/sec - 2.54 Cm/see : 1 pet = 6.B947 Rpa U.S.B.M. APPENDIX B I 1_ �ITI ______II___I_ 'T __i_I_ _ _____ T T TT -T -TI -? 11 I 1 I I I I I I 1 I 1 I I I I 1 I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I a 1 111 1 _! 1 I I I I I I I I-1 IL ILI I I 1 I-1 I I I I 1 I I IL 1 I 11 I I I I I I I I I 1 I I I I I I I I I I I I I I I I ____--_--T-rr_r_____ _ _____ _ T___T__T_ __ __ _ T-T_ t_ -T -T __r-rrrrTT_____ _ ____ n'__ T__T_ _ -T-_lT_ -T-T TTTT p T T __T_-_T_-_T_T_TT_T- _ _ - _ _ _ _ __ _ _-T_-T T'T TTTT T T -T _ - TT-TY TTT -T -+-4-{-F++4 -+-+-+t TT+ -+ -4 -+ T _J _1 : 11� II 1_1_1_Lall 111 _1 1 I I I I I IL I I_ I_ I I I I I I_____ I__ 1_ 1_ I 11_ _ _____ -T-l-i TTTT -T __ -T -T _ -TT-T rTTT -T -T �T __1-4-1 _____ TTTiTi -T 'T T 1 1 1 1 I 1 I I I I I I I I 1 I I I I 1 1 1 I I I I 1 I I I I I I I I I I I I I I I I I I I 1 I I I I I I I 1 I 1 y II yy 1I III II 1 1 1yy11 I -T-TTrT'Ii -T -T -T -T-T-T TT -T -T -T-T-TTTTi -T -T -T +++-_—__+___ +__J __+-J_+--+l.I______! _ __J_ __a-J_+-�+J+____ __!__!_ I__ r i- 11 -TT-T-Y TTT _____-T__- T _ YTiT _____ -Y 11 1 1 11 I I 1 I 1 1 1 1 1 1 I I I I 1 I I I I I I 1 I I I 1 1 I I I I i I 1 I 1 I I I I I I 1 I I I I I 1 I I I _11_1 I1 _ yI _ 1_1_1_l.1 1 (T 1_ _1 _� _1 _� 1 1 I �- �- � I I I I I I I I I I 1 I 1 I 1 I I I I I I III 1 1 1 1 IIII 1 II:II 1 I I111 I I I I 1 1 I I I I I I 1 I I I I 1 I GHt 111 30Hz 3Hz 6112 9Hz ' 30Hz 3Hz GHz 9Hz 3014z Longitudinal Transvel:Se Vertical Inc. UU110n. Matehals Company Quarry �/o/'//4 Report No. /3 an ce • Blasting Report Date Type of Shot L:a deuce Exact Time • "� I Type of Material �i,✓../. /` e Shot Grid ✓-r®wo •E- IU✓oo Distance 9d0 (Ft.) Direction -5 Gritl •ti%mx-/ (To nearest occupied building neither owned or leased) e1 Seis. Location Dist. to Seis.—Grid +r2 rWs. Location en34/e '/<i Dist. to Seis. 900 Grid 03 Sets. Location � Dist. to Seis. 91r6 Gri-99eaE-/// HolwDeck No. Dela y Period Depth Stemming Total Pounds Per Hole/Deck a //O aeq aeo p ss I .3 3 /da Maximum Number of Holes /d- Type of Stemming 4 lbs. Diameter (inches) 5d Face Height .40 Delay Spacing /S Sub Drilling 3 Burden /3 Number of Rows ,P Method of Firing Type of Circuit: Series Parallel Parallel Series Type of Delays: Dawnline A/ Surface Trade Name �'s'� Per 66 G 6% 7 9 8 /O /L,J _ '� -O'L /3 346-- Weather Clear ❑ Cloudy ❑ Rain ❑ Snow (check Iwo) ❑ Hot �arm ❑ Cold Wind From C3 N ❑ry N/,E,, ❑ East ❑ SE (check one) S J Sw ❑ West ❑ NW Fragmentation ❑ Excel ❑ V. Good ❑ Good 0 Fair ❑ Poorl Backbreak O 10 ft. O 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 ft. art more Trade Name of Explosives Amount U r h/9 aXe /s I 4e•,l —,/ 3/5 i Total lbs. Total Pounds Powder Factor 1,V Gal of oil 9W % Oil Content O Bench :_ Grid M^p Date 9-/9-4L Scale Distance �S Tons of Materials 9/%9 Produced ' y Remarks: I i Distribution: Administrative Dept. — ORIGINAL t Plant O0' FileS Si I Lj B up . tg. aster Signature State Safety Rep. I License or S.S. No.: �•s�0 "-i"S --Cb 65 Wcarnm aevasz t 1 I I_II �I' � ��) TT -7 i L ': it 1 � I Ij i , II II ' i I !I! + -+j t Ii--t 7 I IJ ::!,,,!� _ I I '�,,II I, 1 ,,' I 'Il,, +L,I+,; 1,— �=i► i+i; i,ll_I ; ;gal '� ,�I!-��I_j , i �_ i-T t i ;ell -r-f- - :i 1L-_i (,'iil�fi �I ;{� -i �, 11, -1i ll� ,� -{ li-�-� j r( ,',,iii {ll•I+ Li Q9, ,,�__tiE: ' ; , I , f , ICI , 1 , •. , � I 1 , � , , , 1 � � I; , 1 I � � !' I {' ,' 1-:. �� I I � I��� 1 ! t I ..1 i 1 I- �-._, � I-..+- 1 f, L ----- 4 - - - - -- - - - - - - - - - - - --- - - id L tl-i — -1 j s L - i - - TRIGGER ACTIVE, �/07/97 11:21:29 S ** SAFEGUARD SEISMIC UNIT 20BODK *t SH:2039 Fridavp 2/07/97 11:22:55 -- Event: 015 Client: VULCAN Operation: NORTH SSU Location: N 10700 E 11100 Distance to Blast: 900 Operator: R S Comments: N 9900 E 11100 Trigger Levels: 0.10 in/sec, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) SUMMARY L T V PPV (in/sec) 0.05 0.04 0.04 PD (0.001 in) 0,56 0,49 0.64 PPA CS) 0.05 0.05 0.05 FRED (hz) 21.7 31.2 14.7 RESULTANT PPV: (in/sec) 0.07 _ PEAK AIR PRESSURE: (db) 120 (psi) 0.00290 Friday, 2/07/97 11:22:55 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By BeoSonics, Inc. i Box 779, Warrendale, PA 15095 TEL: 412-934-2900 Val1an • Materials Company �� Quarry //oC/ c Report No. • Blasting. Report L Date -V-/1' S�7 Type of Shot lllaedI4 Exact Time •D I Hole/DeckFetyd No. Period Depth Stemming Total Pounds Per Hole/Deck Type of Material Snot Gdd �- in Tao �E Distance 900 (Ft.) Direction t Grid •d-9 O.E-//rd� (To nearest occupied building neither owned or leased) #1 Seis. Location Dist. to Seis. Grid 02 Seis. Location ���/ �� 'I".�/ Dist. to Seis. Grid r3 Seis. Location Dist. to Seis. Gritl ///60 y -///� ( s '/ Maximum Number of Hales Type of Stemming a'%s/.✓e lbs. Diameter (inches) 5 Face Height 411 Delay Spacing /G Sub Drilling 3 Burden <? Number of Rows 4 Method of Firing Type of Circuit: Series Parallel Parallel Series —Type of Delays: Downline '�/� YP Ys: Surface Trade Name F-✓S< per /2 g G9 to //9 — - P �8 rG7 I .9 5 /rl 5'9 / /q I Weather Clear ❑ Cloudy ❑ Rain ❑ Snow (check Iwo) ❑ Hat Warm ❑ Cold Wind From El N ❑ NE ❑ East ❑ BE (check one) El ❑ SW West El NW NW is 33fi/ as .wc p6 Fragmentation ❑ Excel ❑ V. Good El Good El Fair ❑ Poorl Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 ft. O 40 ft. ❑ 50 ft. or more Trade dame of Explos Ves Amount { a4 3>e. U � C / / ax 6 { I Total i2 j3 ;iI fibs. Total Pounds Powder Factor /. 3 SL Gal of Oil 4G 11 4b Oil Content Bench 6 Grid V-p Dale 9- / 91 51 Scale Distance Tons of Materials Produced "8 jp � Remarks: _ I I Distribution: Administrative Dept. — ORIGINAL /��_ Plant Office File Supt. Sig. �•/ r.f/i�^^-e' I p/J Blaster Signature State Safety Rep. VN0.e14 20 REV YR License or S.S. No.:d..f'GS`!o5 J H-t - A A -4- LI t T-- • A -T!. J J— ``k—I— —t Il{.f..;i.- ! i.�1t{€iI �llll t#—a t�t II—�--�«�- — I - I —I[� IF i+ I .I j 1 « I F { k I � ' j F { ! .i 4 ii - #.,i l..i I 1 t ;.. �lEf .�--3- '� i -1 I'--' +- _7_� _� I J_f'..1� � t ! -1 - �- Ail JA i J-1 T i All t 4- -'--1 A, r L E- * SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Wednesday, 2/12/97 11:09:05 Event: 016 Client: VULCAN .- - Operation: NORTH SSU Location: N 9900 E lli00 Distance to Blast: 900 Operator: R S Comments: N 10700 E 11150 - Trigger Levels: 0.10 in/sec. 112 dl - Record Time: 5 secs Range: Auto 5 1Ps VIBRATION & SOUND TIM€ HISTORYI Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air): 0.009 (psi) -I sris SUMMARY L T V PPV (in/sec) 0.10 0.11 0.09 PC (0.001 in) 0.80 0.98 0.81 PPA (g) 0.05 0.05 0.10 FREO (hz) 12.1 22.7 29.4 RESULTANT PPV: (in/sec) 0.13 PEAK AIR PRESSURE: (db) 121 1 (psi) 0.00319 Wednesday, 2/12/97 11:09:05 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By GeoBonics, Inc. li Box 779, Uarrendale, PA 15095 TEL: 412-934-2900 writing file to disk ... ti p, o . A� a49416 imy�s UU11an Materials Company Blasting, Report Quarry A/ f �� Report No. Date Type of Shot >Jl Exact Time 16,3q Type of Material Shot Grid /t/- Distance Z., (Ft.) Direction _ 5 -., Grid i-94CD�� (To nearest occupied building neither owned or leased) #1 W. Location Dist. to Seis. Grid +r2-Gen a. Location Dist. to Seis. Grid I #3 Seis. Location .l� �G� Dist. to Seis. -Grid Hole/Deck No. Delay Period Depth Stemming Total Pounds Per Hole/Deck a 3 3 Maximum Number of holes __ ".5 Type of Stemming G lbs. Per Diameter (inches) Face Height 3 Delay Spacing - ill, Sub Drilling 3 Burden `t Number of Rows Method of Firing Yi of Circuit: Series Parallel Parallel Series Type of Delays: DownlineSurface •�s `�� Trade Name T y� G 3 /i� I Weather Clear ❑ Cloudy ❑ Rain ❑ Snow (check two) ❑ Hot ❑'Warm ❑ Cold Wind From ❑ N ❑ NE ❑ East _ ❑ SE (check one) ❑ S �SW ❑ West ❑ NW AG /'7 y� Fragmentation ❑ Excel ❑ V. Good ❑ Good ❑ Fair ❑ Poor Backbreak ❑ 10 ft. ❑ 20 ft. ❑ 30 ft. ❑ 40 ft. ❑ 50 ft. or more Trade Name of Explosives Amount 9 �S f Total lbs. Total Pounds Powder Factor I•GI Gal of Oil %Oil Content Z9. Bench �Sf�r`�>� Grid Map Date Scale Distance & D Tons of Materials produced Remarks: Distribution: Administrative Dept. -- ORIGINAL Plant Office File Supt. Sig State Safety Rep. I Blaster Signature i I License or S.S. No.: :.25 GAGS vmC aa74 2D AEV 3192 L 1L.�, H I+ i_-0- ram_ r� -�-�� � �-�����' AV ** SAFEGUARD SEISAIC UNIT 2000DK39 ** Tuesday, 2/I8/975 1 3717: 53 i Event:017 Client: ON Operation; NORTH SSU Location: N E 11180 Distance to Blast:t: 850 Cremator: R S Comments: N E 11150 Levels: 0 Trigger Time 0.10 in/sec? 112 db Record Time: 5 secs Ranee: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (sec/dio) Data Scale (seismic): 0.32 (in/sec) Data Scale (air>: 0.009 (psi) i i SUMMARY L T U PPU (in/sec) 0.07 0.05 0.05 PC (0.001 in) 0.66 e.79 0.69 PPA (g) 0.05 0.05 0.07 FREO (hz) 10.6 45.4 29.4 RESULTANT PPU: (in/sec) 0.08 PEAK AIR PRESSURE: (db) 125 (Psi) 0.00522 Tuesday, 2/18/97 10:37:53 DYNAMIC CALIBRATION CHECK SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. .I. Box 779, Warrendale, PA 15095 TELi 412-934-2900 writing file to disk ... .I Serial NueMr : 1079 LYent 005 Oa[ 97Time 10 10: 36:05 Cal rate 01103 Pears : A: 1P.OB P 0.S13a L: 0. W P O.Oola T: 01W P O.a llV: 003p O.00ls wS : 0. 000 ln/aet B 0.001 a Company : VUXAN Blast site SeSamanater : N10700 C11100 SNOT W at : ST.KNMP S CAVRCH N9900 E11100, 650i . AWAY W 0y'� I,l N VT +0.01 AIR -0.01 +0.25 LONG -0.25 +0. 15 I� i TRANS -0.25 +0.25 VENT -0.25 X Axis in seconds Y #!s c2.54 in inch/sec for ground, psi for air. 3 Snch/66C cm/sec 1 psi = 6.B947 Xps Eavironoeentai Technolo . Inc. UUI[UM Materials Company Quarry i Report No. /B I Date Blasting Report Type of Shot P MA"L/ Exact Time e ' � yp Type of Material �o�/e /c Shot Grid .l- F_ - I//.PGO Distance 800 (Ft.) Direction S Grid W'S9AZ�5'///dI2 (To nearest occupied building neither owned orleased) Mi Seis. Location Dist. to Seis. Grid 02 Seis. Location ,q.�/ ��-Dist. to Sela. Grid +3 Seis. Location ��/ Dist. to Seis. Z!2 Grid 175WW - HolelDeck Dela y Period Depth Stemming Total Pounds Par Hole/Deck No. O 4/ rd J/l 3 304 ✓ 8 G /e9 Maximum Number of Holes Type of Stemming sloJE lbs. Per Diameter (inches) AR Face Height .?I Delay P Spacing /G Sub Drilling 3 'H1 Burden /� Number of Rows '% Method of Firin dNE1JS q Type of Circuit: Series Parallel. Parallel Series Type of Delays: Dewnline �// Surface - L Trade Name O /e / Y /XL 9 /6/ /e r9L n z ! /3 192, e18 I /6 >dJ Weather D pear ❑ Cloudy aRain El Show (check two) ❑ Hot 2 Warm ID Cold Wind From N ❑ NE ❑ East ❑ SE (check one) S I-7 SW ❑ West ❑ NW /7 a 93 /8 a3S /9 Fragmentation ❑ Excel ❑ V. Good D Good ❑ Fair ❑ Poor I Backbreak ❑ 10 It. ❑ 20 A. ❑ 30 ft. ❑ d0 ft. ❑ 50 ft. or more /O 9% or Al Trade Name of Explosives Amount ad as' re b4Z s✓ +� di / O I 9X8 drill la�e I i Total 14,T9 I lbs. Total Pounds /5Q S9S Powder Factor /- 0/G Gal of Oil L/ % Oil Content 4 Bench EirY'1/0..t Grid M.^p Date 9-199G Scale Distance 411d' Tons of Materials Produced Remarks: i Distribution: Atlmt Office FDept. —ORIGINAL / Plant Office File Supt. Blaster Signature G State Safety Rep. License or S.S. No.: dsb - GSlS_. 1-1 7, L L Ld L j Ll A 1 VT - 44 1 fit' A f4 TRIGGER ACTIVE, 2/21i97 10:42:57 ® s SAFEGUARD SEISMIC UNIT 2000DK ** SN:2039 Friday. 2�21/97 10:43:28 Event: 018 Client: VULCAN Operation: NORTH SSU Location: N 9900 E 11100 Distance to Blast: 800 Operator: R S Comments: N 10700 E 11200 Trigser Levels: 0.10 inisec, 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY Time Scale: 0.1 (secidio) Data Scale (seismic): 0.32 (in/se Data Scale (air): 0.009 (psi) L T V S SUMMARY L T PPV (inisec) 0.08 0.04 AD (0.001 in) 0.57 0.44 PPA (g) 0.05 0.05 FREQ (hz) 29.4 21.7 RESULTANT PPU: (in/sec) 0.08 PEAK AIR PRESSURE: (db) 118 (psi) 0.00232 Fridav, 2/21/97 10:43928 DYNAMIC CALIBRATION CHECK L T V SHAKETABLE CALIBRATED: 5/10/96 By GeoSonics, Inc. Box 779, Warrendale, PA 15095 TEL: 412-934-2900 State of North Coolina Department of Environment, Health and Natural Resources Division of Land Resources James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Charles H. Gardner, P.G.. P.E. Director and State Geologist February 251, 1997 Ms. Vicki Jones Vulcan Materials Company P.O. Box 4239 Wunston-Salem, North Carolina 271 RE: Blasting Complaint North Quarry Permit No. 34-02 Forsyth County Dear Ms. Jones: \, � rr0 �EHr%%.1Fit This office recently received a second complaint directed at blasting practices conducted at thelabove referenced quarry. According to the complainant, Ms. Lisa Hill, cracks have appeared in her walls and foundation. As provided in the miningpermitfor this site, you are requested to provide to this officelduplicate copies of all shot records related to the blast conducted in January and February, ` 1997 including any seismograph records made. I have received the additional.lshot records requested for the dates of October 25 and 29. 1996. A review of these records will be completed in the near future and you will be advised of our finaings. I I look forward to receiving the requested information in the near future. Your continued cooperation will he appreciated. I sincerely, J dith A.' Wehner Assistant state Mining Specialist' Land Quaiity Section JW cc: Mr. Matthew Gant, P.E. Ms. Lisa Hill - Geological Survey Section (919)733-2423 FAX: (919) 733-0900 - I P.O. Box 27687, Rdeigh, North Carolina 2t611-foot Telephone 919-733-3833 FAX 919-733-4407 An Equal Opporlunly Amrmol Action Employer I 5D% recycled/ 10'apcsbcomsrmer paper 4 1 -_•� aozl —gaol �-�'"�'.0 i i' 1.. •IIv \ t,y.t - Rio, •`' \.\. .� � .:o-v. Ili `, _, 1 o III � ,�\ ti., '.1 � •t'. .. S, ._' y�' .. ... - ,. ,.. . vt 61 LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET i (i= Denotes fields where input data is needed) fi Permit Number: -> 34-02 l Permitte : vmc Nine Name: north quarry I Blast Report0: 100 Date of Blast: 10/25/96 Time of Blast JJ Peak Particle Velocity Check: D =Distance to closest offsite occupied structure (ft): D- = I100 W = Maximum pounds of explosive per delay (pounds): � Wt = 5B0 SD = Scaled Distance : SD = D/W40,5 SD = 45.68 V = Peak Particle Velocity (inches per second): V=160 '(SD)"-1.6 V = 0.35 (*max. limit in mining permit is: v = 1.0 ips) Ei Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: 1 V = Particle velocity measured by seismograph (ips): W = 0.22 DS = Distance from blast to seismograph (ft) DSi = 1100 d = Distance from blast to second location (ft): d* = 2000 PPV = Theoretical peak particle velocity at the closetloffsite occupied structure (ips): PPV=jV(DS/d)^1.5 PPV = 6.A97 Airblast (Overpressure) Check: E P = Unconfined Airblast/Overpressure (psi) P = 82 (D/WI.33)1-1.2 P = 0.228276 To convert (psi) to (dbl): (P/2.9 x11011-9)log x 20 P = 157.92 AB = Confined Airblast/Overpressure (dbl): AB = P JJ(dbl) - 35 dbl (far quarry situation (*max. limit in Lining permit is: AB DBL) 0 AB = 12232 • LUD QUALITY SBCTIOK BLJOIND ANALYSIS WOREMEP (a= Denotes fields Mere input data is needed) Permit Number: -> 34-02 Permitte : vmc mine Name: north quarry Blast Neportf: IOD Date of Blast: 10125/96 Time' f Blast 10:36:0 10 Peak Particle Velocity Check: D = Distance to closest cffsite occupied structure (it): Da = INS P = Maximum pounds of explosive per delay (pounds): I N' - 580 SD = Scaled Distance : SD = D/NA0.5 SD = 1 45.63 V - Peat Particle Velocity (inches per second): V=16D',(SD)A•1.6 V ('max. limit in timing permit is: v = 1.0 ips) 0:35 Based an known distances fro the blast to the seissocnaph and any additional location, the expected vibration level can be setimated at the second location as follows: V = Particle velocity measured by seismograph (ips): Vt = 0.42 DS = Distance from blast to seismograph (it) DS! = 2000 d = Distance from blast to second location (ft): di = 1100 PR = Theoretical peak particle velocity at the closet offsite occupied structure (ipsj: PPV IV(DS/dj^L5 PPV_- 41297�- Airblast (Overpressure) Check: P = unconfined Airblast/Overpressure (psi) P = 82 (D/F0.31)A-2.2 P = D.228276 To convert (psi) to (dbl): (P/2.9 x IOA-9)log x 20 P = 157.92 AB = confined Airblast/overpressure jdbl): AS = PI (dbl) - 35 dbl (far quarry situation ('max. limit in mining permit is: AB jaLDBL) AB = 122.92 ai • Explosives Column Check: i (this is a very approximate method based upon numerous assumptions; specific densities may vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD{(specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11+1= 6932 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* _ Ratio between explosives = 0 Average pounds of explosives used per hole (pounds)* 580 Breakdown of average pounds of explosives per hole dui to ratio: Explosive 11 = 580 Explosive 12 = 0 I� SPD = Specific densities for each explosive: SPD for Explos, 11+ = 1.250 SPD for E,xplos, 12 (use'0.1' here if only have one explosive.)+ _ HD = Hole Diameter Used in Shot (inches): HD* = 5.5 I LD = Loading Density (pounds per foot of column): LD t SPD(.34)(HD)^2 LD for Explos. 11 = 12.8562500 LD for Explos. 12 = 0.0000 Explosive column height for each explosive (feet): Explos. 11 = 45.11424 Explos. 12 = 0.00000 Total Explos. column height = 45.11 Stenning height used in shot (feet)* = 11 Total height of explosive colum(s) and steaminq in the hole = 56.11 Total depth of hole denoted on the blasting report for! the shot in question* = 53' Analysis Completed By: Date: 01 • LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET { (*= Denotes fields where input data is needed) Permit Number: -> 34-02 Pernitte : vmc Mine Name: north quarry Blast geporti: 101 Date of Blast: 10/29/96 Time'of Blast 09:18:00 Peak Particle Velocity Check: I � v0 D = Distance to closest offsite occupied structure (fti ) : Dt = 1100 W = MaxiEuE pounds of explosive per delay (pounds): W+ = 607 SD = Scaled Distance : SD = D/W10.5 SD = 44.65 R V = Peak Particle Velocity (inches per second): V=160 I(SD)^-1.6 V = 0.37; (*max. limit in mining permit is: v = 1.0 ips) Based an known distances fron the blast to the seisaoFaph and any additional location, the expected vibration level can be setimated at the siecond location as follows: V = Particle velocity measured by seismograph (ips): V} = 0.47 DS = Distance from blast to seismograph (ft) DSt = 1100 d = Distance from blast to second location (ft): d* = 2000 PPV = Theoretical peak particle velocity at the closetloffsite occupied structure (ips): PPV =,V(DS/d)11.5 PPV = M517 Airblast (overpressure) Check: P = Unconfined Airblast/Overpressure (psis P = 82 (D/W"0.33)"-1.2 P = 0,232426 To convert (psi) to (dbl): (P/2.9 xIMI-9)loq x 20 P = 158.08 AB = Confined Airblast/Overpressure (dbl): AB = P (dbl) - 35 dbl (for quarry situation AB = 123.08 (*max, limit in aininq permit is: AB=LZaDBL) I LAND QUALITY SBCTION BIAMNG ANALYSIS NtlR URRY (+= Denotes fields where input data is needed) '. Permit Nmber: -> 14-02 Parmitte : M Mine Mane; north quarry ]j Blast Reporti: 101 Date of Blast: 10/25/96 Time of Blast 0918:00 Peak Particle Velocity Check: 0 = Distance to closest offsite ocrupied structure (ftJ: D+ = 2000 N - Maximum pounds of explosive par delay [pounds(: N+ = 607 SD = Scaled Distance : BD = D/PO.5 SD = 81.18 V = Peak Particle Velocity (inches per second): V=160 (SD)^-1.6 V = D.14 (fiax, limit in mining permit is: v = 1.0 ips) I Based on known distances from the blast to the seismgtapb and any additional location, the expected vibration level can be estimated at the secend location as follows: V - Particle velocity measured by seismograph (ips): VI1 = 0.11 US = Distance from blast to seismograph (ft) DS! = 2000 d = Distance from blast to second location (it): d! = 1100 PPV = Theoretical peak particle velocity at the cicaebioffsite occupied structure (iµs): PPV=IV(DS/d)hl.5 PPv= C.31B7 Airblast (overpressure) Check: I P = Unconfined Airblast/Overpressure (psi) P = 82 (O/M%33)A-1.2 P = 0.11342E To convert (psi) to (dbl): (P/2.9 x IW-9llog x 20 P = 151.85 AB - confined Airblast/Overpressure (dbl): AB - P (dbl) - 35 dbl (far quarry situation AB = 116.85 (ttax. limit in mining permit is: AM = a DEL) I �I Explosives Column Check: II (this is a very approximate method based upon numerous assumptions; specific densities nay vary greatly depending upon the type and manufacturer of the explosive products used in the shot; must condider each explosive used; refer to Dupont Handbook for actual SPD, otherwise use the following:) Assumptions: If 'straight' emulsion is used, use SPD f specific density) = 1.20 (per Ireco) If a 'blend/slurry' is used, use SPD (specific density) = 1.25 If 'straight' anfo is used, use SPD (specific density) = 0.85 Ratio between explosives: Total pounds of Explos. 11* �= 8463 Total pounds of Explos. 12 (use 10.1' here if only have one explos.)* = 0 Ratio between explosives = I 0 Average pounds of explosives used per hole (pounds)* I 607 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 607 1i Explosive 12 = 0 SPD = Specific densities for each explosive: SPD for Explos. 11* = 1.250 SPD for Explos. 12 (use 10.1' here if only have one explosive.)* _ HD = Hole Diameter Used in Shot (inches): HD* = t 5.5 I LD = Loading Density (pounds per foot of column): LD SPD(.34)(HD)^2 LD for Explos. 11 = 12.8562500 LD for Explos. 12 = 0.0000 I Explosive column height for each explosive (feet): Explos. 11 = 47.21439 Explos. 12 = 0.00000 Total Explos. column height Stemming height used in shot (feet)* = 10 Total height of explosive column(s) and stemming in the hole = 57:21 Total depth of hole denoted on the blasting report for; the shot in question* = 53 I Analysis Completed By: Date2 114112 7 i 1 ) ®I LAND QUALITY SECTION BLASTING ANALYSIS WORKSHEET {*= Denotes fields where input data is needed) Permit Number: -> 34-02 Permitte : vmc i Hine Name; north quarry Blast Reports; 102 Date of Blast: 10/29/96 Time'of Blast 13:07,96 I Peak Particle Velocity Check: ' D = Distance to closest offsite occupied structure (ftI): D* = 700 W = Maximum pounds of explosive per delay (pounds): IW* = 404 SD = Scaled Distance . SD = D/W10.5 SD = 1 34.83 V = Peak Particle Velocity (inches per second): V=160 (SD)^-1.6 V = 0.55' (*max. limit in mining permit is: v = 1.0 ips) Based on known distances from the blast to the seismograph and any additional location, the expected vibration level can be setimated at the second location as follows: i V = Particle velocity measured by seismograph (ips): Vi = 0.32 DS = Distance from blast to seismograph (ft) DS* = 700 d = Distance from blast to second location (ft): di = 700 PPV = Theoretical peak particle velocity at the closet offsite occupied structure (ips): PPV=iV(DS/d)"1.5 PPV- 0.3200 Airblast (Overpressure) Check: I P = Unconfined Airblast/overpressure (psil P = 82 (D/W10.33)11-1.2 P = 0,390270 To convert (psi) to (dbl): (P/2.9 xi10"-9)loq x 20 P = 161.39 AB = Confined Airblast/Overpressure (dbl); AB = P 1(dbl) - 35 dbl (for quarry situation AB = 126.39 (*max. limit in mining permit is: AB =LaDBL) i •i Explosives CDIM Check: (this is a very approximte aethod based upon none specific densities my vary greatly depending upon of the explosive products used in the shot; oust o refer to Dupont Bandhack for actual BID, othervisa Assonptions: If 'straight' esulsim is used, use (per Ireco) If a 'bland(slurry' is used, use SPD If 'straight' anfo is used, use SPD Ratio hetmen explosives: Total pounds of Explos. 11 Total pounds of Explos. 12 Ratio between explosives = • assmptfom; type and mnufacturer at each explosive used; the following:) specific density) = 1.20 eifie density) = 1.25 ific density) = 0,85 5840 se '0.1' here if only have one eglos. p = 2100.0 2.78 Average pounds of explosives used per hale (pounds)* = 847 Breakdown of average pounds of explosives per hole due to ratio: Explosive 11 = 222.22 Explosive 12 = 124.7E SPD = Specific densities for each explosive: SPD for Inplas. Ili = 1.250 RED for Etplas. 12 (use'0.1' here if only have one explosive.)* Ina = Hole Munster Used in Shot (inches): HD* _ 5.5 I LD = Exuding Density (ponds per fact of colum): LD SPDJ.14)(HD)A2 LD for Was. II = 12,8562500 ID for Explos. 12 - 8.7422500 Explosive caluen height for each explosive (feet): Explos. 11 = 17.28518 Explos. 12 = 14.27292 Total Done. oolum beight = Steming height used in shot (feet)* = 10 Total height of explosive colum(a) and steming in the hole = 4136 Total depth of hole donated on the blasting report for', the shot in question* Analysis Coapleted By: Date, q;k A 0 November 7, 1996 Ms. Judith A. Wehner Assistant State Mining Specialist Land Quality Section D-EHNR P.O. Box 27687 Raleigh, NC 27611-7687 RE: Blasting Complaint -October 29,19% North Quarry Forsyth County Dear Ms. Wehne[ RECEIVED DEHNR Nf1V I � I99(i LAND QUALITY SECTIO14 Per your request, enclosed in duplicate are blasting and seismograph records for October 29, 1996, including one shot prior to and after that blast. After a review of the blasting reports and seismographs, all blasts recorded were well below the allowable limit. Ms. Lisa Hill has resided at her present residence since 1991, Ms. Hill's property is exactly .6 miles south of North's pit and has never filed a blasting complaint with us. Roger Bullins of North Quarry and Ms. Hill discussed her complaint. She has agreed to allow Vulcan to setup its seismograph onto her property to monitor a series of shots. Mr. Bullins also got in touch with Richard Hemming, discovering that Mr. Hemming had no knowledge of the complaint they had been called into your office. Mr. Hemming's son who now lives with him made the call. Mr. Hemmings residence is approximately 1.2 miles northeast of the pit. Vulcan has never received a blasting complaint from Mr. Hemming who was surprised to hear that we had received notice of complaint since he has never had a problem with us. I look forward to hearing from you soon. Vicki D. Jones Enclosures c: R. Bullins MIDEAST DIVISION I P.O. BOX 4239 1 WINSTON-SALEM, NORTH CAPOLINA 271154239 • TELEPHONE 910 761 Vul[atU, • Materials Company , Blasting Report Quarry AL 14 Report No. /C D Date Type of Shot " "�/ Exact Time % Type of Material �sa./, `e Shot Grid At-• a'K 0' - cn Distance /SQL (Ft.) Direction ly-0 'T Gridd-rA.'L/Gc- (To nearest occupied building neither owned or leased) '1 Sets. Location Distto sets.l Grid i µNYoa 02 Sets. Location _S+/e QFG Dist. to Sets. NCO Grid d-rreua +3 Sets, Location Dist. to Sets. �i-�tovo Grid '.- r+�'a - Hole/Deck Delay Period Depth Stemming lPeunds tPer Hole/Deck No. 55— os � /LSD G Maximum Number of Holes /Z Type of Stem ling iJc�✓E lips. Per Diameter (inches) S:ri Face Height sa Delay Spacing � Sub Drilling 3 a Burden / Number of Rows e- Method of Firing r/e/f =12<Type of Circuit: Series Parallel Parallel Series Type of Delays: Down -lr %'" S/yrface�X Trade Name F,✓S.3✓ ,�i�.���F' '/ .7 's i7 I I I Weather dear ❑ Cloudy 0 Rain ❑ Snow (check two) ❑ Hot Er'Warm ❑ Cold Wind From N ❑ NE ❑ East, El BE (check one) ❑ S 2 sw ❑ Wastl ❑ NW i Fragmentation ❑Excel L V. Goc', ❑Good Cl Fair C3 Poor Backbreak ❑ SO fl. L 2011. ❑ 3C it! ❑ 40 g. ❑ 50 it. or more 1 Trade Name of Explosives I Amount i/ �✓r I ley &O � '� � . ✓✓ c'A..i �r � 3S2 i � li , i Total z9! i lbs. Total Pounds et 3(n Powder Factor /.4-/ Gal of Oil N7 % Oil Content !.GS Bench or.: Date Scale Distance Tons of Materials Produced Remarks: _ / I _ 1 Distribution: Administrative Dept. — OR:31NAL //p�� � Plant Office File Supt. ig./� / Blaster Signature .15'-LS65 State Safety Rep. License or S.S No.: •rrnG 74 NY Rev "2 HalelDeck Delay Total No. Period Depth Stemming Pounds Per Hole/Deck I I I II I I I I l i i I I I i i II I 'I I I I I I I I I I I i lit I Total Pounds Tons of Materials Produced Typical Hole Show Primer Location and Stemming Tapp off Bench I, feranni Mb ._ ._. .. ... 67Shre Length of Hole AOa d N D Levee/' _ Flow Level _I (Ft.( of Sub Drilling _ Yuk SAFEGUARD SEISMIC UNIT 200BD9 ** • SN:2039 i Friday, 10/25/96 il:36:44 Event: 100 r Client: UULCA1 1 Operation: NORTH SSU Location: N 11500 E 13500 Distance to Blast: 2000 Operator: LG Comments: N 10800 E 11200 J Trigger Levels: 0.le in/sec, I112 db Record Time: 5 sacs Range: Auto 5 ips - -VIB'RATIN e.,SOUHD TIME HISTORY i Time Scale: 0.1 (sec/div) i Data Scale (seismic); 0.64 (in/sec) Data Scale (air): 0.009j(Psi> SUMMARY L T U PPU (0.001 1.82 i 2.09 j PD (0.001 in) 12.09 1.33 1.13 46 PPE (s) e.4625.8 0.38.4 0.33 FREO (hz) 25.0 38.4 25.0 125.0 RESULTANT PPU: (in/sec) 0. 43 PEAK AIR PRESSURE: (db) i100 (psi) 0.00029 Friday, 10/25/96 11,36:44 DYNAMIC CALIBRATION SHAKETABLE CALIBRATED: 5/10�96 By Gaosonics, Inc. j i Box 779, Warrendale, PA 15095 TEL: 412-934-2900 writing file to disk . Vulearbi Materials Company Blasting Report Quarry AA :"A i Report No. 161 Date. , �19�SG Type of Shot P. >c % Exact Time ' y - Type of Material eZ ^� .✓ •><< Shot Grid, - c /.too Distance ih".:n (Ft.) Direction (To nearest occupied building neither owned or )owed) I 1 � +1 Seis. Lpcatiin�';/ L.1't Dist. to Seis: i1ce Grid)t4v�cc-iy-'r+= *2 Seis- Location Dist. to Seis Grip J-r/ego •3 Seis Location Q'. Dist. to Seis. adao Gridi - �' Hole/Deck Delay Period Dh Depth Sing Stemming Total Pounds Per Hole/Deck No. 2 in 0 P ' ' ., yq co o a G — et Ian !� 61 Maximum Number of Hales / `f Type of Stemming c yp ng G93fvi= Ibs. Per Diameter (inches) D 7z Face Height I 5� Delay Spacing y.5� Sub Drilling Burden rg Number of Rows ? Method of Firing tl t; Type of Circuit: Series Parallel r-> Parallel Series Type of Delays: Dowinline d i 4iSf S rface - i Trade Name = •�- 9 52 ri7 47 /`/z O �7 ro 7 '7 ry A� l00� r o .7 �07 / a,-"9 5.? f .7 I I i Weather aClear ❑ Cloudy E! Rain ❑ Snow (check two) El Hot 2 Warm (D Cold Wind From 0 N ❑ NE ❑,EMI Cl BE (check one) ❑ S Ni SW ❑ Wes t ❑ NW j Fragmentation ❑ Excel ❑ V. Good ❑Good ❑Fair ❑Poor Backbreak ❑ 10 a. ❑ 20 0. O 30 N. ❑ 40 h. ❑ 50 it, or more Trade Name of Explosives I Amount i I S 00 i/„ G•, , / � I ass � I Total _kj1 Ibs. Total Pounds Powder Factor / • Gal of Oil _ .? % Oil Content O_ C';' Bench -_,�, ;= Gdd ."."-- Date Scale Distance G:C Tons of Materials I Produced / CP Remarks: Distribution: Administrative Dept. — ORIGINAL Plant Office File Supt'l Sig. State Safety Rep. I — Blaster Signature Zl�_r" '-ZL25C License or S.S. No.:!L' VMCarrr A REV "2 Y,.69f11MM11✓� _ .._ _. q L Wow Length _.,i(Ft.) of Hole /4✓�L ._.__ _. 401flixeP Floor Level 3 (Ft.) of Sub Orilling Tons of Materials Produced _. 1 ®4 I Sea rl Ra ben : 1000 Ly.nc : 002 Date 1 W9196 Time : ID:De:34 cal Date : DliO3i96 7 Peaks : A: 111, DEB P 1.5225 L: U. IN0.4463 T: 0.47Ips P 0.394a V: 0.441p354a A PVS : 0.534 ininn; 9 0. 394 a cbmpany VU3.CAN NNTERIALS .NORTH QUARNT 9_aet Site : N11800 E11300 SHIJ 101 Selamometet at : 1411900 E13300 OL0 SALES OJ ]LCATIDN 1100FT. AWAY +0.01 r AIR -0.01 +0.50 LONG -0.50 +0.50 TRANS 0.50 D.50 VERT -0. 50 1.00 0.10 a. m 3Hz vju yvvw I % Axis i onds : Y Axis i ncI for groantl, psi for air. 1 inch/sec - 2.54 crI : 1 psi!= 6.8947 Kpa U.S.B.M. APPENDIX B 1 r 1 1 1 1 ' II II I I I I I I 1 I I ___TYIII T1IIIII rIIIIII TYIIIII _ I!IIIII T_YIIIII T TIIII ____ 'iI__ -lII __- TYIII TIII -_TYIIII T!♦IIII '__IIIILL T ___- __- __ -_T _--_1T T1!.i.III fIIIL1FIL Tl1!+III T11Y.+_III TlLLu+III --_TA1#3r _L3_1_LL1 11!1#II Y_1 Y_!YL1! _ _ 1YIIII 1-4-111 J J!!#III _ '. ._ J-1_ i_--+'++1!- -+-i-+'++--+--- 4--+- ------t---t--+- +- ------}---+--}- I I I I I I I 1 I I 1 1 1 1 1 1 1 I I I I I I I I I 1 I I rrT-_____---__Y_ {1JTII1 T1TII1I T11TII'I _________ i3AT'I ____________- 1r+H41III __--T .AY!JIrrI !14!11 1 - '' 1 ' I ; I I 1 1 Ir IIII I ___ ___ 31 ____} _______ + t -t t_tt Y _I__- __ - _1 I Jill II I I-111 T l T _ 111___ _ __ I__I_ -T'll TTTT - -T -'1 _ I I 1 I _____ I I_ I_ i r-I-T rTTT -T -T -T _I I I I111_____ I__ I_ I_ - TI-T-rTTT -T -1 -T I i I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I IL I I I I III I I I I 1 I I Jill I I Li 1- i _J I I 1 i I II I I I 1 I 11 I I I I I I I I I I II I I I I I 1I I 11 I 1 i 1 r II I i I Jill I I I I I I I I I I I I I I I I I 61c: 914z 30Hz 3Hz fiHz 9Hz 304z 3Hz 6Hz 911z 30Hz Longitudinal Transverse Vertical Inc. • I ®I •* SAFEGUARD SEISMIC UNIT 209ODK *�k SN: 2039 1 Tuesday, 10/29/96 10:18:30 Event: 101 ' Client: VULCAN Operation: NORTH I SSU Location: N 11500 E P3500 Distance to Blast: 2000 Operator: LG Comments: N 11800 E 11206 Trigger Levels: 0.10 irvsecp 112 db Record Time: 5 secs Range: Auto 5 ips VIBRATION & SOUND TIME HISTORY I ' Time Scale: 0.1 (sec/div) Data Scale (seismiO: 0.32 (iwsec) i Data Scale (air): 0:009 (psi) . I % Lj T V PPU (in/sec) 0.12- 0.13 0.12 PD (0.001 in) 1.31I 0.91 0.98 PPP (g) 0, 10, 0.10 0.13 FREO (hz) 23. B, 41.6 62.5 RESULTANT PPU: (in/sec) 0.19 PEAK AIR PRESSURE: (db) 114 (psi) 0.00145 Tuesday, 10/29/96 10:10:I30 j DYNAMIC CALIBRATION CHECK - 9 SHAKETABLE CALIBRATED: 15/10/96 By GeoSoni ce, Inc. Box 779, Warrendale,IPA 15095 TEL! 412-934-2900 writing file to disk . AF Vulcan® Materials Company Cuarry Blasting Report Report No. 'G'' Date xc/W�1�6 Type of Shot J�.s ' " " Exact Time j i<:. le ` Shot Grid - '-� - Type of Material �s Distance '7tn (FL) Direction In Grid '''� :'r/'c (To nearest occupied building neither owned or leased) al Seis. Location Z'la' LDist. to Beis. '740' Grid%-",44,='/lac s2 Sets. Location Dist. to Seis. Gritl a3 Sale. Location Dist. to Seis. moo Grid-+%�= Hot `fDeck No. Delay Period Depth Stemming Total Pounds Per Hi ole/Deck G d '� V s Maximum Number of Holes 3 Type of Stemming ?:�_✓�-= Ids. Per Diameter (inches) Q! Face Height . 9 Delay / Spacing %2 /C- 1'7 Sub Drilling yG Burden /'`� -+ %� Number of Rows I � Method of Firi '-/mc Z25 T �9 � Type of Circuit: Serlesl, Parallel Parallel Series T I'' 0 � ype of Delays: Dovmlfne r Surface "✓s Trade Name % 5G '� 9 3' iL ,_ ri !cf /4� ✓p,y^ Weather '72 Clear ❑ Cloudy ❑Rain Cl snow (check two) ❑ Hot ['Worm [I Co Id Wind From _I N NE J East II❑ BE (check one) 1 S ✓SW fP West ❑ NW I Fragmentation J Excel '_ V. Good ❑ Good ❑ Fair O Poor Backbreak 'J 10 fl. ] 2011. LI 3C ft. LE 40 fl. ❑ 50 ft. or more Trade Name of Exi-ioslveF Amount I SS �G —t. — A, 9 �Cff ! �G aoc' Total 7" tbs. Total Pounds %`/ �� Powder Factor Gal of Oil G4 45 Oil Comenl Bench ' i Grc "-,- Date '"., Y-S->/ Scale Distance :.r= Pons of Materials Produced ee Remarks: Distribution: Administrative Dept. — OR,3INAL Plant Office File Supt. Sig, State Safety Rep VMGxV4BI neVM2 Blaster Signature ` License or S.S. No.: Hole/Deck Delays Total No. Period Depth i temming Pounds Per 1 Hole/Deck Total Pounds _ Tons of Materials Produced Typical Hole /Show Primer \Location end Stemming 3 Top of Bench (ij 9'O to a�rfi;�� 6'7$tn,v£ i Length 'a (Ft.) of Hole 4V Floor Level I_ (Ft.) of Sub Drilling 40.01 AIR -0.01 +0. 50 LONG -0.50 +0.50 TRAKS -0.50 +0.50 V RT -0.50 1.00 0.10 If : 1010 Even 003 Out, 29/95 Time 13:57:13 cal note : ml : n: 113.5a9 a o. 9233 L: a 0.4513 T: o.lclpa 0 0.4449 v: 0. 0.354 inroec n 0 452 e I : WWAN MATERIALS NORTH QUARRY : N10500 E11000 SHOT 4 102 3t : N9900 E11100 mATTHEAS CRAM CKI 700 FT ➢MAY. x Axis in seconds : T Axis in inch/.sec fez ground, psi fox air. 1 inch/sec - 2.54 cm/aec : 1 psi 6.8947 Kpa 11 U.S.B.M. APPENDIX B 1 1 1 1 1 1 I I I r I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 _1 _J _1 _1_J_1ILillI 1 I I I I I IIIII I III1111 II I I I I I I I I 1 I 1 I I 1 I I I 1 11I I4I iIIrI _____ -_ TIII TIII TJIIII Y�IIII __iJIII '_T1IIII -- --TL1II TLLIIII -T1I__ ____ --1- ______71I1 _TIII TlIIII _____ - _IIIi TIIII TII1I Y1II11II1JII11 _1IIIIL _11IIII _31III _J 1 _1-J_11111 L1 __1_J _1_L L13 J _J 1 _L-J -1111J a -4 _ 1_J_J 111J J i _1 J � J IL-4J _14 1 L_J_11 1i _J -J —+ 1 1 y -T-Y-T-rTTT -T l -T - T-T-TYTTT 11 I I I I I I I I I I I I I I 1 1 I 1 I I I 1 I I 1 I I 1 1 I 1 I I I 111 - II I I I I 1 I I I : I 1 I 1 I I 1 I I I I I 111 I 1 1 I I I I I 1 1 I 1 1 I I I I I I I I I 1 1 i-J-.L_L111 1 J 1 _v LLLYll 1 1 --1-J_11L1J 1 J _1 Y 4 -4 # + F+1i -♦ + -a— +- il4-T —L1J_+-I-+JJ _+ i- — L-+_L �LLJ — + _J— 1 1 ! J -111-1 -L 111 -1 - J 1 -1 -Lid -1 J -1 IIII ILILII I-TTT T TY TYY -Y T Y Y-TY TT T -T I 1_I_I 111____ I___I_ I_ 1 I_ 1_ 1111 1_____ - �T-T T 1-TTT - T 1 -T _ _____ - -T T TTTTT -T- l -T __I T-TT T ,T -T -1 1 1 I -1- -}I#-+-I-H4 4 -Y 4 4-4-i }+4 I I I I I 1 I I I I I I I I I I I 1 I I I 1 1 1 11 i I i i I I I I I I I III I 1 I I I i I I I I I I I 1 I I I I I I I I I I I I I I I I I I i I I I 6Hz 9H2 30Hz 3Hz 18Hz 9Hz 30Hz 3Hz 6Hz 9H2 30H2 Longitudinal Transverse vertical TRIGGER ACTIVE, I10/29/96 14:06:03 ®I • ** SAFEGUARD SEISMIC UNIT 2000DK a SN:2039 i Tuesday. 10/29/96 14:87109 Event: 102 Client: VULCAN Operation: NORTH SSU Location: N 9900 �1E 11100 Distance to Blast: 700 Operator: LG Comments: N 10500 E 11000 Trigger Levels: 0.101in/sec. 112 db Record Time: 5 secs Range: Auto 5 ips UIBRATION & SOUND TIME HISTORY I Time Scale: 0.1 (sec/div) Data Scale (seismic): 0.32 (in/sec) Data Scale (air)z 0.009 (psi) L T V PPU (in/sec) 0.20 0.09 0.15 PD (0.001 in) 0.85 0.64 0.77 PPA (9) 0.13 0.07 0.13 FRET (hz) 35:7 35.7 41.6 RESULTANT PPV: (i Nsec7 0.21 PEAK AIR PRESSURE: (db)' 120 (Psi) 0.00290 Tuesdav 10/29/96 14:07:09 i 1 DYNAMIC CALIBRATION CHECK SHAKETA5LE CALIBRATED: 5/1V96 By GeoSonics, Inc. Box 779. Warrendale. PA 15095 TEL: 412-934-2900 State of North Celina Department of Environment, Health and Natural Resources 4 • Division of rand Resources q James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Charles H, Gardner, P.G., P.E. Director and State Geologist October 31, 1996 Ms. Vicki Jones i Vulcan Materials Company F.O. Box 4239 1 Winston-Salem, North Carolina 27115, RE: Blasting Complaint l North Quarry ' Mining Permit No. i 34--02 Forsyth County Gear Ms. Jones: This office recently received two. complaints directed at blasting practices conducted at the above referenced quarry. The >complaintants were Mr. �Richard Hemming and Ms. Lisa Hill. The vibrations produced from the blast at approximately 9:00 an on October 29, 1996 caused windows to rattle according to Mr. Hemming. Ms. Hill complained of cracks developing in her windows, house and backyard pool that she contributes to ongoing blasting at the North Quarry. As provided in the mining permit for this site, you are requested to provide tolthis office duplicate copies of all shot records related to the blast conducted on October 29, 1996, including any seismograph records made. . Furthermore, please - forward all --shot records-, for- one (1) -production shot- conducted immediately prior to and after this blast for review. I suggest you contact and discuss this matter with the complainants. Their addresses -are as follows: Mr. Richard Hemming 562 Old Hollow Road Winston-Salem, North Carolina 27105 (910) 76711571 Geological Survey Section (919) 733-2423 FAX: (919) 733-0900 Land Quality Section (919)733-4574 FAX; 733-2876 Geodetic Survey Section (919) 733-3836 FAX: 733.4407 P.O. Box 27697, Raleigh, North Caroli6 a 27611-7687 Tel ephone.919-733-3833 FAX 919-733-4407 An Equal Opportunity Affirmative Action Employer 50% recycled/ t G% post -consumer paper 0 Ms. Jones Page Two Ms. Lisa Hill 5255 Germanton Road Winston-Salem, North Carolina 27105 (910) 767-1005 Home (910) 650-0303 Work I look forward to receiving the requested information in the near future. Your continued cooperation will be appreciated. Sincerely, udith A. Wehner Assistant State Mining Specialist Land Quality Section cc: Mr. Matthew Gant Mr. Richard Hemming Ms. Lisa Hill e Author: Tracy Davis at Date: 10/29/96 5:05 Priority: Normal TO: Judy Wehner Subject: Blasting Compl Judy please handle this Thanks! Tracy NROLROIP PM I int VMC North Quarry ----- _----- Message Contents (see 2nd note fiom Gray) JForward Header Subject: Blasting Complaint VMC North Quarry Author: "Hauser, Gray" <nlIg339@wsro.ehnr.state.nc.us> at Internet Date: 10/29/96 3:35 PM I received two complaints today about a blast a Vulcan Materials North Quarry in Forsyth County) Richard Hemmings 910 767-1571 Lisa Hill 910 767-1005 Home, 910 650-0303 Work 5255 Germanton Road Winston-Salem, NC 27105 Mr. Hemmings said that a blast about 9:15 a.m. was quite severe. He felt the blast and then shock waves about 5-10 seconds after the blast occurred. I Ms. Hill also complained about a blast around 9 a.m. She said she heard the blast and then felt alivibration like a seismic tremor. she grew up in California and the vibration was like the tremors that occurr before earthquakes. She,Icomplained of cracks developing over time in the windows, house and backyard pool. In addition to your review of North Quarry's monitoring data, I request that we set up our seismograph in Ms. Hill's yard. Gray Hauser October 29, 1996 I II ) • Author: Tracy Davis at NROLROIP Date: 10/29/96 5:04 PM Priority: Normal TO: Judy Wenner Subject: VMC North Quarry Judy, please handle Thanks! Tracy Subject: WC North Quarry Author: "Hauser, Gray" <n Date: 10/29/96 5:03 PM I talked with Mr. Hemmings His address is: Richard Hemmings 562 Old Hollow Road Winston-Salem, NC 27105 Message Contents Forward Header ehnr.state.nc.us> at Internet sending you the first memo. He saidthe windows rattled for several seconds after the blast. Gray Hauser