Stormwater and Erosion Control Calculations
RECEIVED
MAR 3 12022
LAND QUALITY
MINING PROGRAM
Steel Gray Mine
Sediment Trap
Trap /
Skimmer Size Drainage Area
Surface Storage Spillway
Area Volume length
T-1
16'X60'X4
0.6 acres
960ft2
3840ft3
4.0'
T-IA
10'X33'X4'
0.12 acres
330ftz
1320ft3
4.0'
T-2
20'x110'x4'
1.87 acres
2200ft2
8800ft3
6.0'
T-3
26'x100'x3'
2.12 acres
2600ftz
10400ft3
6.0'
T-4
36'x125'x4'
3.5 acres
4500ft2
18000ft3
10.0'
T-5
36'x99'x4'
1.95 acres
3564ft2
14256ft3
9.54
Runoff Calculations for Trap T-1
rlascrintinn
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.6
0.5
0.3
Grassland & disturbed Areas
0
0.5
0
Woodlands
0
0.3
0
Roadway ravel
0
0.65
0
Totals 0.6 0.3
C = 0.3 (coef) / 0.6 (acres) = 0.5
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.5 X 7.06 X 0.6 = 2.118 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.5 X 5.21 X 0.6 = 1.563 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.5 X 8.09 X 0.6 = 2.427 cfs
llww� lqwv
Sediment Trap Trap T 1
Trapping Effeclency
Drainage Area Acres 0.6
A = 0.01 X (0) 1 2.118 = 0.0212 X 43560 922.E M Required
Basin Size 16'X60 M(minimu n)
Ft2 Surface area 960
Ft3 Storage area 3840
Trap to be deaned at the plont where the basin no longer funclions well or Is at 50% capadty.
\„�
Runoff Calculations for Trap T-1A
Description
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.21
0.5
0.105
Grassland & disturbed Areas
0
0.5
0
Woodlands
0
0.3
0
Roadway ravel
0
0.65
0
t otals U.21 U.1 Ub
C = 0.105 (coef) / 0.21 (acres) = 0.5
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.5 X 7.06 X 0.21 = 0.7413 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.5 X 5.21 X 0.21 = 0.54705 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.5 X 8.09 X 0.21 = 0.84945 cfs
M
m
Sediment Trap Trap T 1A
Trapping Effeciency
Drainage Area Acres 0.21
A = 0.01 X (0) 0.74 = 0.0074 X 43560 =1 322.3 fl2 Required
Basin Size 10'X3TXC(mtnimum)
Ft2 Surface area 330
Ft3 Storage area 1320
Trap to be deaned at the piont where the basin no longer functions well or Is at 50% c apadty.
\4WOO/
Runoff Calculations for Trap T-2
flacrrintinn
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.75
0.5
0.375
Grassland & disturbed Areas
0
0.5
0
Woodlands
1.12
0.3
0.336
Roadway ravel
0
0.65
0
Totals 1.87 0.711
C = 0.711 (coef) / 1.87 (acres) = 0.3802139
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.38021 X 7.06 X 1.87 = 5.01966 cfs
i = Rainfall Intensity for 2 yea( 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.38021 X 5.21 X 1.87 = 3.70431 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.38021 X 8.09 X 1.87 = 5,75199 cfs
\00
�.d Sediment Trap
EM-3
Trap T 2
Trapping Effeciency
Drainage Area Acres 1.87
A = 0.01 X (0) 5.02 = 0.0502 X 43660
Basin Size 2VX1 I UM(minimum)
Fit Surface area 2200
Ft3 Storage area 8800
2186.7 ft2 Required
Trap to be cleaned at the plont where the basin no longer functions well or is at 50% capacity.
Runoff Calculations for Culvert C-1
nimgn.rinfinn
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.85
0.7
0.595
Grassland & disturbed Areas
0
0.5
0
Woodlands
1.12
0.3
0.336
Roadway ravel
0
0.65
0
Totals 1.97 0.931
C = 0.931 (coef) 1 1.97 (acres) = 0.4725888
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.47259 X 7.06 X 1.97 = 6.57286 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.47259 X 5.21 X 1.97 = 4.85051 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.47259 X 8.09 X 1.97 = 7.53179 cfs
\11111110,
Project Description
Worksheet
Circular Channel - C-1
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient
0.010
Slope
0.010000 Rift
Diameter
15 In
Discharge
7.53 cis
Results
Depth
0.92 ft
Flow Area
1.0 fr
Wetted Perimeter
2.59 ft
Top Width
1.10 ft
Critical Depth
1.09 ft
Percent Full
73.9 %
Critical Slope
0.007304 Rift
Velocity
7.74 ftfs
Velocity Head
0.93 ft
Specific Energy
1.86 ft
Froude Number
1.45
Maximum Discharge
9.03 cis
Discharge Full
8.40 cis
Slope Full
0.008041 Rift
Flow Type
Supercritical
� tb to
0.92 It I
lI
V:t�
H:1
NTS
`44
Runoff Calculations for Ditch DB-2
nescrintinn
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.6
0.7
0.42
Grassland & disturbed Areas
0
0.5
0
Woodlands
0
0.3
0
Roadway ravel
0
0.65
0
Totals 0.6 0.42
C = 0.42 (coef) / 0.6 (acres) = 0.7
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.7 X 7.06 X 0.6 = 2.9652 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.7 X 5.21 X 0.6 = 2.1882 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.7 X 8.09 X 0.6 = 3.3978 cfs
M
Project Description
Worksheet Trapezoidal Channel - DB-2
Flow Element Trapezoidal Channel
Method Manninjs Formula
Solve For Channel Depth
Input Data
Mannings
0.104
Coefficient
Slope
0.020000 ftlft
Left Side Slope
2.00 V : H
Right Side Slope
2.00 V : H
Bottom Width
2.00 ft
Discharge
3.39 cfs
Results
Depth
0.97 ft
Flow Area
2.4 fN
Wetted Perimeter
4.17 ft
Top Width
2.97 ft
Critical Depth
0.43 ft
Critical Slope
0.280312 ft/ft
Velocity
1.40 ft/s
Velocity Head
0.03 ft
Specific Energy
1.00 ft
Froude Number
0.27
Flow Type
Subcdflcal
Determine sheer stress: T= 62.4X 0.97 X 0.02 s 1.21 IbV Permissible Sheer Stress 4.0 IMF Rip Rap Lining OK
0.87 k
-2.00
V:1
H2.0
NTS
`4.
Runoff Calculations for Ditch DB-2A
r)escrintinn
Acres C-Value Coef.
Bare Sandy Soil level
0
0.5
0
Bare Soil (sloping)
0.24
0.7
0.168
Grassland & disturbed Areas
0
0.5
0
Woodlands
0
0.3
0
Roadway ravel
0
0.65
0
Totals 0.24 0.168
C = 0.168 (coef) / 0.24 (acres) = 0.7
i = Rainfall Intensity for 10 year, 1 day storm = 7.06 inches
Q = (C)(i)(A) = 0.7 X 7.06 X 0.24 = 1.18608 cfs
i = Rainfall Intensity for 2 year, 1 day storm = 5.21 inches
Q = (C)(i)(A) = 0.7 X 5.21 X 0.24 = 0.87528 cfs
i = Rainfall Intensity for 25 year, 1 day storm = 8.09 inches
Q = (C)(i)(A) = 0.7 X 8.09 X 0.24 = 1.35912 cfs
\whov
\VAFi
Project Description
Worksheet
Trapezoidal Channel - DB-2A
Flow Element
Trapezoidal Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient
0.104
Slope
0.020000 ft1ft
Left Side Slope
2.00 V : H
Right Side Slope
2.00 V : H
Bottom Width
2.00 ft
Discharge
1.36 cfs
Results
Depth
0.66 ft
Flow Area
1.3 ftz
Wetted Perimeter
3.24 ft
Top Width
2.55 ft
Critical Depth
0.24 ft
Critical Slope
0.305306 ft/ft
Velocity
1.08 ft/8
Velocity Head
0.02 ft
Specific Energy
0.57 ft
Froude Number
0.27
Flow Type
Subcritical
Determine sheer stress: T= 62.0 0.66 X 0.02 0 0.69bW Permissible Sheer Stress 4.0 IMP Rip Rap Uning OK
0.55 ft
.._i-
VAN
H2.0
HTs
5 1 6 1 7 1 a 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 1 / I its I IV
S1
Ll
H1
GI
F I
Ell
IDM
In M
Cross -Section It min of "-bal 4
'u, 0 - It! -------
T,�p 1
40
me fe�
it Flaullt 6 63a Rx, Jai, z a, nil., znd
fabr
:an sel th",
%
Plan View — — — — — —
1*35
ore 6.60a P� era a iotprm" ",WrW' Van
Racl, A:Amstr
5' r
T
2 1
/A
V*cs I �md -T
pack Abv•riavl
A
A
Mtn 15 thwk
Al
Filler Fabr -
F.pi,i,o 6.69w Rork Dqni =S5 S"Mri Cross Se_licri View
1, =111ilt
F.j,n, ,S t2l 9q 1 1V- T- "I I I 'ej 'eanJy omrss he bath ID rsaote
BARRIER FENCE DETAIL
wire
Compacted soil 2
-or min x-
RNIM II
E. typical
Figure 6.20* Temporary earthen dvcimsor chko
Coarse aggregate
['version Berm
+
18 min
3 1 max
1111 17--= 11 -
Figure 6.20b Temporary gravel civerson dike for vehicle crossing modified from Va
ISediment1rao �asi
t
16 min j:\o%N
0~. ale" Zone
•
Figum 6.6511; 1,W'W Of PGRX-i Wlk Ic ICT9 V PC slit, W; ff',:w.M wiemalra spoatA woolu(Wqnumscsr iCltyd #40 �CML, MC deW
8 max standard strength faor,., WIth wire fence
6' max extra strength fabric without wire fence ISediment Fence
max
Steel
post
T Plastic or
wire ties
Wire
fence
Natural
ground
8" down 4 4"
forward along
24' the trench Filter
faanc
Vvire
fence
Cross -Section
View
Filter
Steel fabric Plackfilf trench
post and compact Natural
thoroughly ground
. 4
min
T
2 -1' •min
Figure 6.62a Installation detail of a sediment fence
17C
16C
15C
14(
13(
12-
it(
10(
90
MIRAW
fIa
96.0
0+00 0+50 1+00 1+50
sEc'n0N A
SCALE- HORIZ. 1"=100'
VERL 1"=10'
-Ho'an '%W.W 2' 1. -3 5
t st4&' a J`
SON,- giii III
';Ooqv�' titer,
Ir .1..kamnel 1114" 1�
htcx%i.!
-ap,t,. sod WS MO)y seas W
!ntta " blwsam Messr
�Pqrory chomwtl
NOW
I C." do,. 11 oar
2 swknar rtv, rgoyor, P,
7s o,, 1,'fo,' if tte' s.tam ri 'U top
f, "o., so" .'Mr, of 14. b"
A.ier,. T1-
nr dw to,
%OTES oj
IL Peg* iC06d .11A 15 ? fl- WC to�r� tis.Tl I.IK I 1�1v mm�j t1w -.11 U ortr'�'t-u
IV
1W s• 'Pe
190
17C
16C
15C
14C
13C
12C
lic
100
it
�
a
0
tl
Ir
WS
106.0
0+00 0+50 1+00 1+50 2T00 2+50 3+00
SECTION B
SCALE. HORIZ. 1'=100'
VERT. 1*=10'
;aped Riprap Channel
+
Desi. *,ck ss
Lit-. ttck subvfadL exc
wq
-er layer c-avel or laciric
Trapezo al Riprap Channel
iln top width
Igib, A
FigW063ts
layer, ;;,a,ei
Paiabolic-s-iapecl Riprap Cl-annel
C�.�ijn lop width
dupill
r ilckress
subGrade excaw
I-mer avir. grivel o,
0 hI���illlllS
0
0
C/)
CD
:2
z=
M
9
—
(D
Cf)
C-)
R
U)
fy-
Lij
:Z
0-
W
cn
0
cri
L�
-Z
0
n
Lij
Lj
a-
=D
CC)
P
1 1 6 1 7 8 9 10 1 11 12 13 1 14 1 15 1 16 17 1 18 1 1
kk 0
SEAL
23960
M
L
C)
W
0
LL
z
0
co
03
U)
z
zm
<
U
_j
_j
W.A
Ai
CO
E-4 r__
z 0
00
z LLJ CILi
L C'q
LLJ it o) c)
ON z 6 P C'4 z
_zU)N
0 U) Lj UJ I
LLJ co
;_7 V) U) F- Z
0 — (14
LJ z Ckf =) CL 00
8 UJI U U)
UJ LLI
0
_j :D 0 H
LL_ ,:c
U)Q_
<
_j
z
_j
0
C)
F
0
z
z
W
z W
U) E
LL
< W <
D
(D
of 0 (3
U_ W
_j (D D
W M
W
U) LU
Z:)
—1
ca
C
U)
z
D
0 <
F-
W
W C)
T c_
C) 3: B
Sheet No.:
0
MP-3 A
U
0
,_ 0
1 a- CD
1 20