Loading...
HomeMy WebLinkAbout20220121_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 16-87 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Carteret Farm LLC Applicant's Email: treyrl222@hotmail.com County: Carteret Project Name: Carteret Farm Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 34.81190 Longitude: -76.64250 Please return comments to (at DEMLR CO): Adam Parr adam,parr@ncdenr,gov Comments due by: 01/10/2022 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: See additional comments on second page. Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Feltons Creek Stream Index 21-35-1-1 From Source to North River Class SA;HQW DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I El Is an O & M Plan needed? ✓ I El Are wetlands disturbed at this site? I ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1❑✓ Is a wetland delineation required prior to DWR issuing the permit? I El I✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? LI I 1,(I (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Proposed discharge area is SA;HQW Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements ./ HQW/7Q10 Concerns ./ LI Pay back fees or renew DWR permit Other Please describe the reason to hold the permit: DWR is concerned about the proposed dewatering discharging to class SA;HQW waters. RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? ✓ Reviewed Central Office Date Regional Office Date DWR RO Surface Water John Perry 01/20/2022 RO Aquifer Protection Section Additional Comments: DWR has concerns regarding the proposal to discharge mine water to a ditch which runs to surface waters of Felton's Creek. Felton's Creek is classified as SA;HQW and is a designated primary nursery area by NCDMF. The application lacks the information required to determine if the project will not violate tidal salt water quality standards for SA;HQWs in 15A NCACO2B.0221, water quality standards for HQWs in 15A NCACO2B.0224, and the anti -degradation policy found is 15A NCACO2B.0201. Coordination with the appropriate agencies is needed to ensure that water quality standards for the receiving waters can be maintained. Rev. December 2020-2020r1