HomeMy WebLinkAbout20220121_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
16-87 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Carteret Farm LLC
Applicant's Email:
treyrl222@hotmail.com
County:
Carteret
Project Name:
Carteret Farm Mine
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
34.81190
Longitude:
-76.64250
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 01/10/2022
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
W
Comments: See additional comments on second page.
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Feltons Creek Stream Index 21-35-1-1 From Source to North River Class SA;HQW
DWR Compliance Status of Mine:
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
El
Is an O & M Plan needed?
✓
I
El
Are wetlands disturbed at this site?
I
❑
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑
1❑✓
Is a wetland delineation required prior to DWR issuing the permit?
I
El
I✓
JD
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
1,(I
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Proposed discharge area is SA;HQW
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑✓
❑
Has Violation
O&M Requirements
./
HQW/7Q10 Concerns
./
LI
Pay back fees or renew DWR permit
Other
Please describe the reason to hold the permit:
DWR is concerned about the proposed dewatering discharging to class SA;HQW waters.
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved? ✓
Reviewed
Central Office Date Regional Office
Date
DWR RO Surface Water John Perry
01/20/2022
RO Aquifer Protection Section
Additional Comments: DWR has concerns regarding the proposal to discharge mine water to a ditch which
runs to surface waters of Felton's Creek. Felton's Creek is classified as SA;HQW and is a designated primary
nursery area by NCDMF. The application lacks the information required to determine if the project will not
violate tidal salt water quality standards for SA;HQWs in 15A NCACO2B.0221, water quality standards for
HQWs in 15A NCACO2B.0224, and the anti -degradation policy found is 15A NCACO2B.0201. Coordination
with the appropriate agencies is needed to ensure that water quality standards for the receiving waters can be
maintained.
Rev. December 2020-2020r1