HomeMy WebLinkAbout20220401_Mine_Mapsate--":_
aw
IN
t�4
......
ov,
iP-
.. .
X, 9�m!
. ....
%
'Aft
4 0
-M,
GOLDEN
A oft -to
I
0
vM
w �
w' Z
�C100
rDp n-qw
mz ='i
H -I D
-Rn 3; m
=C 00
• �yD
O
N w i
0
z
M
MU) 0
r0 TI =y
m Z �.=D
=-n >M
Z1 'v 00
In
GJ$ w
C =�D
Cn 1
O M ,
z
TOP AND BOTTOM STRAND -
SHALL BE 10 GAUGE MIN.
WIRE
NOTES
j��rr+-------- 8' MAX. WITH WIRE
i (6' MAX. WITHOUT WIRE
MIDDLE AND VERTICAL WIRES
SHALL BE 12Y2 GAUGE MIN.
FILTRATION GEOTEXTILE
USE WIRE A MINIMUM OF 32"
IN WIDTH AND WITH A MINIMUM
OF 6 LINE WIRES WITH 12" STAY
SPACING.
USE FILTRATION GEOTEXTILE
A MINIMUM OF 36" IN WIDTH AND
FASTEN ADEQUATELY TO THE WIRE
AS DIRECTED.
PROVIDE 5'-0" STEEL POST OF
THE SELF -FASTENER ANGLE STEEL
TYPE.
FOR MECHANICAL SLICING METHOD
INSTALLATION, GEOTEXTILE SHALL
BE A MAXIMUM OF 18" ABOVE GROUND
SURFACE,
i
FILTRAT
24" MAX.
(18" MIN.)
EXTENSION OF GEOTEXTILE AND
WIRE INTO TRENCH
—
Cc
oW
LL V
z W
3 LL
o ~
J
N
N
❑ y.
�CC
O
H
cc
CC
IL
J
z F'
W
z
00
Q
NOTES
oacnn=z
TO LARGE
Z
I< o
1,
PROVIDE TURNING RADIUS SUFFICIENT ACCOMMODATE
TRUCKS.M
h
H
2.
LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION
� u o
ul
BY ALL CONSTRUCTION VEHICLES.
z o H
dd
3.
MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR DIRECT FLOW OF MUD ONTO STREETS,
p~,o
PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY,
o
4.
ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE
CLEANED UP IMMEDIATELY.
S.
LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF
INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE
FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE.
6.
NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO
V
BE DETERMINED BY THE ENGINEER.
a
7.
USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED
BY THE ENGINEER.
o
B.
INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES
FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE.
W
z
00
M
U
¢
6
Z
r N
rn z
Ww
H
J
o W
Wa
NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE
cc
ilAining Area Crcas"Oetion
(I to ssaie)
1141PLUW fttcM PVM?
k3mm
a HC14N9`
.ENHANCE
Construction Detail for 30'40' Basin
Not to Scale
Plan View
aft
zTi excAgmo tolmemr s-rAAAE
60' Cross Section
1.6 It
Overfill
min for sattlomont
tl Ili I
KINnAY......
slope max
mex fill
sft
min
30' Grow Section
FID.Ut_ "RDw'3
1:1 side slope
-BV VN41Al2.f
aft
fabric
UrrcH
o %Nru
El
400$E:
'Sg2N
z
N
N
Reclamation Plan: The entire Mining Area will be left as a pond. All slopes will be
graded to a 3:1 slope or flatter. All disturbed areas above static water level will be
seeded according to approved Revegetation Plan. The haul roads will remain in use as
farm access roads.
CATEGORY
CURRENT AFFECTED
ACREAGE
PROPOSED CHANGETO
AFFECTED ACREAGE
TOTAL AFFECTED
ACREAGE
Tailings/Sediment Ponds
Stockpiles
Waste piles
Processing Areas/Haul Roads
0.70
0.70
Mine Excavations
6.00
6,00
Other (Please explain)
Total Affected Acreage
6.70
6.70
Total Permitted Acreage
8.40
8.40
SAT2N
— —
,
— -- EXISTIIJG F4Ttrtt t'R'tl1 — —. —
��� 25` uNB%l.AVAT27
•— — — — — — _._.
T3UF�F'cR
— — —.
Mr
MtNtU4 Lt mt-r
xl
it
of
N
U,
A
3
III
MINI�rr^
r
�
�
F
�
I
�a
;
aeWRi221NG
ry nrctil
M N4 1_IVJt4"C
Ye¢t E'CE72 St4T
- cc
i
50' uNo1Su1213� T3vFFGu 50' U�iQISTtlrzT3Eq 73U1-ft I
1 rzMtr M Tz l
rat—, c H
1 I
I !
ENTIRE 5 vrp_ Is
w l-ra l N t DO 4e-AT?-
1%Lo0'DPLA tpJ
RECEIVED
Non -4 APR 01 1612
NDv QUALITY
MINING FIROORAM
MINE PLAN AND DETAILS
CARTERET FARM MINE
CARTERET FARM LLC
CARTERET COUNTY
ADbeo t4016 317-5/22- 1'=100' DECEMBER 2, 2021
PAGE 2 OF 2
PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC