Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20210927_Mine_Maps
TO WHIM Winston-O S�em .Greensboro Elizabeth Cityo I3urham +/Wilson �AshevilIe *R.ALEIGH �Greeiivilia Vass • Goldsboro �Charlolte Fayetteville . Lumberton 9 • PF—het nam SITE APPLICANT: RUFUS YOUNG CONSTRUCTION, INC 7126 CHAUNCEY TOWN ROAD LAKE WACCAMAW, NC 284SO 305 N. Chippewa Street Lumberton, NC 2835.8 Office: (910) 671.-9530 Fax: (910.) 618-0838 Email: andersonengineeringpq@gMail.com Licensure #: C-0793 V Z _ J o,U =o a. zp ZIr.LjJ ; w O U Vl EL �c ♦♦ ♦♦tytltt 1!! � - 9 a SEAL r = ... 0 �lfll�Itllttti♦� The creation of authorshipcontained In tfus drawing Including •- ding but not limited to all design, text, specifications and images, are awned, except as otherwise expressly stated, by Anderson Engineering & Associates, P.A. and are protected by copyright and other intellectual property laws. This drawing may not be copied, reproduced, transmitted, displayed, distributed, sub- licensed, altered, utilized for other projects or otherwise used In any manner without the prior written consent of Anderson Engineering & Associates,. P.A., except to the extent that such use constitutes "fair use" under the Copyright Act of 1976 (17 U.S.C. §107). as amended. Project owner may keep one un- altered permanent copy to be used for intended project use only. COVER ISSUE DATE: 08.19 2021 NO. GATE REASON Q 09.0i.2021 OWNER REVISION NAMECHANGE 09.23.202i NO CHANGES TH155HEET SCALE; NTS DRAWN BY: RT CHECKED. BY: LWA PROJECT NO.: 4.0-1832 DRAWING FILE: 1832 FILE NO.: .1.832 SHEET NO. + 3 9) 2021 Ande15t7n E{ �i EBi lli9r& As50ci�te5r P.A, 30* N. Chippewa Street Lumberton, INC 28358 Office: (910) 671-9530 Fax:.(910) 618-0838 Email: andersonengineeringpa@gmail.com Licensure #: C-0793 L�J ,. U J Ilk O ^_J IV Mi. (.9 UJ el <0 >o w U LL r� ��SS10�'•, i 4 SEAL r" 93325 O � 4 'rp tr�GINE��. �D ,�gttp��,r`, The creation of authorship contained in this drawing including 4' ding. . but not limited to all design, text, specifications and images, are owned, except as otherwise expressly stated, by Anderson Engineering $ Associates, P.A. and are protected by copyright and other intellectual property laws. This drawing may not be .copied, reproduced, transmitted, displayed, distributed, sub- licensed, altered, utilized for other projects or otherwise used in any manner without the prior. written consent of Anderson Englneering & Associates, P.A,, except to the extent that such use constitutes "fair use" under the Copyright Act of 1976 (17 U.S.C. §107), as amended.. Project owner may kaeP one un- altered permanent copy to be used for Intended project use only. EXIST[N-<5 GC}�IV�D)ITI OR�N. VSSUE DATE: ae 1 g.2-oz1 No. DATE REASON „ Q 09.01.2021 OWNER REVISION NAME CHANGE 09.23.2021 REMOVE & REPLACE DRIVEWAY PIPE AT ENTRANCE SCALE: 1 "=150' (HORIZ) DRAWN BY: RT CHECKED BY: LWA PROJECT NO., 40-1832 DRAWING FILE: 1832_1 FILE NO.: 1832 SHEET NO. �iZrZrl O 2021 Ande.rsaEngineering & Associates, P.A. B GUE FARMS II LLC J / DB 508, PG 126 / PIN LU Q j � I 305 berto�p l NC 28 / ¢ Lum ER MIT BOUNDARY x Office: (910)71=9 (LIMITS OF DISTURBANCE) ROP. 4' VAGETATEd 25.0 AC BERM ca j Fax: �gEm�a i:8-0� TEMP. SEDIMENT FENCE a so'Rr,rr r ! and - ( _71A Licensure # c 07 ,zz 2671.58' 124 �l ,zz 124 � 7 I 1aa 1a6 ,oe 11a 16 „z d © BOTTOM OF MINE\ A JESSE L MALPASS' \ uB 10 PG 59 S 9 PIN ROP. VFGETATEd \ / �j 11 / / \ 'l �jll W y ' BERM (HEIGHT I[: F- �I '. ; 1 GRADUATES TO 4 FT}Tr, �.. ,\00 Z _ I� °� �` �, 1 \ \ 11 +� c f V I rn v� 1 \` 0 T, 30' UNEXCAVATED \ \ i INE BOUNDARY ( 111 BUFFER (3.84 AC) \ \ / j i (21.16 AC) if fljlr [, - I! Z r. r TEMP. GRAVEL ,oa ,\ \ I j j ; Ij�f I Q s, C! CONSTRUCTION ERMIT BOUNDARY- 111I � C N560 07' 47"W 1 £NTRANCEIEXIT , �� I 1�IMITS OF DISTURBAN f' I l / I,+ 0 0 E \ 25.0 AC) 1 1 l I i �...� Q 20.39' I �l I ;U U 1 j 11 d 0 1�8 71, 1jq 1p2 l�0 108 Ofi l0 M�NLC �\ 1 I 1 \ ARE�1T0 BE PLANTED�j/" .' J t�l L J A a \ 1 WITH TRl;ES / �; ill I �� > F o , S55 47 09 E u- 20.78` N640 47' 46"E �" � -_fir _- _ • � \ i � I f ! 1 ; �. � �� . jr I � � : � x MINE BO2rt 16 Ac '' _- �. '•�:.��-- I 1r f' I I PERMIT. BOUNDARY k � �:4-�1� (LIMITS OF DISTURBANCE) 6 25.0 A � __. ] ... .. •.,:: :• ': •:' 'gyp. �o - t o r r ... . :r• ^ JESSE L MALPASS.,:. { q , SARAH LEE WITH DB 910 PG s ti P 44 p•. DB 374 G 5 1-y i fjfrf ^. ,mot•- .: -: •.�I., •. �. PINPROTECTION PIPE INLET PIN SEAL l ROP 72LF OF 18'0 RCP 7 13325 c PROP. BERM-254 I 1 1. i '�i Q•.;,N.�GQ-ti -�; .� . Y .-. 1 N40° 37, XIST. DITCH �i��rl.W "q`Np����` ]$ 0 0 PROP, CHAINLINK FENCE V'5 Q TEMP. GRAVEL m a? = _ CONSTRUCTION V r'7r4 M1�, .�� / , ; I The creation of authorship contained in thi Q ENTRANCEIEXIT JESSE L MALPASS o RIP RAP APRON # `'` = - : , riS �\ - _ -. Cry �� F. but not iimited.to 0 design, text, specify _ � f' I' f i are owned, except as otherwise exp W B 910 PG 9 `+��� rl _ `` i Anderson Engineering & Associafes, P.A. 4 �� 773 - ' �~, by copyright and other intellectual property } 50.00' may not be copied, reproduced, trap; = I PIN EXIST. DiTC distributed, sub- licensed, altared, utilized f otherwise used in any manner without r09 �l �� a f 1� �! 1 consent of Anderson Engineering & Assoc to the extent that such use constitutes "1 }0 I Copyright Act of 1976 (17 U.S.0 §107) as r109 -'fl I for intended�project use onlyer may keep one un- tered germane tY PROP. GATE WITH LOCK l rob,I . I � • PROP. 50' ASPHALT APRON SITE PLA�f RIP RAP APRON #2 _ e APPLICANT: } RUFUS YOUNG CONSTRUCTION, INC. I ISSUE DATE 08.19 Z021 7126 CHAUNCEY TOWN ROAD Q ROGUE FARMS II, LLC SIDE Na. DATE. REASON . LAKE WACCAMAW, NC 28450 QUARRY SIDE I - � OWNER REVISION 4 I TEMP. SEDIMENT FENCE, 0 ag.a,.zazt PERMIT BOUiVI]ARY & / MOVE PERMIT BOUNDAF - PLACE TOPOGRAPHIC SURVEY PROVIDED BY: PROPERTY LINE ADDEROSIONCON DRIVEWAY 3;1 I A' GRASSED / 09.23.2021 ROD EROSION CONTROL ANDERSON ENGINEERING & ASSOCIATES, P.�. 305 N. CHIPPEWA STREET 12' LUMBERTON, NC 28358 1 ! MINING 3:1 (910) 671-9530 - - ....... . 30' NOTES EROSION CONTROL NOTES: CONSTRUCTION SCHEDULE .'.-CATEGORY.':'.'.'.'-•,`.' AFf.ECTED.ACREAGE. 1: TREE55HALLF3EOFTH£ o SITE NO' ES ................................:...:..............:.. Winston- SPIrCIES MYRICA CERII=ERA Siem Greensboro Elizabeti7 city° + TRAILINGSISEDIMENT PONDS 0.22 TYPICAL BERM CROSS-SECTION A - A (WAX MYRTLE) OR • awilson 1. TOTAL AREA: _50 AC 1. EROSION CONTROL MEASURES ARE GENERAL IN NATURE. 1. FLAG CONSTRUCTION LIMITS. NTS APPROVED EQUAL. Durham STOCK PILES 0.25 Asheville *RALEIGHGreenville 2. ZONE: GENERAL USE± CONTRACTOR IS RESPONSIBLE FOR ADDITIONAL MEASURES AS 2, INSTALL SEDIMENT FENCE. • vase • Goldsboro 3. PROPERTY OWNER AND APPLICANT: REQUIRED TO PREVENT ON OR OFF SITE RUNOFF AND EROSION. 3. CONSTRUCT DRIVEWAY, INSTALL PIPE, INLET PROTECTION, AND RIP PROCESSING AREAINAUL ROADS 1.38 TIP OF BERM �, TREES SHALL BE 5 GALLON. Charlotte o RUFUS YOUNG CONSTRUCTION, INC. 2. ALL INLETS TO HAVE INLET PROTECTION INSTALLED IMMEDIATELY RAP APRON. MINE EXCAVATION 21.16 - Fayetteville 7126 CHAUNCEY TOWN ROAD AFTER INLET HAS BEEN CONSTRUCTED. 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE/EXIT & INSTALL GATE OTHER (EXPLAIN) Lumberton •Elizabe wn LAKE WACCAMAW, NC 28450 3. CONTRACTOR IS RESPONSIBLE FOR INSPECTION OF ALL EROSION AND WITH LOCK. BEES itevil 4 ALL ELEVATIONS ARE NAVD88. SEDIMENT CONTROL PRACTICES WEEKLY $t AFTER ALL RAIN EVENTS. 5. CLEARLAND, AND, STRIP & STOCKPILE LAYER OF TOPSOIL.O Wilmington TOTAL DISTURBED ACREAGE ....... .... . 5• THIS PROPERTY IS DETERMINED TO BE OUT OF THE 0.2%ANNUAL CHANCE NEEDED REPAIRS ARE TO BE COMPLETED IMMEDIATELY. REMOVE 6. CONSTRUCT BERMS FROM STOCKPILE OVERBURDEN. SCALE: 1 " FFLOOD PLAIN ACCORDING TO F.I.R.M.- AP # 3710939200J DATED ACCUMULATED SEDIMENT AND LEGALLY DISPOSE. 7. PREPARE BERMS FOR SEEDING, LIME, AND FERTILIZING. BUFFER'.'.':..'.'.'.`.' T•OTAL......aGIr'.'. 0 0 SIDE SLOPE �.'......................::..:..::........................... � o DRAWN BY: JANUARY 19, 2005. 4. TOPSOIL TO BE STORED ON -SITE; DURING CONSTRUCTION, PROTECT 8. COMPLETE SEEDING, LIME, AND FERTILIZING. ¢ ry OF BERM wwo 6. JURISDICTIONAL DETERMINATION IS BEING SOUGHT ATTIME OF STOCKPILE WITH SEDIMENT BARRIERS AND TARPS AS NECESSARY. 9. RESEED AS REQUIRED. UNDISTURBED BUFFER 0.00 L CHECKED BY: SITE e APPLICATION SUBMISSION. SPREAD TOPSOIL EVENLY OVER DISTURBED AREAS DURING FINAL 10. EXCAVATE & CONSTRUCT DEWATERING BASIN UNEXCAVATED BUFFER 3.84 o1n x y n„o �. I PROJECT NO.: Goa �s y° 7. EXISTING INSTALLATIONS (SUCH AS WATER MAINS/LINES, GAS GRADING. 11. BEGIN EXCAVATING. R° MAINSILINES, SEWER MAINSILINES, TELEPHONE LINES, POWER LINES, 5. EXPOSED SLOPES SHALL HAVE APPROVED GROUNDCOVER WITHIN 21 12. INSTALL DE WATERING PUMP TO DISCHARGE INTO DEWATERING TOTAL BUFFER 3.84 o o DRAWING FILE: y3� AND UTILITY STRUCTURES IN THE VICINITY OF THE WORK TO BE DONE) CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF BASIN.. � N 0 . ® � ` GRADING. ALL DISTURBED AREAS SHALL UL STABILIZED WITH 13. KNOCK DOWN BERMS AND DRESS UP AREA AROUND PIT. �^ FILE NO.: ARE INDICATED ON THI DRAWING ONLY TO THE EXTENT THAT SUCH �P INFORMATION HASPEEN MADE AVAILABLE TO OR DISCOVERED BY PERMANENT GROUND COVER WITHIN 15 WORKING DAYS OR 90 14. COMPLETE FINAL GRADING OF LANDS TO DRAIN INTO POND. t ^ SHEET NO ANDERSON ENGINEERING & ASSOCIATES, P.A. THERE IS NO GUARANTEE CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING 15. PREPARE AREAS FOR SEEDING, LIME, AND FERTILIZING. GRAPHIC SCALE oq� �. AS TO THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION. ALL CONSTRUCTION OR DEVELOPMENT. 51_E SEEDING CHART FOR 16. COMPLETE SEEDING, LIME, AND FERTILIZING. a 50 Ico zan qo© SUCH RESPONSIBILITY FOR 7H£ ACCURACY AND COMPLETENESS THEREOF DETAILS. 17. RESEED AREAS AS REQUIRED. ,00 PL N VIEW r0 WHI VI USy4,��4 Know what's below. otnwu Ta RO IS EXPRESSLY DISCLAIMED. 6. DURING TREE REMOVAL, CHIP ALL SUITABLE TREES, BRUSH AND 18. STOCK POND WITH FISH. ' 8, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL STUMPS, STOCKPILE CHIPPED MATERIAL AfID USE FOR MULCHING 19. WHEN SITE IS STABILIZED, REMOVE TEMPORARY SEDIMENT FENCE. TYPICAL BERM [ IN FEET) C:Elll before you d�.�. AND WJACKsa Y8 EXISTING. INSTALLATIONS. AND STABILIZATION._ . g. SURVEY DATA BY ANDERSON ENGINEERING & ASSOCIATES, P.A. 1 inch W 100 ft. (Horizontal) NTS O 2021 Anderson Erl Ineering & i. 0 JESSE L MALPASS DB 910 PG 595 PIN a BOGUS FARMS II (LLC) DB 508, PG 126 PIN IUNDARY I DISTURBANCE) KNOCK DOWN BERM & DRESS UP AREA AROUND PIT ESTABLISH PERMANENT GROUND a COVER WITHIN 21 DAYS OF FINAL GRADING ¢03J x �U_ l` D M m i rr r 1 10. 777 � l BOTTOM OF MINE\ D_ I J.0.00 U EXCAVATED 0 BUFFER INE BOUNDARY 1(21.16AC) i R l lfj ERMIT BOUNDARY - 1 i I A I l f 1f �25I0 A0� DI5TUR8AN� 1 $! j .• i i l I� �f '� O''Al� ENE I \ AREA TO BE PLANTED I l I j — --_ I: `: - '•' ' _ \ } i WITH TREES 1 11 \ I` f 1 wI MINE BOUNDARY 21.16 AC PERMIT BOUNDARY (LIMITS OF DISTURBANCE) 1 - _ 25.0AC - _ --- i 1 JESSE , v:. i .,m e.•.. .. _ i' L MALPASS- - r / J 4 �_ ,. - • RAH LEE SMITH DB 910 PG 595 SA. _ _ _ ��__- ...... • . ..,.� � � 1 , .. EXIST. DITC _ ,, .•... DB 374, PG 544 PIN PI N 1 _ 1. l 11 i XIST. DITCH `r.51it `"'"-''� JESSE L MALPASS -+. DB 910 PG 59577 PIN 173 r 't . ! EXIST. DITC � / 70-9 r —Loa_ ----- __ — La O q > ¢ �`� 0.9 _ _a 50 UNEXCAVATED BUFFER Z � Z z I La O m o � -. 50' 40' HAUL ROAD 10' o z m w-- LLI wix OPE @ 2.0% SLOPE @ .0% MAX. MAX. APPROX.7.0` FINAL FINAL APPROX.7.0' ESTABLISH PERMANENT _ 21 GROUND COVER WITHIN DAYS OF FINAL GRADING. 3:1 3;1 _ 3'1 Q fl CROSS-SECTION B - B AFTER RECLAMATION NTS CROSS-SECTION C - C APPLICANT: AFTER RECLAMATION RUFUS YOUNG CONSTRUCTION, INC. NT5 7126 CHAUNCEY TOWN ROAD a LAKE WACCAMAW, NC 28450 0l ara w:e� TOPOGRAPHIC SURVEY PROVIDED BY: coI 30' CHANCE ANDERSON ENGINEERING & ASSOCIATES, P.A. LU UNEXCAVATED BUFFER a r OF THE 0.2% ANNUAL 3p5 N. CHIPPEWA STREET 43710939200JDATED LUMBERTON, NC 28358 FINAL APPROX. 7.0' ESTABLISH PERMANENT KiD iiiY SOUGHT AT THIS TIME I 1 (910) 671 �-9530 GROUND COVER WITHIN 21 DAYS OF FINAL GRADING. " 2 MAINSILINES, GAS _ 3.1 LOPE TOWARDS POND ,s Knorr what be1.011. HONE LINES, POWER LINES, OF THE WORK TO BE DONE) }` Cal before you d:g.. i THE EXTENT THAT SUCH TO OR DISCOVERED BY r.A. THERE IS NO GUARANTEE GRAPHIC SCALE 3F SUCH INFORMATION. ALL AND COMPLETENESS THEREOF — "- — — — — — — — too o so NO zoo aoc a ONSIBLE FOR LOCATING ALL CROSS-SECTION D - D (IN FEET } i &ASSOCIATES, P.A. AFTER RECLAMATION al) I inch =100 it. (Horizontal} NTs A RT 305 N.~Chippewa St Lumberton, NC 28: Office: (910) 671-9 Fax: (910) .618-08 Email: andersonengineerin. pa[a Licensure #: C-07 Z ME ZO . " C ^�:, ILL z L� F �� oc V J U z z z_ Uj L LLdo a ,ti,ti riri :a SEAL r r 13325 07 G,I,N,E`r Q AND The creation of authorship contained in thls but. not limited to all design, text, speufca are owned, except as otherwise expr Anderson '£ngineering & Associates, P-A. by copyright and other intellectual property I may not tie copied, reproduced trans distributed, sub- licensed, altered, ubiized. fc otherwise used in any manner without consent of Anderson Engineering & Assoc. to the extent that such use constitutes "fi Copyright Act of 1976 (17 U.S.C. 6M7), as owner may keep one up- altered pormaner for intended project use only. RECLAMATION ISSUE DATE. 08.19.202 1 No. DATE REASON Q 09, 1.262, OWNER REVISION MOVE PERMIT BOUNDAR` REPLACE DRIVEWAY PIPE Q 04.23.2021 SCALE: "- DRAWN BY: CHECKED BY: PROJECT NO.: DRAWING FILE: - FILE NO.: SHEET NO. © 2021 Anderson Fn•9inpering & i TURFING SCHEDULE 1 All disturbed areas shall be dressed to typical sections and plowed to a depth of S. inches. The top two inches shall be pulverized to provide a uniform seedbed. NOTE: LiI`pe should be applied with necessary equipment to give uniform distribution of these materials. The hand -bucket method is not acceptable, 2. The following are rates and kinds of these materials to be applied PER ACRE: Select a temporary AND permanent seed mixture based.upon the dates of seeding. Temporary Seeding: SPECIES RATE PER ACRE DATES Rye (grain) 120 lbs. Aug. 15 - Apr. 15 Kobe Lespedeza 50 lbs. Dec.1-Apr. 15 German Millet 40 lbs. Apr. 15 - Aug. 15. 10-10-10 Fertilizer 750 lbs. Dec. 30 - Aug. 15 1000 lbs. Aug. 15 - Dec. 30 Ground Agricultural Limestone 4000 lbs. Jan.1 - Dec. 31 Permanent Seeding: SPECIES RATE PER ACRE DATES Tall Fescue 5ept.1 - Oct. 31 (blend of two or three improved varieties 200 lbs. or Feb. 15 - Apr. 30 Rye (grain) 25 lbs. 5ept.1 -• Oct. 31 or Feb. 15 - Apr. 30 Centipede .Grass 20 lbs. March - June 10-10-10 Fertilizer 1000 lbs. Sept.1 - Oct. 31 or Feb. 15 - Apr. 30 Ground Agricultural Limestone 4000 lbs. Sept.1 - Oct. 31 or Feb. 15 - Apr. 30 3. Seeded area shall be cultipacked to firm seedbed and to cover seed. 4. Grain straw shall be applied over seeded areas as mulch. No bare ground shall be visible in the mulch area if proper installation 1s achieved. -Thick clumps of straw are not permissible as uniform coverage is expected. Straw shall be applied at a minimum of 4,000 lbs. per acre. 5. The mulched area shall be tacked with liquid asphalt sufficent to hold straw in place where necessary. 6. Ditch treatment shall be used in areas where steep grades could cause ditch erosion. Use of Jute mesh, excelsior matting or fiberglass roving is acceptable. Ditch treatment should be installed AFTER mulching operation. 7. Temporary ground cover on perimeter dikes, swales, ditches, and slope5 shall be seeded, fertilized, and mulched sufficient to prevent erosion within 7 calendar days of completion of any phase of gradi 8. Temporary ground cover on slopes 3:1 or flatter that are less than 50 filet in length and all other disturbed areas with slopes flatter than 4:1 shall be seeded, fertilized, €1nd mulched sufficient to prev erosion within 14 calendar days of completion of any phase of grading: 9. Permanent ground cover sufficient to restrain erosion should be provided on all areas disturbed during.this project within 15 working days or 90 calendar days, whichever period is shorter, following completion of construction. MAINTENANCE SCHEDULE: 1. All erosion and sediment control practices will be checked for stability and operation following every storm event, but in no case, less than once every week. Any repairs or cleaning necessary to maintain erosion and sediment E control practices -shall be completed immediately. Record of weekly inspection reports are to be completed by the site superintendent and maintained on site. 2. All seeded areas will be re -fertilized, re -seeded as necessary and mulched according to the Turfing Schedule. 3. Maintain all measures as per detail sheet requirements and in accordance with manufacturer's recommendations. 1 TURFING SCHEDULE n".. nrrn n,nnnn 9" CLASS B RIPRAP #57STONE PIPE FLOW r 5' PIPE INLET PROTECTION MAINTENANCE: 1. INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. 2. WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. 3. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. 4. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. 111 d5o 3" d5o=3"0 dMAX 5 >ii APRON - ZERO GRADE dMAx = 5">� CLASS B RIPRAP CLASS B RIPRAP Z FILTRATION QO EOTEXTILE COIR FIBER r� O BAFFLE F�l A A O CLASS A STONE A STEEL POST A A r- O N Lrt tD ERTO ............... 4' (MAX) I -STONE ENERGY ,. ,W„ -� - --- 305 N. Chippewa Street a PLAN PLAN O DISSIPATOR a Lumberton, NC 28358 Office: (910) 571-9530 Fax: (910) 618-0838 .. .... ... ... it ll - it 18" RCP L - z w" MIN. Email: 24° "� 12' NO OVERFALL andersonell ineerin a@gmail..com -RISER a.ndersonengine.erinLgpa@gmail..com Licensure #: C-0793 6„o PVC NO OVERFILL _.. =- _ -_ _ - � :III=1I I=�1=1I1=�_I� EARTH DIKE I :I I I-III=1 I I -III I I1-1 11=III-III-I I III-P-11- _ _ =1 11=1 I I=1 11111=111= I I I=1 I I 11 i I =T-III-I I I_� i I I- - I PLAN .I I I-III=III=fII-I LI III=III--1 ! 1=1 I _ _ -1 I I I I I I I I I I I I I IIII I I l I I I 1 11 I I I I I I I 1# I! 1 I I TI I I FILTER FABRIC SECTION A -A FILTER FILTER BLANK BRIC OR SECTION A -A OR FILTER BLANKET 6„ L�1J V RIPRAP APRON MAINTENANCE ' 1.O * 1.0. 1. INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT I �2 (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION 33 - 31 Z RIPRAP APRON MAINTENANCE AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE 1. INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT BEEN DISLODGED. MAX - - Z J (1/2 INCH OR GREATER) RAINFALL_ EVENTS TO SEE IF ANY EROSION 2. IMMEDIATELY MAKE ALL REPAIRS TO PREVENT FURTHER DAMAGE. UNCLA55iFIED AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE EARTW MATERIAL � ANTI. -SEEP O � �" BEEN DISLODGED. COIR FIBER BAFFLE STEEL POSTS COLLAR I 2: IMMEDIATELY MAKE ALL REPAIRS TO PREVENT FURTHER DAMAGE. VARIABLE U. Q ed TYPICAL SECTION VIEW Z 3 RIP RAP APRON #1 6 RIP RAP APRON #2 Q U WITH PIKE OUTLET TO FLAT AREA WITH NO WELL-DEFINED CHANNEL NTS WITH PIPE OUTLET TO WELL-DEFINED CHANNEL NTS GENERAL NOTES: DETERMINE BORROW PIT DEWATERING BASIN SIZE USING V = 8.0203 * Q * T WHERE V IS VOLUME (FT3), 15 PUMP FLOW 0- O O D RATE (GPM), AND t IS DEWATERING TIME (HRASE MAXIMUM FLOW RATE OF 1000 GPM AND A MINIMUM DEWATERING TIME OF 2 ! ( U Z m BARROW PIT SIZING Z W O5TS MAX. 8' APART _ RISER SHALL BE A NON -PERFORATED, SMOOTH OR CORRUGATED J MATERIAL WITH A FLASHBOARD OPTION. V=8.0203QT _ SUPPORT WIRE .,.� J 1411 CONSTRUCT THE COIR FIBER BAFFLE IN ACCORDANCE WITH 0 V=16,040.60 CF ROADWAY STANDARD DRAWING 1640.01 AND WITH'MATERIAL � O W (�j ng, - THAT MEETS THE SPECIFICATIONS OF ROADWAY STANDARD Q 500 GPM FILTER w GRAVEL 1060-14. T = 4 HRS. or ent FABRIC u w u 1 PROVIDE T STEEL POSTS OF THE SELF -FASTENER ANGLE STEEL 1 "` TYPE. INSTALL STEEL POSTS WITH NO MORE T14AN T OF THE POST STORAGE VOLUME DRAWDOWN TIME m CC APPEARING ABOVE GROUND. m z = x 'A 'ATTACH THE COIR FIBER MAT TO THE STEEL POSTS WITH WIRE OR NUMBER OF ORIFICES 1 o w - I I- I - TT H T Co 0.60 rn g z _ _ OTHER ACCEPTABLE MEANS AND STAPLED INTO THE BOTTOM AND -� w tD w : 5 SIDE SLOPES OF THE BASIN WITH 12 STAPLES. O 2.0 IN s1� z-I A ©.Q25F pf COMPACTED _ I -I III I I I---- I- I I-- BASIN AT TYPE T AS SHOWN N THEIDETAI SLOPES AND BOTTOM OF g 3.2 2 FT/SEC' SOIL -�� _ _ ELEVATIONouERF�.aw 113.50FT - I I Imo- I=I I -I I I III -III USE THE TYPICAL SECTION SHOWN FOR THE BORROW PIT ELEVATIONINVERT = 110.00FT -I IPLd-- 1 -- - --�-- DEWATERING BASIN AS A GUIDE. THE BASIN MAY HAVE ANY TYPE Ho = 3.00 zCONFIGURATION AS LONG AS SUFFICIENT VOLUME IS PROVIDED AND PROVISIONS ARE MADE FOR A NON PERFORATED RISER. Ho/3 = . 1.00 , I- - I - - - HE EARTH DIKES REQUIRED - - - - CFS I: I III 111 I I III .- ���� 1�� ��8�_, . ir, o en - TEMPORARY POOLyoI unts = i 1,507.000E t ...1 a-_ .. ., , ., k ; '� 4 � j I I I I I R �, r .... - 17EWAT�A N ,....- Z.87HR. _ _. B D TIMEm _ ,. ,. THE BORROW PlT DEWATERING ASIN SIZE l5 VARIABLET N I-1 1 1A- 'DEPENDENT ON SPECIFIC SITE RE UlREMENTS AS WELL AS QPROPOSED CONSTRUCTION OPERATIONS. �, �".��,`'� 5s,o� F SUBMIT THE SIZE LOCATION AND RISER PIPE MATERIAL FOR APPROVAL PRIORTOCONSTRUCTION. C _ 4 SEAL r 13325 Z xC Y) RUMP THE EFFLUENT INTO TH1=BORROW PIT DEWATERING BASIN I �`' p TO A MAXIMUM DEPTH OF 6 IN. BELOW TOP OF EARTH DIKE. ;,'� ` LNG i N e C9 y SEDIMENT FENCE MAINTENANCE ,�' 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. PROVIDE A STONE ENERGY DISSIPATER PAD AT THE OUTLET OF ''�,,,W •rrAi149,,.o 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. ACCORDANCE WITH ROADWAY STANDARD DRAWING 875 BARREL IN REPLACE BURLAP EVERY 60 DAYS. OUTLET W/O DITCH. i 3.. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. ; i The creation of authorship contained in this drawing Including 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER but not limited to all design text, specifications and images, are owned, except as otherwise expressly stated, by THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. Anderson engineering & Associates, P.A. and are protected by copyright and other intellectual property laws. This drawing may not be copied, reproduced, transmitted, displayed, distributed, sub- licensed, altered, utilized for other projects or otherwise used in any. manner without the prior written consent of Anderson Engineering & Associates, P.A., except to the extent that such use constitutes "fair use" under the NTS 4 SEDIMENT FENCE DETAIL NTS 7 BORROW PIT DEWATERING BASIN DETAIL NTS Copyright Act of 1976 (17 U.S.C. §107), as amended. Project owner may keep one un- altered permanent copy to be used for Intended project use only. *IFTHE TEMPORARY SEDIMENT I CROSS -SECTIONS BASIN WILL BE CONVERTED TO A EXTEND 9 GAUGE WIRE TO BASIN PERMANENT STORMWATER BASIN SIDE OR INSTALL T-POST TO ANCHOR OF GREATER DEPTH, THE BAFFLE BAFFLE TO SIDE OF BASIN AND SECURE & DETAILS HEIGHT SHOULD BE BASED ON THE TO VERTICAL POST. POOL DEPTH DURING USE AS A TEMPORARY SEDIMENT BASIN. 4' MAX. I DRAPE BAFFLE MATERIAL OVER I. WIRE STRAND & SECURE WITH ISSUE DATE. 8.19.2021 PLASTIC TIES & ON WIRE EVERY 121i 50'NO. 11ATl REASON MIN. OWNER REVISION VARIABLE NOTE: INS TALL THREE (3) COIR FIBER BAFFLES IN BASINS AT o9.a1.zo2i i 9 GAUGE MIN. HIGH MOVE PERMIT BOUNDARY TO FRONT OF LOT TENSION WIRE STRAND DEPTH DRAINAGE OUTLETS WITH A SPACING OF 4 THE BASIN ADD RIP RAP APRON, AND PIPE INLET PROTECTION 3 MIN. 2 09,23,2021 DETAILS SHALL BE SECURED TO LENGTH. TWO (2) COIR FABRIC BAFFLES CAN BE POST TO SUPPORT BAFFLE MATERIAL INS PALLED IN THE BASINS LESS THAN 20 FT. IN LENGTH WITH. A SPACING OF Y THE BASIN LENGTH. SECURE BOTTOM OF BAFFLE TO GROUND BAFFLE ! - WITH STAPLES AT 1 2" MAX. SPACING EARTHEN (TYP) o z BAFFLE MATERIAL CROSS-SECTION OF A POROUS BAFFLE EMBANKMENT TLET CLASS I RIPRAP MAINTENANCE: 6" MIN. 1. INSPECT BAFFLES AT LEAST ONCE A WEEKLY AND THICKNESS2-3 INCH. STONE PLACED BAFFLE AFTER EACH RAINFALL. MAKE ANY REQUIRED ON FILTER FABRIC MATERIAL REPAIRS IMMEDIATELY. 2. MAINTAIN ACCESS TO BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, i. SCALE: NTS DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT GRAVEL CONSTRUCTION ENTRANCE/EXIT MAINTENANCE: DRAWN BY: RT 11 GAUGE PROMPTLY. 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TOPREVENT MUD OR SEDIMENT. LANDSCAPING 3, REMOVE SEDIMENT DEPOSITS WHEN IT REACHES CHECKED BY: LWA STAPLE FROM LI=AVING THE CONSTRUCTION SITE. ' HALF FULL TO PROVIDE ADEQUATE STORAGE INLET ZONE 2. PERIODIC TOPDRESSING WITH 2" STONE: PROJECT NO:: 1832 VOLUME. TAKE CARE TO AVOID DAMAGING BAFFLES 25% OF SURFACE AREA 3, AFTER EACH RAINFALL, INSPECT ANY USED TO TRAP SEDIMENT DRAWING FILE: � 1832 DURING CLEANOUT. SEDIMENT DEPTH SHOULD FIRST CHAMBER AND CLEAN IT OUT AS NECESSARY, NEVER EXCITED HALF THE DESIGNED STORAGE 25% OF 5URFACE AREA 4. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR FILE NO.: 1832 STEEL POSTS DEPTH. z'-D"DEPTH 4. AFTER THE DRAINAGE AREA HAS BEEN STABILIZED, SECONO CHAMBER TRACKED ONTO PUBLIC ROADWAYS. r REMOVE ALL BAFFLE MATERIALS AND UNSTABLE 2S/a OF SURFACE AREA SHEET NO. OUTLET ZONE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, �' OF SURFACE AREAIIr AND STABILIZE. 25 se i NTS 8 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT i 2 TEMPORARY PIPE INLET PROTECTION NTS COIR POROUS BAFFLE DETAIL