DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
24-30 1 Project Acti!7t
OUT BY DEMLR
Modification Transfer Release
Applicant Name:
Rufus Young Construction, Inc.
Li
Li
1-1
Applicant's Email:
patman0482@gmail.com
County:
Columbus
Project Name:
Whitehall Road Mine
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
34.382703
Longitude:
-78.596041
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 10/25/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS? NCG020988
✓
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
F I
✓
Comments: DWR has reviewed the application and found that the closest water bodies are Spring Branch and Bogue Swamp. These watercourses are
greater than 2000 ft from the mining permit area, and DWR does not have concerns regarding water quality as proposed.
Does this mine (or previous owner) have DWR back fees to pay?
I
L
I./
(If Yes, amount):
Watershed/Stream Name & Classification:
Spring Branch Stream Index: 15-3-1 Class C; Sw From source to Bogue Swamp. Lumber River Basin.
DWR Compliance Status of Mine:
N/A
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
I
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑
I
❑✓
Is a wetland delineation required prior to DWR issuing the permit?
I
El
I
✓
JD
Consultant
Onsite
❑
❑
Offsite
❑
❑
Stream Determination Needed?
1
❑
1
❑✓
Stream Determination Completed?
I
❑
I
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
❑✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
1,(I
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
❑✓
Has Violation
O&M Requirements
HQW/7Q10 Concerns
El
Pay back fees or renew DWR permit
❑
Other
❑
Please describe the reason to hold the permit:
RO contact:
I
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed by
Central Office Date Regional Office
Z
Date
DWR RO Surface Water I Megan Faulkner & Holley Snider
10/20/2021
RO Aquifer Protection Section