Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20220329_Mine_maps
U.S. HIGHWAY 421 _ . - . -- - - EXIS77NG 2550 _--- _ UBNIDIRB Efftm 71 EXIS77NG F£MA FLOODWAY EXIS77NG F£MA ,� � • \ ' � ---ago-- � `\ /� CLEANWATER DITCH TO BE FULLY / 100 - YEAR ESTABLISHED WITH INTO GRASS FFER PRIOR .0y NI / / % / / F100OPLV TO DISCHARGING INSTALL CHECK DAM /` / //% // •/ / \ \� PRIOR TO CHARGE INTO BUFFER / // / / / / • \. RIP -RAP APRON / / EXISTING FE ww D50 = 15" j / S7RGW BUFFER MIN. DEPTH = 36" FILL AREA WIDTH =VARIES / / I (STAGE 5 FILL GRADING) a LXIS77NG 25 UNDISTURBED BUFFER Ll% BREAK SILT FENCE AT NEW \� I I CLEANWATER DITCH LOCATION WHEN DIVERSION , IS COMPLETE L / x; /�. N ISRAP J/ \ f '"p INLET EXIS77NG PROTECTION \y�7 f / 7REELIN£�a lro EXISANG FEMA / I DOUBLE WALL r 0 764 I IX/577NG POLISHING AST -I - V � � I EXIS77NG S17F FENCING - DO NOT DISTURB PS �. JO' VUC PRIVA7F ACCESS EASEMENT \ PROPOSED / \ CLEANWATER DITCH \ J ONCE FINAL GRADES ABOVE JTf SEDIMENT SUMP \ v AREH HAS BEEN FULLY / STABILIZED 75b - �-!7O 100 EXIS77NG 400 RCPnCULVERT 1 • ` ` • ` / / T •` PS / / FLOODPLAIN PROPOSED 4"0 SDR 35 ` O 780-- �- PVC PUMP LINE FOR s - / -- STAGE 5 GRADING, '" yC�_ I / \� `X p� 24-WIDE EXISANG /-� GR\ LIMITS OF DISTURBANCE HAUL UEL ACCESS ROAD ^\ ` �i / 8.35 ACRES / -� y;> ------ �- KESTER MILL ROAD ---------- -- _ . ------_-----. 90----_____—--_-----..--- _- / \ I CX/S77NO PROPOSED PUMP 25'-UNDI57URBED LOCATION FOR \ I / GRADING BUFFER \ -_ _ OPERATION; i \ I I REFERENCE 1. EXISTING SITE BOUNDARY AND TOPOGRAPHICAL INFORMATION PROVIDED BY VULCAN MATERIALS COMPANY, INC. ON AUGUST 2, 2021. PROPOSED SEDIMENT SUMP FOR PHASE 5 GRADING OPERATIONS GENERAL NOTES LEGEND 1. SEE SHEET C001 FOR GENERAL NOTES. PROPERTY LINE 2. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS EXISTING FEMA 100-YEAR FLOODPLAIN CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. IT IS NOT THE ENGINEER'S INTENT THAT ANY SINGLE PLAN EXISTING FEMA FLOODWAY SHEET IN THIS SET OF DOCUMENTS FULLY DEPICT ALL EXISTING 50-FT STREAM BUFFER WORK ASSOCIATED WITH THE PROJECT. - - EXISTING 25-FT UNDISTURBED BUFFER EXISTING STREAM PHASE 3 CONSTRUCTION SEQUENCE EXISTING TREE LINE C 1. CONTINUE FILL OPERATIONS UNTIL FINAL GRADES ABOVE SEDIMENT SUMP ARE REACHED. EXISTING CHAIN -LINK FENCE a EXISTING EDGE OF PAVEMENT 2. ONCE FINAL GRADES ABOVE THE SEDIMENT SUMP ARE REACHED, CUT IN CLEANWATER DITCH. CONTRACTOR SHALL EXISTING UNPAVED ROAD PROVIDE NA GREEN S250 MATTING IN DITCH AND PROVIDE c PERMANENT SEED/GRASS ACCORDING TO SEEDING EXISTING INDEX CONTOUR SPECIFICATIONS, SEE SHEET C800 DETAIL NO. 6. eDNTIEDwa�Ge�ITIe� . i1 N 3. PROVIDE PERMANENT SEEDING/GRASSING ON AREA ABOVE � SEDIMENT SUMP SEEDING SPECIFICATIONS, SEE SHEET PROPOSED TREE LINE C800 DETAIL NO. 6. - PROPOSED STORM SEWER LINE L 4. ONCE AREA ABOVE SUMP HAS BEEN FULLY STABILIZED 720 PROPOSED INDEX CONTOUR THE SEDIMENT SUMP WILL BE FILLED IN. 722 PROPOSED INTERMEDIATE CONTOUR cc 5. ONCE FILLED IN PROVIDE PERMANENT SEEDING/GRASSING PER PERMANENT SEEDING SPECIFICATIONS, SEE SHEET _i...--�...�...- PROPOSED DRAINAGE DITCH C800 DETAIL NO. 6. . • . , . , LIMITS OF DISTURBANCE 6. ONCE SITE HAS BEEN FULLY STABILIZED EROSION CONTROL MEASURES CAN BE REMOVED. -- - X PROPOSED SILT FENCE n p$ PROPOSED PERMANENT SEEDING RECEIVED MAR 2 9 2022 LAND QUALITY MINING PROGRAM BEFORE YOU OIC31 CALL 1-800-632-4949 N.C. ONE -CALL CENTER rrS THE LAWI SALE INFE�� AN ��J••,.' 3.29 0 60 120 NORTH CAROLINA BOARD Of EXAMINERS FOR ENGINEERS AND SORV YORS LICENSE NO C-30:- o© U 4 N T. ry R { i N O m E '1 O oz Fo \I of jd j CT �TJ i•1 U � m U 0 fJ N z m 3 m 0 $ - 4 C 0 z ti m o M F w < z u C d W O o u C ti LL a Q M of x Q' t � O z z a C o z 3 x 0 w SHEET NUMBER C302