HomeMy WebLinkAbout20220329_ADI_ReceivedMarch 29, 2022 Adam Pan-, PE NCDEQ Assistant State Mining Engineer 1612 Mail Service Center Raleigh, NC 27699-1612 Dear Mr. Parr: Subject: Vulcan 421 Quarry Forsyth County Mining Permit Number 34-01 CEC Project 314-511 Civil&Environmental Consultants, Inc. RECEIVED MAR 2 9 2022 LAND QUALITY MINING PROGRAM Per NCDEQ review comments dated March 24, 2022 for the subject project, CEC is providing the following responses. Each comment is listed below and responses are in Italic. The additional information letter dated December 21, 2021, item 15, requested that additional details including testing and reporting procedures be provided to achieve a minimum 90% standard proctor. In your February 11, 2022, response to the December 21, 2021, additional information letter it was stated that since this activity is not for construction purposes as a structural fill, engineered compaction of the fill was not warranted. On Sheet C302, item I of the Phase 3 Construction Sequence, states that "Fill material shall be compacted to a min. 90% standard proctor." Please clarify your intent for compaction. Please provide details on how a 90% standard proctor will be achieved over the entire fill as stated on the mine maps. . Res onse: Phase 3 Construction Sequence on Sheet 302 has been revised. The 90% compaction specification has been removed from note #1. The fill material will be placea in controlled lifts and compacted with reasonable effort and equipment to provide a stable, firm surface. No testing, reporting, or specification is required for the fill placement. 2. The February 11, 2022, response to item 15 states that "differential settlement should not be a concern." Please provide proof through engineering calculations that differential settlement will not occur to cause small pools as referenced in N.C.G.S. §74-53 (4). Response: Any partial or final fill placement activity will ensure that the fill area has a crown elevation with positive drainage away from the crown at a minimum of 3%slope, to avoid ponding or pooling occurring because of settlement of the fill material. In addition, the Owner shall conduct periodic inspection as needed and, if needed, repair of the surface of thefill placement to maintain positive drainage and prevent ponding/pooling. Following 3701 Arco Corporate Drive, Suite 400 1 Charlotte, NC 28273 1 p: 980-237-0373 f: 980-237-0372 1 www.cecinc.com NCDEQ CEC Project 314-511 Page 2 March 29, 2022 reaching final fill elevations, Owner shall conduct an inspection of the surface annually for three years or until an inspection concludes that repair of the surface to prevent ponding/pooling is not needed, whichever is less. Should you have any questions or require any additional information in support of this review please do not hesitate to contact us at 980-237-0373. Sincerely, CIVIL & ENVIRONMENTAL CONSULTANTS, INC. Matthew Johnson Assistant Project Manager Nathan Bivins, PE Project Manager III Civil & Environmental Consultants. Inc.