Loading...
HomeMy WebLinkAbout20220214_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: SECTIONTHIS TO BE OUT 78-50 Project Action New BY DEIVILR Modification Transfer Release Applicant Name: Autry Grading, Inc X Applicant's Email: mrmorgan@autrygrading.com County: Robeson Project Name: Parkton Borrow Pit YES NO Date Commencing Have land disturbing activities started?? X L 12/18/2019 Latitude: 34.93880 Longitude: -79.03160 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 03/03/2022 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? i Is the RO concerned that the operation, as proposed, would violate standards of water quality? X Comments: Does this mine (or previous owner) have DWR back fees to pay? El (If Yes, amount): Watershed/Stream Name & Classification: Rockfish Creek; B DWR Compliance Status of Mine: 401 Wetland Cert. required? L1 I Q 401 Wetland Cert. existing? I 0 (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑X Central Coastal Plain Capacity Use Area (CCPCUA). Required? Central Coastal Plain Capacity Use Area (CCPCUA). Existing? (If Yes, Permit #): Does DWR RO have enough information to determine if a CCPCUA is required? Is an O & M Plan needed? I El Are wetlands disturbed at this site? 0 Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD Consultant Onsite Offsite Stream Determination Needed? El X Stream Determination Completed? x I ❑ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑X Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? Buffer Determination Completed? Recycle system permit existing? (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? LI I i< 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ El Has Violation O&M Requirements El HQW/7Q10 Concerns Pay back fees or renew DWR permit El Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? (- CentralOffice Date Regional Office I Date DWR RO Surface Water Chad Turlington 02/14/2022 RO Aquifer Protection Section Rev November 2021 r0