HomeMy WebLinkAbout20220214_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS TO BE OUT
78-50 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
Autry Grading, Inc
X
Applicant's Email:
mrmorgan@autrygrading.com
County:
Robeson
Project Name:
Parkton Borrow Pit
YES
NO
Date Commencing
Have land disturbing activities started??
X
L
12/18/2019
Latitude:
34.93880
Longitude:
-79.03160
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 03/03/2022
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
i
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
X
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
El
(If Yes, amount):
Watershed/Stream Name & Classification:
Rockfish Creek; B
DWR Compliance Status of Mine:
401 Wetland Cert. required?
L1
I Q
401 Wetland Cert. existing?
I 0
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑X
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
Is an O & M Plan needed?
I
El
Are wetlands disturbed at this site?
0
Does DWR RO suspect or know of nearby wetlands to the site?
X
Is a wetland delineation required prior to DWR issuing the permit?
X
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
El
X
Stream Determination Completed?
x
I
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑X
Rev November 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
Buffer Determination Completed?
Recycle system permit existing?
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
LI
I
i<
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
El
Has Violation
O&M Requirements
El
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
El
Other
Please describe
the reason to
hold the permit:
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
(-
CentralOffice Date Regional Office I Date
DWR RO Surface Water
Chad Turlington
02/14/2022
RO Aquifer Protection Section
Rev November 2021 r0