Loading...
HomeMy WebLinkAbout20170418_Mine_Mapst NDEX LOCATION MAP NOT TO SCALE r._ w'10 c,afi r _1 2- Ash JI11 s ... ft5] I, L'nb.i4iIlag � @�Irrrlore -,* bet r t caxer�i n Ia r�1 inei'- IIti I' -Ines 01k I'alp, .: I I�Frtlar. ;.. a Bldg, tt.l4 i :r-a fe 1 ,:mvrS� VICINITY MAP NOT TO SCALE MORSE PARK M N NG/-)REDGE PERM IT MOD F CAT ON BPOWN CONSULTANTS, PA ZJ BEN LIPPEN SCHOOL RD SUITE 202 ASHEVILLE NC 28806 PHONE: 828.350.7683 FAX: 828.350.7684 . •l.:t Ii-•I ti-W cl-64 N 0 MAGNETIC FOR 0 A- /< PERMIT NO.: 81-10 PREPARED FOR: Town of Lake Lure P.O. Box 255 Lake Lure, North Carolina 28746 Phone: 828.625.9983 Contacts: Ron Nalley, Town Manager Dean Givens, Director of Lake Operations SOIL EROSION AND SEDIMENT CONTRO1410TES: 1. Provisions to prevent erosion of the soil from the site shall conform to the requirements of the "North Carolina Sedimentation Pollution Control Act of 1973" as shown herein and stipulated in the "Erosion and Sediment Control Planning and Design Manual" by various agencies within the State of North Carolina. Installation shall be in a manner so as to minimize erosion of the disturbed areas and prevent sediment from leaving the site. 2. All disturbed areas to be grassed as soon as construction phases permit. The erosion control measures detailed hereon shall be continued until permanent drainage structures have been installed and until vegetation on planted shoulders and slopes is scfficiently established to be (ineffective erosion deterrent. The sediment - removed from the control structures shall be evenly distributed outside construction limits. Disposed sediment shall 5e permanently grassed. 3. Temporary and permanent vegetative cover shall be installed in accordance with the requirements of chapter 6, section 10 and 11 of the "Planning and Design Manual" as described in note no. 1 above. 4. The contractor shall not restrict the use of silt fences or any other means of erosion control to the locations shown on these plans. Moreover, the contractor should constantly be aware of minimizing soil erosion and use erosion control means accordingly. The contractor shall promptly repair, improve or add erosion control measures as. required by the local reviewing agency. 5. Divert all runoff to the erosion control devices shown on the drawings. 6. Sediment and erosion control measures and practices to be inspected daily. Devices shall be maintained so they function properly at all times. 7. Disturbed areas left Idle for five (5) days, and not to final grade, will be established to temporary vegetation. Disturbed areas left idle for two weeks or more will be established to permanent vegetation. All areas to final grade will be established to permanent vegetation immediately upon completion. S. Erosion and sediment control devices must be installed and inspected prior to any grading on site. Please call the appropiate permitting agency with enough lead time for an inspection to rneet your schedule. 9. Additional sediment control measures may be required by the appropriate permitting agency. 10. The escape of sediment from the site shall be prevented by the installation of erosion control measures and practices prior to, or concurrent with land -disturbing activities. 11. Maximum cut and fill slopes shall be two (2) foot horizontal to one (1) foot vertical. 12. Erosion control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source. 13.When hand planting, mulch (hay or straw) should beuniformlyspread over seeded area within 24 hours of seeding. 14. Mulch will be used as a temporary cover. On slopes that are greater than 2:1 mulch, if used, will be anchored. 15. Land Disturbance Permit must be displayed on site at all times during construction and in plain view from a road or street. 16. Sediment/erosion control devices must be checked ai�ter each storm event. Each device is to be maintained or replaced �I, f sediment accumulation has reached one half the capacity of tale device. Additional devices must be installed if new channels have developed. PROJECT DESCRIPTION The purpose of this project is to redesign and improve an existing dredge disposal site located in Lake Lure, NC. 24—HOUR EMERGENCY CONTACT: Dean Givens 828.447.1825 BEFORE YOU EAGI CALL 1-800-632-4949 N.C. ONE -CALL CENTER ITS THE LAW[ BROWN CONSULTANTS, PA 30 BEN LIPPEN SCHOOL RD SUITE 202 ASHEVILLE NC 28806 PHONE: 828.350.7683 FAX: 828.350.7684 DESCRIPTION SHEET NO. Cover 1 Overall Plan 2 Plan & Cross Sections 3 Reclamation Plan 4 Erosion Control Details 5 REVISION AND]SHEET NO. DESCRIPTION DATE ISSUE NO. 1. 1 4 1 Added per 3/7/2017 Comments April 2017 Morse Park Mining/Dredge Permit Modification for Town of Lake Lure Rutherford County, NC INFORMATION BLOCK REF: PERMIT NO.: 81-10 RECEIVED APR 18 2017 LAND IIUALIT'r MINING PROPQ , ,%`' BROWN CONSULTANTS, PA po 30 BEN LIPPEN SCHOOL RD SUITE 202 ASHEVILLE NC 28806 PHONE: 828,., 350.7683 FAX: 828.150.7684 Project No. 160C-36 Date: JANUARY 2017 ,Y4t1U, I N CA Y ~•• / % O W L �¢ ` Sheet 1 of 5 GH ) r"' I 2bIUNtAUAVAItU \� \ &UNDISTURBED BUFFER DREDGE PERMIT BOUNDARY (57.86 AC) „LAKE LURE- .. UMIITS OF PROPOSED LIMITS OF PROPOSED DREDGING: 57.86 AG <EDGING MINING AREA (INCLUDING ACCESS ROAD)_ 16 80 AC is 69 AC) ITOTAL PERMITTED ACREAGE: 68.66 AC LIMITS Of H 1 �3 4 , _. DREDGE I-1AYNES HILL ALI"" 4 I - --- PROPOSED - h LIMITS OF PROPOSED \ \ / ESTATE LLC - HUG' COL t )' _ - - GLORIA MEYER & DREDGING' "r PERMIT DREDGING 48.69 AC ./ \ - x I i mot, '' d \ ( ) �\ \ f THOMAS OWENS 4869! BOUNDARY .EA.4uND- 1 _1 iiuHWAY Lu.?5� BERTSCH KEPHANIE LA S \„ ",;ELANY ,. ,.DREDGE I2u7SKY.. ,.r•. PERMIT �OANJ 25UNEXC+lkTED BOUVDAR GOBEYBy ., _ HUSKY ,... .� &UND'I.S. UNDISTURBED86 AC) L __. HILL ESTATEBllFFER LLC r iSTE�VE_._. 0x,_.. , ._- m1jq4 rnNOLAND rn _... ._ ' < 1 r+ LIVING , , . \ ` \r \/\ •, \\/\ � % ' r �// /`./r\ / '',<. LLCI� CsSFyd�+ rA CLARENC\E`, •,t�.y 4L, h TRUST JR & i 0 Z rn.W2hOA I TOWNO� JOSEfHINE fl z LAKE LR_ CLA , , _R�\ STOKES DAlV iUb,s —4 v; _`c?• �• � �,� 1i -- ALAN & KAR— �„„' -.-. � MOSLEY I /S, /;L. ,.'NES - -�- r LLC `• i / JOHN & ANY, I � —� JR ✓�.;- _ I . hr. (NEB .; ,., <: � I /- � HILL ESTATE ., •., i - A - i ,;I ;,,' I � I m D] H Q 0 z z 00 U W Q I O Z >..:.... ) IPHi 1'-i G3' �� I '�I LL __. LAKE LURE , \, PROPOSEH N1ARJA(J I , TO REDGING 69 AC i V A DRE GLdG PROPERTIES I - ---L O PROP LLC (48 A' 69' LAKE LITRE tGj,� a / A v A - _ 1 PROP_ LLC r 0n V / KE , URE rAARK -I I tRRY j '_._ ( Lit Q �' _ - TO YIi OF y / - , Li i� \ 1 `✓ LAKELURE / ��� W i LAKE LURE - ', A \L .v a PROF. LLC - % / _ � �.� - Ali C_i L. 5'UNEX VATED '` UNDIST \ BED G -LLP.ra ', ��. `v I' 2 Ri lSAR / �. a ^CLL I: ; BUFFER ` 25' UN CAVATED i DREDG& U BTU BED PERMIT OFFER i v' / OUNDARY ' LAKE LURE C)< <y' �. -� PROP: LLC V � / � O" � ��Q I i L I J RCR PROPERTIES i - A _ �, A Q ' ` I ii i ., I Q OK//: NA / gEEOT, \ 1 / i.rH � OF e vv r `v FILE NAME: OVERALL PLAN.dwg --- .I =— sau,vu bgxQ4 �, LEGEND: fc� #5 EIR _ -' MAGNETIC READING 0- I FOOD'LONEX. FLO00 ZONE #5 EIR EXISTING IRON ROD 0— - ---_ #4 EIR '. 3/4" EIP '\ R/W PER PB 1 PG 49) #4 EIR \ /` —"'—v^ "' #5 EIR EIP (DISTURBED) 314" EIP 3/4 (BOLT T #4 EIR ---_� �_.- '' '' I . \2,� `, ' f•' --- �' JEAN R. MGDANIEL �\ \ - - DB 720 PG 369; TRS. 1-3 \*`�_j^\ 4" EIP ' #5 EIR #4 EIR (HEX) PIN 0632-79-7805 - _ VICKI A. SMITH 'fie . DB 758 PG 353 -_.. PROPERTY LINE IS \ I-1 LOTS 26-35 46-53 9952 EIR (DISTURBED) 992 CONTOUR PER HAPPY PB,P;EG 49' ?/• OVEPHANG �+ #4 EIR OB 720 PG 369, HOLLOW ( / PIN 0632-79 3810* CODBA766 PG 426TIN DWELLING/ s BOATHOUSE - .. ssza'+ HOUSE BOAT +es2s ' - ROO ROO - #5 EIR #5 EIR•, f., ` .y'a :`�' z ' LOTS 41-45 _ `,9 CH K LANE C J92 BAPTIST YHURCH L/-11 V L ` 05 -O .- , , PB 1 PG49 ( O _- .�� DB 190 PG 538 4 -' PIN 0632-79-4881 ( _ _ //c. \ PIN 0632-79-9846 V • r r r /."tD'v INV 990 5 __ _ _.'. D� y K �,�� ' \ 25 R/W PER LC RENTALS LLC s �•',' - /+'' +9834' - (PB1PG49) ' DB 918 PG 164 t'uQ I' �.� {../ /...j SHED '#4 EIR (HE EIR I'INLET UNKNOWN il/•*>y\\ \.\\\ LINE PER PB 1 PG 49 1 \ \ PIN 0632-79-2728 ! ' 2 Np^ I �5y�• #5 EIR LAKE LURE LINE PER PB 32 PG 14 GRAVEL \ I .i �\ �`� OAK 9D I -\\ \ } 992 9 rrF +9933 I. ROAD 3/4' EIPo l., O - , J LINE. PER , �9 • �'' - "�\ (IN GONG.) 1LINE.PER *A #5 EIR � // � , � \ PB 1 PG 49 ""� - \ \:. � .PROPERTY LINE IS -G -r9U - \ 99 tDONTOUR PER i ii PB 1 PG 49 0\�➢�' D„O�CK ,.,.:: :.''.. _ 90!... ;: , .;'/ J-. \\ DB 190 PG 538 3/4 EIP ;.'\ \ #5 EIR .._'t/fN��:` LAKC LURE HORACE MARLOWE .. ,� 9y3.. ' De 628 PG 64511542 ' I\ BO DER 3/4 EIP ' r PE / / '89c) /' 'r '-` - -" - \ - SUPER SIFT � ',, \. CHIMNEY ROCK. ,O PINS 0632-79-1731 &t649 "� �(TYP L) -- " :/ •' - — _-` FENCE (Tl'P.) \\ CHURCH ':' DWELLING. \':..� 3/4 EIP, __._. „- _ - -.l. .... 1007 ,\ 3PG 105 \\ i \ "998 _ _ _. _ .. �Y... / m _ - ".""';�� *; . r; ; �\\ PIN 0 32-89-1755 ' #5EIRi In 194 y .: a.... ... E�� LOODZO SINE ,:�-...d -r 1004 l O o i j NE 'AE„ TPEE , r'� p _ -. �.' . _ .. tea.. � i d ORN 32^ ,S' i " } '�' 02 _ OZONE . r'IryA 1... _. �' . � � "\ �. WEST ;� eF ( S./ ._ _. EDGE'.. RIP RAR 1 — - 994 4' Pp zr .• •. d, '. TB tf2 RESAR + L. `\� "1 OF DITCHLINE va. , ... Cv�F9-:. _ .._� - _...- ,'--...:.� #5 EIR i\If 70 . �d . S �- -� -d1 - d:"....- _ r�, 9y �,,, CREEK Q '' 'a. _. S - d _- A. I +992.5' E. 603 75' NAD 83/1t A: Q �'(• V / �\ „ i �, �, - 29669S63'NAD 3/ :.�., 'S ♦ .. _. -_. .- ...9 Z 1.003.0' NAVD 88 3 .-i ,N.h,� 1 ,. CREEK (i d.• .��\' 'Q FOR RETENTION CMP +993.6, }993.T DREGE ..014.flOp.D -,. "'MOORING 5 I ��-f '°a -� A MP _ ,.� _ - +991.3' POATs I i i•� ' _ .. p � ,: , rn � .g ,! : 9962 _.. ... Jti _. 995.5' ram` STAI D PIPE INV.; 998.9 _. �'�'T�' =��. `� � /,+ CURRENT f e. + " -- " H (1/2 FULL SAND BAG RIM ELEV 1 001 7 A ) I 1 Ji `I 0 DISTURBED(= �' i ' 1 a, +992.9' ��'� 9> LINE PER \`4ip� 'f �� '.` 0 1 i AREA, �,\`> \ \ ;, r,•" INV.: 9985 .i PB 32 PG _ `'L• /: AV i I " ,�,�-;"'� +994.9• +sear +9ss3 13/4 ALL) #5 EIR ! Div, \ c �\ \ •� g9G %t (., �.. - - __. - -__ 1000' -- -. -_ .� INV.: 998.4', .. CUT-OFF 36 CMR, — — \..._SQI4 OAO � 10o2s"._ CFO .., lOd �Q�J rc. R REPENT CREEK -1�000 i; .': I' +1;0d2.9�'.�'. d +'.'r,8B2.Z a .-� �P:- ..-,r_ 1..._..... Q. s_T i°'� /',. "' •,.�pi .SILT FENCE ITYP.Y _ �{ a ° ,�,. 990 +1.000.4 a 1006 \ '.`d' / ..� �, F ,,,,,,,,„...ur' - SUPEFI SILT ,_. OIJ x _ FENCE (TYP.) NW SONNY `,�;. U,< _ - FLOOD Z _- -- 6EACHUM,. INC `�• - - -. .. vONE r,.� DB 1013 PG r .' yoo - ` n _ o0o F��oo LAKE LURE PB 32 PC 14 _. PIN0632_79-0578 LAKE LURE �--i ggA OP OF 15 PIPE 995.9' / 8 {' DOCK f/� �' / / %/ /: - /,r`-•"` r :' .�,L///,/' "/,'/� i / . , . , - r , . rF ,DREDGING PLAN' ` f r !. /,' /., _ - SCALE: 1" = 50' _--L--/i' �,. �.i' � ,�:.. //,: �.' i / � is % � � :� � �. 'ri ., ;r °i �' ;. ,''' i; ,. :.',{ ,. •. .. .. rr fil ` r f 0+00 1010 970 1 1 +00 BASINS TO BE S EDED PER NODENR SPECIFICATION AFTERTF iEGGEIP;IINING O EXISTING IRON REBAR (EIR) EXISTING IRON PIPE (EIP) ❑ TEMPORARY BENCH MARK. cQ, UTILITY POLE A,, GUY WIRE ANCHOR LIGHT POLE + SPOT ELEVATION DECIDUOUS TREE (SIZE AND TYPE AS NOTED) BOUNDARY LINE (APPROXIMATE) - EDGE OF WATER C/L STORM DITCH OHU OHU— OVERHEAD UTILITY LINE — FEMA FLOODLINE — — INDEX CONTOUR LINE — — INTERIM CONTOUR LINE _-' - - SF ----- SILT FENCE ABBREVIATIONS: NTS... NOT TO SCALE (T)... TOTAL DB ..DEED BOOK PB... PLAT BOOK PG ..PAGE CONC. _ CONCRETE ORN... ORNAMENTAL CMP... CORREGATED METAL PIPE PIN...PARCEL IDENTIFICATION NUMBER NAD... NORTH AMERICAN DATUM NAVD...NORTH. AMERICAN VERTICAL DATUM NSRS..,NATIONAL SPATIAL REFERENCE SYSTEM 1010 OP OF rX RERI q 1000 30 BEN LIPPEN SCHOOL RD SUITE 202 ASHEVILLE NC 28806 PHONE: 828.350.7683 FAX: 828.350.7684 ,t\91tf 1141 �aa CA, a` ,�srQr SEA,C 3� 611, !�Cti4'GtNV L u . DATE a ,fix r�. r 07 s ( ) z z O o E- C/-) a / N w 0 a z (O (D W < z O t-D W J O f ( n C nf� < o Liz Q _J F 0 Q W o D 0 z w LL I 00 Iw F— Q n z o LLl v)n � Li z 0 o o o of D 0 Ld vyvv/ II� /\\ \ 990 EX. GRApE i u 0 980 SECTION- - z w o — IRIZ.SGALEk-'_50' (n VERT. SCALE -I" = 10' ' 9 L W 1-7q -, W ry F— w III _ cn (FIELD BOOK#: N/A I 0' 50 100, 150' 3 OF FILE NAME,16066-01 sa, w b2I m MAGNETIC READING - o ' #5 EIR ,-� EXISTWG IRON ROD \� #4 EIR 3{4 EIP R/W PER PB 1 PG 49) ^ -A-._. _ #4 EIR EIP 3/ EIP ��--- "- #5 EIR P 4' #4 EIR \ JEAN R. MCDANIEL DB 720 PG 369, TRS. 1-3 � �g/4^ EIP VICKI A. SMITH #5 EIR --� #4 EIR (HEX) d PIN 0632-79-7805 PG353 _ PROPERTY LINE IS 99zo FIOUSE 35, 46 53 _ ' s95.2'+ EIR (DISTURBED) 892' CONTOUR PER I \\ 7 y. ; I DODB 788 PG 426TI OVERHANG y J BOATHOUSE .. - _ _ / + BOAT +992.9 LOTS 2 NALD E. E MA HAPPY I7 f7\/ 0 1 PG 4,4 ` #4 EIR DB 720 PG 389. ' It11 r� �1/ PIN 0632-79-3610 �-'IpLL,Oyy ' #S EIR #5 EIR LOTS 4145 J9,%-`u';� BAPCHIT�STECHURCH LANE ' ' - Q / PB 1 PG 49 / DB 190 PG 538 °1z 11 / ' % / ,' �t PIN 0632-79-4881 � � _ - PIN 0632-79-9846 j n (26 M PER LC RENTALS, LLO H / // a `/ / f _ i f; +993.4' %t 1IVV_ Jo D� �K r 7 \ \\ \\ R r #4 EIR (HEX) , \,\ PB 1 PG49) DB 918 PG 164 w a r LINE PER PB 1 PG 49� j SHED #8 EIR I -''IIL t F i1N,:ivObvfd \ PIN 0632-79-2783h:. x.#6 EIR p„ - - % \�w LINE PER PB 32 PG 14 GRAVEL ` I. �lo '. 1. F e"i i ,y , :: \ \+992s' 3.aonK 4a /� LAKE LURE \ m .' r ; ; / ..� ,. r /., ,. LINE PER +99 / s't y 2` /': '/ �/ .'.'\ \ 314"EIP ROAD 4i I�"! O %/ / \ �^" '* - *\ \ PROPERTY LINE IS (IN CONC.) ;, LINE PER sA #5 EIR DOCK / �iY. \,. PB 1 PG 49 _ ! � ( .990�_- _ --- , ,a ,,\, '\ 995' CONTOUR PER. _ I!\ ."/, ,:t •;•� r. ii ,. %,. DB 190 PG 538 i. 3/4° EIP 0, PB` PG a9 -'Q\ : ,/, , ;6= /r. .. /; HORACE MARLOWE 1.:., { QS 993. #5 EIR t /', - LAKE LURE - :.✓ --.. _..., - _ -.. -.- _ `..9 \ D0 628 PG 545 & 542 t '� 60 DER t : / -. Oi: ! / / / •� r� ' 0 PINS 0632-79-7731 & 1649 `. (TYP Aq.3/4- EIP r'iri r -. _ \ -. _. SUPER SILT , / ..,� \' CHIMNEY flOGK .? ' ; -� •'- - FENCE (IYP.) \ BAPTIST CHURCH DWELLING . \ .;,'1 ,i 3/4 EIP. ' - , kr00 \, \\. DB 213 PG 105. -\ I \ ...' ` l.F 3„6 --. ,,. _ _ m — -- PIN 0632-89-1756 `.. O . . 994.. "-- -'_-. FLpOD - .. E {EA i -I CYe3E S,ED�D ;'ER - / l _J - :,.+_. �,-` , �' . a- • < . ,. f / ~ #5 EIR \o ",.�- ,. , ?ON SPECIFICATION / L:.00: E -1ftEE IC.:3rNR SPEC, FI(.,AT • i �. ...yN, / ..` F' �O.0 .- -:-�•_ . _. .. AF cH DREDG"P+1il J N{3�• / ORN. 12^ qy ',; : ! d� . -_ -._ .. D ZpNE"X.6,.... y. r....,_ ,'HOCESS IS COMPUTE qq >A,REAS 110.: E SEEDED PER - v SPECIFICATION -'�.. `3i ) ..�:... ��� WEST RIP-RAP 3 : ,P�. NCDENR S -. , --- a __- ,1_.� I - �.... .',\ �. - �95, yFim EDGE </ RIP RAP '"' EDGE/MINING - ,..., ,... NF -2. "..y0 r AFTER;D� ao c.0 a-.._ DITCHLINE ;- . ` ... PROCES!�� IS COMI=L;ET[? ..�OIC :. n �i . " " ...,-4 .. •.s: A 629,6z"Reena �F\.. i� •.`.� OF #5 EIR : ..-. ( fb /"® �_ ( 4 . �777 I N 929;64575' DAD a3/11 ;.M1.d Eq� CREEK 799963 NADe 11 CREEK.,. , 1I \ _ .. ao3.a Novo ea 4 :'gyp .:ij. 'ul-0Fl-36C N.',.i ` c $ L_ E . . :. - \ 1 - K 1 i .. .. ., 0r : ---For: RErF�-n.oN \ r.\ LROAp .. / ..,.... �� I. ir:r -- ti �"� MOCHING I V ! .:SOA 1 Oo o. "' _ ., .�....,.:....� +s9i 9: PJ3TS { P •- , 1. ,-.. �.`, A: ,.., ..I F r.-.Lev.: I ,n -- _A 1,< \ _.. .,,I .. :CURRENT /� +. , ( SAND -BAG ,9 J �.PISTURF3ED WALL } JJ LINE PER �`Y: o ' AREA,. 1 .. �,-.,,..,...,... )8 5 .. PB 32 PG 14 #5 EIR T �.�. INV.::968 4 'CUT OFF 36> C N A Tetvi 1 2 ./ �"�..,:, _ -.F R RETEN Y # +, +la a 2 E50 2 y. S � '�. . 4 "- _ � SQIk CAD FOR a d CREEK , '\ E-, c/ \ ,,.. s T oTzs.- °� — '`_ P L z, 1T � _ - - - i�ut10= - - ,_.- ��✓'i � �u _ '-( a M a i m +1,0009 -\SUPER SILT INLET FENCE (fYP.) ' NW SONNY` d'1. UKNOWN BEACHUM iNC /�....0 •-„, .;, .. .w„�-.W�.,y..,.., Clr. _,� :1000 �FiOD ZONE°AE r - > LAKE LURE - DS1018PG1 - `—' PB 32 PG 14 #S hIR GO.. �fa.. r... O. PIN 0632-79-0578 - 9 ,. / �� LAKE LURE -� , „ r DOCK ,; - / !:/ 1 i,: , � �„e k , . � - / 7 1, r'< ®KEDGING PLAN /, .r SCALE: :fr t 0+00 1 +00 1 1010 P OF\ r.1 \ EX GRADE (TYP ) � 7 r , 1000 ! I I - — 990 980 970 2+ 3+00 4+00 5+00 6+00 7+00 8+00 f I - --- r- -- I , i I 1010 -TOP OF _. I. EX BERM POST TO OF CON EX BER , I- CONDITIONS ;BASINS�R)BE SEEDEDP�RI��CONDI'hONSNCDE SPEGIFIGATIGfd k,\\� _ _/ AFTEREDGE/MININ // �i�p�/����:. 1000 _.. PR7C�SS IS COMPL \ \. .. I > BASINS TO B -.SEEDED PER /V - / ' / / SPECIFICATION � NCDENR i / / / \ / AFTER DR GE MINING �-r� � r-�`�/ FTE D / / T� / /i �� PROCESS I OOMPLETE._. I \`.i.7• � MM'� - I..__�/ I /.\Z'n990 .j._-- -- - - ----" -- ----- T---- ---------- - 980 SECTION A , L • dQRIZ. SCALER' = 50, 4 Af VERT, SCALE:1" - 10` 970 I I LL=GEND: O EXISTING IRON REBAR (EIR) EXISTING IRON PIPE (EIP) ❑ TEMPORARY BENCH MARK qh UTILITY POLE A, GUY WIRE ANCHOR LIGHT POLE + SPOT ELEVATION ` DECIDUOUS TREE (SIZE AND TYPE AS NOTED) BOUNDARY LINE (APPROXIMATE) EDGE OF WATER C/L STORM DITCH — OHU— OHU— OVERHEAD UTILITY LINE .—FEMAFLOODLINE - --INDEX CONTOUR LINE --- INTERIM CONTOUR LINE ----- x7(1 - ---- SILT FENCE ABBREVIATIONS: NTS... NOT TO SCALE (T) TOTAL DB DEED BOOK PB. PLAT BOOK PG .PAGE CONC... CONCRETE ORN.. ORNAMENTAL CMP... CORRELATED METAL PIPE PIN... PARCEL IDENTIFICATION NUMBER NAD... NORTH AMERICAN DATUM NAVD..: NORTH AMERICAN VERTICAL DATUM NSRS... NATIONAL SPATIAL REFERENCE SYSTEM 0+00 1+00 2+00 I 1010 I 101D -- -- — - BASINS TO BE SEEDED PER - i TOP OF - -i - _.. Y - - - --1 NCC..ENR SPEC FICATION- EX. BERM .----._...._....._. ... _....T.OP_OF----- AFT ER DRIED INING EX -BE PROCESS IS C MPLETE -----� 11 I : I 1000 yx1r�i, 1000 I i I EX. GRA DE (TYP.) - 980 980 B --- SECTION ; I IHORIZ. SCALE - --" --.... VERT. SCALE.}: = 10 I 0' 50, 100, 150' 30 BEN LIPPEN SCHOOL RD SUITE 202 ASHEVILLE NC 28806 PHONE; 828.350.7683 FAX: 828.350.7684 "01M, CA 0] 0 V J Z z O0 F- tY U) L�L/J L� O Z Co LID Ll Q o 1 . i L� Q .-- CD cQ U o LLJ z 0 _J Ljj Q < L O 0 n` _D o 1 LL z W Q oaf 0 o Ei _ W (f) � W a_ z v lY Q O W 0LiW � 0 _ O cV Q J z O H— Q Q o _I czn IJ— 0 W Q L� � W w W < W = cn U 1k' 4 OF 5 FILE NAME:16066-01.dwg f 63 fr r* R A { A If A R R � d A A if R /R tf 1-12y Of if OVERLAP ROf If (f 2" 4" R P //� 12" MIN, if if --4G� R �/ ac aT %/�• ISQMETRfC VIEW i r ONGTU01tyj ANCHOR TRENCH INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK CLOT 11... SLOPE SURFACE SHALL BE FREE OF ROCKS CLODS, STICKS NOTES: AND GRASS. MATS / BLANKETS SHALL HAVE GOOD SOIL CONTACT. 1. CHECK SLOTS TO BE CONSTRUCTED PER MANUFACTURE'S. SPECIFICATIONS. 2 APPLY PERMANENT SEEDING BEFORE PLACING BLANKETS. 2. .STAKING OF STAPLING. LAYOUT PER MANUFACTURES SPECIFICATIONS. 3: LAY BLANKETS LOOSELY AND STAKE OR .STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. ROLLED EROSION CONTROL PRODUCTS N.T.S. 1) MAJOR ELEMENTS GROUND STABILIZATION 3) MAJOR ELEMENTS DISCHARGES 7D FEDERALLY -LISTED WATERS 7) MAJOR ELEMENTS BULLING WASTES HANDLING the permit. A I A Requirements are some as previous No point or liquid wastes in stream or e perml a ows re uc Ion from a acre minimum r e Director of DWQ determines that other BMPs provide equivalent protection. DECRIPTION. FRAME - storm drains Oecdtcated areas for demolition, construction PERIMETERDIKES 7 DAYS NONE 4 MAJOR. ELEMENTS INSP CTIONS and other wastes located 5from strum ,SWALES,DITCHES drains and streams unless no reasonable alternatives are available. Some weekl inspection re uirements AND Rfr)Prl� Some rain ra e & ins ections after 0.5" rain event. HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE Inspections are only required during "normal business hours" Earthen -material stockpiles must be located 50' from strom drains and streams unless no reasonable alternatives 7 DAYS If slopes bra. 10` or less in R Inspection reports must be available on -site during business SLOPES STEEPER length and are not steeper ecific exam tian is a roved. hours unless a site-s available. THAN 3:1 than 2:1, 14days are Records must be kept for 3 years dfld available upon request. Cold must controlled to allowed £Isctronically-avoilable records may e substituted under avoi contactete with w contact with suface waters, wetlands, or buffers. SLOPES 3:1 14 DAYS 7-Days for slopes greater OR than 5Q fast in certain conditions. ri A, Irm All OTHER AREAS None (except for perimeters 5) MAJOR ELEMENTS IMPLEMENTATION. F NEW PERMIT CONDITIONS MAJOR ELEMENTS SEDIMENT BASINS Projects permitted under the previous permit can continue to follow WITH SLOPES r14 DAYS and HOW Zones) FLATTER THAN 4:1 the reviousl - ernnuf ed conditions. Complete applications received prior o August 3,201 t can follow Outl sur t structures must withdraw from basin ce unless drainage area is lessthan 1 2) MAJOR ELEMENTS BUILDING WASTES HANDLING conditions of a proved application acre. No liquid Pint or li Wastes in stream or storm drains p 9 pp rca Ions receive a er ugus mustcomply w new a only DWO-approved flocculonts ermit conditt ns. 6 MAJOR ELEMENTS CONDITIONS IN E SON &SEDIMENTATION Dedicated areas for demolition, Construction and other Wastes must be located 50' from Strom drains and CONTROL PLAN Designation on the plans where the and 14-day ground StF ari'IS Unless n0 8a ono i alternativ S aV011 1 stabilization uirement of the E rmit o comp y wi K e Earthen -material stockpiles must be located 50 from esrgra ion on pans were awns suface-withdrawal req uiements of NPDES permit are located. Strom drains and streams unless no reasonable alterootlyes available. t_ T Concrete materials must be controlled to avoid NOTES (CONT)� DEFINITION A PERMANENT VEGETATIVE COVER USING GRASSES, TREES, OR SHRUBS. - SEEDED PREPARATION: NOT REQUIRED WHERE HYD LIC SEEDING AND FERTILIZING EQUIPMENT IS TO BE USED. WITH CONVENTIONAL SEBBW, ING. NO -TILL SEEDING, WITH PUTT O APPROPRIATE EQUIPMENT, IS PERMISSIBLE INTO ANNUAL COVER CROPS IF THE PLANTING STAND IS DONE AFTER THE COVER CROP HAS MATURED OR IF THE TEMPORARY COVER - REDUCE RUNOFF, EROSION, AND SEDIMENTATION IS SPARSE ENOUGH TO ALLOW ADEQUATE GROWTH OF THE PERMANENT SPECIES. - IMPROVE AESTHETICS - IMPROVE TILTH AND ORGANIC MATTER - SLOPE / SEEDBED - REDUCE. DOWNSTREAM COMPLAINTS 3:7 OR FLATTER 4"-6'; DEPTH -. REDUCE LIKELIHOOD OF LEGAL ACTION - REDUCELIKELIHOOD OF WORK STOPPAGE DUE TO LEGAL ACTION 31 TO 2:1 / 1 "-4" DEPTH _ - INCREASE "GOOD NEIGHBOR" BENEFITS 2:1 OR STEEPER / HAND. TQOLED PffS OR ' TREN ES, 6"-8" APART' INSTALLATION �-- --_ METHODS IF POSSIBLE S CONVENTIONAL PLANTING- i. U ETAKE SAMPLES FROM SEVERAL AREAS ON SIT SOIL SAM CHEMICAL FOR EFFICIENT H 2. APPLY ACCORDING TO APPROVED PLAN APPLICATION AND OPTIMUM PLANT HEALTH. IN THE ABSENCE 0F SOIL ANALYSIS REPORTS, 3.. CHECK THE TAG ON THE BAG OF SEED TO VERIFY TYPE AND GERMINATION OF THE APPLY AGRICULTURAL LIME AT THE RATE OF 1 TO 2 TONS PER ACRE, A MAINTENANCE SEED TO BEPLANTED AND THE DATE OF THE TEST. APPLICATION OF 1 TON OF AGRICULTURAL LIME IS REQUIRED EVERY 4 TO 6 YEARS. 4. SCARIFY, PIT OR TRENCH SEALED OR CRUSTED. SOIL. - MULCH IS REOUIRED ON ALL SLOPES STEEPER TH. N 3 PERCENT, IN THE BOTTOM OF 5. FERTILIZE BASED ON SOIL TESTS OR AS SHOWN IN TABLE. SPILLWAYS, ON ROADBANKS, AND WHEN SEEDING I DONE TOO LATE IN THE FALL OR 6. APPLY AGRICULTURAL LIME AS. PRESCRIBED BY SOIL TESTS OR AT A RATE OF 1 TO 2 WINTER FOR QERMINATION TO BE EXPECTED BEFO SPRING. TONS PER ACRE. CYCLONE SEEDER DRILL 0 HYDRO -SEEDER. SEED PLANTED 7: APPLY SEED BY HAND, L NE " R MATERIAL! / SEED ED WITH A DRILL SHOULD BE PLANTED 1/2"-l" DEEP. DRY STRAW / 2_TO "PER ACRE -' 8, IRRIGATION SHOULD BE USED TO SUPPLEMENT RAINFALL, BUT NOT 70 THE EXTENT TO HAY / 2 2. .TONS PER ACRE CAUSE EROSION. _DRY ---�-� -- WOOD CELLULOSE OR 0.5 T / YS PER ACRE WOOD PULP FIBER (WHE SLOPE = 0.75:1) MAINTENANCE.. • RE -SEED AREAS WHERE AN ADEQUATE STAND OF PERMANENT VEGETATION FAILS TO SERICEA LESPEDEZA HAY / J TO PER ACRE EMERGE OR WHERE A POOR STAND EXISTS. (WITH MATURE SEED)' SPRING AS REQUIRED."-"- • APPLY FERTILIZER IN LATE FALL AND EARLY 1PINE - STRAW OR BARk / EQUI " ENT TO 3 DEPTH . APPLY ONE TON OF AGRICULTURAL LIME AS INDICATED. BY SOIL TEST OR EVERY 4-6' - --- -- ---------- YEARS, • MOW AS DESIRED, HOWEVER MOW SERICEA LESPEDEZA ONLY AFTER FROST TO ENSURE NOTE SOIL RETENTION BLANKETS, EROSION CONTROL MATERIALS OR BLOCK SOD MAY BE REQUIRED IN A D VETTING, OTHER MANUFACTURE ION TO MULCH ON UNSTABLE SOILS SEED ARE MATURE. AND CONCENTRATED FLOW AREAS, • MAINTAIN 6".OR MORE OF TOP GROWTH, ANCHOR STRAW OR HAY MULCH IMMEDIATELY AFTER PLICATION WITH ONE OF THE FOLLOWING METHODS: NOT S - SPRAY WITH EMULSIFIED ASPHALT - CRITICAL AREA: DISTURBED LAND THAT IS EITHER HIGHLY ERODED OR HIGHLY ERODIBLE. -. PRESS INTO THE SOIL WITH A ROLLER. PACK q DISK, ETC. ATYPICALLY ADJACENT TO NATURAL AREAS, LESS FORMAL AND HAVING LOWER - APPLY SYNTHETIC 7ACKIFIERS OR BINDERS MAINTENANCE REQUIREMENTS THAN GRASSED LAWN AREAS. (EXAMPLES: CUT OR FILL - ADD 'RYE OR WHEAT SEED TO FALL AND WIN PLANTINGS SLOPES, EARTH SPILLWAYS, BORROW AREAS, CHANNEL BANKS, BERMS, ROADSIDES, SPOIL - INSTALL i"X1" MESH NETTING AREAS, GULLIED LANDS, ETC.) - GRADING AND SHAPING REQUIRED WHERE FEASIBLE AND PRACTICAL. WOOD CELLULOSE AND WOOD FIBER MULCH IS SELF CHORING. - SEEDING MIXTURE STEEP SLOPES (STEEPER THAN 3:1) AVERAGE SOILS TALL FESCUE SERICEA LESPEDEZA KOREAN LESPFDEZA REDTOP KENTUCKY BLUEGRASS ROCKY, ROUGH, & DRY SOILS TALL FESCUE CROWN VETCH KOREAN. LESPEDEZA RFDTOP GENTLE SLOPES L11 OR LESS) AVERAGE SOILS TALL FESCUE BLEND EQUi PARTS OF TWO OR MORE TURF -TYPE TALL FESCUES ROCKY, .ROUGH, & DRY SOILS TALL FESCUE CROWN VETCH KOREAN LESPEDEZA EDDNG SCHEDULE _ RATE (LB/ACRE) _ FERTILIZER TYPE & RATE RECOMMENDED PLANTING DATES NURSEPI REQU' 100 5-10-10 0 1,000 LB/AC. JULY MAR 15 - i - SEPT 15 MAY 15 YES 120 10 5 5 40 5-10-10 0 1,000 LB/AC. JULY MAR 15 - i - SEPT 15 MAY 15 YES 10 _10 -.5 200-250 10-10-10 0 1,200 LB/AC. JULY MAR 15 - 1 - SEPT 15 MAY 15 NO 40 ,. 5-10-10 0 1,000 LB/AC. JULY MAR 15 - 1 - SEPT 15 MAY 15 YES 10 -10 5 175-200 .... - - JULY MAP 15 - 1 - SEPT 15 MAY 15 YES PERMANENT SEEDING, N.T.S. NURSE PLANTS - BETWEEN MAY 1 AND AUG 15, ADD 10 LB/ACRE GERMAN MILLET. - PRIOR 70 MAY i OR AFTER AUG 15, ADD 40 LB/ACRE RYE (GRAIN). DEFINITION ROUGHEMNG A BARE SOIL SURFACE WITH HORIZONTAL GROOVE RUNNING ACROSS THE SLOPE, STAIR STEPPING,. OR TRACKING WITH CONSTRUCTION EQUIPMENT. PURPOSE - REDUCE RUNOFF, EROSION, AND SEDIMENTATION. - AID ESTABLISHMENT OF VEGETATIVE COVER FROM SEED. - REDUCE RUNOFF VELOCITY. - INCREASE INFILTRATION INSTALLATION REQUIRED BMPS FIRST. - NSTALL 1L OTHERQ A - SURFACE ROUGHEN ALL SLOPES STEEPER THAN 3:1 MAINTENANCE - INSPECT AFTER HEAVY RAINS FOR EROSION O NOTE USE DOZER TRACTS ' TO CREATE GROOVES PERPENDICULAR TO SLOPES. F SURFACE ROUGHENING N.T.S. DEFINITION A SILT FENCE AND ROCK DAM AT A CULVERT INLET. PURPOSE PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM. INSTALLATION - INSTALL ACCORDING TO APPROVED PLAN. - PLACE SILT FENCE IN A SQUARE WITH SIDE LENGTH EQUAL TO PIPE DIAMETER. - PLACE A MINIMUM OF 12" OF WASHED STONE ON THE EXTERIOR OF THE SILT FENCE. MAINTENANCE • INSPECT WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT AND REPAIR IMMEDIATELY. DI f(57 WASHED u_ STONE SILT FENCE CULVERT INLET PROTECTION N.T.S. DEFINITION VEGETATIVE COVER WITH FAST G A TEMPORARY VEGET ROWING SEEDING FOR UP TO A 12-MONTH PERIOD OR UNTIL PERMANENT VEGETATION IS ESTABLISHED. PURPOSE - REDUCE RUNOFF, EROSION, AND SEDIMENTATION IMPROVE AESTHETICS - IMPROVE TILTH AND ORGANIC MATTER INSTALLATION 1. INSTALL ALL EROSION CONTROL MEASURES PRIOR TO APPLYING TEMPORARY VEGETATION. 2. GRADING AND SHAPING ARE NOT REQUIRED IF SLOPES CAN BE PLANTED WITH A HYDROSEEDER OR BY HAND SEEDING. 3. SEEDBED PREPARATION IS NOT REQUIRED IF SOIL IS LOOSE AND NOT SEALED BY RAIN. 4. WHEN THE SOIL IS SEALED OR CRUSHED, IT SHOULD BE PITTED, TRENCHED OR SCARIFIED TO PROVIDE A PLACE FOR SEED TO LODGE AND GERMINATE. 5. APPLY AGRICULTURAL LIME AT RATES RECOMMENDED BY SOILS REPORT OR A MINIMUM OF 1500 LBS/ACRE. 6. FERTILIZE LOW FERTILITY SOILS BY ADDING AN MIXING INTO SOIL PRIOR TO PLANTING AT THE RATE OF 500-700 POUNDS PER ACRE OF 10-10-10 FERTILIZER OR EQUIVALENT. 7. IT IS IMPERATIVE THAT YOU CHECK THE TAG ON THE BAG OF SEED TO VERIFY TYPE AND GERMINATION OF THE SEED TO BE PLANTED. B. APPLY SEED BY HAND, CYCLONE SEEDER, DRILL OR HYDRO -SEEDER. SEED PLANTED WITH A DRILL SHOULD BE PLANTED 1/2" TO 1' DEEP. MAINTENANCE • RE -SEED AREAS WHERE AN ADEQUATE STAND OF TEMPORARY VEGETATION FAILS TO EMERGE OR WHERE A POOR STAND EXISTS, TEMPORARY SEEDING SCHEDULE DATES SEEDING MIXTURE RATE (LB./ACRE) FEB. 1 - MAY 15 RYE (GRAIN) 120 ANNUAL LESPEDEZA 50 MAY 15 - AUG. 15 GERMAN MILLET 40 AUG. 15 - DEC. 31 RYE (GRAIN) 120 NorES -SEEDING DATES MAY NEED 70 BE ALTERED TO FIT TEMPERATURE VARIATIONS AND LOCATION CONDITIONS. - UNUSUAL SITE CONDITIONS MAY REQUIRE HEAVIER SEEDING RATES. - SEEDINGS FOR JANUARY AND FEBRUARY FOLLOW NCDENR RECOMMENDATIONS - USE "MULCHING" WHERE NO TEMPORARY VEGETATION IS AVAILABLE. - MULCH: 25 TONS OF HAY OR STRAW PER AERE (IF NECESSARY). TEMPORARY SEEDING N.T.S.. SECURLY ATTACH FABRIC TO POST -FILTER FABRIC WOVEN WIRE FENCE BEHIND FABRIC DIG 6"X6" DITCH -� LAY IN FABRIC AND COMPACT SACKFILL DRIVE POST 2 FEET INTO GROUND STEEL POST FILTER FABRIC WIRE FENCE 6" MIN. ....-EI.QN' MIN, 2�„ CROSS-SECTION DEFINITION A TEMPORARY STRUCTURE MADE OF SILT FENCE SUPPORTED BY STEEL POSTS. PURPOSE - SLOW THE VELOCITY OF RUNOFF AND CAUSE SEDIMENT DEPOSITION AT THE STRUCTURE. STEEL -. FILTER SEDIMENT FROM RUN-OFF.'I POSTS INSTALLATION - INSTALL ACCORDING TO APPROVED PLAN. - DO NOT PLACE IN WATERWAYS OR AREA OF CONCENTRATED FLOW. 0 - INSTALL WHERE SHEET FLOW CONDITIONS EXIST. DRAINAGE AREA NOT TO EXCEED 1/4 ACRE PER 100 FEET OF NON -REINFORCED SILT FENCE, OR 1/2 ACRE PER 100 FEET OF WIRE -REINFORCED SILT FENCE 18-24" - VERIFY FABRIC BY INSPECTION OF FABRIC NAME PRINTED EVERY 100 FEET OF SILT FENCE. - START INSTALLATION AT THE CENTER OF THE LOWER POINT WITH REMAINING POSTS SPACED A MAXIMUM OF FEET APART, MAINTENANCE - INSPECT BARRIERS AT THE END OF EACH WORKING DAY, OR AFTER EACH RAIN, AND REPAIR OR CLEAN AS NECESSARY. - REMOVE SEDIMENT FROM BARRIER WHEN TWO-THIRDS FULL (OR AS INSTRUCTED BY INSPECTOR). - REPLACE FILTER FABRIC WHEN DETERIORATED. - DESIGN LIFE OF A SYNTHETIC SILT FENCE IS APPROXIMATELY 5 MONTHS. - MAINTAIN UNTIL THE PROJECT IS. VEGETATED OR OTHERWISE STABILIZED. - REMOVE BARRIERS AND ACCUMULATED SEDIMENT AND STABILIZE THE EXPOSED AREA WHEN THE PROJECT IS STABILIZED. NOTES - POSTS, WOVEN WIRE FENCE, FILTER FABRIC, AND ATTACHMENT DEVICE SHALL MEET THE REQUIREMENTS OF SECTION 1605 - TEMPORARY SILT FENCE, OF THE DEPARTMENT OF TRANSPORTATION, STATE OF NORTH CAROLINA, STANDARD SPECIFICATIONS, 2006 EDITION. - STEEL POSTS SHALL BE A MINIMUM OF 5 FEET LONG, SPACED A MAXIMUM OF SIX FEET APART. - FILTER FABRIC SHALL MEET THE PHYSICAL REQUIREMENTS OF THE ABOVE MENTIONED SECTION AND SHALL HAVE A MINIMUM WIDTH OF 36 INCHES. - THE FILTER FABRIC SHALL BE INSTALLED WITH A MINIMUM OF 6 INCHES OF THE BOTTOM BURIED. - SILT FENCING SHALL BE INSTALLED PRIOR TO ANY GRADING OR CONSTRUCTION. TEME2 ARY SILT FENCE N.T.S. DEFINITION A STONE -STABILIZED PAD LOCATED AT ANY POINT WHERE TRAFFIC WILL BE LEAVINQ A CONSTRUCTION SITE TO A PUBLIC RIGHT-OF-WAY, STREET, ALLEY, SIDEWALK, OR PARKING AREA. PURPOSE O REDUCE OR ELIMINATE THE TRANSPORT F MUD FROM THE CONSTRUCTION AREA.. INSTALLATION - INSTALL ACCORDING TO APPROVED PLAN. - USE 1.5" - 3.5" STONE. - MINIMUM PAD THICKNESS OF 6 INCHES. - MINIMUM PAD WIDTH OF 20 FEET. - MINIMUM PAD LENGTH OF 50 FEET. - EXCAVATE FOCTPRINT 3 INCHES. - ROUTE RUNOF` FROM WASHING(IF REQUIRED) TO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. INSTALL #200 ROAD STABILIZATION FABRIC AS A BASE UNDER STONE. MAINTE PERIO ALLY DRESS WITH 1:5" - 3.5° STONE. . MAINTAIN IN A CONDITION THAT WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGr1TS OF WAY. . IMMEDIATELY REMOVE MUD AND DEBRIS TRACKED OR SPILLED ONTO ROADWAYS. JR4 POE Ng0 0,1YOI0 P00 COARSE AGGREGATE GEOTEXTILE UNDERLINER 6" MIN. THICKNESS CONSTRUCTION EXIT N.T.S. DEFINITION A TEMPORARY COVER OF PLANT RESIDUES APPLIED TO THE SOIL SURFACE FOR A PERIOD t SIX (6) MONTHS OR LESS WHEN SEEDING IS NOT PRACTICAL PURPOSE - REDUCE RUNOFF, EROSION, AND SEDIMENTATION. - REDUCE DUST. - CONSERVE MOISTURE. - PREVENT SURFACE COMPACTION AND CRUSTING. - CONTROL UNDESIRABLE VEGETATION. INSTALLATION - INSTALL ALL OTHER REQUIRED BMPS FIRST. - GRADE SITE It- POSSIBLE, TO PERMIT THE USE OF EQUIPMENT FOR APPLYING AND ANCHORING MULCH, - LOOSEN COMPACTED SOIL, IF POSSIBLE, TO A DEPTH OF THREE (3) INCHES. - APPLY STRAW oR HAY UNIFORMLY, BY HAND AN ANCHOR BY PRESSING INTO SOIL OR USE NETTING. - MULCH ON SLOPES GREATER THAN 39. SHOULD BE ANCHORED WITH EMULSIFIED ASPHALT (GRADE AE-5 OR SS -I) OR OTHER SUITABLE 7ACKIFlER. - WOOD WASTE (W SLOPES FLATTER THAN 3:1 DO NOT NEED ANCHORING. MAINTENANCE - INSPECT AFTER HEAVY RAINS FOR EROSION AND DISLODGED MULCH. - ADD MULCH AS NEEDED TO MAINTAIN THE SUGGESTED DEPTH. - IF ORGANIC MULCH IS TO BE LEFT AND INCORPORATED INTO THE SOIL APPLY 20 TO 30 POUNDS OF NITROGEN IN ADDITION TO THE FERTILIZER REQUIRED FOR VEGETATION. MULCHING APPLICATION RATES MATERIAL RATE PER ACRE DEPTH STRAW OR HAY 1.5 TO 2.5 TONS 6" TO 10" WOOD CHIPS 5 TO 6 TONS 2" TO 3" OR FIBERS BARK 35 CUBIC YARDS. 3" TO 4" CORN STALKS 4 TO 6 TONS 5" TO 6" GEOTEXTILES, JUTE MATTING, SEE MANUFACTURER'S RECOMMENDATIONS NETTING, ETC. MULCHING N.T.S. BAFFLES AS REQUIRED BY BAFFLE DETAIL DESIGN SETTLED TOP / NOTE: ALWAYS PROVIDE BAFFLES AS REQUIRED BY BAFFLE DETAIL. 12" MIN. OF NCDOT #5 - OR #57 WASHED STONE 3600 CU. FT./ACRE 1.5' DEFINITION ANY OUTLET WHERE STORM FLOW BYPASS MUST BE STABLILIZED AGAINST EROSION. PURPOSE TO DETAIN SEDIMENT LADEN RUNOFFF. INSTALLDON 1. PLACE STABILIZED OUTLET EVERY 200' OF SILT FENCE. 2. SET FABRIC HEIGHT AT 1 FT MAXIMUM BETWEEN SUPPORT POSTS SPACED NO MORE THAN 4 FT APART INSTALL A HORIZONTAL BRACE BETWEEN THE SUPPORT POSTS TO SERVE AS AN OVERFLOW WEIR AND TO SUPPORT TOP OF FABRIC: PROVIDE A RIPRAP SPLASH PAD AS SHOWN IN FIGURE 6.62C. 3. EXCAVATE FOUNDATION FOR THE SPLASH PAD A MINIMUM 5 FT WIDE, 1 FT DEEP, AND 5 FT LONG ON LEVEL GRADE. THE FINISHED SURFACE OF THE RIPRAP SHOULD BLEND WITH SURROUNDING AREA, ALLOWING NO OVERFALL. THE AREA AROUND THE PAD MUST BE STABLE, 5' MIN: NON -EROSIVE OUTLET N.T.S. 1.5' MIN. CLASS "B" RIPRAP 5• MAX FILTER FABRIC CROSS-SECTION 21" MIN. FLAT BOTTOM EMERGENCY BYPASS 6" BELOW SETTLED TOP OVERFILL 6" FOR OF DAM SETTLEMENT ---.- SPILLWAY (4' MIN.) 3' MIN. PLAN VIEW FILTER FABRIC NATURAL GROUND - SPILLWAY DESIGN DRAINAGE AREA (AC.) MIN. WEIR LENGTH (FT.) 1 4.00 2 6.00 3 8.00 4 1000 5 72.00 DEFINITION TEMPORARY PONOING EMBANKMENT OR EXCAVATION 70 CAPTURE SEDIMENT. A SMALL, TEMP BASIN FORMED BY AN PURPOSE TO DETAIN SEDIMENT -LADEN RUNOFF AND TRAP THE SEDIMENT TO PROTECT RECEIVING STREAMS, LAKES, DRAINAGE SYSTEMS, AND PROTECT ADJACENT PROPERTY, INSTALLATION CLEAR, GRUB AND STRIP i 7 EMBANKMENT OFF ALL VEGETATION AND ROOT MAT. REMOVE AL SURFACE SOIL CONTAINING IGH AMOUNTS OF ORGANIC MATTER i. EAR HE AREA UNDER HE L SURF C 0 LH ILE OR DISPOSE AU ALL OBJECTIONABLE MATERIAL 0 THDESIGNATED S AND STOCKPILE SE OF IT PROPERLY. HAUL AT E DISPOSAL AREA. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOOD: VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL PLACE. THE. FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT CONSTRUCT THE OUTLET S EMBANKMENT. PROTECT THE CONNECTION E T i A G FILTER FABRIC OR A KEYWAY 3. NSTR Q L SECTION IN THE EMBANK R H NN BETWEEN HE RIPRAP AND SOIL FROM PIPING BY USING CUTOFF TRENCH BETWEEN THE RIPRAP STRUCTURE AND SOIL. 4. CLEAR THE POND AREA BELOW THE ELEVATION OF THE CREST OF THE SPILLWAY 70 FACILITATE SEDIMENT CLEANOUT. 5. MATERIAL USED IN THE STONE SECTION SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D SIZE OF 9 INCHES (CLASS B EROSION CONTROL. STONE -IS RECOMMENDED) U STONE SIZE MACHINE CF:. TO 0 OF THE LARGER STONES. THE STONE AND A MAXIMUM ZE OF 14 INCHES. THE STONE MAY BE MA H P CED AND THE SMALLER STONES WORKED INTO THE VOIDS SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. 6. ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOW OF THE EMBANKMENT UNTIL STABLE CONDITIONS ARE REACHED AND OUTLET VELOCITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE OUTLET SECTION FLUSH WITH THE SURROUNDING GROUND, AND SHAPE THE CENTER TO CONFINE THE OUTFLOW STREAM. EMERGENCY BYPASS AREA RELOCATE BYPASS OUTLETS SO THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 7. DIRECT EME S TO NATURAL, STABLE S E E B NT S. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION. MAINTENANCE INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (Y2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA, AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE.. ANY RIPRAP DISPLACED FROM THE. SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS, AND STABILIZE PROPERLY. INSIDE DIA. PIPE REINFORCEMENT W, Wz H, H� D E 4 @ 8" EW 44" 64" 23" 42 1 z to 1 2 27" 21';24" #4 8" EW 50" 85" 31'" 50" 24" 33" 27'30" 36" #4 @ 8" EW 64"' 108" 52" 72" 36" 49" 42",48" #4 @ 6" EW 79" 150" 52" 79" 1. ALL CONCRETE SHALL BE 4000 PSI MINIMUM. 2. REINFORCEMENT STEEL SHALL MEET ASTM-A615 GRADE 60 WITH 2" MINIMUM CLEARANCE, 3. REINFORCING SHOWN IS TYPICAL IN WALLS AND SLABS, 4. PROVIDE STANDARD. HOOK @ WALL VERT BARS 9 BASE OF WALL. 5. ALL BAR SPLICES SHALL BE CLASS B LAPS. UNLESS OTHERWISE SHOWN. PRECAST CONCRETE HEADWALL NOT TO SCALE 30 BEN LIPPEN ;CHOOL RD SUITE 202 ASHEVILLE NC 28806 'HONE: 828.350,7683 FAX: 828.350.7684 IN.. • ©+3' OA DATE M m H Q -z z 0 o F- a_ C) U) Lij c O O Z c co W a Z 0J co W p 0 0 Of U o LLJ z 1- I- LLJ Q W 0 c\D 1 0 q �- L_ I >_ z O W LLI C/1) LLB EL Z U Q I- O W -D : O W � -, I �. O V J 0 U zI­__ 0 W J I-- W W LLJ S (/7 SHEET: 5 OF 5 FILE NAME:16066-01.dwg %WIW hq 0)