This letter is to inform the NCDEQ that NJR Group Inc. has purchased and will be operating the Riley
Street Borrow Pit previously operated by JT Russell and Sons, Inc. NJR Group Inc. is requesting that Mine
permit 84-08 for Riley Street Borrow Pit be transferred to them. NJR Group Inc. understands and agrees
with all applicable responsibilities and liabilities with regards to the Mine Act of 1971. In addition with
the applicable NCDEQ forms I have included a copy of the property deed and the section from the
transfer agreement from NJR Group and JT Russell and Sons with regards to transfer of the Mine permit.
Best Regards,
Nathan Russell
President NJR Group Inc.
NORTH CAROLINA MINING State of North Carolina
1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612
Division of Energy, Mineral, and Land Resources (919) 707-9220
NOTE: It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE -
APPLICATION MEETING to discuss your intentions and address any questions.
1. Name of Mine �� y 54r&-� Ro<<ow IP,
Countyr�nl�i River Basin
Yadk,,n
Latitude (decimal degrees to four
places) 3 S„ 3 629
Longitude (decimal degrees to four
places) —8o . J 96 q
2. Name of Applicant
Applicant Contact
Applicant Email
Telephone
Cell Phone
3. Permanent Address for Receipt of
Official Mail;
5_ Consultant Contact
Wipe; .Lw9onsultant Email
Telephone
Wl - 905 - 5 Z8 5 Cell Phone
1 '
�a A I�' - .a
4. Mine Office Address 1-72 f cn t,U 52 AI , j1 berr�r1e . tVL 2800i
S. Mine Manager (fin =<W6 "4-S
Mine Manager Email b�p•a� n,rOcouP;nC, . ('0Y17
Telephone qLID - Sg t - S f o z Cell Phone -7oi% - 785 - 5 2-89
I certify that all details contained in this permit application are true and correct to the best of our knowledge. We
fully understand that any willful misrepresentation of facts will be cause for permit revocation.
Signature***
Print Name
Title
Date 3 -1 • ZZ-
*This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond (security) that
corresponds to this site.
**The Division of Energy, Mineral, and Land Resources must be notified of any changes in the permanent address or telephone number.
"'Signature of company officer required.
G.S. 74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete
application or, if a public hearing is held, within 30 days following the hearing and the filing of any supplemental information
required by the Department. All questions must be addressed, and all required maps provided before this application can
be considered complete. Attach additional sheets as needed.
Revised July 13, 2021 Page 11
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612
Division of Energy, Mineral, and Land Resources (919) 707-9220
NOTE: All the following questions must be thoroughly answered regarding your mining operation for the intended
life of the mine. All responses must be clearly conveyed on a corresponding, detailed mine map.
A. GENERAL CHARACTERISTICS OF THE MINE
1. Answer all the following that apply:
F-1 This is an application for a NEW permit.
Indicate the total acreage at the site to be covered by the permit
(This is the acreage the new permit fee will be based upon.)
Of this acreage, how much is owned and how much is leased?
Acres owned: Acres leased:
Property owner if leased:
This is an application for a MODIFICATION to a mining permit.
Mining Permit Number:
Total permitted acreage:
Does the modification involve acreage within the previously approved permitted boundary.)
F-1 YES NO
If yes, indicate the acreage to be covered by this modification
Does the modification involve acreage outside the previously approved permitted boundary?
FIYES ]NO
If yes, indicate the additional acreage to be covered by this modification
NOTE: You must complete all of Section F of this application form entitled Notification of Adjoining
Landowners
Of the acreage to be added to the permit, will any portion be affected (i.e.: disturbed, ground cover
removed by the mining operation?
YES NO
If yes, indicate the acreage to be affected within the acreage to be added to the permit
The modification fee is based upon the proposed new affected acreage within the previously
approved permitted boundary plus the proposed total acreage to be added outside the previously
approved permitted boundary.
This is an application for TRANSFER of a mining permit.
Mining Permit Number: 8 -- O 8 Total permitted acreage:
Revised July 13, 2021 Page 12
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612
Division of Energy, Mineral, and Land Resources (919) 707-9220
MINING FEE SCHEDULE
A nonrefundable permit application processing fee when filing for a new mining permit, permit modification, or transferred permit is
required as follows:
APPLICATION TYPE
0 — 25 ACRES
26+ ACRES
New Permit Applications
$3,750.00
$5,000.00
Permit Modifications
$750.00
$1,000.00
Permit Transfers
$100.00
$100.00
Annual Operating Fee
$400.00
$400.00
Acres for new permits means the total acreage at the site to be covered by the permit. Acres for modification of permits means the
new affected acres within the previously approved permitted boundary plus the proposed total acreage to be added outside the
previously approved permitted boundary.
2. Name of all materials mined: Cf uShtA S4hng.,.
3. Mining Method:
❑ Hydraulic Dredge ❑ Front-end Loader & Truck ❑ Shovel & Truck
❑ Dragline & Truck ❑Self loading Scraper
❑ Other (please explain): X G� r . Mob; I e, C.ruSk4,r , Ffol-*� loader
4. Expected maximum depth of mine (feet) 30 Pe&+ -
Depth is relative to what benchmark? (e.g., natural ground level, mean seal level, road elevation, etc.)
R«zd eicva-�. C'yi
Expected average depth of mine (feet) O " Zo fert
5. Has an area at this site been mined in the past?
YES NOF-]
If yes, when and by whom was this activity conducted? Zo/o — ZVZ ( S•`�". RvSSe// Z So -is, -rnc.
6. Estimated life of the operation (years): Z Symr-es
NOTE: The Department may request clarification on how life of mine was calculated.