HomeMy WebLinkAbout20220308_Mine_MapsNo HEIDELBERGCEM ENT Group HAN N AGGREGATES SOUTHEAST, LLC 63 SHEET INDEX: COVER SHEET I MINING & EROSION CONTROL PLAN M&ECP-1 ENLARGED PLANS M&ECP-2 RECLAMATION PLAN RP-1 CROSS -SECTIONS & DETAILS X-1, X-2, X-3, X-4, X-5 3825 BARRETT DRIVE Suite 300 RALEIGH, NC 27609 Phone: (919) 380.261 O HOLLY SPRINGS QUARRY 7000 CASS HOLT ROAD Holly Springs, NC 27540 Wake County Phone: (919) 567=9512 VICINITY MAP �-v4o.A INV IL IJ � a MINING PERMIT No: 92m 13 PERMIT MODIFICATION RECEIVEn MAR 0 8 2022 LAND QUALITY MINING PROGRAM NO SCALE LAT: 36.60700 N LONG:-78.88200 W MARCH 2O22 NAj1IX1Y5RRIN0S 0O MATCH NE �_- \ / 1 Y Sediment DUKE PROGRESS NC. Basin #6 aru (Existing) j - P 11 3 Z QED \ u- +� w f N/F PS �. 01 _ '<r o 'X, Lu t Ph L V) Lu Q / Joe toEu \ \ Q iar 9 R I N/F Sheila M. Stinson & Theora Irene S. Johnson N/F Red Rock Disposal LLC C/O Waste Ind. USA Inc. X3 a v N/F Red Rock Disposal LLC' C/o waste Ind. USA Inc. iV FAlice Naomi R9enkins- l �/ , ff lack Rogers & Eva R.IWeldon lil'i I 4 1< If 0M.3 N/F lip &� , LI S jonn, tmmTe,.. Nick & Marea 1 erm u i - Il i opoul OS It ion. ■ 30.i �: li I 1,j 1 Hanson f/ Pro See Details s Existing k/// ��� DIVERSION Sheet X 5 5-72° Pipes CMP A y EDIMEN �� 4 DITCH Sediment Basin #7 (Existing) Ex, 'ng 2-54" RCP PERMANENT SLOPE / DRAIN _,, -wing Visual St/ajhz�. C-3 COB Ojj• ASIN OB- L ..a. i'; i 3 "Y I ` Ct Y. �'/ WEST / r. , f/f j ����` , .2pi 1` �7� MMU ! l.in Levi& I - Q� • "> . Shan DIVERSION ;P ENT Rl' CC-•,_.w.._} _i' _ �3.-- % ROAD @ 1.0„ � ( // 1;,`:i> s TCH 'ia�y' GRADE I -- PP I--n I a P I an, Sheet X-4� Proposed 18"PI e with n ra OVERBURDEN EXT Stl n�q Dirt Road " �I II ;LOPES�.� >E / f / I ACCESS POINT down slo a to basin bottom - ExI stT n .,, i !,��-� 6 I�^ i _ John Emmi e,, P P P P 9 Existin P Water I 1 \ `\ \ Nick & Maiwa S ' ChannelF Retention i ti Pipe 18' Sediment Trap#1 - r f ' Propane`` -a P, I (Existing) 330 - 3zo y ` / 11 i o 9u05 l Sediment Trap #4 (Existing) Existin �- Pond #1 , EXISTINC, Tank t \`\\ TENANT`S HOT--.- (Existin9) �yss0 _ \\ _ / '• Check Dam %- - F� \ MIX ASPHAL ' -A h�!� I Sediment �. _ .■.� �' { SDO# (Existing) oas■� -�. SILT FENCE PLAT Existing I - I \ Existin i , I , 1 _ 339 stir B ssNI ` Nl' ( \ A a Pipe No.1 1� Basin#4 //�f -- PROP, eo f (Existing) -_ ' p x TENS 2 42" RCP E HGF Pie ans L rI �' / Existin ,' :� �� �a CURRENT _�� ��, I �\PY'O�iei t5` I ll . i \) � -. �• 1 �/J o ��}}����/l F'�'I��k EXISTING RIP -RAP � �1 \ �" / _. 9 `O\W CHANNEL C r D. RCP Pipe PIT LIMITS m �A� \\�\! / f /` o i0 5 . % Ac SDO #4� P Sediment Trap #2 f EXISTING GRASS '. ` ! i' i ,'n / 330 \, A Rock Exist,n \ "t I SDO#7� n SDO #3 �� (Existing) / FUTURE PIT LIMITS CHANNEL E tee_ A� 9 I %i SDO #2 r /-�_ �� "�� Check Dam % ?� i 1-e ��-ri sty ng� a'y 2: �(Existing) .y'ale ci3OI Rip -Rap "� DIVERSION £ p ' P P / / fin: ��` N/F Channel G o . d • DITCH > /% l ` (Existing) p / /. °; }�F Fu1_urta_ x, .:! Ockp.lc �. I i7 ErvllCf�Y/t ° Sediment Trap � /- /. r \ toc I,.p e �� Area \\\c) \ I r � #3 (Existing) s I � � / / ti' � dd � « 1 , -,may "a. ��� �' Existing o. ." x3 PROPOSED MINE ._ Pl-t _ '.�.. ?pe;^t.�/ $tOC kr)l �e:. i ,.,,� ' RCP Pipe �`�..._� \\/'; •� \. _'� L� ■� j, LIMITS EXPANSION YF 49 � , o , rir, t x3z, , / '. i -- �tr,\\� 1 �j / Ex ,.T, N/F T i adimen Trar #5 j (Existing) (SDO-6) WDO-1 DISCHARGE POINT Basin (Exist y30] rVi n Future Mine Area 33.h �.. ,i n N V - �:./ -..� On a.i n10_nt Ud`. _ It / t ( Stockpile o /��� \ . , _ Rock Dam #1 Isoo-sl Area _ N/F SA 13,800 ^ i p , I i , a, e . f3 (, C. ��i 1� Yueli.• Lei .zse r t `� Existing' Wan, �( -xist n ( % V ) x39,.9 Plant °€' '/ Try a i� Pile PROPOSED PIT F_XPAN9 nN' / / fS\ k �, C(K:;-I I t�lle \ � - i +'a err/ ,ice RCP Pip- �`�° j 9, P Y �'l t s'E a0 I ram�2`�% v 3179 1 ,0 •_ , ECP% / T, 29vIDE ROCK BAFFLE *40e 1� A ` 9 r� r�• I � I Ila 1 Rip I F annel -� 3 , sti ng 't' �,.., - �toc pi 11� 8 Natural Gas Line Hanson Property 0.86 Ac Existing Entrance With Gate `�r A ea Za:l Retention - A \, -�- --- See Enlarged Plans, , �� P d� Sheet M&ECP-2 on \ Future Plan Lofation - f--- - N/F `-� d Existin VisualBarrierBerm 'N/F Terry R. `I �t ��,�•, r . , PExirfing) esta �,p� ae`az �j r OB-2 Stabgizedwith vegetation. �eD / �, Betty Bejster / \ -ems - - I I t i RCP via. ---_-.z„Zt� ® .. -_. _ � // Jtadd & I = 11 I 9 �� Proposed Grass,, �j a r ron LEGEND: kktt xi sti n Wate RPondt#2n / Channel rt / Y?,I�l Ii5 1' Existin ✓ � / � I � _ ~'�T � � Permit Boundary I RCP Existing iiI 1 � � � � r -_ Property Line r ,- ---�.� , 3 .� vv 1 I c•+.. - �pe 12' WIDE BAFFLE I - i� - ,; - _ F Existing Pit as FFLE �I ,j ng N/F �� ' vSediment I' % _� Selo / i - d E. ��',� Y Carolina'✓� Basin #2� 1 ( _ �1FZ `i - / %�� erki ns r Pit Limits (Existing) �i� U I ExistingVisual Barrier POLeghri \ft 1 JI \ Berm Stabilized with \, Company'�. I v vegetation. \�/--� I 1- GRAPHIC SCALE: HORIZONTAL SCALE: I" = 200' 200 0 200 600 REV NO: DESCRIPTION OF REVISION: DATE: <s> MINE MODIFICATION 3.22 Q MINE MODIFICATION 6.29.21 Q ADDED INSET 2 AND NOTES REVISIONS 12.20.16 n MINE MODIFICATION 11.1.16 �. Hannan 1=roperty 86.67 AC a M �,� �-- Existing J -� NOTES: �� i Pipe No.7 Sediment \I I Basin #1 (Existing) i Existing RCP Pipe 1. BASE TOPOGRAPH ' / l�EPI ' J------ 18" RCP ' CONTINENTAL AERIAL SU EYS, INC.j 3356 REGAL DRIVE �� ALCOA, TN 37701 F'V"' &� (865) 970-3115 ley �urt 2 BOUNDARY INFORMATION FROM WAKE COUNTY TAX MAP. 3. EXISTING MINING PERMIT N0. 92-13 HOLLY SPRINGS QUARRY ( \` Existing 7000 CASS HOLT ROAD / i Pipe No.6 = HOLLY SPRINGS, NC 27540 \18' RCP (919) 567-9512 TOBY LEE, GENERAL MANAGER NC SALES AND OPERATIONS N/F William & ShaPon Wilson 4• THE INFORMATION SHOWN HAS BEEN COMPILED FROM PREVIOUSLY N/F Watson Adcock LLC APPROVED PERMIT RENEWALS AND/OR MODIFICATIONS. \ 5 • FOR MORE SPECIFIC DETAILS, SEE PREVIOUSLY APPROVED PLANS. N/F William & Sharon Wilson 6, UNLESS OTHERWISE NOTED, THIS SITE WILL MAINTAIN A N/F Fred & Shirley Burt 50-FOOT UNDISTURBED BUFFER ALONG PERMITTED BOUNDARY. i 7,I ALL SEDIMENT REMOVAL FROM DETENTION PONDS SHALL BE DISPOSED IN AN AREA DRAINING TO THE PIT OR TO A CONSTRUCTED SEDIMENT REMOVAL DEVICE. / cm k skins i % Eta ESt N/F 'y Brian ►��� Smith & , Jamie r1W M.S. Terhune �k\ `�N/F Permitted to be Affected Permitted & �' �� Raymo Affected Acreage & Sari Hanson Aggregates Southeast LLC 2016 2022 Total Judd Holly Springs Quar Modification Modification j N/F ' Goldie GOV M. Judd a N/F N/F N/F Jerry & Kenneth Jerry & Deborah ' X Marion Marie Taylor \Taylor Brown Tailin s/Sediment Ponds 32.8 0.0 32.8 Stockpiles 34.3 17.5 51.8 Wastepiles 26.0 64.1 90.1 Processing/Haul Roads 17.2 0.8 18.0 Mine Excavation 56.8 1.7 58.5 Other Areas Permitted for Disturbance: Asphalt Plant, etc 11.5 0.0 11.5 Total Area to be Affected 178.6 84.1 262.7 Other: Buffers, Wetlands, etc 107.7 23.8 131.5 Total Mine Permitted Acres 286.32 107.90 1 394.22 Buffer w Treeline Berm - Existing 0 Berm (to be built based on overburden supply) Contour Index - Contour intermediate OStructure RECEIVED Road Paved MAR 08 ZOZZ Road Access Body of water LANDQUALITY MINING PROGRAM, OSediment Basin/Trap as noted Energy Dissipater Pipe - �- �- Diversion Ditch Temporary Diversion Ditch Permanent o a+ doe Drainage Direction H„ .., creek O Stockpile Existing __. Slope Drain J J N m s N > oar A o •c 0m� O ryryry Q Y :o ZMM C A m�,LM0 C N L M J X I MN R'i-QQLL 2 C 0- F- �Z Z HU ce, W LU W S ■■■ MEN J y > 1LI C ild O W 3 vn LLI W 12Zz F La 2 ~ d Z o`yo' r Fe c� J Z C J 0 Q r' Uj V Jw WY N a Z W :D Z F' W JIM Z O Z V W a O a - W O m W DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: SHEET NO.: M&ECP-1 OF: \\\ LEGEND: Permit Boundary _.. __. Property Line ffi C Existing Pit` -_� \;�J\\ \� \ / \ \ \ �111�� t, Pit Limits ;'�� A�V� �� M� Buffer =� ; � `��V\V A. w0 VVV0RA \ i 1 r, \� \ \\ \ \ \ >` Q Treeline ,+�� � �\\�\�\ � �\` � \ -•�� ��\\,��� �1\ \ \ �� \ \ �\� � \ \ / �^� \\ \ Berm - Existing\ �.~� ` \ \\�\\ V \`�\\, \` \\ \ •� 1 r \ \\\ \ / e - 1 I50 UNDISTURBED \) ,�-J J Permitted to be Affected Permitted & Affected Acrea e NO `1. BERMS MAY EXPAND DUE TO MINE NEEDS, ANY t}1j Hanson Aggregates Southeast LLC 2016 2022 \\ FUTURE IMPACTS TO WETLANDS OR STREAMS WILL Total \ \ BE PERMITTED THROUGH THE PROPER AUTHORITIES. HOII Springs QuarryModification Modification 2. FENCING TO BE INSTALLED BEHIND SCREENING Tailings/Sediment Ponds 32.8 0.0 32.8 BERM ALONG PROPERTY WITH EXISTING SOCCER Stockpiles 34.3 17.5 51.8 FIELD TO PROTECT CHILDREN FROM ENTERING THE vv MINE $ T / / ' Waste Iles 26.0 64.1 90.1 \� \ \I, �� Processing/Haul Roads 17.2 0.8 18.0 (\(l \ \ \ �` ` i /r�(\ Mine Excavation 56.8 1.7 58.5 ~\ t \ Other Areas Permitted for Disturbance: 11.5 0.0 1< Asphalt Plant, etc 11.5 Total Area to be Affected 178.E 84.1 262.7 Other: Buffers, Wetlands, etc 107.7 23.8 131.5 , \ \ -- Total Mine Permitted Acres 286.32 107.90 394.22 1 Berm \\\\\'\' \ \\ \\\\\\ , ' \ \\ + �' J \ \ j� + J / (to be built based\�wv�\�yA V \ / /w ♦ V r''. r,,,,`I'I:, sr,l / \�\�\\� �.�.�:..,.� BUFFER on overburden supply) \ \ } \ \� J i I contour Index j �� \� `� �- \ ` (il'. \\, \ �� ((J / / /: Contour Intermediate ����a_ \\\\� \�\ \.,\� J' 50"WIDE, 8'TALL Structure v i�� r Ij _\ \\\``\ �� PLANTED \ \ V Road Paved iil �- ` �)\ \\\\\+` \� �. �''IC% f ` = \ SCREENING 1 � l� V I(I�iI fir_-�-� BERM AKE COUNTY Road Access 1 \�1 \� \� \ j �il�l iA��/ I v BOARD' OF `� �„ �; ,�� )I // v�v�v\�\� v v Body of water �� \ \ \/ / \ ` ✓ EDUCATION Sediment Basin/Trap as noted IN i Energy Dissipater i Pipe 'A N:677539.12 _ Diversion Ditch Temporary `~ /\ , . r / �� / \ \\ \ �i - N. 677549.75 N/F E: 2035365.50 ? 1 � -'�'�- X RbAQ - - ,�i � � „ p y Eki'Sting � - -� _ j E:2034436.88 LA RUE M POWELL Diversion Ditch Permanent �� /� E11t►ance -"� v1\ r .. / ;TOWN /0 OLL 1 r E HE y -= , VV `} SPRINGS �) /\A -With Gat \ _/ SPCH DDrainage Direction SEDIMENT reoBASIN 27 N: 67 5. 0 E203612(Creek ` \\ I l \v _ -- stockpile Existing � � � - ��� i � � , ,� � 'i , OB 5 - =-=-_" � ql ` p 9 /�' l ✓ / �i l- N IF J A slope Drain - \�/!� �� 11 ;� I �� I N F' � �_/ � -�� , � J\01 -6 BRADY RBTHERE ROBE OB T \ \ . v �.TENBRINK -� � )i ��� '� �- 0. seDIMENT�� �� // AND 'isj ROBEHA 70hr NICk � • I �I I ! I I) I \\ �, _N.676544,19 J/- NORTH EAS OB- 676/ � /f i E.2036089.13 436.75 n �. E: 2032605.50 N: 6764 E:2033485.62 \\ N/F 1 -- ., -- - i / i H, ` I F I / \ 13(MENT lip ps % Sediment J _ Phi & Basin#6 j �V �� �/ / N \ _ J - '; ill Nick &. t�ar`e0 I / } 9 ru I Iliopoulo5' r r 1 \ Av � (' \� i/ � /�,// tom_/ � s „•�. z � ; � %�' �� N" F AS <: � �� � / i� ��a I �., _,, .,.li veget ion. �� ��Pil /Z4 �S ME w y ����\\�� ° Ex, ,n tt t in ,\\\ ��2-54" RCP i xisting Rom` -acr: �����! o`ert., PERMANENT SLOre s�L z See Details 'r Ceti\- / DIVERSION e / Sheet X-5 1 r � � � � I I �x sting � / DITCH Pipes ill. �I 5-72 LAM JOB-4 ,- , lam, \ S.� yi 1 N/F/r' \ Mar/aret I. M Sheila M. Sti nsoli lins i_ BASIN f \ V - �� r - v \ I %,� WEST l �:. �2 > �v a� ul& _ `Theora Irene S. johns Shawn Levi �\ I� ,_:�o� . ,-,:. F / 1 \�w ai ENTRY ROAD 1G.�, � --.-.� F Red Rock Disposal LLC ( '� ��: Sediment I - „-, �. VERSION �' P j \ \ /i 111 _ 0.9, . c •d GRADE I -Sea m arged r I an , Sheet, X 4 /0 Waste Ind. USA Inca, \ % Existirq Dirt Road / �n pos Basin #7 OVERBURDEN 1� 3: 1 s%-M N Fy (Existing) --- Proposed 8"Pipe , with riprap r ° , EXl Stl n sLorE;, - \ o slope �% _.- \' i I, • ,\�,,,:.-. \ �\ / John,. Emmi \ J \ \ r ACCESS POINT down slo o basin bottom V _ ... Water g I,1 t'. -_ `� i0 a �\�,'u \ \/ % � % '� � \ .. - I ( ';' I -Nick & Mam�ea ;�-__✓ \ ; " Channel F X Retention E j i /� f . r �� , Existing �� C < 11 i o OUh05 1- i Sediment Trap #1 _�-�-- � �� .., e . ' � f_ P ,opane _ ` p (Existing) Sediment Trap #4 . (Existing) . , azo � Pond #1 Ex TING Tank----- l ( _„ . -- _ - v 330 , o�n� �s nti M X ASPHA � i � ,-----_ Existing) �.. _Check Dam _ \ 11 ` J \ PLAN Existing Basin#4 -.... SDO# _ g) oa( E3' 4- PR PI eNo.1 \ Sediment (Existing) `� SILT PENCE-, -, , � � PNlI II4 ' 'coPOSE \ 2 CF )' • i�� r' `---... TEivn LT ��;zIIX � CURRENT o e' �uo.v.r xxras J Property J r✓ ` - f PIT LIMITS M �\ '/ ,, a, � y308.8 • ` _ m ` R' E\ STING RIP -RAP + i RCP Pipe \ Lee C11 \NNEi_ C o ` \ y 1�5.7r1_- Sediment Trap #2 © \ EXISTING GRASS =�i e / \ % I /-$DO#7 = (ExistinA) 330 �\ \\,\ ` \ Rock Exi 5tl n - aeo- } . FUTURE PIT LIMITS n HANNEL E ' Check Dam I SDO #2 7 / _ (Existing) 9 Shop 1 Z Rip -Rap �� DIVERSION /� ci.� \ 1 ' ' ' / O • d /`-. DITCH Lr' ;ChannelG ... et- /. r P'd( �`` ..`. FilitUl"' - \ O'm .`."Cock 'lE` Existin P ✓ _ --- P g) Sediment Trap � �✓V / Area \ V / #3 Exist' ?f' k.p- ` Existing Pit Stockpi RCP Pipe z �`'PROPOSED MINE P f d Rock Disposal LLCM\+ LIMITS EXPANSION E" (eR dd rx� aste Ind. US nc. I \ t ( M 1 �� // r7 r \\,/ / .3zo / j_ .3];.i ➢ EX A:S �� -N"' Yl it \ C Future Mine Area N/F Ali e( O I r � Jack Ro S _ ✓. 1 \\ _ f / 8.3 JP Dam#1 U�"' """' �� -. St:oCkpl le ,3z .3/�. �� �\ 1i1 � �h �;rr \ _ N/ I i REV N0: DESCRIPTION OF REVISION: DATE: \ (SDO-5) /� ` r ± Area/ \ems\ j II //A1 SA-13,800 �- �. .; '}n 4 ,.., .-h ( `� O �:YUeI l ♦ ��', \� f �� W111, 1!' I 1 < MINE MODIFICATION 3.22 L,> '�` @elev.298 •y - - EXlStlti �,. - ` '\ i ! i`l a MINE MODIFICATION 6.29.21 / - ? $r .-, , , $ 4 `, - �a \ _ Wan a ADDED INSET 2 AND NOTES REVISIONS 1 6 Plant �- �`�'. �Ti"dl n tie,) 1 -;B`. Line _ Gas Q 2 20 1 :. % �'- I � / Natural son Q MINE MODIFICATION 11.1.16 �' \t '�- \ / Cent,P,r/�)/ ADDED FORMER MONITORING WELLS 9-15-08 A% v c " -pep' ..-*ter J H 4 0 V Ozons�a N W N � Uj I& Z Z W ~ a N Z 0 NJU) � t9 a �J Z ® J 0 2 = a J v F d LFE z r F � C9 ZO Z NINE C c � Z Wa NEW O a W O im 19 W DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: OF: 111 Haul/Access Road Detail Notes Notes: 1. Haul or Access Roads shall be constructed with a 4' minimum height safety berm on downgradient side of road. As field circumstances dictate, a safety berm may be constructed on both sides of the roadway. 2. In order to control sediment, rock outlets shall be installed at natural low points in the road alignment and every 200 linear feet at a minimum. Additional outlets may be installed as necessary to control discharge. 3. Rock dam shall be constructed of Class B Rip Rap and a 1 foot thick #57 stone filter layer installed on the upgradient side of the outlet. 4. Maintenance: a. Inspect Rock outlets weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. b. Restore outlets to the original design dimensions. c. Replace #57 stone filter layer as clogging occurs. COMPACTED SOIL _ SAFETY BERM II-III=1-� WIDTH VARIES PROFILE VIEW ROCK OUTLET IN NATURAL LOW POINT IN ROAD ALIGNMENT (MIN. EVERY 200 LF) +G FLOW HAUL OR ACCESS ROAD DETAIL NO SCALE SEDIMENT TRAP SC14EDIJLE Structure No. Disturbed Area (Acres) Drainage Area (Acres) Sediment Storage -ftA3 Basin Dimensions L' x W x D' (Average) Wei ST-1 up to 0.2 up to 0.2 720 261 x 13'W x 4'D ST-2 up to 0.2 up to 0.2 720 26'L x 13'W x 4'D ST-3 up to 0.2 up to 0.2 720 261 x 13'W x 413 ST-4 up to 0.2 up to 0.2 720 261- x 13'W x 413 ST-5 up to 2.6 up to 2.6 9,360 881 x 44'W x 473 ST-6 up to 2.2 up to 2.2 1 7,920 821 x 41' W x 4'D SEDIMENT TRAP DIMENSIONS NUMBER DURATION SURFACE WIDTH SURFACE LENGTH SURFACE ELEVATION BOTTOM ELEVATION WEIR LENGTH FABRIC BAFFLE SPACING INLET ZONE 1ST & 2ND CELLS OUTLET ZONE ST 7 .LONG-TERM 53' 106, 277 273.5 12' ST 8 LONG-TERM 55' 110, 276 272.5 12' stone Baffles ST 9 LONG-TERM 49' 98' 277 273.5 10, cT 10 SHORT-TERM 11' 22' 275 272.5 4' 8' 5' 4' ,T 11 SHORT-TERM 11' 25' 277 273.5 4' 9' 6' 4' ST 12 SHORT-TERM 16, 42' 273 269.5 4' 15 10' 4' ST 13 SHORT-TERM 17' 41' 273 269.5 4' 8' 5' 7' ST 14 LONG-TERM 35' 101' 277 273 8' Stone Baffles ST 15 LONG-TERM 35' 105, 302 298.5 10, ST 16 LONG-TERM 54' 115, 318 314.5 12' ST 17 SHORT-TERM 10' 20' 322 320 4' 7' 5' 3' ST 18 SHORT-TERMI 10' 1 20, 322 320 4' 7' S' 3' ST 19- SHORT-TERM 10' 23' 322 320 4' 9' S' 4' ST 20 SHORT-TERM 10' 20' 322 320 4 7' 5' 3' ALL TRAPS DESIGNED FOR 25 YEAR LIFE -SPANS 12" MIN. SEDIMENT PIT (-50cf) 2 CLASS B 2 RIPRAP SLOPE ROCK OUTLET DETAIL NO SCALE ,111,1 squars Mound 1._++' _ 3.1 min � Hold-down Stakes Each Side Q 10' o.c. -III-III- III -I I I� I J _ Corrugated Plastic Pipe as Bend _ Wye Brench '4 Stabilize - I I I 11-1 I I-III-j 1 OnUet SECTION 4' min. level section PLAN Construction Specifications and in and causes washouts. A common failure of slope drains is caused by water saturating the soil and seeping along the pipe. This creates voids from consolidationp p g a i e and the soil at fillip around and under the pipe "haunches"with stable soil material and hand compacting in 6-inch lifts to achieve firm contact between the pp Proper backfilling p p all points will eliminate this type of failure. 1. Place slope drains on undisturbed soil or well compacted fill at locations and elevations showfl on the plan. 2. Slightly slope the section of pipe under the dike toward its outlet. 3. Hand tamp the soil under and around the entrance section in lifts not to exceed 6 inches. 4. Ensure that fill over the drain at the top of the slope has minimum dimensions of 1.5 feet depth, 4 feet top width, and 3:1 side slopes. 5. Ensure that all slope drain connections are watertight. 6. Ensure that all fill material is well -compacted. Securely fasten the exposed section of the drain with grommets or stakes spaced no more than 10 feet apart. 7. Extend the drain beyond the toe of the slope, and adequately protect the outlet from erosion. 8. Make the settled, compacted dike ridge no less than 1 feet above the top of the pipe at every point. 9. Immediately stabilize all disturbed areas following construction. Maintenance Inspect the slope drain and supporting diversion after every rainfall, and promptly make necessary repairs. When the protected area has been permanently stabilized, temporary measures may be removed, materials disposed of properly, and all disturbed areas stabilized appropriately. SLOPE DRAIN DETAIL N.T.S. EXISTING HAUL ROAD NOTE: CHANNEL SLOPE 6.8% TEMPORARY CHANNEL, TO BE FILLED AFTER SLOPE ABOVE HAS BEEN STABILIZED 6' 1 6' 1 6' 2' 3' 2' 21" 1 3 THICK �1 CLASS 1 ii_ SICK #57 STONE CHANNEL I DETAIL (LOOKING UPSTREAM) N.T.S. PROPOSED FLUSH * Dimension may be less Construction Specifications for short-term traps 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic Weir Length class B matter, and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. ,,,•/ \� Erosion Top of Berm 1 ONGITUDI NAL SECTION 2• Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in See Table Control Stone lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 2 3. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and soil. E Place the filter fabric between the riprap and the soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or i I,1 1 _ II II I I 11 I (- CROSS SECTION AT SPILLWAY CL DITCH Oft. 4ft. 5-ft. SHOULDER EXISTING GRADE lin./ft 3 -+----_" \� 1 1 F-3-III-I 1 1/4in./ft. IL 30' ROADWAY NOTES: 1) Roadway shoulders and side line ditches shall be vegetated or otherwise stabilized. 2) Roadway must be stabilized (with stone or pavement). _III Excavate a keyway trench along the center line of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 feet deep and 2 feet wide with 1:1 side slopes. -III 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. - -Filter Fabric 5. All cut and fill slopes should be 2:1 or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 feet and maximum side slopes of 1:1 that extend _ to the bottom of the spillway section. TEMPORARY SEDIMENT TRAP 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. N . T . S . 8. Material used in the stone section should be a well -graded mixture of stone with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Discharge inlet water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 10. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground, and shape the center to confine the outflow stream (References: Outlet Protection). CL DITCH 9. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 5ft. 4ft. 4ft. 10. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References: Surface Stabilization). SHOULDER 11. Show the distance from the top of the spillway to the sediment cleanout level (1/2 the design depth) on the plans and mark it in the field. 14. Install porous baffles as specified in Practice 6.65, Porous Baffles. Maintenance: EXISTING GRAD 1/4i n. /ft. li n. /ft. Inspect temporary sediment traps at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Remove 3 3 sediment, and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the 1 sediment that is removed in the designated disposal area, and replace the part of the gravel facing that is impaired by sediment. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 feet below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the - TRAFFIC SURFACE spillway must be replaced immediately. 8i n. ABC After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas, and stabilize properly. Notes: 1) Sediment traps are sized for the total drainage area with 1 clean -out per year 2) Weir dimensions are minimum requirements from NCESCPDM (Table 6.60a) SITE ACCESS ROAD - TYPICAL SECTION Weir 10 ft. Min. 24 ft. Min. Front View Upstream stone or 5 ft. Min. gravel facing 1 ft. thick Rock abutment 2 ft. Min. 2 3 1 1 8 ft. Max. Filter Fabric Cut -Off Trench -/ 2ft. Deep min. 2ft. Wide min. side view Structure No. Disturbed Area (Acres) Drainage Area (Acres) Sediment Storage - ftA3 Surface Area ftA2 Weir Elevation Weir Min. R'idth ST-1 up to 8,0 up to 8.0 28,800 11.800 298' 10' SB 11 21.46 23.84 25,150 32,700 325' 27' N.T.S. Key f in 2 ft. Min. i Min. Spillway Rock Apron r,ieer rabric 4 ft. Min. r1.5 ft. Min. Construction Specifications 1. CLEAR THE AREAS UNDER THE EMBANKMENT AND STRIP OF ROOTS AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEANING THE RESERVOIR AREA UNTIL THE DAM IS IN PLACE. 2. COVER THE FOUNDATION AREA INCLUDING THE ABUTMENTS WITH EXTRA -STRENGTH FILTER FABRIC BEFORE BACKFILLING WITH ROCK. IF A CUTOFF TRENCH IS REQUIRED, EXCAVATE AT CENTER LINE OF DAM, EXTENDING ALL THE WAY UP THE EARTH ABUTMENTS. APPLY FILTER FABRIC UNDER THE EMBANKMENT THE DAM TO THE DOWNSTREAM EDGE OF THE APRON. OVERLAP FILL MATERIAL A MINIMUM ROCKFILL EMB T FROM THE UPSTREAM EDGE OF E OF 1 FOOT AT ALL JOINTS, WITH THE UPSTREAM STRIP LAID OVER THE DOWNSTREAM STRIP. 3. CONSTRUCT THE EMBANKMENT WITH WELL -GRADED ROCK AND GRAVEL TO THE SIZE AND DIMENSIONS SHOWN ON THE DRAWINGS. IT IS IMPORTANT THAT ROCK ABUTMENTS BE AT LEAST 2 FEET HIGHER THAN THE SPILLWAY CREST AND AT LEAST 1 FOOT HIGHER THAN THE DAM, ALL THE WAY TO THE DOWNSTREAM TOE, TO PREVENT SCOUR AND EROSION AT THE ABUTMENTS. 4. SEDIMENT -LADEN WATER FROM THE CONSTRUCTION SITE SHOULD BE DIVERTED INTO THE BASIN RESERVOIR AT THE FURTHEST AREA FROM THE DAM.. 5. CONSTRUCT THE ROCK DAM BEFORE THE BASIN AREA IS CLEARED TO MINIMIZE SEDIMENT YIELD FROM CONSTRUCTION OF THE BASIN. IMMEDIATELY STABILIZE ALL AREAS DISTURBED DURING THE CONSTRUCTION OF THE DAM EXCEPT THE SEDIMENT POOL (REFERENCES: SURFACE STABILIZATION). 6. SAFETY --SEDIMENT BASINS SHOULD BE CONSIDERED DANGEROUS BECAUSE THEY ATTRACT CHILDREN. STEEP SIDE SLOPES SHOULD BE AVOIDED. FENCES WITH WARNING SIGNS MAY BE NEEDED IF TRESPASSING IS LIKELY. ALL STATE AND LOCAL REQUIREMENTS MUST BE FOLLOWED. 7. MAINTENANCE: Check sediment basins after each rainfall. Remove sediment and restore original volume when sediment accumulates to about one-half the design volume. Sediment should be placed above the basin and adequately stabilized. Check the structure for erosion, piping, and rock displacement weekly and after each significant (M inch or greater) rainstorm and repair immediately. Remove the structure Ong any unstable sediment immediately after the construction site has been permanently stabilized. Smooth the basin site to blend with the surrounding area and stabilize. All water and sediment should be removed from the basin prior to dam removal. Sediment should be placed in designated disp®sal areas and not allowed to flow into streams or drainage ways during structure removal. CHANNEL N0. SIDE SLOPES BOTTOM WIDTH MINIMUM CHANNEL DEPTH CHANNEL E 3:1 15, 2. 5' CHANNEL F 3:1 50, 3' CHANNEL H 3:1 12' 3' DEPTH VARIES (SEE CHART ABOVE) 3 Maintenance: Inspect permanent diversion ditches after every rainfall during the construction operation. Immediately remove an P Y Y obstructions from the flow area, and repair the diversion ridge. Check outlets, and make timely repairs as needed. Maintain WIDTH VARIES the vegetation in a vigorous, healthy condition at all times. (SEE CHART ABOVE) GRASS LINED CHANNEL N.T.S. / I1 3 CHANNEL N0. SIDE SLOPES BOTTOM WIDTH MINIMUM CHANNEL DEPTH STONE SIZE THICKNESS CHANNEL C 3:1 10, 1' CLASS B 30" CHANNEL G EXISTING EXISTING EXISTING CLASS 2 42" CHANNEL J 3;1 12' 1' CLASS 1 27" THICKNESS 0 0 0Q 1� tl Of 3 Maintenance: Inspect permanent diversion ditches after every rainfall during the construction operation. immediately remove any obstructions from the flow area, and repair the diversion ridge. Check outlets, and make timely repairs as needed. Maintain the vegetation in a vigorous, healthy condition at all times. WIDTH VARIES (SEE CHART ABOVE) DEPTH VARIES (SEE CHART ABOVE) O o0 tl.000_00_p0 y0 O?_tlQ 10" - #57 STONE FILTER LINING RIP -RAP_ LINED CHANNEL N.T.S. N fl d S 0 O m Y >00, 01 In N d A N NNN 0 m � Omm 4 '10ZMM a 90.600 m MA N. dJX A m3dlu4 s Mazl-e. J F N Z W 7. Z n W 04 Y o_'a v) t9 0 3 (n LLJa' Wen Z r Q d Z Z W ` r ' y } V Z ® J d a Z J J O = to Z a X W u MM P CL F Oil W a W °a W 0: Z UpJ LU m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-X-1 DWG FILE: SCALE: HORIZONTAL: AS NOTED VERTICAL: AS NOTED ROCK DAM N.T.S. SHEET NO.: X-1 OF: GROUND ELEV. 333± to F- H H J 350 300 200 150 1 1` 50 C -50 0+00 GROUND ELEV. 306± F- H H J Z GROUND ELEV. 344± H z H 350 EXISTING GRADE 315 FINAL WATER EL. WEATHERED ROCK 275 E PYTSITNr PIT ABC 235 B 95 BEN AREA ACTIVE MINE & FUTURE PIT 155 BENC 115 BENCH 5 BENCH 35 BENCH -15 FOOT LEVEL - NAL FLOOR ELEV. -5 BENCH _... _- 2+00 4+00 6+00 8+00 10+00 12+00 SECTION A' -A' 1 =200 HORIZONTAL '111=50' VERTICAL PLANT WATER POND SILT POND 400 WATER EL. 379± WATER EL. 387± 400 390 390 1 3 1 380 80 1 1 �1 1r 370 370 30 36 J __. 4+50 0+00 0+50 1+00 1+50 0 4+00 2+00 2+50 300 3 5 EXISTING PLANT WATER & SILT PONDS SECTION C'-C' 1"=50' HORIZONTAL 111=10 VERTICAL C'TI T r1r11.111 400 vvr 1I 1u 400 SILT POND WATE EL. 380± 390 390 1 1 380 380 1 1 370 370 3601 360 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 EXISTING SILT PONDS SECTION D'-D' 1"=50' HORIZONTAL 1"=10' VERTICAL 14+00 16+00 16+00 18+00 BENCH 300 (ENCH 250 NCH GROUND ELEV. 316± 400 350 1 1; 250 _po 200 150 150 100 100 50 50 L -50 20+00 H H J U Z H GROUND ELEV. 370± H 400 H J Z H OVERB RDEN z rOVERBUR�DEN 315 FINAL WATER EL. FATHERED ROCK 275 BE EXISTING1- T PIT 235 BEN ABC -J 155 BENCH 15 BENCH 75 BENCH 35 EENCH -1E FOOT LEVE - FINAL F OOR ELEV. -5 BENCH 0+00 NOTE: ALL BENCH FACES ARE TO BE MINED ON a TO 1 SLOPE WITH FACE HEIGHTS OF 35 FT AND BENCH WIDTHS OF 1S FEET. SLOPES EXCAVATED IN UNCONSOLIDATED MATERIALS (OVERBURDEN) WILL BE LAID BACK ON 2 TO 1 GRADES. 2+00 4+00 6+00 8+00 10+00 12+00 SECTION B'-B' 7' MINIMUM VE QUARRY SIDE BR�RSION- 1 1 1/4" PER FT. 6" SLOPE DRAIN-. / 1 2 1L_ 2 2 _ 4 4 18" MIN. TEMPORARY DIVERSION CHANNEL Qr\RRv ='DE 12' TEMPORARY DIVERSION CHANNEL SECTION 2' 7' MIN. PLAN VISUAL BARRIER BERM N.T.S. 1=200' HORIZONTAL 1'r-50' VERTICAL 18" MIN. L TEMPORARY DIVERSION CHANNEL 10' OUTSIDE 4 4 1 1 12' TEMPORARY DIVERSION CHANNEL 1� 2 BENCH 350 ENCH 300 JCH 250 H 200 150 111 50 % 14+00 16+00 OUTSIDE 1.5 ft. min beynd ditch bank �y},p 9 inch. min. below "0 natural ground level O pO O O00 00�000 0 1�00 �0000 Channel width varies Plan View of check Dam 1.5 ft. Min Class B Riprap 12" of NCDOT #5 or #57 washed Stone 2 �1 2 ft. max. at center Filter Fabric Cross -Section view of Check Dam Length is the distance such that points A and a 0 O�0�,.00 are of equal elevations 00 00O$ 00 A Length B O 0000 00 0 000 O O 000 0 Spacing for check Dams Construction Specifications: 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the clarinet banks. 3. Extend stone at least 1.5 feet beyond the ditch bank to keep water from cutting around the ends of thed+eck dam. 4, Set spacing between dams to assure that the elevation at the top of the lower dam is the same as tie bw elevation of the upper dam. 5. Protect the channel after the lowest check dam from heavy flow that could cause erosion 6. Make sure that the channel reach above the most upstream dam is stable 7. Ensure that other areas of the channel, such as culvert entrances below the check dams, are not suoject to damage or blockage from displaced stones. Maintenance: Inspect check dams and channels at least weekly and after each significant (1/2 inch or greater) remits event and repair immediately. Clean out sediment, straw, limbs, or other debris that could dog the channel when needed. Anticipate submergence and deposition above the check dam and erosion from high flows around the edgss of the dam. Correct all damage immediately. Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation. alb& - to drain through the stone check dam, and prevent large flows from carrying sediment over the dam Adds,, - - as needed to maintain design height and cross section. TEMPORARY ROCK CHECK DAM N.T.S. 12 Gauge 4 ft.X4 ft. or 2 ft.X 2ft. welded wire hooked on to preformed channels on metal posts. Ultraviolet resistant geotextila fabric or equivalent, secured to wire with metal clips or wire at 8 in. on centers. I Max. sediment storage level is 1/2 height. Remove sediment when this level is reached or as directed by the conservation Inspector. 2 ft. Sheet drainage only r. Natural Grade 8 in.Wmetal Carry 12 inches of fabric into trench, cover with soil, tamp and backfill, 8 18 in.inches down and 4 inches horizontal. ry 6 in. of wire o trench. osts at 8 ft. X. 4 '"' Note: Silt Fence should not be used at pipe 8 ft. I outlets or in areas of concentrated flow I- O.C. -I (Creek, Ditch lines, swales, Etc.) { Max. Silt Fence Note: Flow Should not fun Sedlm=_nt J along silt fence, Use storage Pit diversion ditches instead. ' Flow Flow To increase storage capacity and prolong the life of the Silt Fence, It is generally advisable to dig a sediment pit in front of the Silt Fence whenever possible. Construction Specifications: MATERIALS 1. Use a synthetic filter fabric of at least 95% by weight of polyolefins or polyester, which is certified by the manufacturer or supplier as conforming to the requirements in ASTM D 6461. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120° F. 2. Ensure that posts for sediment fences are 1.33 lb/linear ft steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric 3. For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. CONSTRUCTION 1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3. Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have minimum 50 pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches. 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh support fence. Securely fasten the filter fabric directly to posts. Wre or plastic zip ties should have minimum 50 pound tensile strength. 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier. 6. Place 12 inches of the fabric along the bottom and side of the trench. 9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10. Do not attach filter fabric to existing trees. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, sediment fence may be installed using specially designed equipment that inserts the fabric into a cut sliced in the ground with a disc Installation Specifications: 1. The base of both end posts should be at least one foot higher than the middle of the fence. Check with a level if necessary. 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard applications. 3. Install posts 2 feet deep on the downstream side of the silt fence, and as close as possible to the fabric, enabling posts to support the fabric from upstream water pressure. 4. Install posts with the nipples facing away from the silt fabric. 5. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a post nipple when tightened to prevent sagging. 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level. 8. The installation should be checked and corrected for any deviations before compaction 9. Compaction is vitally important for effective results. Compact the soil immediately next to the silt fence fabric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Maintenance, Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sedibjent deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fahcing material and unstable sediment deposits and bring the area to grade and stabilize it after the con(ftbuting drainage area has been properly stabilized. SEDIMENT FENCE DETAIL N.T.S. N m d s 20 M 0 0)0 0 m aZ rinn 6 NNN i Y 00 m V m m Q oZMM L an I o mM mm� F 3 R W Q T MVI MfLL n 0 ® v H Z w m J W S W � DATE: U J J Q Z W I- Z <i 3 p a Y O - a 0 W y Z N a a Z ``: i N V W = ® Z V J d a _ J Z J U) TZ i rn W M u r Q IX MMA W Pill LLI 13 W OC z G W fig F W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-X-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: SHEET NO.: X=2 OF: La PLAN STONE CLASS CLASS "1" = 5 To 200 lbs CLASS "2" = 25 To 250 lbs CLASS "A" = 2" TO 6" W CLASS "B" = 5" TO 15" d = 1.5 times the maximum stone - diameter but not less than 6" la = length of riprap apron RIP -RAP LINING 0 o eo 0o eo d -1- FS-2 FILTER STONE SUBLAYER SECTION 6" BEDDING THICKNESS APRON NO. do La W STONE DIA, d LINING LINING THICK. LINING DIA. 1 2-42" 44' 60' CLASS 2 1 58" YES 12" CLASS A 2 1-36" 30' 1 39 CLASS 2 68" YES 12" CLASS A 3 2-54" 56.251 76' CLASS 2 64" YES 12" CLASS A 4 5-72" 60' 110' CLASS 2 30" YES 10" CLASS A 5 1-18" 12' 16.5' CLASS 2 60" YES 12" CLASS A 6 1-18" 9' 13.5' CLASS B 18" NO 6" #57 7 1-18" 12' 16.5' CLASS 2 40" YES 12" CLASS A 8 9 1-36" 1-30" 24' 26' 27' 28.5' CLASS 2 ICLASS 2 48" 15" YES YES 12 17 CLASS A 15" 10 1-30" 24' 26.5' ICLASS 1 1 21" 1 YES 21" 1 15" Construction Specifications: 1, Ensure that the subgrade for the filter and riprap follows the required lines and grades shown in the plan. Compact any fill required in the subgratl, to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap so the top layer Is above the downstream layer a minimum of 1 foot It the damage is extensive, replace the entire filter cloth. 4. Riprap may be placed by equipment, but take care to avoid damaging the titter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 7. Construct the apron on zero grade with no overfill at the end. Make the top of the riprap at the downstream end level with Me receiving area or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length, If a curve Is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation.. Maintenance: Inspect riprap outlet structures weekly and after significant (1/2 inch or greater) rainfall events to see if any erosion around of below the riprap has taken place, or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. ENERGY DISSIPATER DETAIL N.T.S. TYPE "A" SEEDING SCHEDULE FOR STABILIZATION GRASS DATE TYPE PLANTING RATE MAR. 15 - MAY 15 PERRENNIAL SEED MIX 10 LBs/ACRE N.C. WILDLIFE RESOURCES COMMISSION MAR. 1 - JUN. 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE (MAR. 1 - APR. 15) ADD TALL FESCUE 120 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD WEEPING LOVEGRASS 10 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUN. 1 - SEP 1 *** TALL FESCUE AND 120 LBS/ACRE *** BROWNTOP MILLET 35 LBS/ACRE OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SEP. 1 - MAR. 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) 70 LBS/ACRE AND TALL FESCUE 120 LBS/ACRE (NOV. 1 - MAR 1) AND ABRUZZI RYE 25 LBS/ACRE TYPE "B" SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES (MAx. 3:1) DATE TYPE PLANTING RATE AUG. 15 - NOV. 1 TALL FESCUE 300 LBS/ACRE NOV. 1 - MAR. 1 TALL FESCUE 300 LBS/ACRE & ABRUZZI RYE 25 LBS/ACRE MAR. 1 - APR. 15 TALL FESCUE 300 LBS/ACRE APR. 15 - JUN. 30 HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUL. 1 - AUG. 15 TALL FESCUE AND 120 LBS/ACRE *** BROWNTOP MILLET 35 LBS/ACRE *** OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SLOPES (3:1 TO 2:1) MAR. 1 - JUN. 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE (MAR. 1 - APR. 15) ADD TALL FESCUE 120 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD WEEPING LOVERGRASS 10 LBS/ACRE (MAR. 1 - JUN. 30) OR ADD HULLED COMMON BERMUDAGRASS 25 LBS/ACRE JUN. 1 - SEP. 1 **^' TALL FESCUE AND 120 LBS/ACRE *°* BROWNTOP MILLET 35 LBS/ACRE *** OR SORGHUM - SUDAN HYBRIDS 30 LBS/ACRE SEP. 1 - MAR. 1 SERICEA LESPEDEZA (UNHULLED - UNSCARIFIED) 70 LBS/ACRE AND TALL FESCUE 120 LBS/ACRE NOV. 1 - MAR. 1 ADD ABRUZZI RYE 25 LBS/ACRE SEEDING SCHEDULE FOR REVEGETATION BENEFICIAL TO WILDLIFE DATE TYPE PLANTING RATE FEB. 1 - APR. 1 KOBE LESPEDEZA 20-40 LBS/ACRE FEB. 1 - APR. 15 ORCHARD GRASS 15-25 LBs/ACRE MAR. - APR. SHRUB LESPEDEZA 16 LBS/ACkE MAR. - APR. SWITCHGRASS 6-8 LBS/ACkE APR. - MAY BAHIA GRASS 25-35 LBS/ACRE APR. 15 - JUN. 15 LOVEGRASS 4-5 LBS/ACRE CONSULT CONSERVATION ENGINEER, SOIL CONSERVATION SERVICE OR WILDLIFE BIOLOGIST FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGE- TATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING COMBINATIONS AND SEEDING RATES ARE POSSIBLE. "' TEMPORARY -- RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING,OTHERWISE FESCUE MAY BE SHADED OUT. 1. Chisel compacted areas and spread topsoil inches deep over adverse soil conditions, if available. `Apply: 2.Ro the entire area to 6 inches depth. Agricultural Limestone - 2 tonvacre 3. Remove all loose rock, roots, and other obstructions leaving surface reasonable smooth and uniform. / so' or 3 tons acre In clay II§ . 4. Apply agricultural lime, fertilizer, and super phosphate uniformly and mix with soil (see below'). Fertilizer - 1000 lbs/acre (10-10-10) 5. Continue tillage until a well -pulverized, form, reasonable uniform seedbed is prepared 4 to 6 Inches deep. Super phosphate - 500 lbg/acre (205) 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or cultipack after Mulch - 2 tonslacre (small grain straw) seeding. Anchor - Asphalt emulsion at 450 gal/acre 7. Mulch immediately after seeding and anchor mulch. 8. Inspect all seeded areas and make necessary repairs or res"clings within the planting season, if possible. If stand should be over 60%damaged reestablished following original lime, fertilizer and seeding rates. 9. Consult conservation inspector on maintenance treatment and fertilization after permanent cover is established. SEEDBED PREPARATION NATURAL GROUND CARRY RIP -RAP UP SIDES OF SPILLWAY - TOP OF BERM III-1 FLOOD STORAGE ZONE „ , L „ 2.5 III „F ., 1 J I -III 1 TOP ELEV. OF SPILLWAY - "N" #57 WASHED STONE CLASS B RIP -RAP II„ till=l III- Il�I I I_il I- 11�111=���1=III = "G" SEDIMENT STORAGE ZONE) TOTAL BASIN CAPACITY "p" 1� =7 L 1111 ll 11=III-I I -II-II - MAX. SEDIMENT DEPTHI- 1' y 1=L =T, I-11111 ° II II MAX LEVEL OF SEDIMENT COLLECTED 1�=11 ill- 11=1J 11 1=r I- - rt n- - 2 CLEAN BASIN WHEN LEVEL IS REACHED KEY WAY (20' WIDE) SECTION THRU (.EDIMENT BASIN CARRY RIP -RAP UP SIDES OF SPILLWAY maintenance: Inspect sediment basins at least weekly and after "0" each significant (K inch or greater) rainfall event and repair immediately. Remove sediment and - - restore the basin to its original dimensions when - "J" it accumulates to one-half the design depth. l Place removed sediment in an area with sediment controls. check the embankment, spillways, and outlet for CLASS B KEYWAY RIP -RAP I' I P erosion damage, and inspect the embankment for ail piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris II' from the riser and pool area. C11 SECTION THRU BERM &-FILTER SEDIMENT BASIN DIMENSIONS S ALL BASINS DESIGNED FOR 25 YEAR LIFE -SPANS SEDIMENT„ A » » B » „ C „ >, D "E" "F" "G" "H" "I" "J" "K „ L » „ M „ » N "0" "P "Q" WIDTH RISER BASIN YES NO N0. 1 20 1'-0' 18'-0' 3'-0' 1'-6' 1'-0" 4'-O' 1'-0" 6'-0" 1 -0 2.5 - 7'-0' 1 -0" 10-0" 10'-0'X2 55 1'-0" 18-0" -0" 1-6" 1-0" 4'-0" 1-0 6'-0' 1'-0" 2.5 2.5 - 7-0 1-010-0 20'-0" X3 40 1-0" 18'-0" 3'-0" 1 -6" 1-0 4-0 1'-0 6'-0' 1 -0 13'-"2.5 2.5 2.5 - 7 -0 1'-0" 10'-0"W25'_0 X 4 40 1'-0" 18'-0" 3'-0" 1'-6" 1'-0" 4-O 1-0 6'-O" 1'-0" 2.5 2.5 - 7'-0" 1'-0" 10'-0"X 5 60 1'-0" 18'-0" 3'-0" 1'-6" 1'-0" 4'-0" 1'-0" 6'-0" 1'-0" 2.5 2.5 - 7'-0" 1'-0" 10'-0"X 6 70 „ 1 -0 „ 18 -0 3 -0 1 » -6 1 -0 » 4 -0 „ 1 -0 6 -0 1 -0 2.5 2.5 - 7 -O;; 1 -0 " 10 -0 X 7 67 1 -0 18 -0 3 -0 1 -6 1 -0 4 -0 1 -0 6'-0" 1 -0' 3 -0" 2.5 2.5 - 7 -0 1 -0 10 -0 X 8 65 1'-0" 18'-0" 3'-0" 1'-6" 1'-0" 4'-p" 1'-0" 6'-0" 1'-0" 3'-0" 2.5 2.5 - 7'-0" 1'-0" 10'-0"X 8'-P" 11 100 1'-0" 18'-0" 3'-0" 3'-0" ''--" 1'-0 5'-0" 2'-0" 6'-0" 3.0 2.0 326.0 27' 5'-0" 35' 175' X I NOTE: SEE SEDIMENT BASIN DETAIL., SHEET X-4, FOR SEDIMENT BASINS SB 9, SIB 10 & 5B 12. Ri OVERBURDEN PILE DITCH BETWEEN ROADWAY AND OVERBURDEN PILE 20' ACCESS ROADWAY, GRADED TOWARDS OVERBURDEN PILE GRADE BERM TOWARDS SEDIMENT BASIN SEDIMENT j BASIN - - SPILLWAY 12" HOPE PIPE UNDER ACCESS ROADWAY, SPACED EVER 200' STREAM BUFFER TYPICAL SEDIMENT BASIN ACCESS CROSS SECTION rvnT Tn crni c 15' MIN CONTROL SECTION -121 MIN. = - -----I- I_ _ -I i,_ - EXISTING CHANNEL -MATCH EXISTING GRADE 1t,=1I --IIL T� 20' LEVEL - I_ OR GREATER 1 , APPROACH RIP -RAP DOWN' - CHANNEL STREAM SIDE PROFILE 3 -- lz" 1__ I - I: =1 -=11=111= � �,- -11 - 1 1-11----- 11 I_III-IT�I-Ii1 111" 1= I I I -III -1 I I I -I 11-1L '. I a 11= -1, 20' CROSS SECTION EMERGENCY SPILLWAY DETAIL N.T.S. Crushed CONSTRUCTION SEQUENCE: Stone 1. Construct berm by placement of ovtlrburden. 2. Prior to placement of materials for berm formation, cut vegetation nearly flush with ground (if applicable). 3. Compact materials in I foot lifts by construction traffic. MAX WATER LEVEL EL. 323.85 @ 41 EL. 313.00 @ #2 CONSERVATION WATER LEVEL EL. 294.00 @ #3 EL. 311,25 @ #2 EL. 321,00 @ #4 EL. 292.00 @ #3 EL. 326.00 @ #4 SEE DETAILTB� 1 RISER STEM CM RISER PIPE - SEE DETAIL B - 12" SLIDE GATE - SEE DETAIL C QI SEE DETAIL POND #1 = #1 POND #2 = #2 POND #3 = #3 POND #4 = #4 RETENTION DAM - 2 l� EXISTING GRADE NOTES: 1. NO end dumping of overburen shall occur during berm construction. 2. Slopes will be tracked during construction to aid in the establishment of vegetative cover. OVERBURDEN AREA - not to scale 60" @ #1 EMERGENCY SPILLWAY 30" @ #2 EL. 321.50 @ #1 EL. 312.19 @ #2 30 @ #4 EL. 292.94 @ #3 EL. 328.00 @ #4 CREST EL. 325.00 @ #1 EL. 5.00 @ #2 29 EL. 295.00 @ #3 EL. 330.00 @ #4 IMPERVIOUS FILL MATERIAL �42" CONDUIT PIPE -ANTI-SEEP COLLARS 1 OUTLET EL. 289.0 @ #2 OUTLET EL. 283.0 @ #3 OUTLET EL. 310.0 @ #4 �L OUTLET PROTECTION 0': 0 0. 0 (SEE DETAIL) 11 4r .. 1 �10--I ZSTRIP CUT OFF 8"-12" BENEATH DAM TRENCH FOUNDATION AREA TYPICAL SECTION THROUGH PRIMARY SPILLWAY ---- N.1.S. Place material from excavation on downhill side of flow. Use additional fill I to achieve specified height 2' min. I� and width. 1. ti �a+ 1 and Flow Pal. 3.1 ma seed and mulch diversion channel and dike immediately after construction. varies choose appropriate seeding mixture 3' min. from the seeding schedule. Construction Specifications: 1) Remove and properly dispose of all trees, brush, stumps, and other objectionable material. 2) Ensure that the minimum constructed cross section meets all design requirements. 3) Ensure that the top of the dike is not lower at any point than the design elevation plus the specified settlement. 4) Provide sufficient room around diversion to permit machine regarding and cleanout. 5) Vegetate the ridge immediately after construction, unless it will remain in place less than 30 working days. Maintenance: Inspect temporary diversions once a week and after every rainfall. Immediately remove sediment from the flow area and repair the diversion ridge. Check outlets, and make timely repairs as needed. When the area protected is permanently stabilized, remove the ridge and the channel to blend with the natural ground level and appropriately stabilize k. TEMPORARY DIVERSION DITCH N.T.S. CONDUIT PIPE (St I- NOTE) 36" @ #2,4 42" @ #3 2000 PSI CONC 48" @ #2,4 54" @ #3 9„ 6'-6" SQ. DETAIL A COVER TOP OF TRASH RACK WITH EXPANDED METAL SCREEN (12 GAGE) 'IPE 00 ATTACH TRASH RACK WITH � THREE a"X 1j" STEEL STRAPS SPACED 12" APART. STRAPS CAN BE WELDED OR BOLTED TO TRASH BACK AND RISER PIPE. N.T.S. NOTE: THE RISER PIPE TO OUTLET CONDUIT CONNECTION SHALL BE MADE WITH CONNECTING BANDS CONFORMING TO ASTM-A-444 AND SHALL BE FITTED WITH THICK CIRCULAR RUBBER GASKET EQUAL TO THE WIDTH OF THE BAND. THE BAND SHALL BE DRAWN TOGETHER WITH SUITABLE BOLTS THROUGH THE USE OF A BAR AND STRAP HARNESS ASSEMBLY TO PROVIDE A STRUCTURALLY SOUND AND TIGHT CONNECTION. THE RISER PIPE SHALL BE FITTED WITH A "TEE' CONNECTION AT THE BOTTOM SUITABLE TO RECEIVE AND CONNECT THE OUTLET CONDUIT. SLIDE GATE DETAIL C N.T.S. NOTE: TRASH RACK TO BE 54" @ #2,4 FULLY BITUMINOUS 60" @ #3 COATED. CORRUGATED METAL PIPE (16 GAGE MIN.) RISER PIPE 48" @ #2 4 54" @ #3 DETAIL B N.T.S. 0 J J Y rs v a 0 N « > a r e n N N, O d N y V M `oz^M Q o mM mm� N C N..- dJX m S 0=aus MN LL'FLL 0 C2 1- ®v z u C� W m J W W DATE: V J �Jp V/ Q r Z 4W i ~ Z O W ® O U ��yr v a W W 0) Z F C9 Z W ~ y z y O_ U) Q J N Q U) W Ci ai ~ v r 1 H J 4* W W a ®F W OC Z G W d H W f� DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: LOCATION: HOLLY SPRINGS HA-iOLLYSPRINGS-X-1 DWG FILE: SCALE: HORIZONTAL: 1' = 200' VERTICAL: SHEET NO.: X-3 OF: we-(nX ON-� w d-wwa w 0 L'J CE :2 w U C)X Qa= oaf �o TOP OF BANK CAPACITY OF 36" RCP CULVERTS = 133.8 CFS EARTH FILL COVERED BY /-LARGE ANGULAR ROCK FILTER CLOTH LARGE ANGULAR ROCK OVER EARTH A LL TOP OF BANK PARTIAL PLAN AT STREAM CROSSINGS SCALE: 1" = 20' COIR WATTLES PLACED 32' OFF OF SILT FENCE ROW AREA BETWEEN SILT FENCE AND STAKED COIR WATTLES TO BE MATTED AND SEEDED WITH ANNUAL RYE(TEMPORARY) AND A WETLAND MIX (PERMANENT) SILT FENCE, PLACED AT HIGH __Nz WATER MARK COIR WATTLES PLACED 32' OFF OF SILT FENCE ROW NOTE: LESS THAN OR EQUAL TO 40 LINEAR FEET OF RIPARIAN EXISTING HAUL ROAD TO BE REMOVED EXISTING HAUL ROAD TO BE REMOVED STREAM AND WETLAND RESTORATION DETAIL WETLAND CROSSING CONSTRUCTION SEQUENCE 1. INSTALL COFFERDAM AND PUMP AROUND TO WORK IN THE DRY 2. LAY FILTER CLOTH AND BED PIPES. 3. INSTALL ROCK FILL OVER PIPES FOR CROSSING. 4. REMOVE COFFERDAM AND MAINTAIN ROCK. 5. REMOVE CROSSING PER DETAIL AFTER NEED FOR ROAD IS GONE. 50' STREAM Emerg. Anti- Anti - Bottom Bottom Bottom Surface Sediment Top of Spillway Top of Riser Barrel Skimmer Orifice Flotation Flotation Riprap Riprap Basin # Length Width Elevation Elevation Elevation Riser Elev Dam Diameter Diameter Diameter Diameterxw depth Wu Riprap WI Length 10 161 70 339 341 340 1 341 342 344 36 24 4 no plate 4.5 1 6 22 20 21 irregular 335 337 336 337 338 339 48 24 2.5 no plate 4.5 1.5 6 28 24 22 irregular 331 334 332 334 335 336 36 18 2.6 2.1 4.5 1 4.5 25 22 23 220 15 329 332 330 332 333 334 36 18 2 2.0 4.5 1 4.5 21 18 24 irregular 297 299 298 299 300 301 36 18 2.5 2.0 4.5 1 4.5 22 19 25 irregular 1 307 309 308 309 310 311 18 15 2 1.5 4.5 1 3.75 17.5 16 26 irregular 297 299 298 299 300 301 60 36 3 no plate 6 1.5 9 29 24 27 irregular 337 339 338 339 340 1 341 18 15 1.5 1.4 4.5 1 3.75 1 13.5 12 28 regular 315 1 317 316 317 1 318 1 319 36 18 2.5 2.0 5 2 4.5 1 23 20 5' 1' Line with 2' Class 1 riprap N0N-W0VEN CECIFXIH E PERMANENT SLOPE DRAIN DETAIL Floating Skimmer with gravel pad to rest on Class B Erosion Control Stone Buff Top Elev. of Pool Bottom Elev. of Pool 44 bar Layout Shown is suggested: However, other layouts may be used provided openings are 64" e square in area Trash Rack Sediment Storage TRASH RACK DETAIL Class B Riprap Apron L5 R. thick CPP Barrel RIP -RAP OUTLET DETAII. NOTE: SKIMMER TO BE STAKED TO BERM IN ACCESSIBLE LOCATION WITH A RETRIEVAL ROPE Bottom Elev. of Spillway Riser -Anti-Flotation Device (see detail) Top of Dam Elevation i Line with grass according f to Seeding Schedule 3 f] Top of Dam Elevation Anti -Seep ALL BASINS DESIGNED FOR 25 YEAR LIFE -SPANS Cuttoff Trench: 2'deep Rip -Rap Outlet 3'bottom (see outlet detail) 2:1 side slopes Basin Number Width Ripmp Size Riprap Thickness SB 10 6' Class B F-6" SB 26 5' Class B F-6" Width I Compacted Subgrade Riprap Freeboard �- Filter Fabric _Bottom Elev. of Spillway Concrete SPILLWAY CROSS SECTION ANTI -FLOTATION DEVICE Construction Specifications: 1. Site preparations --Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material, Delay clearing the pool area until the dam is complete and then remove brush, trees, and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2. Cut-off trench --Excavate a cut-off trench along the center the of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment, but in no case less than 2 feet. Make side slopes of the trench no steeper than 1:1, Compaction requirements are the same as those he trench d during backfillin and compaction o erattons. p p p q ose for the embankment. Keep t dry g g p p 3, Embankment --Take fill material from the approved areas shown on the plans. It should be clean min vegetation, roc and other objectionable material. Scarify areas on pp p eral soil, tree of roots, woody vegetal n, rocks, I ty which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, it is too wetter proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and compact it. Compaction maybe obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of heavy equipment, or a compactor may be used, Construct the embankment to an elevation 10 percent higher than the design height to allow for settling. 4. Conduit spillways -Securely attach the Haar to the barrel or barrel stub to make a watertight structural cue all connections between barrel sections b approved watertight assemblies. C g connection. Secure y pp g Place the barrel and riser on a firm smooth foundation of Impervious soil. Do not use pervious material such s sad ravel or crushed stone as backfill around the a or anti -see collars. Place the fill I pe p ha sand, pp p material around the pipe spillway in 4-inch layers, and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with Its foundation when compacting under the pipe launches. f backfill over the spillway before crossing it with constructionequipment. Anchor the riser in lace b concrete or other satisfaaor means to prevent Place a minimum depth of 2 feet o compacted h pipe sp I y gp y y flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway --Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. 6. Inlets --Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. 7. Erosion control --Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 8. Install porous baffles. 9. Safety --Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance'. Inspect sediment basins at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. SCALE: 1"=20' rTVrvow rinvl- rw�u RISER & BARREL SEDIMENT BASIN DETAIL C2 0 o O h z w C U W m J W Z ■ ■ V J -J `n r ` / r F W Igo ZQ� O O -tea W W 3 N H /yam V Z � Z t9 L yJ ,ydw/ Z Ili y J re U) a J J Z 0J 0 Z a U) W V M u H z W W R W � Z � W �0. H W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA_HOLLYSPRINGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 300' VERTICAL: SHEET NO.: X-4 OF: *4-1 52.9 SEDIMENT BASIN 20 PLAN VIEW SCALE 1" = 30' _ Construction Specifications: 1. Site preparations --Clear, grub, and strip topsoil from areas under the embankment to remove trees, vegetation, roots, and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees, and other objectionable materials to t facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below he basin as needed. t t t ff t h--E t c t-off trench alon the center line of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 feet deep. The cut-off trench must extend into both abutments to least he elevation of the riser crest Concrete Grout I Riser Concrete Basin Dimensions #20 5'-611 x 5'-6" x 3'-011 3' min. L L- 5I 1 min ANTI -FLOTATION DEVICE Top of Dam 327.0' 20' Freeboard 1 �% Max. Depth of Flow 3 for25-yr. Storm Line with grass according to Seeding Schedule Compacted Botfom oC Spillway Subgrade 326.0' Riser Basin Min. Slope Max. Slope Bottom Elev. of Spillway Top of Dam Flev. Width Max. Depth of Flow for25-yr. Storm Freeboard f20 1.0% 1.0% 326.0' 327.0' 1 20' 1 0.66 .34' SPILLWAY (cross section) 12'----- -�2'J 2 / \`�' SHOT ROCK 2 . y STONE BAFFLE DETAIL NO SCALE Stone Baffle Construction and Maintenance Notes: 1. Stone baffles shall be embedded a minimum of 2 feet into embankments to prevent wash around. 2. Top of baffle shall be level and within 6-inches of permanent pool elevation or at elevation specified on sediment basin detail. 3. Class B Rip Rap filter blanket shall be installed on upgradient side of baffle. 4. Maintenance: a. Class B Rip RsP filter blanket shall be removed and replaced during sediment removal activities in the sediment basin or detention pond cleanout. Refer to sediment basin maintenance specifications. b. Filter blanket should be removed and replaced if clogging occurs. c. Filter blanket should be inspected after each rain event. d. Any erosions of embankment around stone baffle embedment shall be repaired immediately. e. Top of the rock baffle shall be maintained level. 2. Cu -o rent xcava e a u g Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment, but in no case less than 2 feet. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench HDPE OR PVC END dry during backfilling and compaction operations. CAP 3. Embankment --Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks, and other objectionable material. Scarify areas on which fill is to be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the ball, It is too wet for proper compaction. Place fill material in 6 to 8 inch continuous layers over the entire length of the fill area and compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by at least one wheel or tread track of heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10 percent higher than the p design height to allow for settling. Watertight structural connection. Secure all connections between barrel sections b approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do -f`4�- 4. Conduit spillways --Securely attach the riser to the barrel or barrel stub to make a Yt 9 y pp g p not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers, and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Emergency spillway --Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the emergency spillway. 6. Inlets --Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. HOPE OR PVC TC.- 7. Erosion control --Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 8. Install porous baffles. 9. Safety --Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. Maintenance: Inspect sediment basins at least weekly and after each significant (% inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when it accumulates to one-half the design depth. Place removed sediment in an area with sediment controls. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. SEDIMENT BASIN DETAILS AND SPECIFICATIONS HOPE OR PVC ELBOW HOPE OR PVC END CAP HOPE OR PVC PIPE 1/2' HOLES IN UNDERSIDE FLEXIBLE OR PVC PIPE -\ HOSE WATER SURFACE HOPE OR PVC PIPE HOPE OR PVC VENT PIPE END VIEW FRONT VIEW ILLUSTRATION OF SKIMMER OR PVC TEE 5' Line with 2' -� Class 1 riprap NON -WOVEN GEOTEXTILE PERMANENT SLOPE DRAIN DETAIL #4 bar Layout Shown is suggested: However, other layouts may be used provided openings are 64" ± square in area I TRASH RACK DETAIL Rip -Rap Outlet `ram Pipe Outlet Starting Width Ending Width Length Depth d50 Size/Class S13 020' 15 ft 1 26 $ 22 ft. 1.5 ft. 9 inch. =Class B PIPE I 18 ft. 1 39 R. 30 ft. 2 ft. 9 inch. = Class B " RIP RAP PROTECTION TO BE USED FOR BOTH BASIN INLETS AND BASIN OUTLET RIP -RAP OUTLET DETAIL NO SCALE HOPE OR PVC PIPE ORIFICE PLATE PERSPECTIVE VIEW Stone Baffle 12' wide top Top of Dam elev.:326.0 Trash Rack Bottom of Spillway Elevation 327.0' (see detail) 326.0' LINE DIVERSION 3 CLASS B ROCK DONUT Top of Pool silt fence term -c� p 3 Floating watersedge .. edge CHANNEL WITH <o LL O 12" TALL 325.0' Skimmer CLASS B RIPRAP Riser 325.0' 1 - - - - - - - _ Approximately waters edge I 3'1 0 Z'` °°°° °°°°°°°° ? 1 43 LF OF 36" CMP @ 2.0% SLOPE�� 0 0 0 0 0 0 0 0 0 0 0 0 5' TYP. DIVERSION BERM I Inv Out:321.14 CLASS B z Anti -Seep Collar 22' Ri - ROCK DONUT z Bottom of Pool Install riser 4' from toe of slope see outlet detail) DIVERSION o = 323.0' Sediment ( ) BERM z v Storage r Z J Y ¢ Cuttoff Trench: V o p 2'deep, Tbottom Bottom of Riser w Inv of barrel 2:1side slopes 0 322.0' Anti -Flotation �p �P _J Device (see detail) oo� S�Q�o PROFILE VIEW 0 nottom:319.0' PLAN VIEW SEDIMENT BASIN 20 PROFILE NO SCALE REV NO: DESCRIPTION OF REVISION: DATE: Riser Drainage Disturbed Min. Surface Min. Sediment Bottom Elev. Min. Top Elev. Top of Riser Bottom Elev. Top of Berm Riser Dia. Barrel Dia. Skimmer O I ROCK LINED PERMANENT SLOPE DRAIN Basin Areas (Ac) Area (Ac) Area Storage Of Pool Dimensions of Pool Elev. Of Spillway Elev. (in.) (in.) Dia. (in.) -4;_ MINE MODIFICATION t12.20.16 2 INLET PROTECTION DETAIL Q MINE MODIFICATION 9.21 20 12.0 6.3 24,691 sq-ft 45,471 cu-ft 323.0' o'7'x315' 325.0' 325.0' 326.0' 327.0' 36 36 4 2 REVISED PER COMMENT n MINE MODIFICATION 11119 "C' ENCLOSURE ER ENTRY UNIT Orifice 3'1 N d N o0 W d ZMM C mpi�o Mello C N N 00916WQ i MNe.'FLL C 0 O u z �U U 09 tog W �S v J J n N W n X Igo ci O 0 -�Y W N W�3 Z Z W ~ d Z I IOG V 0y !w >0 re d y a v/ J J Z Q G O = s Q U) W V M u N k Z J C W W a G W Z W L H W m DESIGNED: LAB DRAWN: LAB CHECKED: LAB DATE: NOVEMBER 2014 REGION: SOUTH LOCATION: HOLLY SPRINGS HA-HOLLYSPRINGS-M&ECP-1 DWG FILE: SCALE: HORIZONTAL: 1' = 30' VERTICAL: SHEET NO.: X-5 OF: