Loading...
HomeMy WebLinkAbout20210719_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 52-17 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Banks Landscaping, LLC Applicant's Email: banks43@aol.com County: Jones Project Name: Ives Pit YES NO Date Commencing Have land disturbing activities started?? - Latitude: 35.05707 Longitude: -77.45698 Please return comments to (at DEMLR CO): Jenna Spencer jenna.spencer@ncdenr.gov Comments due by: 06/30/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? Is the RO concerned that the operation, as proposed, would violate standards of water quality? E71 I ✓ Comments: No r-omments Does this mine (or previous owner) have DWR back fees to pay? Ll./ (If Yes, amount): Watershed/Stream Name & Classification: DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ ❑✓ Is a Pumping Operation & Monitoring (OM) Plan needed? ✓ Are wetlands disturbed at this site? I ❑ I ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1❑✓ Is a wetland delineation required prior to DWR issuing the permit? I El I✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑ (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ Has Violation ❑ 1 EL I O&M Requirements ❑ I ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other ❑ ❑ Please describe the reason to hold the permit: RO contact: 7Tina Martin Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed b Central Office Date Regional Office Date DWR RO Surface Water Tina Martin 07/19/2021 RO Aquifer Protection Section Rev. April 2021