Loading...
HomeMy WebLinkAbout20536 Mine Permit Renewal Calc Package 6-10-21DESIGN CALCULATIONS FOR STALITE MINE 2021 MINE PERMIT RENEWAL CAROLINA STALITE COMPANY GOLD HILL, NORTH CAROLINA PROJECT NO. 20536 JUNE 10, 2021 alley, Williams, carmen, &king, inc. CONSULTING ENGINEERS FIRM LICENSE No. F-0203 120 SOUTH MAIN STREET P. O. BOX 1248 KANNAPOLIS, NC 28082 704/938-1515 •oFEssioti ��2' SEAL - 16883 N 2/13/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: New London, North Carolina, / USA* Latitude: 35.4592°, Longitude:-80.1828° Elevation: 807.98 ft** T. source: ESRI Maps - source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) Furati ����� 1 2 5 10 25 50 100 200 500 1000 5-min 4.82 5.69 6.62 7.27 7.99 8.47 8.90 9.25 9.64 9.89 (4.44-5.24) (5.24-6.20) (6.08-7.21) (6.67-7.90) (7.30-8.66) (7.72-9.19) (8.06-9.65) 1 (8.35-10.0) 1 (8.62-10.5) (8.80-10.8) 10-min 3.85 4.55 5.30 5.81 6.37 6.75 7.07 7.34 7.62 7.79 (3.55-4.19) (4.19-4.96) (4.87-5.77) (5.33-6.31) (5.82-6.91) (6.14-7.32) (6.41-7.67) 1 (6.62-7.96) 1 (6.82-8.27) 1 (6.92-8.47) 15-m i n 2 3.21 3.81 4.47 4.90 5.38 5.70 5.96 6.17 6.39 6.52 ( .96-3.49) (3.52-4.16) 1 (4.11-4.87) 1 (4.50-5.32) 1 (4.92-5.84) 1 (5.19-6.18) (5.40-6.46) (5.57-6.70) (5.72-6.94) (5.79-7.08) 30-min 2.20 2.63 3.18 3.55 3.98 4.29 4.56 4.80 5.09 5.28 (2.03-2.39) (2.43-2.87) 1 (2.92-3.46) (3.26-3.86) 1 (3.64-4.32) 1 (3.91-4.65) (4.14-4.95) (4.34-5.21) (4.55-5.52) (4.69-5.73) 60-min 1.37 1.65 2.04 2.31 2.65 2.91 3.14 3.37 3.65 3.85 (1.26-1.49) 1 (1.52-1.80) 1 (1.87-2.22) (2.12-2.51) 1 (2.42-2.88) 1 (2.65-3.15) 1 (2.85-3.41) 1 (3.04-3.66) 1 (3.26-3.96) 1 (3.42-4.19) 2-hr 0.798 0.964 1.20 1.37 1.59 1.75 1.92 2.07 2.27 2.42 (0.732-0.872) (0.882-1.06) 1 (1.10-1.31) 1 (1.25-1.49) 1 (1.44-1.73) 1 (1.72-2.09) 1 (1.85-2.26) (2.01-2.48) (2.12-2.64) 3-hr 0.568 0.686 0.856 0.984 1.15 1.29 1.42 1.55 1.72 1.86 (0.520-0.622) (0.629-0.752) (0.783-0.937) (0.898-1.07) 1 (1.05-1.26) 1 (1.16-1.40) 1 (1.27-1.54) 1 (1.38-1.68) (1.52-1.87) (1.62-2.02) 6-hr 0.346 0.417 0.521 0.600 0.707 0.791 0.876 0.962 F 1.08 1.17 (0.317-0.379) (0.382-0.457) (0.476-0.570) (0.547-0.656) (0.640-0.770) (0.711-0.859) (0.782-0.952) (0.851-1.04) (0.943-1.17) 1 (1.01-1.27) 12-hr 0.205 0.248 0.311 0.360 0.428 0.482 0.538 0.596 F 0.676 F 0.740 (0.189-0.224) (0.228-0.272) (0.285-0.340) (0.330-0.394) (0.388-0.466) (0.434-0.524) (0.479-0.584) (0.525-0.647) (0.586-0.733) (0.632-0.803) 24-hr 0.124 0.150 0.189 0.219 0.260 0.292 0.326 0.360 1 F 0.407 0.445 (0.116-0.134) (0.140-0.162) (0.175-0.203) (0.203-0.236) (0.240-0.279) (0.269-0.314) (0.299-0.351) (0.330-0.388) (0.371-0.440) 1 (0.404-0.481) 2-day 0.073 0.088 0.109 0.126 0.149 0.167 0.186 0.205 0.232 0.252 (0.068-0.078) (0.082-0.094) (0.102-0.118) (0.117-0.136) (0.138-0.160) (0.155-0.180) (0.171-0.200) (0.188-0.221) (0.211-0.250) (0.229-0.273) 3-day 0.052 0.062 0.077 0.089 0.104 0.117 0.130 0.143 0.162 0.176 (0.048-0.055) ( 0.058-0.067) ( 0.072-0.082) ( 0.082-0.095) (0.097-0.112) (0.108-0.126) (0.120-0.140) (0.132-0.154) (0.148-0.174) (0.160-0.190) 4-day 0.041 0.049 0.061 0.070 0.082 0.092 0.102 70.112 70.127 F 0.138 (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.065-0.075) (0.076-0.088) (0.085-0.098) (0.094-0.109) (0.103-0.121) (0.116-0.136) (0.126-0.149) [�-d:ay7F-0.0-27 0.032 0.039 0.044 0.052 0.058 0.064 0.071 0.079 0.086 (0.025-0.029) (0.030-0.034) (0.036-0.041) (0.042-0.047) (0.049-0.055) (0.054-0.062) (0.060-0.069) (0.065-0.076) (0.073-0.085) (0.079-0.093) 10-day 0.021 0.026 0.031 0.035 0.040 0.044 0.049 0.053 0. 559 0.064 (0.020-0.023) (0.024-0.027) (0.029-0.032) (0.033-0.037) (0.038-0.043) (0.042-0.047) (0.046-0.052) (0.050-0.056) (0.055-0.063) (0.059-0.068) [20-7day 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.034 0.037 I 0.040 (0.014-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.027-0.030) (0.029-0.033) (0.031-0.035) (0.035-0.039) (0.037-0.042) 30-day 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.030 (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) (0.028-0.031) 45-day 0.010 0.012 0.013 0.015 0.016 0.018 0.019 0.020 0.022 0.023 (0.010-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.017-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 60-day 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0.009-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.014-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PIMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_Printpage.html?lat=35.4592&Ion=-80.1828&data=intensity&units=english&series=pds 1/4 2/13/2020 Precipitation Frequency Data Server PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.45921, Longitude:-80.13281 10.000 3110 [SIC. e 0 3 9L 0.010 ti c c c e e 6. 6. L- >, >. 71 >. }, >. >, >. L L L L L rp rq r4 M r4 r4 r4 r9 r4 O O O N A4/3 r 4 A 4 V � O O O U' O -I H m [ar-I ry rn v Ln Duration 10.000 3Ob [SI4. 0 001 1 1 1 1 1 1 1 L 1 2 5 10 75 50 100 200 500 10DD Average recurrence interval (years) NOAAAtlas 14, Volume 2, Version 3 Created {GMT}: Thu Feb 13 15:17:0a 2020 Back to Top Maps & aerials Small scale terrain Average recurrence inlerval (years) — 1 2 — 5 — 1Q 25 50 100 200 500 1000 Duration — "in — 2-day — 10-min — 3-day 15-min — 4-aay — 30-min — 7-day — 5"in — 1D-day — 2-hr — 20-day — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day — 24-hr https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4592&Ion=-80.1828&data=intensity&units=english&series=pds 2/4 2/13/2020 Precipitation Frequency Data Server .blew London — f Large scale terrain Bristol l� �• will Stoll-5 alell} • • • E]uI'I}al}} Greensboro �. I��li Mitchell Greensboro NORTH L I N A Charlotte Fayette'rille Greenville' + 0 L I N A 1�11II}}II}C�tG: Large scale map GI'I:EoI Johnson City t ji.stonE EemGreensboro e Darham RaEeig h North Carolina arlotte I F ettevllle v Y le 100km 60mE Large scale aerial https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4592&Ion=-80.1828&data=intensity&units=english&series=pds 3/4 2/13/2020 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.4592&Ion=-80.1828&data=intensity&units=english&series=pds 4/4 J 0 p - +731.9 IT - ...... 00 eEATTY--/— FpR p pAD w SKIMMER SEDIMENT +73 7.1 BASIN SKB 20-1 —t 3 0. 7 SKB 20-1 A: 10.0 Ac C: 0.40 0.5 Tc: 10 min TEMPORARY �a SKB 20-2 110: 5.81 in/hr I DIVERS A: 9.2 Ac DITCH TD 20-4 C: 0.40 kr) Tc: 10 min +729.3 cy 110: 5.81 in/hr -472 .7 o a ^N -4716.7 Tp I � I � 720.5 TD TD TO TD — TD 724 TEMPORARY DIVERSION rB1T6j I TD 20-2 SKIMMER SEDIMENT TEMPORARY DIVERSION \1 725 BASIN SKB 20-2 DITCH TD 20-3 -4728.7 alley, Williams, Carmen, & king, inc. 2020 MINE PERMIT RENEWAL R". No. DESCRIPTION DATE INITIAL SCALE w'M-5-13-21 JOB NO. 20536 PL#t 1. = 120� MAWN �: RCC CONSULTING ENGINEERS STALITE QUARRY PRORLE NGNo: SEDIMENT BASINS SHEEP NO. 1 FIRM LICENSE N0. F - 0203 20536 DRAINAGE AREA MAP 1 120 SOUTH MAIN STREET P.O. BOX 1248 HOM: Stalite KANNAPOUS, NC 28082 704/938-1515 CAROLINA STALITE COMPANY vw.: 2021.dwg OF: 5 P 20-4 50 LF "RCP @ 2.00% INV :732.0 I OUT: 731.0 I TEMPORARY DIVERSION DUCH TD 20-5 NOTE: SEE SHEET 5 FOR DRAINAGE AREAS TO TD 20-5 AND TD 20-7 =nfilknall CLASS 1 RrPMP OUTLET PROTE N r:40'T RY GRAVEL ACCES� ROAD WITH ` CONSTRUCTIONION ENENTR � CONTACT NCDOT AND OBTAI TEMPORARY DRIVEWAY PERMIT ` PRIOR TO INSTALLATION SKIMMER SEDIMENT BASIN SKB 20-4 +724.8 ODD g FATTY FORD ROAD 725 I SKB 20-4 & TD -6 A: 1.9 Ac 0 0 C: 0.40 o Tc: 5.0 min ~ 110: 7.27 in/hr �o +737.1 �(� 1 TEMPORARY DIVER ON DITCH TD 20-6 o +720.5 I TEMPORARY DI ERS SKB 20 2 TEM DIVERSION D CH TD 20-4 A: 9.2 Ac I DITCH TD 20-8 C: 0.40 I� Tc: 10 min 110: 5.81 in/hr J SKB 20-3 & TD 20- o A: 1.9 Ac C: 0.40 V 0 Tc: 5.0 min 0 110: 7.27 in/hr �� To TEMPORARY DIVERSION— „ \ DITCH TD 20-7 .5 / 16.7 T ` 740.5 720.5 TD � 724 SKIMMER SEDIMENT BASIN SKB 20-3 SK MMER SEDIMENT TEMPOR, BASI SKB 20-2 DITCH TD 725 r� alley, williams, carmen, & king, inc. 2020 MINE PERMIT RENEWAL REV. No. DESCRIPNON DATE NRIAL SCALE d'TE5-19-21 JOB NO. 20536 PIiJt 1 " = 120' MAN �: RCC CONSULTING ENGINEERS STALITE QUARRY PROFILE �N.: SEDIMENT BASINS SHEEP NO. 2 FIRM LICENSE F 0203 20536 DRAINAGE AREA MAP 120 SOUTH MAINAIN STREET � P.O. BOX 1248 H0'` Stalite KANNAPOLIS, NC 28082 704/938-1515 CAROLINA STALITE COMPANY vw.: 2021.dwg On 5 +731.9 OtD eEAr'Y _ FORD ROAD NOTE: THE INITIAL EASTERN SIDE BERM TD 20-4 — CONSTRUCTION WILL DIVERT ° A: 1.71 Ac RUNOFF TO THE SOUTH C: 0.40 37.1 Tc: 10.0 min 125: 6.37 in/hr +730.7 TD 20-2 A: 7.44 Ac J ° Tc: 10.0 min TEMPORARY DIVERSION 125: 6.37 in/hr D TCH TD 20-4 \ TD 20-3 A: 6.24 Ac +729.3 cv Tc: 10.0 min 125: 6.37 in/hr n SKIMMER SEDIMENT BASIN SKB 20-1 4716.7 — TD TD TD 720.5 TD TD TD —724 TEMPORARY DIVERSION TD 20-A A: 0.57 Ac DITCH TD 20-2 C: 0.40 SKIMMER SEDIMENT TEMPORARY DIVERSION Tc: 5 min BASIN SKB 20-2 DITCH TD 20-3 �7 p /25 125: 7.99 in/hr 47ZO.7 a11ey, Williams, Carmen, & king, inc. 2020 MINE PERMIT RENEWAL REV. No. DESCRIPTION DATE INITIAL SCALE CAh5-19-21 FOR. O. 20536 1" = 120' mm W.' RCc INITIAL DIVERSION CONSULTING ENGINEERS STALITE QUARRY DITCHES DRAINAGE NO. 3 FIRMNO.PROFlLE 036E120 DCENSE AIN F R 0203 Stalite 120 SOUTH MAIN STREET P.O. BOX 1515 CAROLINA STALITE COMPANY . 2021.dwg 5 KANNAPOLIS, INC 28082 704/938-1515 AREA MAP +731.9 v / i ODD EEgTTy '/-- !0.5 TEMPORARY DIVERSION D TCH TD 20-4 TD 20-4 A: 1.41 Ac C: 0.30 Tc: 5.0 m i n 125: 7.99 in/hr 4716.7 725 0 "A S 37.1 I / 720.5 -724 SKIMMER SEDIMENT BASIN SKB 20-2 100'SHEET '\ FLOW @ 1.3% 755.7 7S5.0 100'SHEET /FLOW @ 2.2% 752.8 -/ 3 0.7 I' � YI 20-2 A: 5.38 Ac C: 0.30 Tc: 12.4 min / 125: 5.89 in/hr 1s3'sHALLow CONC. FLOW @ 3.1%�/ 472 7 �7 7SO / 410' CHANNEL FLOW @ 5.0% � - - - 750.0 - - 750 .vAS WsW � TEMPORARY DIVERSION - DITCH TD 20-3 YI 20-1 A: 5.62.62 Ac C: 0.30 - Tc: 11.3 min 125: 6.11 in/hr 750 334'SHALLOW \ /CONC. FLOW @ 2.3% +729.3 294'CHANNEL FLOW @ 5.0% \ 1745.0 - - - TD \ TD TEMPORARY DIVERSION- 7TD 20-2 TD 20-2 TD .58 �28.7 A: 1.Ac A: A: 1.58 Ac C: 0.3030 C: 0.30 Tc: 5.0 min Tc: 5.0 min 125: 7.99 in/hr 125: 7.99 in/hr TD SKIMMER SEDIMENT BASIN SKB 20-1 LQ), Q alley, williams, carmen, & king, inc. CONSULTING ENGINEERS F R 0203 LICENSE NO.MAIN KANNAPOLISMNC 80 2 704/938-15is a 2020 MINE PERMIT RENEWAL STALITE QUARRY I130 CAROLINA STALITE COMPANY DATE I 1N1TAL SCALE ""5-19-21 FINAL STORM DRAINAGE &DIVERSION DITCHES DRAINAGE AREA MAP - 20536 1" = 120' mm Ff: RCC SHEEP NO. OF: 5 PROFILE 0 36 2021.dwg LUZI. "°�� 0 —N— / / / RogO SHEET 0% LOW / \ 786.0 780.0 / ' \ 1162' S ALLOW CONC. P 20-4 FLOW @ 4.0% A: 10.65 Ac \ CLASS 1 RIPRAP / / \ C: 0.25 ` OUTLET PROTECTION Tc: 15.0 min ` / 125: 5.38 in/hr \ / / \ IX \ P 20-4 / 50 / LF " RCP @ 2.00% INV :732.0 j 7 3.0 OUT: 731.0 I \ 40' TEMPORARY\L ACCESS ROAD WITH STONE \ TEMPORARY DIVERSION I CONSTRUCTION ENTRANCE. TCH TD 20-5 CONTACT NCDOT AND OBTAIN A TEMPORARY DRIVEWAY PERMIT / ` PRIOR TO INSTALLATION TD 20-5 w SKIMMER SEDIMENT A: 1.13 Ac N BASIN SKB 20-4 \ Tc: 5.0 min I� 24.8 i 125: 7.99 in/hr ~ 0 725 0 to 0 ` \I TEMPORARY DIVER ON ` O DITCH TD 20-6 \ I TE \ ` I \ ` I DITCH TO 20-DIVERSION TD 20-6 0 A: 0.95 Ac C: 0.30 0 \ 125: 7.99 in/hr I � 0 \ TO TEMPORARY DIVERSION �, _ j, 0.5 DITCH TO 20-7 (�l� 7405 F \ N3 \ ` SKIMMERS MENT BASIN 20-3 alley, wiuiams, Carmen, & king, Inc. 2020 MINE PERMIT RENEWAL RED. NO. DESCRIPTION DATE INmAL SCALE d 5-13-21 'IDB NO. 20536 1" = 160' �: Rcc FINAL STORM DRAINAGE CONSULTING ENGINEERS STALITE QUARRY & DIVERSION DITCHES �"�F"D- 5 120 FIRM LICENSE N0. F — 0203 PROFILE 0536 KANNAPOLIS, INC UTH MAIN 8082 7 4/938-1515 CAROLINA STALITE COMPANY "°�'° St°lire DRAINAGE AREA MAP 2021.dwg OF: 5 WIN TR-55 CALCULATIONS 20536 Carolina Stalite Mine Modification Rowan NOAA County, North Carolina Sub -Area Time of Concentration Details Sub -Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time -------------------------------------------------------------------------------- (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) YI 20-1 SHEET 100 0.0220 0.130 0.135 SHALLOW 334 0.0230 0.050 0.038 CHANNEL 294 5.000 0.016 Time of Concentration .189 YI 20-2 SHEET 100 0.0130 0.130 0.166 SHALLOW 183 0.0310 0.050 0.018 CHANNEL 410 5.000 0.023 Time of Concentration .207 P 20-4 SHEET 100 0.0600 0.240 0.147 SHALLOW 1162 0.0400 0.050 0.100 Time of Concentration .247 SKIMMER SEDIMENT BASIN DESIGN - E.S.C.P.D.M. PRACTICE 6.64 Stalite Quarry RCC 2021 Mine Permit Renewal 5/13/2021 20536 REQUIRED PROVIDED FREEBOARD SPILLWAY SEDIMENT SURFACE SEDIMENT (SPILLWAY TO BASIN BOTTOM CLEANOUT SEDIMENT SURFACE AREA AREA LENGTH STORAGE AREA DEPTH TOP OF DAM) DIMENSIONS DEPTH STORAGE DIMENSIONS SURFACE AREA ACRES FT (FT') (FT2) FT FT FT FT (FT') FT (FT2) Lu w c7 F- D Z C 110 (IN/HR) U o z z Q CO (n w J w J Q SKB 20-1 2.0 10.0 0.40 5.81 23.2 24.0 3,600.0 7,553.0 2.0 1.5 IRREGULAR - SEE BELOW 1.2 11,800.0 IRREGULAR - SEE BELOW 7,921.0 SKB 20-2 2.0 9.2 0.40 5.81 21.4 22.0 3,600.0 6,948.8 2.0 1.5 IRREGULAR - SEE BELOW 1.2 12,931.0 IRREGULAR - SEE BELOW 7,441.0 SKB 20-3 1.5 1.9 0.40 7.27 5.5 6.0 2,700.0 1,795.7 2.0 1.5 12.0 90.0 1.2 3,040.0 20.0 98.0 1,960.0 SKB 20-4 1.3 1.9 0.40 7.27 5.5 6.0 2,340.0 1,795.7 2.0 1.5 12.0 90.0 1.2 3,040.0 20.0 98.0 1,960.0 BASIN # STORAGE AREA CLEANOUT DEPTH SEDIMENT STORAGE SURFACE AREA SPILLWAY LENGTH W1 L1 D1 W2 L2 D2 W3 L3 D3 (FT3) A2 FT SKB 20-1 IRREGULAR - SEE BELOW 1.2 11,800.0 7,921.0 24.0 SKB 20-2 IRREGULAR - SEE BELOW 1.2 12,931.0 7,441.0 22.0 SKB 20-3 12.0 90.0 2.0 20.0 98.0 3.5 26.0 104.0 1 1.2 1 3040.0 1 1960.0 1 6.0 SKB 20-4 12.0 90.0 2.0 20.0 98.0 3.5 26.0 104.0 1 1.2 1 3040.0 1 1960.0 1 6.0 L1 = BASIN LENGTH AT THE BOTTOM OF THE BASIN W1 = BASIN WIDTH AT THE BOTTOM OF THE BASIN L2 = BASIN LENGTH AT THE TOP OF THE SEDIMENT STORAGE W2 = BASIN WIDTH AT THE TOP OF THE SEDIMENT STORAGE L3 = BASIN LENGTH AT THE TOP OF THE EMBANKMENT W3 = BASIN WIDTH AT THE TOP OF THE EMBANKMENT D1 = THE DEPTH OF SEDIMENT STORAGE D2 = THE OVERALL DEPTH OF THE SEDIMENT BASIN D3 = THE CLEANOUT DEPTH OF SEDIMENT A2 = SURFACE AREA AT THE TOP OF THE SEDIMENT STORAGE SKB 20-1 ELEVATION SURFACE AREA SF INC. VOLUME FT STORAGE VOLUME FT NOTES 720.5 3897 0.00 0.00 BASIN FLOOR 721.0 4891 2197.00 2197.00 722.0 1 6903 1 5897.00 1 8094.00 CLEANOUT 721.7 722.5 7921 3706.00 11800.00 SEDIMENT STORAGE 723.0 8948 4217.25 16017.25 724.0 11024 9986.00 26003.25 TOP OF DAM DESIGN NOTES: 1 2 3 4 5 6 7 8 SKB 20-2 SEDIMENT STORAGE = 1800 CUBIC FEET PER DISTURBED ACRE REQUIRED SURFACE AREA = 325'Q10 CLEANOUT DEPTH = 60% OF THE DESIGN STORAGE ALL RUNOFF HAS BEEN CALCULATED USING THE RATIONAL METHOD SKIMMER DESIGN BASED ON FAIRCLOTH SKIMMER DESIGN STANDARDS DESIGN STORM IS 10-YEAR TO PASS THROUGH SPILLWAY THE SPILLWAY LENGTH IS BASED ON THE STANDARD IN THE EROSION CONTROL MANUAL SEDIMENT VOLUME CALCULATIONS BASED ON AVERAGE END AREA METHOD ELEVATION SURFACE AREA SF INC. VOLUME FT STORAGE VOLUME FT NOTES 720.5 5526 0.00 0.00 BASIN FLOOR 721.0 5981 2876.75 2876.75 722.0 1 6938 1 6459.50 1 9336.25 ICLEANOUT 721.7 722.5 7441 3594.75 12931.00 SEDIMENT STORAGE 723.0 7958 3849.75 16780.75 724.0 9041 8499.50 25280.25 TOP OF DAM FAIRCLOTH SKIMMER CALCULATIONS Job Name: Stalite Quarry 2021 Mine Permit Renewal 20536 Job Description: Material Storage Erosion Control RCC Job Location: Gold Hill, NC 5/13/2021 SEDIMENT BASIN FAIRCLOTH HEAD TARGET TARGET TARGET TARGET ACTUAL ACTUAL ACTUAL ACTUAL BASIN DESIGN SKIMMER ABOVE DEWATER ORIFICE ORIFICE ORIFICE ORIFICE ORIFICE ORIFICE DEWATER ID VOLUME SIZE USED ORIFICE TIME FLOW AREA DIA. DIA. AREA FLOW TIME (cf) (in) (in) (hr) (cfs) (in2) (in) (in) (in2) (cfs) (hr) SKB 20-1 11,800.0 2.0 2.0 72 0.0455 3.3915 2.08 2.00 3.1416 0.0422 77.7 SKB 20-2 12,931.0 2.0 2.0 1 72 0.0499 1 3.7166 2.18 2.00 3.1416 0.0422 85.2 SKB 20-3 3,040.0 1.5 1.5 1 72 0.0117 1 1.0089 1.13 1 1.00 0.7854 0.0091 92.5 SKB 20-4 3,040.0 1.5 1.5 1 72 0.0117 1 1.0089 1.13 1 1.00 0.7854 0.0091 92.5 Notes: 1. Design calculations are based on the orifice equation Q = CA(2gh)112, where C = 0.59 2. Design head is based on the Faircloth Skimmer design standards Job No.: 20536 Job Description: Stalite 2021 Mine Permit Modification Date: 5/13/2021 RATIONAL METHOD RUNOFF CALCULATIONS (10-YR STORM EVENT) Structure No. C-Value 110 in/hr A acres Q10 cfs Notes YI 20-1 0.40 5.57 5.62 12.52 Tc = 11.3 min, Final Grading YI 20-2 0.40 5.37 5.38 11.56 Tc = 12.4 min, Final Grading P 20-4 0.25 4.90 10.65 13.05 Tc = 15 min, West Berm Final Grading RATIONAL METHOD RUNOFF CALCULATIONS (25-YR STORM EVENT) Structure No. C-Value 125 in/hr A acres Q25 cfs Notes TD 20-2 0.40 6.37 7.44 18.96 Tc = 10 min, PH 1-3 Initial Grading TD 20-3 0.40 6.37 2.47 6.29 Tc = 10 min, Initial Grading TD 20-4 0.40 6.37 1.71 4.36 Tc = 10 min, Initial Grading TD 20-A 0.40 7.99 0.57 1.82 Initial Grading YI 20-1 0.40 6.11 5.62 13.74 Tc = 11.3 min, Final Grading YI 20-2 0.40 5.89 5.38 12.68 Tc = 12.4 min, Final Grading. P 20-3 (TD 20-2) 0.40 6.37 7.44 18.96 Tc = 10 min, PH 1-3 Initial Grading P 20-4 0.25 5.38 10.65 14.32 Tc = 15 min, West Berm Final Grading TD 20-5 0.30 7.99 1.13 2.71 Tc = 5 min, West Berm Final Grad'n TD 20-6 0.40 7.99 1.90 6.07 Tc = 5 min, West Berm Initial Grading TD 20-7 0.30 7.99 0.95 2.28 Tc = 5 min, West Berm Final Grading TD 20-8 0.40 7.99 1.90 6.07 Tc = 5 min, West Berm Initial Grading Notes: Time of Concentration is 5.0 minutes unless otherwise noted. Rational method calculations using a runoff coefficient C-value of 0.40 are a brush, weed, grass & bare earth mix. Design drainage areas listed for structures represent the largest area for all phases of construction. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-A (25-yr storm) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.69 Total Depth (ft) = 1.50 Q (cfs) = 1.820 Area (sqft) = 0.95 Invert Elev (ft) = 724.00 Velocity (ft/s) = 1.91 Slope (%) = 1.00 Wetted Perim (ft) = 3.09 N-Value = 0.035 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 2.76 Calculations EGL (ft) = 0.75 Compute by: Known Q Known Q (cfs) = 1.82 Elev (ft) 726.00 - 725.50 725.00 724.50 724.00 723.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 1 11 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-2 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 1.66 Total Depth (ft) = 2.00 Q (cfs) = 18.96 Area (sqft) = 5.51 Invert Elev (ft) = 725.00 Velocity (ft/s) = 3.44 Slope (%) = 1.00 Wetted Perim (ft) = 7.42 N-Value = 0.035 Crit Depth, Yc (ft) = 1.42 Top Width (ft) = 6.64 Calculations EGL (ft) = 1.84 Compute by: Known Q Known Q (cfs) = 18.96 Elev (ft) Section Depth (ft) 728.00 3.00 727.50 727.00 2.50 2.00 726.50 1.50 726.00 1.00 725.50 0.50 725.00 724 50 0.00 0 50 1 2 3 4 5 6 7 Reach (ft) 8 9 10 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-2 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 1.46 Total Depth (ft) = 2.00 Q (cfs) = 18.96 Area (sqft) = 4.26 Invert Elev (ft) = 722.50 Velocity (ft/s) = 4.45 Slope (%) = 2.00 Wetted Perim (ft) = 6.53 N-Value = 0.035 Crit Depth, Yc (ft) = 1.42 Top Width (ft) = 5.84 Calculations EGL (ft) = 1.77 Compute by: Known Q Known Q (cfs) = 18.96 Elev (ft) Section 725.00 724.50 724.00 723.50 723.00 722.50 722.00 Depth (ft) 2.50 2.00 1.50 1.00 0.50 M _n Fn 1 2 3 4 5 6 7 8 9 10 vVV Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-3 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 1.10 Total Depth (ft) = 1.50 Q (cfs) = 6.290 Area (sqft) = 2.42 Invert Elev (ft) = 725.00 Velocity (ft/s) = 2.60 Slope (%) = 1.00 Wetted Perim (ft) = 4.92 N-Value = 0.035 Crit Depth, Yc (ft) = 0.91 Top Width (ft) = 4.40 Calculations EGL (ft) = 1.21 Compute by: Known Q Known Q (cfs) = 6.29 Elev (ft) 727.00 - 726.50 726.00 725.50 725.00 724.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-3 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.96 Total Depth (ft) = 1.50 Q (cfs) = 6.290 Area (sqft) = 1.84 Invert Elev (ft) = 722.50 Velocity (ft/s) = 3.41 Slope (%) = 2.00 Wetted Perim (ft) = 4.29 N-Value = 0.035 Crit Depth, Yc (ft) = 0.91 Top Width (ft) = 3.84 Calculations EGL (ft) = 1.14 Compute by: Known Q Known Q (cfs) = 6.29 Elev (ft) Section Depth (ft) 725.00 724.50 2.50 724.00 2.00 1.50 723.50 723.00 1.00 0.50 722.50 722 00 0.00 0 50 0 1 2 3 4 Reach (ft) 5 6 7 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-4 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.96 Total Depth (ft) = 1.50 Q (cfs) = 4.360 Area (sqft) = 1.84 Invert Elev (ft) = 725.00 Velocity (ft/s) = 2.37 Slope (%) = 1.00 Wetted Perim (ft) = 4.29 N-Value = 0.035 Crit Depth, Yc (ft) = 0.79 Top Width (ft) = 3.84 Calculations EGL (ft) = 1.05 Compute by: Known Q Known Q (cfs) = 4.36 Elev (ft) 727.00 - 726.50 726.00 725.50 725.00 724.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-4 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.84 Total Depth (ft) = 1.50 Q (cfs) = 4.360 Area (sqft) = 1.41 Invert Elev (ft) = 722.50 Velocity (ft/s) = 3.09 Slope (%) = 2.00 Wetted Perim (ft) = 3.76 N-Value = 0.035 Crit Depth, Yc (ft) = 0.79 Top Width (ft) = 3.36 Calculations EGL (ft) = 0.99 Compute by: Known Q Known Q (cfs) = 4.36 Elev (ft) Section Depth (ft) 725.00 2.50 724.50 2.00 724.00 1.50 1.00 723.50 723.00 0.50 0.00 722.50 722 00 0 50 0 1 2 3 4 Reach (ft) 5 6 7 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-5 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.80 Total Depth (ft) = 1.50 Q (cfs) = 2.710 Area (sqft) = 1.28 Invert Elev (ft) = 732.00 Velocity (ft/s) = 2.12 Slope (%) = 1.00 Wetted Perim (ft) = 3.58 N-Value = 0.035 Crit Depth, Yc (ft) = 0.65 Top Width (ft) = 3.20 Calculations EGL (ft) = 0.87 Compute by: Known Q Known Q (cfs) = 2.71 Elev (ft) 734.00 - 733.50 733.00 732.50 732.00 731.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-5 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.55 Total Depth (ft) = 1.50 Q (cfs) = 2.710 Area (sqft) = 0.60 Invert Elev (ft) = 732.00 Velocity (ft/s) = 4.48 Slope (%) = 7.30 Wetted Perim (ft) = 2.46 N-Value = 0.035 Crit Depth, Yc (ft) = 0.65 Top Width (ft) = 2.20 Calculations EGL (ft) = 0.86 Compute by: Known Q Known Q (cfs) = 2.71 Elev (ft) 734.00 - 733.50 733.00 732.50 732.00 731.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, May 14 2021 Temporary Diversion Ditch TD 20-6 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 1.08 Total Depth (ft) = 1.50 Q (cfs) = 6.070 Area (sqft) = 2.33 Invert Elev (ft) = 740.00 Velocity (ft/s) = 2.60 Slope (%) = 1.00 Wetted Perim (ft) = 4.83 N-Value = 0.035 Crit Depth, Yc (ft) = 0.90 Top Width (ft) = 4.32 Calculations EGL (ft) = 1.19 Compute by: Known Q Known Q (cfs) = 6.07 Elev (ft) 742.00 - 741.50 741.00 740.50 740.00 739.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, May 14 2021 Temporary Diversion Ditch TD 20-6 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.73 Total Depth (ft) = 1.50 Q (cfs) = 6.070 Area (sqft) = 1.07 Invert Elev (ft) = 735.00 Velocity (ft/s) = 5.70 Slope (%) = 8.60 Wetted Perim (ft) = 3.26 N-Value = 0.035 Crit Depth, Yc (ft) = 0.90 Top Width (ft) = 2.92 Calculations EGL (ft) = 1.23 Compute by: Known Q Known Q (cfs) = 6.07 Elev (ft) 737.00 - 736.50 736.00 735.50 735.00 734.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-7 (25-yr storm, minimum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.75 Total Depth (ft) = 1.50 Q (cfs) = 2.280 Area (sqft) = 1.12 Invert Elev (ft) = 742.50 Velocity (ft/s) = 2.03 Slope (%) = 1.00 Wetted Perim (ft) = 3.35 N-Value = 0.035 Crit Depth, Yc (ft) = 0.61 Top Width (ft) = 3.00 Calculations EGL (ft) = 0.81 Compute by: Known Q Known Q (cfs) = 2.28 Elev (ft) Section Depth (ft) 745.00 744.50 2.50 744.00 2.00 1.50 743.50 743.00 1.00 0.50 742.50 742 00 0.00 0 50 0 1 2 3 4 Reach (ft) 5 6 7 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, May 13 2021 Temporary Diversion Ditch TD 20-7 (25-yr storm, maximum slope) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.49 Total Depth (ft) = 1.50 Q (cfs) = 2.280 Area (sqft) = 0.48 Invert Elev (ft) = 742.50 Velocity (ft/s) = 4.75 Slope (%) = 10.40 Wetted Perim (ft) = 2.19 N-Value = 0.035 Crit Depth, Yc (ft) = 0.61 Top Width (ft) = 1.96 Calculations EGL (ft) = 0.84 Compute by: Known Q Known Q (cfs) = 2.28 Elev (ft) Section Depth (ft) 745.00 744.50 2.50 744.00 2.00 1.50 743.50 743.00 1.00 0.50 742.50 742 00 0.00 0 50 0 1 2 3 4 Reach (ft) 5 6 7 8 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Friday, May 14 2021 Temporary Diversion Ditch TD 20-8 (25-yr storm) Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 1.08 Total Depth (ft) = 1.50 Q (cfs) = 6.070 Area (sqft) = 2.33 Invert Elev (ft) = 742.00 Velocity (ft/s) = 2.60 Slope (%) = 1.00 Wetted Perim (ft) = 4.83 N-Value = 0.035 Crit Depth, Yc (ft) = 0.90 Top Width (ft) = 4.32 Calculations EGL (ft) = 1.19 Compute by: Known Q Known Q (cfs) = 6.07 Elev (ft) 744.00 - 743.50 743.00 742.50 742.00 741.50 1 2 3 Section 4 Reach (ft) 5 6 7 Depth (ft) 2.00 1.50 1.00 0.50 L -0.50 8 Culvert Report Hydraflow Express Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. Tuesday, Nov 3 2020 Pipe P 20-3 (25-yr storm) Invert Elev Dn (ft) = 720.50 Calculations Pipe Length (ft) = 100.00 Qmin (cfs) = 18.96 Slope (%) = 1.00 Qmax (cfs) = 18.96 Invert Elev Up (ft) = 721.50 Tailwater Elev (ft) = 2 Rise (in) = 24.0 Shape = Cir Highlighted Span (in) = 24.0 Qtotal (cfs) = 18.96 No. Barrels = 1 Qpipe (cfs) = 18.96 n-Value = 0.013 Qovertop (cfs) = 0.00 Inlet Edge = Projecting Veloc Dn (ft/s) = 7.16 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) = 7.16 HGL Dn (ft) = 722.07 Embankment HGL Up (ft) = 723.07 Top Elevation (ft) = 727.00 Hw Elev (ft) = 724.03 Top Width (ft) = 90.00 Hw/D (ft) = 1.27 Crest Width (ft) = 50.00 Flow Regime = Inlet Control Elev (R) 726.00 727.00 726.00 725.00 724.00 723.00 722.00 721.00 720.00 719.00 Pipe P 20-3 (25-yr storm) Cif Culvert HGL Embank H,v Depth (R) 6.50 5.50 4.50 3.50 2.50 1.50 0.50 0.50 1.50 2.50 Reach (ft) Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, May 11 2021 Pipe P 20-4 (25-yr storm) Invert Elev Dn (ft) = 731.00 Calculations Pipe Length (ft) = 50.00 Qmin (cfs) = 14.32 Slope (%) = 2.00 Qmax (cfs) = 14.32 Invert Elev Up (ft) = 732.00 Tailwater Elev (ft) = 1.33 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 14.32 No. Barrels = 1 Qpipe (cfs) = 14.32 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.24 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 6.28 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 731.99 HGL Up (ft) = 733.36 Embankment Hw Elev (ft) = 734.05 Top Elevation (ft) = 737.00 Hw/D (ft) = 1.02 Top Width (ft) = 40.00 Flow Regime = Inlet Control Crest Width (ft) = 50.00 Elev (it) 73S.OD 737. D--- 736.00 735.00 734.OD 733.00 732."vim 731.00 730.00 0 Pipe P 20A (25-yr storm) Hw Depth (ft) 6.DD 5.00 dID 3.00 21n IA0 OAn -t.00 -2.00 5 10 15 20 25 30 35 40 45 50 55 60 65 70 CircularCulvert HGL Embank Reach (ft) Appendices 2 1 n.. 3 } 3 5 10 20 50 100 200 500 1000 Discharge (0/Sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum taiiwaler condition (Tw c 0.5 diameter). Rev. 3 2/93 8.06.3 Appendices 2 1 n.. 3 } 3 5 10 20 50 100 200 500 1000 Discharge (0/Sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum taiiwaler condition (Tw c 0.5 diameter). Rev. 3 2/93 8.06.3 Appendices 2 1 n.. 3 } 3 5 10 20 50 100 200 500 1000 Discharge (0/Sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum taiiwaler condition (Tw c 0.5 diameter). Rev. 3 2/93 8.06.3