Loading...
HomeMy WebLinkAboutVMC Clear Creek 11523_MINMOD22 R1 2-25-22 Full Seto 625 COMPILED BY: v r�. 0 + + Q x x �d o � � O Aso 1 1995 PERMIT RELEASE AREA LAND CLEARING DEBRIS DISPOSAL AREA , APPROVED RIPRAP CHANNEL RR� APPROVED GRASS CHANNEL GL APPROVED CHANNEL GRASS DITCH 01-* RIPRAP DITCH 01-*\ INSTALLED PREVIOUSLY PROPOSED APPROVED STRUCTURES o TO BE BUILT SEDIMENT BASIN ST ® ST ROCK DAM RD ® RD ® RD RISER SEDIMENT BASIN RSB RSB f� TEMPORARY DIVERSION TDTD TD 725 "SO I DANI L JUAREZ & ,�CQUELINE JUAREZ AS TRUS OF THE �ANIEL & JACQUELINE 1` JUAREZ F L UST, DOMINICH CHARLES 1 LEVI & LILLIAN MOYA-LEVI \ �_ BOAR ARY / / \ \ \ WILL AM COTTEN GILLIAM, LOIS EL ABETH WA SH, LOIS ANN TODD, WILLIAM DPI NIEL \ AR OLD, ALICE ELIZABETH GILLIAM, �DWIN SAND SCA / \ R TODD, DAMES RNOLD & 1000, ANIEL JUARE & JACQUELI E ARE AS E IZABETbi JA E TODD / \ f TRUSTEES OF E DANIEL JACQU /NE r',r � \ \ � JUAR Z FAMIL TRUST, DOMINICH HA ES \ / \ �., L LILLIAN MOYA-LEVI' E T �RM�—i 1 Ap whq WS • � 1 P CATHERINE / H. DYLLORD GATHER/ DILLA D �\ r c C ILI ��. • 1 1 y, _ �� --� SIM IMP! / _ ,��. , ,.1 � ♦ • � � • - • 11 auk P1 = ME ME IN 4141-mul mil �'R. �d• �tr . �! INEEPM r WA Will i ro, FE all WIN v / / \ •► ' 1 \ r . )s. ���__,��_�_ III - i4 SILT FENCE X X 0 0 NOTE: OTHER SYMBOLS MAY BE USED TO DELINEATE EROSION o CONTROL MEASURES. REFER TO SITE NOTES. 0 � AST 4 ) i PROR AST OSE SEDDA 11 (EXIST D No. 3 1� 725 750 BASIN No. 1 DETAd SHEET 2 (EXISTING) I UAS-rs _ _ E No 2 \ ) 1 2� PIPE No. 1 (EXISTING) BO- CJ(P ®1.5X GRADE IWH • 3 B OUTLET PROTEC77ON OCK DA) SEDnf ff BASIN No. 2 SEDIAO�IVT 2 R 1�sTnvc ZVnWNT BAM o. 3—R DITCH o. 4—R (gyp) S E B. CONNER M TO TIME IN W Y CLEARING / -A-ROW R❑W OF I FENCING ALONG EAM B ' R THE NC ILL BE-- 5 T OF A UFFER. I I I � I ^ \ v � 1 Ole I / / / 0 / PIPE No. G) / 24- M& 7X GRADE / fl17'H 0 PR07Ts' /� AD ENT C RISTI� CD I CE OFF / ❑ I. - 675 `00 ROAD LLC CIO ROBERT CO & CROSSNORE HILDREN'S FOUNDATION 00 0 0 I/ ADVENT C ISTIAN GENERAL N ICOONFERENC OF AMERICA INC. 0 0 00 CAN LAS DS IN.AM \ X (MUSTING) IN NTH LL ool,� DITCH No. 11 (E�STING �'`��(` P• / o �•" j VULCAN LANDS INC. SotiP 750 N f` IM ./----... fie'' I � � - ♦ rf CARo SEAL 16883 DocuSigned by: 'L \� �s\\ 2-25-22 E�J. 3AODOO5E6BA648B... CATEGORY AFFECTED ACREAGE TAILINGS/SETTLING PONDS 11.6 ACRES OVERBURDEN STORAGE 39.5 ACRES STOCKPILES 32.4 ACRES PROCESSING/HAUL ROADS 6.4 ACRES PIT 73.9 ACRES OTHER 47.9 ACRES PROPERTY PERMITTED 447.0 ACRES PROPERTY OWNED 473.7 ACRES M. MINE MAP NOTES: 1. THIS MAP HAS BEEN PREPARED TO MODIFY THE EXISTING MINING PERMIT TO SHOW THE EXPANSION OF THE PIT ON THE NORTHWESTERN SIDE OF THE PIT AND THE EROSION O 2. CONTROL MEASURES THAT WILL BE INSTALLED TO PREVENT SEDIMENT LOSS FROM THE PROPOSED OVERBURDEN REMOVAL AREA ON THE NORTHWESTERN SIDE OF THE SITE. PROPERTY LINES AND BUFFERS ARE SHOWN FOR REFERENCE ONLY. REFER TO THE BOUNDARY SURVEYS FOR THE ACTUAL LOCATION OF PROPERTY LINES AND BUFFERS. BOULDER 3. ALTERNATE CULVERT MATERIALS OF THE SAME SIZE MAY BE USED FOR ALL CULVERTS LABELED PIPE 01-*. DUAL WALL SMOOTH CORE HDPE PIPE OR CORRUGATED ALUMINIZED HOLDINGS LLC STEEL PIPE ARE ACCEPTABLE MATERIALS. SUBSTITUTIONS ARE NOT TO BE MADE WITHOUT THE PRIOR APPROVAL OF CHRIS SCOTT OR TONY JOHNSON. KCB BOYS LLC •I. ALL ZONING BUFFERS AND SETBACKS AND NOT SHOWN ON THE MAP. REFER TO APPROVED ZONING MAPS FOR THE LOCATION OF S.W.I.M. BUFFERS, POST CONSTRUCTION STREAM SETBACKS, MECKLENBURG COUNTY COMMUNITY FLOOD HAZARDS AND ZONING SETBACKS. 5. THE OWNER IS RESPONSIBLE FOR OBTAINING DOCUMENTS CONFIRMING ZONING COMPLIANCE FROM THE CITY OF CHARLOTTE FOR SITE ACTIVITIES ASSOCIATED WITH ADDITIONAL LAND DISTURBING ACTIVITIES AND PIT EXPANSION PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. I 6. THE SEDIMENT BASINS THAT HAVE BEEN INSTALLED ARE SHOWN IN DARK GREEN. EROSION CONTROL MEASURES SHOWN IN DARK RED WERE PREVIOUSLY APPROVED, BUT NOT INSTALLED. THE DESIGN FOR THESE BASINS HAS BEEN UPDATED TO REFLECT SURFACE AREA EFFICIENCY DESIGN STANDARDS. OTHER EROSION CONTROL MEASURES SUCH AS SILT FENCE, TEMPORARY DIVERSION DITCHES, SLOPE DRAINS, AND PERMANENT CHANNELS THAT ARE DARK GREEN HAVE BEEN PREVIOUSLY APPROVED. SOME OF THESE MEASURES HAVE NOT BEEN INSTALLED TO DATE AND WILL BE INSTALLED WHEN THE ASSOCIATED DISTURBED AREA IS IMPACTED. 7. FEMA FLOOD FRINGE AREAS ARE BASED ON NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM. THE LOCATION OF THE FLOOD FRINGE LIMIT HAS NOT BEEN ADJUSTED FOR MORE ACCURATE TOPOGRAPHY MAPPING. THIS INFORMATION SHOULD ONLY BE USED TO IDENTIFY POTENTIAL AREAS OF FLOODING AS RELATED TO F.I.R.M. MAPPING AND THE LOCATION ' OF OCCUPIED STRUCTURES IN THESE AREAS. 8. 9. OBSCURED AREAS IN THE TOPO ARE SHOWN WITHIN A PURPLE BOUNDARY LINE. THE PLANT SUPERINTENDENT ADDS ADDITIONAL SILT TRAPS WITHIN THE SITE TO COLLECT SEDIMENT CLOSER TO THE DISTURBED AREAS AND FACILITY THE REMOVAL OF SEDIMENT. THESE MEASURES ARE TEMPORARY AND ARE NOT SHOWN ON THE MINE MAP. tuckINC.MAPPING SOLUTIONS, I www.tuckmapping.com DATE OF PHOTOGRAPHY: 2/8/21 alley, williams, carmen, & king, inc. Q CONSULTING ENGINEERS FIRM LICENSE No. F-0203 120 SOUTH MAIN STREET P.O. BOX 1248 KANNAPOLIS, NC 28082 704/938-1515 DATE.• JOB No.: DRAWN BY. CHECKED BY.- DRAWING No.: 12-17-21 1 1523 RCC GWW 1152JMINMOD22 REVISION No. DESCRIPTION DATE INITIAL 1. ADDED MATERIAL STORAGE 2-25-22 GWW BERM, LQ COMMENTS PERMIT LIMITS AND ACREAGES ARE BASED ON AN AGGREGATE OF PROPERTY DEEDS, TAX MAPS AND BOUNDARY SURVEYS. A BOUNDARY SURVEY OF THE SITE WAS NOT PERFORMED BY ALLEY, WILLIAMS, CARMEN & KING, INC. ADJACENT PROPERTY LINES AND INTERIOR PROPERTY LINES ARE APPROXIMATE AND SHOWN FOR REFERENCE ONLY. PROPERTY OWNERS ARE NOW OR FORMERLY. WETLANDS/SURVEYED STREAMS EXISTING SITE ACCESS ROAD** --------------- --------------- PROPOSED SITE ACCESS ROAD UNDISTURBED STREAM BUFFER — PIT LIMIT (BLASTING) ULTIMATE PIT LIMIT (BLASTING) PERMIT LINE PROPERTY/PERMIT LINE PROPERTY LINE — - - - - — HORIZONTAL CONTROL POINT QH VERTICAL CONTROL POINT INDEX CONTOUR "- 3500 INTERMEDIATE CONTOUR SPOT ELEVATION + 751.6 WATER J � PAVED ROAD DIRT ROAD BUILDING LOCATED OBJECT F — FENCE TREES PIPE----� POLE TOWER WELLS I00' UNDISTURBED ZONING BUFFER FEMA FLOODWAY — FEMA 100-YEAR FLOOD FRINGE — — ** Existing site access roads locations based on December, 2001 aerial topo data THIS MAP MEETS OR EXCEEDS NATIONAL MAP ACCURACY STANDARDS FOR 1 "=200', WITH A 5' CONTOUR INTERVAL, EXCLUDING AREAS MAPPED OUTSIDE OF EXISTING GROUND CONTROL OR IN DENSE TREE AREAS. PORTIONS OF THIS MAP HAVE BEEN COMPILED OUTSIDE THE LIMITS OF CONTROL AND THEREFORE DO NOT MEET THE NATIONAL MAP ACCURACY STANDARDS HORIZONTAL DATUM: NORTH CAROLINA, NAD83, USFT VERTICAL DATUM: NAVD88, GEOID 1996 CONTOURS IN TREED AREAS ARE APPROXIMATE 200 0 200 400 SCALE 1" = 200' CONTOUR INTERVAL 5' Uu [an Materials Company CLEAR CREEK QUARRY 2022 PEA IT MODIFICATION MINE MAP SHEET 1 OF 6 Gvv DANIEL JUAREZ & JACQ ELI JUAREZ AS _ / �, TRUSTEES OF THE DANI L JACQUELINE COMPILED BY: a /JUAREZ FAMILY TRUST, MINICH CHARLES / a f ILE &LILLIAN MOYA- E_Vf / ., 625 O I V O 01 I x o ,�` s,;: t 1•., � / ✓> 6s0 �� �I.1 ..�. 725 DANI L JUAREZ & ,d�CQUELINE JUAREZ AS 0 Q x JUAREZ F UST, DOMINICH CHARLES TRUS OF THE DANIEL & JACQUELINE �\ :. xJ LEVI & LILLIAN MOYA-LEVI ) tuck,OLUTIONS, INC. ^`ti ' �. 00 www.tu-,kmapping.com AR / � � WILL AM GOTTEN GILLIAM, LOIS EL ABETH AR OLD,LALICENELIZABETHWGILLIAMILLIAM ,�DWIN NIELRE 0 E R DATE OF PHOTOGRAPHY: \ SAND SCA / R ♦ODD, JAMES RNOLD & ( MS \ ANIEL JUARE & JACQUELI E JUAREZ AS DA S YP / E H v% SH H TRUSTEES OF E DANIEL JACQUELINE �00 IZA BET JA E TODD A \ 2/8/21 JUAR Z FAMIL TRUST, DOMINICH CHARLES I Q L LILLIAN MOYA-LEVK MOVE SEDIM / NT ASINS (TYP) � / 675 675 / RD \ ,N 1 7 RD.,2 4T MlC AEL R. KERR, RO EY KERR, \\\ � cos / I — I AL BEM LE ROAD LLC CIO ROBERT REMO AL _ 41 + + 64 ITTENG CO & CROSSNORE \ P 1 RO D _ ,yr r ,2 \ \— ` I SCHOOL HILDREN`S FOUNDATION / WILL 6 T N I ROCK DAMS �� 1 _ o \\ BE REMO VED SST 1-2 FOR GAFF EY BB NE L ° / a ST 7 /TD 1 � _ B SINS, CULV TS /-24 N PIT E CAV N RD l POND TO REMAIN ° / o 01- / ST �] )1- CA THERINE / FUTURE T H. D L RD WELERvnrio D s v WELL 0-2 GATHER/ 01-14 � /� � o � � DILLA D II r OT alley, williams, carmen, & king, inc. 1 \ / /7 - `� O CONSULTING ENGINEERS 1 f \ O �\( .. (� 675 l\ FIRM LICENSE No. F-0203 TD_ �ZD I j � �I \� p r°� U ��� D S V 10 120 SOUTH MAIN STREET P.O. BOX 1248 Ti 01ST 1 �kWELL 0-10 ^�� KANNAPOLIS, INC 28082 704/938-1515 \� I � \ /� l l DATE.• JOB No.: DRAWN BY: CHECKED BY:DRAWING No.: D 12-17-21 11523 RCC GWW 1 1523MlNMOD22 / 01-1 ^o° / I PIT TO BE FILLED /l I REVISION No. DESCRIPTION DATE INITIAL WITH WA TER ° D 1. ADDED MATERIAL STORAGE 2-25-22 GWW BERM, LQ COMMENTS 25 PERMIT LIMITS AND ACREAGES ARE BASED ON AN AGGREGATE OF PROPERTY DEEDS, TAX MAPS AND BOUNDARY SURVEYS. A BOUNDARY SURVEY OF THE SITE WAS NOT PERFORMED BY ALLEY, WILLIAMS, CARMEN & KING, INC. ODADJACENT , PROPERTY LINES AND INTERIOR PROPERTY LINES ARE APPROXIMATE AND SHOWN FOR REFERENCE ONLY. PROPERTY OWNERS ARE 00( / ' D ' I NOW OR FORMERLY. 01-16 O Q O O T` I WETLANDS/SURVEYED STREAMS CHR/SENBU Y � � � � ,O J EXISTING SITE ACCESS ROAD** --------------- --------------- (TYP I PROPOSED SITE ACCESS ROAD 1 / ^ POND TO ` 1 Oz UNDISTURBED STREAM BUFFER � � 1 6� � ^ I — TD REMAIN $0 PIT LIMIT (BLASTING) ULTIMATE PIT LIMIT (BLASTING) I o T_1\ �� � 575_ I I PERMIT LINE O TD PROPERTY/PERMIT LINE O �� N PROPERTY LINE / STORM WATER �_ 650 0 1 ` I DETENTION v. / \� _ 700 ADVENT C lSTIAN GENERAL / POND TO ° CONFERENC OF AMERICA INC. REMAIN 725 HORIZONTAL CONTROL POINT QN OST TD � VERTICAL CONTROL POINT �INDEX CONTOUR ' --� A AFL OR TO / a � 3500 "DRA1h 0 THE / INTERMEDIATE CONTOUR n $ C SS ROAD oo / T oo o ❑ o o REMAIN ^� PIT AN BI ZE � PIPE No. 7 O � / 1 SPOT ELEVATION + 751.6 TO REMAIN Q I GRO C E WATER TD • n 1 PAVED ROAD %00 DIRT ROAD 1 — o TO MAN l� '7�� 72rj ' BUILDING %�� 1 �00 D s DITCH. REMAIlV19� — O LOCATED OBJECT F_— ,� / Q PLAT QUIPMENT \\ x 1 FENCE S R T 1 u TO BE REMOVE 1 TREES EDI Q LANT ANPSTOCKPILE ROCK DAM SEDIMENT BASIN No. 11 TO BE REMOVED I \ 1 PIPE > - — — — — - < \ s I T l REA TO BE SCARIFIED I x AND SEEDED / `� 1 ��,. POLE x TOWER 1 WELLS A Qi100' UNDISTURBED ZONING BUFFER FEMA FLOODWAY — �25 FEMA 100-YEAR FLOOD FRINGE Q oiT REM A17V ' 1 ROCK D SEDIMENT BASIN o. 4 . Q � TO BE MO \ TO ERE D 1 X X DITCH No. 99- SEDIME B N No. 3' 1 OBSE ION TO REMAIN �� TO BE O ELL -7 ** Existing site access roads locations based on December, 2001 aerial topo data q � DITCH No. 9-1 I � AST 4 •00, \ O ❑ TO REMAIN 99-g TDITCH No. O REMAIN 3PR SE • \\ ��� • � / AST T } 9 Asr9 T1 THIS MAP MEETS OR EXCEEDS NATIONAL MAP 750 ACCURACY STANDARDS FOR 1 "=200', WITH A 4r � •t z � TO B / p Q p RE ATED DITCH No. 1B O / R � lY / 5' CONTOUR INTERVAL, EXCLUDING AREAS MAPPED No. s To REMAIN / OUTSIDE OF EXISTING GROUND CONTROL OR IN DENSE TREE AREAS. — H ` OESERVA80N y / / Li' / \� PROPANE ST ENTRANCE♦ I /t'.11 TO REMAIN CONFERENCE/ OF AM NCAR l C. / ❑ OQ fi✓ * p o ROTE ^ = , PORTIONS OF THIS MAP HAVE BEEN COMPILED OUTSIDE PorAs THE LIMITS OF CONTROL AND THEREFORE DO NOT LD & TO No. 1 lop T 5 WELL\ Q MEET THE NATIONAL MAP ACCURACY STANDARDS C 0 O \ n � � CK AM SED BASIN No. 2 BE ovED C S TO � 1CA O P CO. p } �, �5 / HORIZONTAL DATUM: NORTH CAROLINA, NAD83, USFT } I V L A A' S INC. , �'.�`�O� \� i i i i i i i i,VERTICAL DATUM: NAVD88, GEOID 1996 4 �, OFFICE TO �� x } 725 � � � \ �" `�� �N ° ° ° ° ° ° ° ° 0�/'%, CONTOURS IN TREED AREAS ARE APPROXIMATE /d�p0 BE REMOVED REMOVE \ =OO °°�FESS/0v B. 'ONNER �'p , BASIN WHEEL WAS = ° Q� SEAL 9< 0 0 DITCH AI 16883 8 � To REMAIN / MOORS DITCH No. 2 L 4N LAA,DS INC. EATTY e e ` O W TO REMAIN SEDIMENT BASIN No. y� - X / ^ G NE ^ ° 200 0 200 400 7 5 SEDIMENT BASIN ado. INVE$TMENT� % ' /A�� �\ TO BE REMOVED TO BE REMO LLC /'�i ry ° ° ° ° ...... ° V FSL E TO BE SEDIMENT BASINOVED No. B E�. cuSignedby: Yj1� \\\' 2-25-22 \ \ RO BFDREMOVE AM BAo. / �Ck;` / /� 1. x x 725 DITCH No. 10 '-/_i%/� �f �!�E9 Q P �y INKY t t — t O ^ \ TO REMAIN / / P �7 / 1� o SCALE 1 - 200 RR TO REEL9IN 11 ' ODOO5E6BA648B... VULCAN LANDS /NC. 50" �� \ CONTOUR INTERVAL 5' U 750 y LA \750 ` D R 1995 PERMIT RELEASE AREA ® �MAnv PIPE 0 PRO o 0 + DQsNT 5 1D LAND CLEARING DEBRIS DISPOSAL AREA , �\ +�+ BE SED REM VIED N . B �50 \ CCC/// CEM. a APPROVED RIPRAP CHANNEL ,� RR— x S S/G No 9 / a ° �0 x • L % D RRE B. LMS / ❑1 Materials Company u ion APPROVED GRASS CHANNEL GL ; � � NNO H x ,�•� OLK SO TH � � U R7 A O �\ APPROVED CHANNEL GRASS DITCH 01_* " ❑j O RIPRAP DITCH 01-* x e E No. OTEC:iON ' �* o MINE MAP NOTES: CLEAR CREEK 1. THIS MAP HAS BEEN PREPARED TO MODIFY THE EXISTING MINING PERMIT TO SHOW THE EXPANSION OF THE PIT ON THE NORTHWESTERN SIDE OF THE PIT AND THE EROSION INSTALLED PREVIOUSLY PROPOSED O CONTROL MEASURES THAT WILL BE INSTALLED TO PREVENT SEDIMENT LOSS FROM THE PROPOSED OVERBURDEN REMOVAL AREA ON THE NORTHWESTERN SIDE OF THE SITE. QUARRY APPROVED STRUCTURES • _ 2. PROPERTY LINES AND BUFFERS ARE SHOWN FOR REFERENCE ONLY. REFER TO THE BOUNDARY SURVEYS FOR THE ACTUAL LOCATION OF PROPERTY LINES AND BUFFERS. TO BE BUILT /x�x�x BOULDER 3. ALTERNATE CULVERT MATERIALS OF THE SAME SIZE MAY BE USED FOR ALL CULVERTS LABELED PIPE 01-*. DUAL WALL SMOOTH CORE HDPE PIPE OR CORRUGATED ALUMINIZED SEDIMENT BASIN ST ® ST ® ^`'� HOLDINGS LLC STEEL PIPE ARE ACCEPTABLE MATERIALS. SUBSTITUTIONS ARE NOT TO BE MADE WITHOUT THE PRIOR APPROVAL OF CHRIS SCOTT OR TONY JOHNSON. KCB BOYS LLC I. ALL ZONING BUFFERS AND SETBACKS AND NOT SHOWN ON THE MAP. REFER TO APPROVED ZONING MAPS FOR THE LOCATION OF S.W.I.M. BUFFERS, POST CONSTRUCTION STREAM SETBACKS, MECKLENBURG COUNTY COMMUNITY FLOOD HAZARDS AND ZONING OMP SETBACKS. 2022 E E IPM I T ROCK DAM RD RD RD � 5. THE OWNER IS RESPONSIBLE FOR OBTAINING DOCUMENTS CONFIRMING ZONING COMPLIANCE FROM THE CITY OF CHARLOTTE FOR SITE ACTIVITIES ASSOCIATED WITH ADDITIONAL LAND x x_ a I DISTURBING ACTIVITIES AND PIT EXPANSION PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. ^ RISER SEDIMENT BASIN RSB T RSB �,YY �'�I^yy�, 6. THE SEDIMENT BASINS THAT HAVE BEEN INSTALLED ARE SHOWN IN DARK GREEN. EROSION CONTROL MEASURES SHOWN IN DARK RED WERE PREVIOUSLY APPROVED, BUT NOT T } INSTALLED. THE DESIGN FOR THESE BASINS HAS BEEN UPDATED TO REFLECT SURFACE AREA EFFICIENCY DESIGN STANDARDS. OTHER EROSION CONTROL MEASURES SUCH AS SILT FENCE, TEMPORARY DIVERSION DITCHES, SLOPE DRAINS, AND PERMANENT CHANNELS THAT ARE DARK GREEN HAVE BEEN PREVIOUSLY APPROVED. SOME OF THESE MODIFICATION TEMPORARY DIVERSION TD - TD TD MEASURES HAVE NOT BEEN INSTALLED TO DATE AND WILL BE INSTALLED WHEN THE ASSOCIATED DISTURBED AREA IS IMPACTED. /� /� �T MAP SILT FENCE X X • • Q . 7. FEMA ACCURATOEOD FRINGE TOPOGR TOPOGRAPHY MAPPING. EAS ARE BASED THIIS ON NORTH INFO MATIONASOLINA HOULDFONOLYP EINUSEDMAPPING IDENTFY POTENTIALLOCATION OFFFLOODINGGFLOOD ASFRINGE RELATEDLIMIT TO FHAS I R.M. MAPPING AND THE LOCATIONT BEEN ADJUSTED FOR MORE �E C LAMATI O 1 �l ldJ�l P NOTE: OTHER SYMBOLS MAY BE USED TO DELINEATE EROSION �r o OF OCCUPIED STRUCTURES IN THESE AREAS. CONTROL MEASURES. REFER TO SITE NOTES. L�rJ 8. OBSCURED AREAS IN THE TOPO ARE SHOWN WITHIN A PURPLE BOUNDARY LINE. SHEET 2 OF 6 v ° 9. THE PLANT SUPERINTENDENT ADDS ADDITIONAL SILT TRAPS WITHIN THE SITE TO COLLECT SEDIMENT CLOSER TO THE DISTURBED AREAS AND FACILITY THE REMOVAL OF SEDIMENT. THESE MEASURES ARE TEMPORARY AND ARE NOT SHOWN ON THE MINE MAP. #57 WASHED STONE r CLASS 1 RIPRAP 1' THICK MAX. LEVEL OF 1' THICK MAX. LEVEL OF SEDIMENT SEDIMENT 6' OF #57 5' CARRY RIPRAP UP COLLECTED - CLEAN TOP OF BERM 6COLLECTED - CLEAN WASHED STONE 1' MI SIDES OF SPILLWAY BASIN WHEN THIS BASIN WHEN THIS LEVEL IS REACHED LEVEL IS REACHED III I I= I' 1 SPILLWAY �� TOP OF BERM TOP ELEVATI❑N JF O O 18' FREEBOARD IIIII= III, D2 _ 0- INIMUM IIIII_ 1 STORM WATER IIII I= III I- 2' MAX. _ IIII I=IIII _SEDIMENT cu CLASS B ER❑SI❑N _ IIIII= ca CONTROL STONE 1 IIIII= I -IIIII III= .5' MAX. -IIII IIII= =IIIII =IIIII -IIIII I I _SEDIMENT MAX SSIZE 14' MINIMUM SURFACE AREA IIII_ IIII - AS REQUIRED ON PLAN CLASS II RIPRAP -IIII IIII I=IIIII= IIII I =IIIII IIIII I=IIII I OR NOTED BELOW 18' MINIMUM FILTER FABRIC MINIMUM SURFACE AREA KEY IN BOTTOM LAYER AS REQUIRED ON PLAN Z OF RIPRAP 17' MINIMUM do 18' MINIMUM r. FILTER FABRIC .04 SPILLWAY LENGTH KEY IN BOTTOM LAYER DESIGN OF RIPRAP SETTLED ❑VERFILL 6' 2' T❑P ti FOR SETTLEMENT 4' MIN II IIIII- �1=-IIIII_IIIII_ � ROCK DAM SEDIMENT BASINS 5' MAX. II I I II _� EMERGENCY I II - 2�1 SIDE BY-PASS FILL SLOPE MAX. 6' BELOW FILTER �� _ SETTLED TOP FABRIC _ = 1:1 SIDE OF DAM ROCK ABUTMENTS SHALL EXTEND TO AN ELEVATI❑N AT LEAST 2 FT ABOVE THE SPILLWAY, ABUTMENTS SHALL BE 2 FT THICK II SLOPE MAX. WITH 211 SIDE SLOPES. THE ROCK ABUTMENTS SHALL EXTEND DOWN THE DOWNSTREAM FACE OF THE DAM TO THE TOE, AT LEAST r NATURAL GROUND 1 FT HIGHER THAN THE REST OF THE DAM TO PROTECT THE EARTH ABUTMENTS FROM SCOUR. OUTLET PR❑TECTI❑N - A ROCK APRON AT LEAST 1,5 FT THICK SHALL EXTEND DOWNSTREAM FROM THE TOE OF THE DAM, ON 3' ZERO GRADE, A SUFFICIENT DISTANCE TO PREVENT CHANNEL ER❑SI❑N, OR A DISTANCE EQUAL TO THE HEIGHT OF THE DAM MIN, WHICHEVER IS GREATER. ROCK FILL - ROCK SHALL BE WELL GRADED, HARD, ER❑SI❑N RESISTANT STONE WITH A MINIMUM D50 SIZE OF 9 INCHES. PR❑TECTI❑N FROM 'PIPING' - A KEYWAY LINED WITH GE❑TEXTILE FILTER FABRIC SHALL BE ON THE S❑IL F❑UNDATI❑N UNDER TEMPORARY SEDIMENT BASIN THE ROCK FILL. TO PREVENT S❑IL MOVEMENT AND PIPING UNDER THE DAM, THE FILTER FABRIC MUST EXTEND FROM THE KEYWAY TO THE DOWNSTREAM EDGE OF THE APRON AND MUST RUN UNDER THE DAM'S ABUTMENTS. BASIN DEWATERING - THE ENTIRE UPSTREAM FACE OF THE ROCK STRUCTURE SHALL BE COVERED WITH FINE GRAVEL (NCD❑T #57 WASHED STONE OR EQUIVALENT) A MINIMUM OF 1 FT THICK TO REDUCE THE DRAINAGE RATE. C❑NSTRUCTI❑N SPECIFICATI❑NS 1, CLEAR THE AREAS UNDER THE EMBANKMENT AND STRIP IT OF ROOTS AND OTHER ❑BJECTI❑NABLE MATERIAL. CLEAR THE RESERV❑IR AREA TO FACILITATE SEDIMENT REMOVAL. 2, EXCAVATE A CUTOFF TRENCH A MINIMUM OF 2 FT DEEP AND 2 FT WIDE WITH 1l1 SIDE SLOPES UNDER THE TOTAL LENGTH OF THE DAM AT ITS CENTERLINE, LINE THE TRENCH WITH EXTRA -STRENGTH FILTER FABRIC BEFORE BACKFILLING WITH ROCK, APPLY FILTER FABRIC UNDER THE R❑CKFILL EMBANKMENT, FROM THE UPSTREAM EDGE OF THE KEYWAY TO THE DOWNSTREAM EDGE OF THE APRON. OVERLAP FILTER MATERIAL A MINIMUM OF 1 FT AT ALL J❑INTS, WITH THE UPSTREAM STRIP LAID OVER THE DOWNSTREAM STRIP, 3, CONSTRUCT THE EMBANKMENT WITH WELL -GRADED ROCK AND GRAVEL TO THE SIZE AND DIMENSI❑NS SHOWN ON THE DRAWINGS. IT IS IMP❑RTANT THAT ROCK ABUTMENTS BE AT LEAST 2 FT HIGHER THAN THE SPILLWAY CREST AND AT LEAST 1 FT HIGHER THAN THE DOWNSTREAM FACE OF THE DAM, ALL THE WAY TO PREVENT SCOUR AND ER❑SI❑N AT THE ABUTMENTS. 4, SEDIMENT -LADEN WATER FROM THE C❑NSTRUCTI❑N SITE SHOULD BE DIVERTED INT❑ THE BASIN RESERV❑IR AT THE FURTHEST AREA FROM THE DAM. 5, CONSTRUCT THE ROCK DAM BEFORE THE BASIN AREA IS CLEARED TO MINIMIZE SEDIMENT YIELD FROM C❑NSTRUCTI❑N OF THE BASIN. STABILIZE IMMEDIATELY ALL AREAS DISTURBED DURING THE C❑NSTRUCTI❑N OF THE DAM EXCEPT THE SEDIMENT POOL, MAINTENANCE CHECK SEDIMENT BASINS AFTER EACH RAINFALL, REMOVE SEDIMENT AND RESTORE ❑RIGINAL VOLUME WHEN SEDIMENT ACCUMULATES TO ABOUT ONE-HALF THE DESIGN VOLUME. CHECK THE STRUCTURE FOR ER❑SI❑N, PIPING, AND ROCK DISPLACEMENT AFTER EACH SIGNIFICANT RAINST❑RM AND REPAIR IMMEDIATELY. REMOVE THE STRUCTURE AND ANY UNSTABLE SEDIMENT IMMEDIATELY AFTER THE C❑NSTRUCTI❑N SITE HAS BEEN PERMANENTLY STABILIZED. SMOOTH THE BASIN SITE TO BLEND WITH THE SURR❑UNDING AREA AND STABILIZE. ALL WATER AND SEDIMENT SHALL AND SEDIMENT SHALL BE REMOVED FROM THE BASIN PRI❑R TO DAM REMOVAL, SEDIMENT SHALL BE PLACED IN DESIGNATED DISP❑SAL AREAS AND NOT ALLOWED TO FLOW INT❑ STREAMS OR DRAINAGEWAYS DURING STRUCTURE REMOVAL, ROCK DAM NO. STORAGE AREA CLEANOUT DEPTH VOLUME SPILLWAY L1 I W1 I D1 L2 I W2 D2 L3 I W3 I D4 FT FT RD 01-1 SEE SHEET 4 FOR REVISED DESIGN RD 01-7 SEE SHEET 4 FOR REVISED DESIGN RD 01-10 58.0 1 29.0 1 4.0 1 74.0 1 45.0 7.0 86.0 1 34.0 1 2.0 110,024.0 1 12 RD 01-11 1 74.0 1 37.0 1 4.0 1 90.0 1 53.0 7.0 102.0 1 34.0 1 2.0 1 15,016.01 15 RD 01-12 1 SEE SHEET 4 FOR REVISED DESIGN L1 = BASIN LENGTH AT THE BOTTOM OF THE BASIN D1 = THE DEPTH OF SEDIMENT STORAGE W1 = BASIN WIDTH AT THE BOTTOM OF THE BASIN D2 = THE OVERALL DEPTH OF THE SEDIMENT BASIN L2 = BASIN LENGTH AT THE TOP OF THE SEDIMENT STORAGE L3 = BASIN LENGTH AT THE TOP OF THE EMBANKMENT W2 = BASIN WIDTH AT TOP OF THE SEDIMENT STORAGE W3 = BASIN WIDTH AT THE TOP OF THE EMBANKMENT INSTALL COLLAR WITH CORRUGATIONS VERTICAL CONTINUOUS WELD O CD CD SPACE 8" CC CONTINUOUS WELD O.D. OF PIPE INCLUDING PIP -2" 2- CD O OI SPACE 8" CC 00 CE 2 A--� ELEVATION OF UNASSEMBLED COLLAR COLLAR TO BE SAME GAGE AS THE PIPE WITH WHICH IT IS USED. 1/2" x 2" SLOTTED HOLES FOR 3/8" DIAMETER BOLTS 2" 12" MIN. _E1" CORRUGATED METAL SHEET WELDED TO WELD BOTH SIDES CENTER OF BAND SECTION A -A NOTES FOR COLLARS: 1. ALL MATERIAL TO BE IN ACCORDANCE WITH CONSTRUCTION AND CONSTRUCTION MATERIAL SPECIFICATIONS. 2. WHEN SPECIFIED ON THE PLANS, COATING OF COLLARS SHALL BE IN ACCORDANCE WITH CONSTRUCTION AND CONSTRUCTION MATERIAL SPECIFICATIONS. 3. UNASSEMBLED COLLARS SHALL BE MARKED BY PAINTING OR TAGGING TO IDENTIFY MATCHED PAIRS. 4. THE LAP BETWEEN THE TWO HALF SECTIONS AND BETWEEN THE PIPE AND THE CONNECTING BAND SHALL BE CAULKED WITH ASPHALT MASTIC AT TIME OF INSTALLATION. 5. EACH COLLAR SHALL BE FURNISHED WITH TWO 1/2" DIAMETER RODS WITH STANDARD TANK LUGS FOR CONNECTING COLLARS TO PIPE. DETAILS OF CORRUGATED METAL ANTI -SEEP COLLARS alley, williams, carmen, & king, inc. CONSULTING ENGINEERS FIRM LICENSE # F-0203 120 SOUTH MAIN STREET P.O. BOX 1248 KANNAPOLIS, NC 28082 704/938-1515 C❑NSTRUCTI❑N SPECIFICATI❑NS 1, CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATI❑N AND ROOT MAT, REMOVE ALL SURFACE S❑IL C❑NTAINING HIGH AMOUNTS OF ❑RGANIC MATTER AND ST❑CKPILE OR DISP❑SE OF IT PROPERLY. HAUL ALL ❑BJECTI❑NABLE MATERIAL TO THE DESIGNATED DISP❑SAL AREA, 2, ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATI❑N, ❑RGANIC MATTER, AND OTHER ❑BJECTI❑NABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT, 3, CONSTRUCT THE OUTLET SECTI❑N IN THE EMBANKMENT. PROTECT THE C❑NNECTI❑N BETWEEN THE RIPRAP AND THE S❑IL FROM PIPING BY USING FILTER FABRIC OR A KEYWAY CUTOFF TRENCH BETWEEN THE RIPRAP STRUCTURE AND THE S❑IL. PLACE THE FILTER FABRIC BETWEEN THE RIPRAP AND S❑IL, EXTEND THE FABRIC ACROSS THE SPILLWAY F❑UNDATI❑N AND SIDES TO THE TOP OF THE DAM; OR EXCAVATE A KEYWAY TRENCH ALONG THE CENTERLINE OF THE SPILLWAY F❑UNDATI❑N EXTENDING UP THE SIDES TO THE HEIGHT OF THE DAM. THE TRENCH SHOULD BE AT LEAST 2 FT DEEP AND 2 FT WIDE WITH li 1 SIDE SLOPES. 4, CLEAR THE POND AREA BELOW THE ELEVATI❑N OF THE CREST OF THE SPILLWAY TO FACILITATE SEDIMENT CLEANOUT. 5, ALL CUT AND FILL SLOPES SHOULD BE 211 OR FLATTER. 6, ENSURE THAT THE STONE (DRAINAGE) SECTI❑N OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FT AND MAXIMUM SIDE SLOPES OF 111 THAT EXTEND TO THE BOTTOM OF THE SPILLWAY SECTI❑N, 7, CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 211 SIDE SLOPES EXTENDING TO THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY. 8, MATERIAL USED IN THE STONE SECTI❑N SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D50 SIZE OF 9 INCHES (CLASS B ER❑SI❑N CONTROL STONE) AND A MAXIMUM STONE SIZE OF 14 INCHES, THE STONE MAY BE MACHINE PLACED AND THE SMALLER STONES WORKED INT❑ THE V❑IDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. 9, ENSURE THAT THE STONE SPILLWAY OUTLET SECTI❑N EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE C❑NDITI❑NS ARE REACHED AND OUTLET VEL❑CITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE OUTLET SECTI❑N FLUSH WITH THE SURR❑UNDING GROUND AND SHAPE THE CENTER TO C❑NFINE THE OUTFLOW STREAM. 10. DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS S❑ THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 11. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER C❑NSTRUCTI❑N. MAINTENANCE INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERI❑D OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ❑RIGINAL DIMENSI❑NS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISP❑SAL AREA AND REPLACE THE C❑NTAMINATED PART OF THE GRAVEL FACING, CHECK THE STRUCTURE FOR DAMAGE FROM ER❑SI❑N OR PIPING. PERI❑DICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW P❑INT OF THE EMBANKMENT, IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT-PR❑DUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJ❑INING AREAS AND STABILIZE PROPERLY. SILT TRAP STORAGE AREA STORAGE SPILLWAY H 99-1 3' X 26' X 60' 4, 680 CUBIC FT. 8' 5' 99-2 3' X 18' X 50' 2, 700 CUBIC FT, 6' 5' 99-3 3' X 15' X 40' 1, 800 CUBIC FT, 4' 5' SEDIMENT TRAP NO. STORAGE AREA CLEANOUT DEPTH I VOLUME ISPILLWAY L1 I W1 D1 L2 I W2 D2 L3 W3 D4 FT3 FT ST 01 - 2 SEE SHEET 4 FOR REVISED DESIGN ST 01- 3 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 4 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 5 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 6 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 8 SEE SHEET 4 FOR REVISED DESIGN ST 01- 9 38.0 1 19.0 3.0 50.0 31.0 4.5 56.0 37.0 1.5 3,408.0 12 ST 01 - 13 SEE SHEET 4 FOR REVISED DESIGN ST 01- 14 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 15 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 1 6 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 17 SEE SHEET 4 FOR REVISED DESIGN ST 01-19 20.0 1 10.0 3.0 32.0 22.0 4.5 38.0 1 28.0 1 1.5 1 1,356.01 8 ST 01 - 21 SEE SHEET 4 FOR REVISED DESIGN ST 01- 23 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 24 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 25 SEE SHEET 4 FOR REVISED DESIGN ST 01 - 26 SEE SHEET 4 FOR REVISED DESIGN L1 = BASIN LENGTH AT THE BOTTOM OF THE BASIN D1 = THE DEPTH OF SEDIMENT STORAGE W1 = BASIN WIDTH AT THE BOTTOM OF THE BASIN D2 = THE OVERALL DEPTH OF THE SEDIMENT BASIN L2 = BASIN LENGTH AT THE TOP OF THE SEDIMENT STORAGE L3 = BASIN LENGTH AT THE TOP OF THE EMBANKMENT W2 = BASIN WIDTH AT TOP OF THE SEDIMENT STORAGE W3 = BASIN WIDTH AT THE TOP OF THE EMBANKMENT STORAGE AREA BOTTOM DIMENSIONS = 23' X 150' 84' CMP TRASH AND ANTI -VORTEX DEVICE SEE DETAIL 54' CMP 698.0 RISER PIPE FPRINCIPAL SPILLWAY 695.0 10, EMBANKMENT STABILIZED WITH VEGETATION �i�i�i�i�i�i�i � • e �1 �••••� 1 RISER PIPE SEDIMENT BASIN (RSB 01-18) THE BASIN MAY ALSO BE DEWATERED BY PERF❑RATING THE RISER WITH 1/2-INCH HOLES WITH A SPACING OF APPR❑XIMATELY 3 INCHES IN EACH ❑UTSIDE VALLEY, TRASH GUARD - INSTALL A TRASH GUARD ON THE TOP OF THE RISER TO PREVENT TRASH AND OTHER DEBRIS FROM CL❑GGING THE C❑NDUIT. C❑NSTRUCTI❑N SPECIFICATI❑NS 1, SITE PREPARATI❑NS - CLEAR, GRUB, AND STRIP T❑PS❑IL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATI❑N, ROOTS, AND OTHER ❑BJECTI❑NABLE MATERIAL. TO FACILITATE SEDIMENT CLEANOUT AND REST❑RATI❑N, CLEAR THE POOL AREA OF ALL BRUSH, TREES, AND OTHER ❑BJECTI❑NABLE MATERIALS. ST❑CKPILE ALL T❑PS❑IL OR S❑IL C❑NTAINING ❑RGANIC MATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. 2, CUT-OFF TRENCH - EXCAVATE A CUT-OFF TRENCH ALONG THE CENTERLINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE S❑IL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FT DEEP. THE CUT-OFF TRENCH MUST EXTEND INT❑ BOTH ABUTMENTS TO AT LEAST THE ELEVATI❑N OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT ❑PERATI❑N OF EXCAVATI❑N AND C❑MPACTI❑N EQUIPMENT BUT IN NO CASE LESS THAN 2 FT. MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 111. C❑MPACTI❑N REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND C❑MPACTI❑N ❑PERATI❑NS. 3, EMBANKMENT - THE EMBANKMENT SHOULD BE CLEAN MINERAL S❑IL, FREE OF ROOTS, WOODY VEGETATI❑N, ROCKS, AND OTHER ❑BJECTI❑NABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL MUST C❑NTAIN SUFFICIENT M❑ISTURE S❑ IT CAN BE FORMED BY HAND INT❑ A BALL WITH❑UT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT IS T❑❑ WET FOR PROPER C❑MPACTI❑N. PLACE FILL MATERIAL IN 6 TO 8-INCH C❑NTINU❑US LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND THEN COMPACT IT. C❑MPACTI❑N MAY BE ❑BTAINED BY R❑UTING THE C❑NSTRUCTI❑N HAULING EQUIPMENT OVER THE FILL S❑ THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF THE HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATI❑N 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 4, C❑NDUIT SPILLWAYS - SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL C❑NNECTI❑N. SECURE ALL C❑NNECTI❑NS BETWEEN BARREL SECTI❑NS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH F❑UNDATI❑N OF IMPERVI❑US S❑IL. D❑ NOT USE PERVI❑US MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTI -SEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS F❑UNDATI❑N WHEN C❑MPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FT OF HAND -COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CR❑SSING IT WITH C❑NSTRUCTI❑N EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHER SATISFACT❑RY MEANS TO PREVENT FL❑TATI❑N. IN NO CASE SHOULD THE PIPE C❑NDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5, EMERGENCY SPILLWAY - INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED S❑IL. MAINTENANCE CHECK SEDIMENT BASINS AFTER PERI❑DS OF SIGNIFICANT RUN-OFF. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ❑RIGINAL DIMENSI❑NS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR ER❑SI❑N DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. WELDED METAL BAR TRASH RACK SCREEN 6" ON CENTER EACH DIRECTION A ANTI-VORTE PLATES PLAN L A INSIDE DIAMETER SECTION A -A A B C MIN. SIZE SUPPORT BAR 54" 84" 24" 1 1/2" X 1 1/2" X 1/4" ANGLE A ANTI -VORTEX PLATES 'WELD JOINTS -VORTEX FES - 1 /4" METAL CMP, 14 GAUGE MANUFACTURER TO DESIGN AND SUBMIT SHOP DRAWINGS FOR ALL COMPONENTS OF THE ANTI -VORTEX DEVICE. ANTI - VZ7R TEX 1PE_ VICE -- CLEAR CREEK QUARRY 2022 MINE PERMIT MODIFICATION VULCAN CONSTRUCTION MATERIALS, L.P. MECKLENBURG COUNTY, NORTH CAROLINA 4' MIN �l 1,5" MIN, DIKE 311 HOLD DOWNSTAKES PLASTIC CORRUGATED PIPE I II -11 =11 -11 - II -11 10' SPACING = II II II INLET PIPE STABILIZEDOUTLET PR❑TECTI❑N III -11I II II =11 1111 .II-III=III- II = II 4 LE VELL SECT, PLAN VIEW STANDARD T-SECTI❑N PERMANENT SLOPE DRAINS C❑NDUIT - CONSTRUCT THE SLOPE DRAIN FROM HEAVY-DUTY, FLEXIBLE MATERIALS SUCH AS N❑NPERF❑RATED, CORRUGATED PLASTIC PIPE OR SPECIALLY DESIGNED FLEXIBLE TUBING. INSTALL REINF❑RCED, HOLD- DOWN GROMMETS OR STAKES TO ANCHOR THE C❑NDUIT AT INTERVALS NOT TO EXCEED 10 FT WITH THE OUTLET END SECURELY FASTENED IN PLACE, THE C❑NDUIT MUST EXTEND BEYOND THE TOE OF THE SLOPE, ENTRANCE - CONSTRUCT THE ENTRANCE TO THE SLOPE DRAIN OF A STANDARD T-SECTI❑N FITTING, TEMPORARY DIVERSI❑N - USE AN EARTHEN DIVERSI❑N WITH A DIKE RIDGE TO DIRECT SURFACE RUN-OFF INT❑ THE TEMPORARY SLOPE DRAIN. THE HEIGHT OF THE RIDGE OVER THE DRAIN C❑NDUIT SHALL BE A MINIMUM OF 1.5 FEET AND AT LEAST 6 INCHES HIGHER THAN THE ADJ❑INING RIDGE ON EITHER SIDE, THE LOWEST P❑INT OF THE DIVERSI❑N RIDGE SHOULD BE A MINIMUM OF 1 FT ABOVE THE TOP OF THE DRAIN S❑ THAT DESIGN FLOW CAN FREELY ENTER THE PIPE. C❑NSTRUCTI❑N SPECIFICATI❑NS 1, SLOPE DRAINS ON UNDISTURBED S❑IL OR WELL -COMPACTED FILL AT L❑CATI❑NS AND ELEVATI❑NS SHOWN ON THE PLANS, 2, SLIGHTLY SLOPE THE SECTI❑N OF PIPE UNDER THE DIKE TOWARD IT'S OUTLET, 3, HAND TAMP THE S❑IL UNDER AND AROUND THE ENTRANCE SECTI❑N IN LIFTS NOT TO EXCEED 6 INCHES. 4. ENSURE THAT FILL OVER THE DRAIN AT THE TOP OF THE SLOPE HAS MINIMUM DIMENSI❑NS OF 1.5 FT DEPTH, 4 FT TOP WIDTH, AND 3:1 SIDE SLOPES, 5. ENSURE THAT ALL SLOPE DRAIN C❑NNECTI❑NS ARE WATERTIGHT. 6, ENSURE THAT ALL FILL MATERIAL IS WELL -COMPACTED, SECURELY FASTEN THE EXPOSED SECTI❑N OF THE DRAIN WITH GROMMETS OR STAKES SPACED NO MORE THAN 10 FT APART, 7, EXTEND THE DRAIN BEYOND THE TOE OF THE SLOPE AND ADEQUATELY PROTECT THE OUTLET FROM ER❑SI❑N, 8, MAKE THE SETTLED, COMPACTED DIKE RIDGE NO LESS THAN 1 FT ABOVE THE TOP OF THE PIPE AT EVERY P❑INT. MAINTENANCE INSPECT THE SLOPE DRAIN AND SUPP❑RTING DIVERSI❑N AFTER EVERY RAINFALL AND PROMPTLY MAKE NECESSARY REPAIRS. WHEN THE PROTECTED AREA HAS BEEN PERMANENTLY STABILIZED, TEMPORARY MEASURES MAY BE REMOVED, MATERIALS DISP❑SED OF PROPERLY, AND ALL DISTURBED AREAS STABILIZED APPR❑PRIATELY, NOTES: 1. USE DIMENSIONS SHOWN ABOVE UNLESS NOTED OTHERWISE. 2. TEMPORARY DIVERSION DITCHES FLOWING INTO RD 01-11 AND TEMPORARY DIVERSIONS AT THE TOP OF PIT EXCAVATION LIMITS THAT DIVERT RUNOFF INTO THE PIT SHALL BE STABILIZED WITH A NORTH AMERICAN GREEN P300 LINER. \\\`�riii�►�/// PLAN SYMBOL TD ss 0 SEAL = TEMPORARY DIVERSION DITCH 16883 NTS o IVCIN6. Docu 1Sig''n��ed by: // FSLEY O \\\\ Lft_D005F6BA648B We,4-Q,e,�, �e Irlr 12-17-21 ... REVISION No. DESCRIPTION DATE INITIAL " SCALE ""' 12/17/21 PLAN: DRAWN BY: RCC PROFILE CHECKED BY: HORIZ.: GWW DWG No.: 11523MINMOD22 VERT.: D ET\S H EET3 110 MIN MX115011 JOB NO. 11523 SHEET NO. 3 OF: 6 2' PVC SEDIMENT CLEANOUT REFERENCE STAKE. MARK SEDIMENT CLEANOUT - nFPTH nN CTAWF IIIII=1., IIIII=II►11s<o IIIII=IIII►p�' MINIMUM STORAGE AND IIII 1=IIII = SURFACE AREA AS =IIII REQUIRED ON PLAN POROUS BAFFLES (SEE DETAIL) 12' OF #5 OR #57 KEY IN BOTTOM LAYER OF RIPRAP ROCK DAM SEDIMENT BASINS WITH SURFACE AREA EFFICIENCY DESIGN CLASS I RIPRAP CLASS II RIPRAP =IIIII FILTER FABRIC THE STORAGE AREA FOR BASINS WILL LIMIT THE C❑NSTRUCTION OF THE FINAL OVERBURDEN STORAGE AREA SLOPES. THE BERMS SHALL BE CONSTRUCTED UP TO WHERE THE BASIN STORAGE AREAS ARE LOCATED AND THEN STABILIZED. ONCE THE OVERBURDEN STORAGE AREA HAS BEEN STABILIZED, THE STORAGE AREA OF THE BASIN MAY BE REDUCED AND THE FINAL GRADING FOR THE BERM COMPLETED. THE BASIN WILL REMAIN UNTIL THE COMPLETED BERM HAS BEEN STABILIZED. ROCK ABUTMENTS SHALL EXTEND TO AN ELEVATI❑N AT LEAST 2 FT ABOVE THE SPILLWAY, ABUTMENTS SHALL BE 2 FT THICK WITH 2:1 SIDE SLOPES, THE ROCK ABUTMENTS SHALL EXTEND DOWN THE DOWNSTREAM FACE OF THE DAM TO THE TOE, AT LEAST 1 FT HIGHER THAN THE REST OF THE DAM TO PROTECT THE EARTH ABUTMENTS FROM SCOUR, OUTLET PR❑TECTI❑N - A ROCK APRON AT LEAST 1.5 FT THICK SHALL EXTEND DOWNSTREAM FROM THE TOE OF THE DAM, ON ZERO GRADE, A SUFFICIENT DISTANCE TO PREVENT CHANNEL ER❑SI❑N, OR A DISTANCE EQUAL TO THE HEIGHT OF THE DAM WHICHEVER IS GREATER. ROCK FILL - ROCK SHALL BE WELL GRADED, HARD, EROSI❑N RESISTANT STONE WITH A MINIMUM D50 SIZE OF 9 INCHES, PROTECTI❑N FROM 'PIPING' - A KEYWAY LINED WITH GE❑TEXTILE FILTER FABRIC SHALL BE ON THE S❑IL F❑UNDATI❑N UNDER THE ROCK FILL. TO PREVENT S❑IL MOVEMENT AND PIPING UNDER THE DAM, THE FILTER FABRIC MUST EXTEND FROM THE KEYWAY TO THE DOWNSTREAM EDGE OF THE APRON AND MUST RUN UNDER THE DAM'S ABUTMENTS, BASIN DEWATERING - THE ENTIRE UPSTREAM FACE OF THE ROCK STRUCTURE SHALL BE COVERED WITH FINE GRAVEL (NCD❑T #57 WASHED STONE OR EQUIVALENT) A MINIMUM OF 1 FT THICK TO REDUCE THE DRAINAGE RATE. C❑NSTRUCTI❑N SPECIFICATI❑NS 1, CLEAR THE AREAS UNDER THE EMBANKMENT AND STRIP IT OF ROOTS AND OTHER ❑BJECTIONABLE MATERIAL, CLEAR THE RESERV❑IR AREA TO FACILITATE SEDIMENT REMOVAL, 2, EXCAVATE A CUTOFF TRENCH A MINIMUM OF 2 FT DEEP AND 2 FT WIDE WITH 1:1 SIDE SLOPES UNDER THE TOTAL LENGTH OF THE DAM AT ITS CENTERLINE. LINE THE TRENCH WITH EXTRA -STRENGTH FILTER FABRIC BEFORE BACKFILLING WITH ROCK, APPLY FILTER FABRIC UNDER THE R❑CKFILL EMBANKMENT, FROM THE UPSTREAM EDGE OF THE KEYWAY TO THE DOWNSTREAM EDGE OF THE APRON. OVERLAP FILTER MATERIAL A MINIMUM OF 1 FT AT ALL J❑INTS, WITH THE UPSTREAM STRIP LAID OVER THE DOWNSTREAM STRIP, 3, CONSTRUCT THE EMBANKMENT WITH WELL -GRADED ROCK AND GRAVEL TO THE SIZE AND DIMENSIONS SHOWN ON THE DRAWINGS, IT IS IMP❑RTANT THAT ROCK ABUTMENTS BE AT LEAST 2 FT HIGHER THAN THE SPILLWAY CREST AND AT LEAST 1 FT HIGHER THAN THE DOWNSTREAM FACE OF THE DAM, ALL THE WAY TO PREVENT SCOUR AND EROSI❑N AT THE ABUTMENTS, 4, SEDIMENT -LADEN WATER FROM THE C❑NSTRUCTI❑N SITE SHOULD BE DIVERTED INT❑ THE BASIN RESERV❑IR AT THE FURTHEST AREA FROM THE DAM. 5, CONSTRUCT THE ROCK DAM BEFORE THE BASIN AREA IS CLEARED TO MINIMIZE SEDIMENT YIELD FROM CONSTRUCTI❑N OF THE BASIN, STABILIZE IMMEDIATELY ALL AREAS DISTURBED DURING THE C❑NSTRUCTI❑N OF THE DAM EXCEPT THE SEDIMENT POOL, 6, INSTALL A MINIMUM THREE ROWS OF POROUS BAFFLES ACROSS WIDTH OF BASIN. BAFFLE MATERIAL TO BE SILT FENCE FABRIC BACKED BY WIRE FENCE (HOG WIRE), SLITTING THE FABRIC IN ALTERNATING SQUARES, MAINTENANCE CHECK SEDIMENT BASINS AFTER EACH RAINFALL, REMOVE SEDIMENT AND RESTORE ORIGINAL VOLUME WHEN SEDIMENT ACCUMULATES TO ABOUT ONE-HALF THE DESIGN VOLUME, CHECK THE STRUCTURE FOR EROSI❑N, PIPING, AND ROCK DISPLACEMENT AFTER EACH SIGNIFICANT RAINST❑RM AND REPAIR IMMEDIATELY, REMOVE THE STRUCTURE AND ANY UNSTABLE SEDIMENT IMMEDIATELY AFTER THE C❑NSTRUCTI❑N SITE HAS BEEN PERMANENTLY STABILIZED, SMOOTH THE BASIN SITE TO BLEND WITH THE SURR❑UNDING AREA AND STABILIZE. ALL WATER AND SEDIMENT SHALL AND SEDIMENT SHALL BE REMOVED FROM THE BASIN PRI❑R TO DAM REMOVAL, SEDIMENT SHALL BE PLACED IN DESIGNATED DISP❑SAL AREAS AND NOT ALLOWED TO FLOW INT❑ STREAMS OR DRAINAGEWAYS DURING STRUCTURE REMOVAL. SEDIMENT BASIN STORAGE AREA CLEANOUT DEPTH (FT) D3 VOLUME FT3 SURFACE AREA(FT2) A2 SPILLWAY FT SPILLWAY ELEVATION FT L1 W1 D1 L2 W2 D2 L3 W3 RD 01-1 136.0 68.0 4.0 152.0 84.0 6.0 160.0 92.0 2.0 44 032.0 12 768.0 31 RD 01-7 108.0 54.0 4.0 124.0 70.0 6.0 132.0 78.0 2.0 29,024.0 8,680.0 1 20 RD 01-12 160.0 80.0 4.0 176.0 96.0 6.0 184.0 104.0 2.0 59,392.0 16,896.0 39 RD 22-1 IRREGULAR - SEE BELOW 1.8 24,961.0 8,429.0 29 656.5 RD 22-2 IRREGULAR - SEE BELOW 1.8 12,312.0 4,477.0 49 646.5 L1 = BASIN LENGTH AT THE BOTTOM OF THE BASIN W1 = BASIN WIDTH AT THE BOTTOM OF THE BASIN L2 = BASIN LENGTH AT THE TOP OF THE SEDIMENT STORAGE W2 = BASIN WIDTH AT TOP OF THE SEDIMENT STORAGE L3 = BASIN LENGTH AT THE TOP OF THE EMBANKMENT W3 = BASIN WIDTH AT THE TOP OF THE EMBANKMENT D1 = THE DEPTH OF SEDIMENT STORAGE D2 = THE OVERALL DEPTH OF THE SEDIMENT BASIN D3 = THE CLEANOUT DEPTH OF THE SEDIMENT BASIN A2 = SURFACE AREA AT THE TOP OF THE SEDIMENT STORAGE RD 22-1 ELEVATION SURFACE AREA (SF) INC. VOLUME (CF) STORAGE VOLUME (CF) NOTES 653.0 7,273.0 0,0 0,0 BASIN FLOOR 654.0 8,031.0 7,652.0 7,652.0 655.0 8,821.0 8,426.0 16,078.0 CLEANOUT 654,8 656.0 1 9,645.0 1 9,233.0 1 25,311.0 656.5 10,069.0 1 4,928.5 1 30,239.5 1 SEDIMENT ST❑RAGE RD 22-2 ELEVATION SURFACE AREA (SF) INC. VOLUME (CF) STORAGE VOLUME (CF) NOTES BASIN FLOOR 643.0 3,516.0 0,0 0,0 644.0 4,058.0 3,787.0 3,787.0 645.0 4,634.0 4,346.0 8,133.0 CLEANOUT 644,8 646.0 1 5,244.0 1 4,939.0 1 13,072.0 646.5 5,561.0 1 2,701.3 1 15,773.3 SEDIMENT STORAGE alley, williams, carmen, & king, inc. CONSULTING ENGINEERS FIRM LICENSE # F-0203 120 SOUTH MAIN STREET P.O. BOX 1248 KANNAPOLIS, NC 28082 704/938-1515 2' PVC SEDIMENT CLEANOUT REFERENCE STAKE. MARK SEDIMENT CLEANOUT - DEPTH ON STAKE. MAX. LEVEL OF SEDIMENT COLLECTED - CLEAN BASIN WHEN THIS LEVEL IS REACHED ----% MINIMUM STORAGE AND SURFACE AREA AS REQUIRED ON PLAN POROUS BAFFLES (SEE DETAIL) 12' OF #5 OR #57 WASHED STONES MIt o �■ 4' MAX. BETWEEN POSTS 11 CARRY RIPRAP UP SIDES OF SPILLWAY 9-GAUGE MINIMUM HIGH TENSION WIRE STRAND ATTACHED TO STEEL POSTS TO PREVENT SAGGING "_5' STEEL POST / 18' FREEBOARD INIMUM 7T-M CLASS B EROSION CONTR❑L STONE INLET ZONE 9' d50 �� 25% OF SURFACE AREA MAX, SIZE 14' COIR EROSION BLANKET, COIR MESH (OR SIMILAR) �\ _ STRAND OVER WIRE FIRST CHAMBER I-IIIII 25% OF SURFACE AREA KEY IN BOTTOM FILTER FABRIC LAYER OF RIPRAP DESIGN SETTLED ❑VERFILL 6' TOP FOR 15' SETTLEMENT 4' MIN I=IIIII=IIIII='� 5' MAX, III II- '�� �I _ EMERGENCY BY-PASS2il SIDE 6' FILL IIIII u_I SLOPE MAX. BELOW FILTER SETTLED TOP FABRIC = lil SIDE OF DAM I III SLOPE MAX, NATURAL GROUND 3' MIN. TEMPORARY SEDIMENT BASIN WITH SURFACE AREA EFFICIENCY DESIGN THE STORAGE AREA FOR BASINS WILL LIMIT THE C❑NSTRUCTI❑N OF THE FINAL OVERBURDEN STORAGE AREA SLOPES. THE BERMS SHALL BE CONSTRUCTED UP TO WHERE THE BASIN STORAGE AREAS ARE LOCATED AND THEN STABILIZED. ONCE THE OVERBURDEN STORAGE AREA HAS BEEN STABILIZED, THE STORAGE AREA OF THE BASIN MAY BE REDUCED AND THE FINAL GRADING FOR THE BERM COMPLETED. THE BASIN WILL REMAIN UNTIL THE COMPLETED BERM HAS BEEN STABILIZED. C❑NSTRUCTI❑N SPECIFICATI❑NS 1, CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATI❑N AND ROOT MAT. REMOVE ALL SURFACE S❑IL C❑NTAINING HIGH AMOUNTS OF ❑RGANIC MATTER AND ST❑CKPILE OR DISP❑SE OF IT PROPERLY. HAUL ALL ❑BJECTI❑NABLE MATERIAL TO THE DESIGNATED DISP❑SAL AREA. 2, ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATI❑N, ORGANIC MATTER, AND OTHER ❑BJECTI❑NABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3, CONSTRUCT THE OUTLET SECTI❑N IN THE EMBANKMENT. PROTECT THE C❑NNECTI❑N BETWEEN THE RIPRAP AND THE S❑IL FROM PIPING BY USING FILTER FABRIC OR A KEYWAY CUTOFF TRENCH BETWEEN THE RIPRAP STRUCTURE AND THE S❑IL. PLACE THE FILTER FABRIC BETWEEN THE RIPRAP AND SOIL. EXTEND THE FABRIC ACROSS THE SPILLWAY F❑UNDATI❑N AND SIDES TO THE TOP OF THE DAM OR EXCAVATE A KEYWAY TRENCH ALONG THE CENTERLINE OF THE SPILLWAY F❑UNDATI❑N EXTENDING UP THE SIDES TO THE HEIGHT OF THE DAM THE TRENCH SHOULD BE AT LEAST 2 FT DEEP AND 2 FT WIDE WITH 111 SIDE SLOPES. 4, CLEAR THE POND AREA BELOW THE ELEVATI❑N OF THE CREST OF THE SPILLWAY TO FACILITATE SEDIMENT CLEANOUT. 5, ALL CUT AND FILL SLOPES SHOULD BE 21l OR FLATTER. 6, ENSURE THAT THE STONE (DRAINAGE) SECTI❑N OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FT AND MAXIMUM SIDE SLOPES OF 1i1 THAT EXTEND TO THE BOTTOM OF THE SPILLWAY SECTI❑N. 7, CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 2:1 SIDE SLOPES EXTENDING TO THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY. 8, MATERIAL USED IN THE STONE SECTI❑N SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D50 SIZE OF 9 INCHES (CLASS B ER❑SI❑N CONTROL STONE) AND A MAXIMUM STONE SIZE OF 14 INCHES, THE STONE MAY BE MACHINE PLACED AND THE SMALLER STONES WORKED INT❑ THE VOIDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. 9, ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE CONDITI❑NS ARE REACHED AND OUTLET VEL❑CITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE OUTLET SECTI❑N FLUSH WITH THE SURR❑UNDING GROUND AND SHAPE THE CENTER TO C❑NFINE THE OUTFLOW STREAM. 10, DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS S❑ THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 11. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION. 12. INSTALL A MINIMUM THREE ROWS OF POROUS BAFFLES ACROSS WIDTH OF BASIN. BAFFLE MATERIAL TO BE SILT FENCE FABRIC BACKED BY WIRE FENCE (HOG WIRE). SLITTING THE FABRIC IN ALTERNATING SQUARES. uf_11►11�►�L[ya INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERI❑D OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ❑RIGINAL DIMENSI❑NS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISP❑SAL AREA AND REPLACE THE C❑NTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE FROM ER❑SI❑N OR PIPING, PERI❑DICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW P❑INT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE, ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY, AFTER ALL SEDIMENT-PR❑DUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT, SMOOTH THE AREA TO BLEND WITH THE ADJ❑INING AREAS AND STABILIZE PROPERLY, SEDIMENT BASIN STORAGE AREA CLEANOUT DEPTH SEDIMENT STORAGE SURFACE AREA (SF) SPILLWAY LENGTH L1 W1 D1 L2 W2 D2 L3 W3 D3 (CF) A2 (FT) ST 01-2 38.0 84.0 2.0 46.0 92.0 3.0 50.0 96.0 1.2 7,424.0 4,232.0 8.0 ST 01-4 25.0 60.0 2.0 33.0 68.0 3.0 37.0 72.0 1.2 3,744.0 2,244.0 6.0 ST 01-5 58.0 122.0 2.0 66.0 130.0 3.0 70.0 134.0 1.2 15,656.0 8,580.0 12.0 ST01-6 48.0 106.0 2.0 56.0 114.0 3.0 60.0 118.0 1.2 11,472.0 6,384.0 10.0 ST01-8 35.0 75.0 2.0 43.0 83.0 3.0 47.0 87.0 1.2 6,194.0 3,569.0 8.0 ST 01-13 48.0 103.0 2.0 56.0 111.0 3.0 60.0 115.0 1.2 11,160.0 6,216.0 10.0 ST 01-14 34.0 75.0 2.0 42.0 83.0 4.0 50.0 91.0 1.2 6,036.0 3,486.0 8.0 ST 01-15 43.0 92.0 2.0 51.0 100.0 3.0 55.0 104.0 1.2 1 9,056.0 5,100.0 10.0 ST 01-16 45.0 97.0 2.0 53.0 105.0 3.0 57.0 109.0 1.2 9,930.0 5,565.0 10.0 ST 01-17 55.0 118.0 2.0 63.0 126.0 3.0 67.0 130.0 1.2 14,428.0 7,938.0 12.0 ST 01-21 32.0 66.0 2.0 40.0 74.0 3.0 44.0 78.0 1.2 5,072.0 2,960.0 6.0 ST 01-23 18.0 38.0 2.0 26.0 46.0 3.0 30.0 50.0 1.2 1,880.0 1,196.0 4.0 ST 01-24 22.0 46.0 2.0 30.0 54.0 3.0 34.0 58.0 1.2 2,632.0 1,620.0 6.0 ST 01-25 1 28.0 58.0 2.0 36.0 66.0 3.0 40.0 70.0 1.2 4,000.0 2,376.0 6.0 ST 01-26 16.0 36.0 2.0 24.0 1 44.0 3.0 28.0 1 48.0 1.2 1,632.0 1,056.0 4.0 L1 = BASIN LENGTH AT THE BOTTOM OF THE BASIN W1 = BASIN WIDTH AT THE BOTTOM OF THE BASIN L2 = BASIN LENGTH AT THE TOP OF THE SEDIMENT STORAGE W2 = BASIN WIDTH AT THE TOP OF THE SEDIMENT STORAGE L3 = BASIN LENGTH AT THE TOP OF THE EMBANKMENT W3 = BASIN WIDTH AT THE TOP OF THE EMBANKMENT D1 = THE DEPTH OF SEDIMENT STORAGE D2 = THE OVERALL DEPTH OF THE SEDIMENT BASIN D3 = THE CLEANOUT DEPTH OF SEDIMENT A2 = SURFACE AREA AT THE TOP OF THE SEDIMENT STORAGE CLEAR CREEK QUARRY 2022 MINE PERMIT MODIFICATION VULCAN CONSTRUCTION MATERIALS, L.P. MECKLENBURG COUNTY, NORTH CAROLINA BAFFLE INSTALLATION - STEP 1 COIR MESH STAPLED OR TRENCHED INTO BOTTOM AND SIDES Porous Baffles COIR MESH ATTACHED TO ROPE OR WIRE WITH TIES PERSPECTIVE VIEW TOP OF BAFFLES SHOULD BE 6" HIGHER THAN THE SPILLWAY INVERT AND 2" LOWER THAN THE TOP OF THE BERM BAFFLE INSTALLATION - STEP 2 3' MIN. FABRIC STAPLED TO BOTTOM AND SIDES OR BURIED IN TRENI 6"x6" TRENCH, ' BACKFILLED AND ' 24' COMPACTED Construction Specifications - Maintenance - 1. Grade the basin so that the bottom is level front to back and side to side. inspect baffles at least once a week and after each rainfall. make any required repairs 2. Install posts across the width of the sediment trap (6.62m sediment fence). immediately. 3. Steel posts should be driven to a depth of 24 inches, spaces a maximum of 4 feet apart, and installed up the sides of the basin as well. The top of the fabric should be 6 inches Be sure to maintain access to the baffles, Should the fabric of a baffle collapse, tear, higher than the invert of the spillway. Tops of baffles should be 2 inches lower than the top decompose, or become ineffective, replace it immediately. of the berms. 4. Install at least three rows of baffles between the inlet and outlet discharge point. Basins Remove sediment deposits when it reaches half full to provide adequate storage volume for the less than 20 feet in length may use 2 baffles. next rain and to reduce pressure on the baffles. Take care to avoid damaging the baffles 5. When using posts, add a support wire or rope across the top of the measure to prevent during cleanout. Sediment depth should never exceed half the designed storage depth. sagging. 6. Wrap porous material like the jute backed by coir material, over the top wire. The fabric After the contributing drainage area has been properly stabilized, remove all baffle materials and should have five to ten percent openings in the weave. Attach fabric to a rope and a unstable sediment deposits, bring the area to grade and stabilize it. support structure with zip ties, wire or staples. 7. The bottom and sides of the fabric should be anchored in a trench or pinned with 8-inch erosion control matting staples. 8. Do not splice the fabric but use a continuous piece across the basin. POROUS BAFFLES NORTHERN PIT EXPANSION CONSTRUCTION SEQUENCE 1. ENSURE EXISTING BASINS HAVE SEDIMENT STORAGE. INSTALL TEMPORARY DIVERSION TO DIVERT THE DISTURBED AREAS INTO THE EXISTING PIT. IF RUNOFF CANNOT BE DIVERTED INTO THE PIT, INSTALL ROCK DAM RD-01-1 AND ANY TEMPORARY DIVERSION CHANNELS NEEDED TO DIVERT FLOW INTO THE BASIN. 2. BEGIN EXCAVATION OF THE PIT EXPANSION AREA. DIVERT ALL DISTURBED AREAS POSSIBLE INTO THE PIT. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE PIT EXPANSION PROCEEDS. 3. ONCE THE PIT EXCAVATIONS REACH THE PIT LIMITS, STABILIZE THE SLOPES PER THE RECLAMATION DETAIL AND SEEDING SPECIFICATIONS. 4. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES, ROCK DAMS, OR SEDIMENT BASINS. 5. ONCE THE EXPANSION IS COMPLETED AND ALL AREAS STABILIZED REMOVE THE TEMPORARY EROSION CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. NORTHWESTERN PIT EXPANSION CONSTRUCTION SEQUENCE 1. ENSURE EXISTING BASINS ROCK DAM RD-01-10, RD-01-11 AND DAM TEMPORARY SEDIMENT BASIN NO. 14 HAVE THE DESIGN SEDIMENT CAPACITY. 2. BEGIN CLEARING FOR THE EXPANSION OF THE PIT. 3. PRIOR TO THE REMOVAL OF STUMPS, TEMPORARY DIVERSION DITCHES SHALL BE INSTALLED TO DIVERT FROM THE TIMBER REMOVAL AREAS INTO THE PIT OR EXISTING SEDIMENT BASINS. IF THE RUNOFF CAN NOT BE DIVERTED INTO THE PIT, INSTALL ROCK DAMS 22-1 AND 22-2. 4. INSTALL TEMPORARY DIVERSIONS AROUND THE PERIMETER OF THE DISTURBED AREAS TO DIVERT SEDIMENT INTO THE EXISTING PIT OR SEDIMENT BASINS. 5. LIMIT THE DISTURBED AREA TO THE AMOUNT OF OVERBURDEN THAT WILL BE REMOVED IN THE IMMEDIATE FUTURE. 6. BEGIN EXCAVATION OF THE PIT EXPANSION AREA. DIVERT ALL DISTURBED AREAS POSSIBLE INTO THE PIT. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE PIT EXPANSION PROCEEDS. 7. INSTALL ROCK DAMS 22-1 AND 22-2 AND TEH ASSOCIATED TEMPORARY DIVERSION DITCHES ONCE THE DISTURBED AREA CAN NOT BE DIVERTED INTO THE PIT. 8. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES, ROCK DAMS, OR SEDIMENT BASINS. 9. AS THE PIT IS EXPANDED, EROSION CONTROL MEASURES RD 01-10, RD 01-1 1, RD 22-1 CAN BE REMOVED WHEN DRAINAGE FROM DISTURBED AREAS IS CHANGED TO FLOW INTO THE PIT. 10. ONCE THE PIT EXCAVATIONS REACH THE PIT LIMITS, STABILIZE THE SLOPES PER THE RECLAMATION DETAIL AND SEEDING SPECIFICATIONS. 11. ONCE THE EXPANSION IS COMPLETED AND ALL AREAS STABILIZED REMOVE THE TEMPORARY EROSION CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. SEE SHEET 5 FOR THE EASTERN OVERBURDEN EXCAVATION AREA CONSTRUCTION SEQUENCE EASTERN PIT EXPANSION PHASE CONSTRUCTION SEQUENCE 1. NOTE: DO NOT EXCAVATE THE OVERBURDEN IN THE EASTERN PIT PHASE 2 AREA. UNTIL A PERMIT HAS BEEN ISSUED FOR THE REMOVAL OF WETLANDS. 2. INSURE EXISTING BASINS (RISER BASIN RSB-01-15) HAS SEDIMENT STORAGE. 3. INSTALL TEMPORARY DIVERSIONS AROUND THE PERIMETER OF THE DISTURBED AREA TO DIVERT SEDIMENT INTO THE EXISTING PIT OR SEDIMENT BASINS 3. INSTALL ROCK DAM RD-01-1 IF SEDIMENT CANNOT BE DIVERTED INTO THE PIT OR RSB-01-15. 4. LIMIT THE DISTURBED AREA TO THE AMOUNT OF OVERBURDEN THAT WILL BE REMOVED IN THE IMMEDIATE FUTURE. 5. BEGIN EXCAVATION OF THE PIT EXPANSION AREA. DIVERT ALL DISTURBED AREAS POSSIBLE INTO THE PIT. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE PIT EXPANSION PROCEEDS. 6. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES, ROCK DAMS, OR SEDIMENT BASINS. 7. ONCE THE PIT EXCAVATIONS REACH THE PIT LIMITS, STABILIZE THE SLOPES PER THE RECLAMATION DETAIL AND SEEDING SPECIFICATIONS. 8. ONCE THE EXPANSION IS COMPLETED AND ALL AREAS STABILIZED REMOVE THE TEMPORARY EROSION CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. EASTERN PIT EXPANSION PHASE 2 CONSTRUCTION SEQUENCE 1. NOTE: DO NOT EXCAVATE THE OVERBURDEN IN THE EASTERN PIT PHASE 2 AREA UNTIL A PERMIT HAS BEEN ISSUED FOR THE REMOVAL OF WETLANDS. EXCAVATION OF THIS AREA CANNOT BEGIN UNTIL THE OVERBURDEN IN THE NORTHERN PIT EXPANSION AND THE EASTERN PIT EXPANSION HAS BEEN REMOVED AND SEDIMENT CAN BE DIVERTED INTO THE PIT. 2. INSTALL TEMPORARY DIVERSIONS AROUND THE PERIMETER OF THE DISTURBED AREA TO DIVERT SEDIMENT INTO THE EXISTING PIT OR SEDIMENT BASINS 3. LIMIT THE DISTURBED AREA TO THE AMOUNT OF OVERBURDEN THAT WILL BE REMOVED IN THE IMMEDIATE FUTURE. 4. BEGIN EXCAVATION OF THE PIT EXPANSION AREA. DIVERT ALL DISTURBED AREAS POSSIBLE INTO THE PIT. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE PIT EXPANSION PROCEEDS. 5. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES. 6. ONCE THE PIT EXCAVATIONS REACH THE PIT LIMITS, STABILIZE THE SLOPES PER THE RECLAMATION DETAIL AND SEEDING SPECIFICATIONS. 7. ONCE THE EXPANSION IS COMPLETED AND ALL AREAS STABILIZED REMOVE THE TEMPORARY EROSION CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. REVISION No. DESCRIPTION DATE INITIAL SCALE 12/17/21 REVISED ROCK DAM SPILLWAY 1 2 25 22 GWW PLAN: DRAWN BY: LENGTHS, ADDED SPILLWAY RCC ELEVATION, MODIFIED PROFILE NORTHWEST PIT SEQUENCE. CHECKED BY: GWW HORIZ.: DWG No.: 1 1523MINMOD22 VERT.: DET\SHEET5 ���11111111/��� �N••CAR� °OFESS SEAL < ° - 16883 - NG I NE����� \ � FSLEY ...... DocuSigned by: V),Irb- 2-25-22 L3A0D005F6BA648B JOB NO. 11523 SHEET N0. OF. 6 4' HIGH FENCE VARIABLE AS DIRECTED BY THE ENGINEER WITH 3 STRAINS OF BARBED WIRE C 6' MAX. ) EXIST, GROUND EXIST, GROUND 2 2 2 �1 N W_ J III=I =I I =I I -III—III—III—III—III—III=III=III=I I III —III— OVERBURDEN = OVERBURDEN FLOOR GRADED 2' TO DRAIN INT❑ THE PIT J LJ F__ LO V) — ~ 0 STEEL POST � 0-T❑P OF ROCK GENERAL NOTES: FILTER FABRIC FENCE FABRIC SHALL BE A MINIMUM OF I OVERBURDEN EXCAVATION AREA TYPICAL SECTION 32' IN WIDTH AND SHALL HAVE A ' W 32' MIN. 30 —III—_III- MINIMUM OF 6 LINE WIRES WITH 12' J FILTER FAII11 NTS STAY SPACING. _ FILTER FABRIC SHALL BE MIRAFI 100 �` a ZR FABRIC OR EQUIVALENT, BURLAP o CANN❑T BE USED WHERE SILT FENCE IS if NT❑ REMAIN F❑R A PERI❑D ❑F M❑RE THAN 30 DAYS. I -III III� III=III=III=III=III=III=III=III =III.. STEEL POSTS SHALL BE 5'-0' IN HEIGHT ANCHOR SKIRT MINIMUM ❑F 6' 3I AND BE OF THE SELF -FASTENER ANGLE L6# STEEL TYPE. A 1 j TURN SILT FENCE UP SLOPE AT ENDS. POST4'HMAR'DE WHEN FABRIC IS USED WITH WIRE MESH 8' CENTERED POSTS MAY BE USED, REMOVE SEDIMENT WHEN 12 INCHES DEPTH SILT FENCE SILT FENCE OF SEDIMENT HAS ACCUMULATED, H HARDWARE CLOTH BETWEEN POSTS HARDWARE CLOTH AND SILT FENCE TEMPORARY SILT FENCE NOTE: TO BE BURIED MINIMUM OF 1' STRUCTURAL STONE SHALL BE CLASS "B" STONE A FOR EROSION CONTROL PURPOSES. TOP VIEW SEDIMENT CONTROL STONE SHALL BE NO. 57 OR NO. 57 STONE. 2' POST SILT FENCE & POST HARDWARE CLOTH 3' MINIMUM TOP OF BERM ELEVATI❑N, 705,0 2 SEDIMENT CONTROL 1'-6" STONE MIN. SILT - 1 SILT � �I FENCE FENCE =111=111=1 =_—_ 2 3' MAX. ___ 1_=1 I I-1 I I —I I I —I I I —I 1 2 � z I —I I I —=I � I —III —I I I —I I El 11-1 I I —I -Ti-I 11-1 11=1 I I -III- f 1� 1=1 11=1 11=1 I I III III III III III I � '- =1- ;i�1 _ 6 —1 Ili I _ _ = 111—I1 � STRUCTURAL STONE =1 I I -III —III —III —III —III —III -I I 1-1 El 111 I II I II I II I II I II I II I' I SECTI❑N 'A -A' FRONT VIEW NOTES: 1. USE DIMENSIONS SHOWN ABOVE UNLESS NOTED OTHERWISE. 2. A MINIMUM 0.5% CHANNEL SLOPE SHALL BE MAINTAINED FOR THE CHANNEL DRAINING INTO THE PIT. 3. THE DIVERSION BERM SHALL BE USED TO DIVERT RUNOFF INTO THE PIT. STABILIZE THE BERM WITH A VEGETATIVE GROUNDCOVER IMMEDIATELY AFTER CONSTRUCTION. SILT FENCE STONE OUTLET NTS OVERBURDEN EXCAVATION DIVERSION BERM EASTERN OVERBURDEN EXCAVATION CONSTRUCTION SEQUENCE MATERIAL STORAGE AREA 08-22 CONSTRUCTION SEQUENCE NOTE: DO NOT EXCAVATE THE OVERBURDEN UNTIL THE DIVERSION BERM HAS BEEN CONSTRUCTED. 1. INSTALL ROCK DAM 22-2, SILT FENCE, SILT FENCE OUTLETS, AND THE TEMPORARY DIVERSION 1. INSTALL THE ORANGE SAFETY FENCING ALONG THE EDGE OF THE STREAM BUFFER DITCH IN THE AREA DOWNSTREAM OF THE PROPOSED MATERIAL STORAGE AREA CONSTRUCTION. 2. BEGIN EXCAVATION OF THE CHANNEL AND THE CONSTRUCTION OF THE DIVERSION BERM AT THE PIT AND PROCEED EAST 2. BEGIN PLACING FILL MATERIAL IN THE PROPOSED STORAGE AREA. DIVERT ALL DISTURBED AREAS THROUGH THE EXISTING OVERBURDEN STORAGE BERM. KEEP ALL DISTURBED AREAS DRAINING INTO THE PIT AT ALL TIMES. POSSIBLE INTO THE EROSION CONTROL MEASURES. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE FILL PLACEMENT PROCEEDS. THE TOP OF THE FILL AREA SHOULD BE 3. INSTALL THE SILT FENCE ALONG THE EDGE OF THE PROPOSED DISTURBED AREA. CLEAR THE EXISTING TREES AS SLOPED TO DRAIN TO THE SOUTH AT ALL TIMES. NECESSARY TO ALLOW FOR THE INSTALLATION OF THE SILT FENCE AND THE PROPOSED DIVERSION BERM. 3. CONSTRUCT THE PERMANENT SLOPE BENCH AND RIPRAP CHANNEL ADJACENT TO THE MATERIAL 11C,gR0C 4. INSTALL THE DIVERSION BERM AND ASSOCIATED DIVERSION CHANNEL AS SHOWN ON THE MINE MAP. STORAGE AREA AS SOON AS POSSIBLE TO PREVENT SLOPE EROSION. �•��\\�N 5. BEGIN CLEARING OF THE OVERBURDEN REMOVAL AREA. KEEP ALL DISTURBED AREAS DRAINING INTO THE PIT AT ALL TIMES. 4. STABILIZE THE NORTH SIDE OF THE STORAGE AREA AS SOON AS POSSIBLE TO REDUCE THE `0�°°FESS/p �9�°ate SEDIMENT LOAD TO THE SILT FENCE. _ �a^Q�� 6. BEGIN EXCAVATION OF THE OVERBURDEN. INSTALL HIGH WALL PROTECTION ALONG THE TOP OF THE CUT SLOPE AS THE SEAL =_ CUT WALL FACE IS SHIFTED. 5. STABILIZE THE OUTSIDE SLOPES WITH VEGETATION AS SOON AS THE AREA IS BROUGHT TO GRADE. _= - 16883 - 7. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION BERM, DITCHES, AND SILT FENCE. 6. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED ��� •°°FNGINE.��� SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES, ROCK DAMS, OR SEDIMENT 8. ONCE THE OVERBURDEN EXCAVATION REACH THE LIMITS, STABILIZE THE SLOPES PER THE RECLAMATION DETAIL AND BASINS.°•.•..•••���`�. � SLE`( Do( by: i1111 SEEDING SPECIFICATIONS. 7. ONCE THE FILL PLACEMENT IS COMPLETED AND ALL AREAS STABILIZED, REMOVE THE EROSION 1 1 i i i 1 � `���� W�Qe� ��. 2-25-22 [ODOMF6BA648B 9. ONCE THE EXPANSION IS COMPLETED AND ALL AREAS STABILIZED REMOVE THE SILT FENCE AND STABILIZE THE IMPACTED CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. ROCK DAM RD22-2 MAY NEEED TO AREAS. THE DIVERSION BERM SHALL REMAIN IN PLACE TO KEEP RUNOFF DIVERTED INTO THE PIT. STAY IN PLACE IF THE NORTHWEST PIT EXPANSION HAS NOT BEEN COMPLETED. alley, williams, carmen, & king, inc. CLEAR CREEK QUARRY 2022 MINE PERMIT MODIFICATION REVISION No. DESCRIPTION DATE INITIAL SCALE DAB' 12�17�21 JOB "°� 11523 1 ADDED BERM SEQUENCE, SILT 2�25�22 GWW PLAN: RAWOWN BY: RCC CONSULTING ENGINEERS FIRM LICENSE F-0203 VULCAN CONSTRUCTION MATERIALS, L.P. PROFILE DETAILS SHEET NO. 5 CHECKED BY: # HORIZ.: GWW 120 SOUTH MAIN STREET P.O. BOX 1248 COUNTYC NORTH CAROLINA DWG No.:11523 ART" KANNAPOLIS, INCECKLENBURG 28082 704/938-1515 , DET\SHEET22 SHEET6 OF. 6 TRAPEZOIDAL RIPRAP CHANNEL L APPROVED FILTER FABRIC DIMENSI❑NS SHOWN IN CHART D❑ (MIRAFI 60OX OR EQUAL) NOT INCLUDE UNDERCUT FOR LINING AND FILTER MATERIAL. NOTE: BOTTOM WIDTH =0' IS A VEE DITCH, RIPRAP CHANNEL C❑NSTRUCTI❑N SPECIFICATI❑NS 1. CLEAR THE F❑UNDATI❑N AREA OF TREES, STUMPS, ROOTS, LOOSE ROCK, AND OTHER ❑BJECTI❑NABLE MATERIAL, 2. EXCAVATE THE CROSS SECTI❑N TO THE LINES AND GRADES OF THE F❑UNDATI❑N OF THE LINER AS SHOWN ON THE PLANS. BRING OVER - EXCAVATED AREAS TO GRADE BY INCREASING THE THICKNESS OF THE LINER OR BY BACKFILLING WITH M❑IST S❑IL COMPACTED TO THE DENSITY OF THE SURR❑UNDING MATERIAL, 3. PLACE FILTERS, BEDDINGS, AND F❑UNDATI❑N DRAINS TO LINE AND GRADE IN THE MANNER SPECIFIED. PLACE FILTER AND BEDDING MATERIALS IMMEDIATELY AFTER SLOPE PREPARATI❑N. SPREAD GRANULAR MATERIALS IN A UNIF❑RM LAYER. WHEN MORE THAN ONE GRADATI❑N IS REQUIRED, SPREAD THE LAYERS S❑ THERE IS MINIMAL MIXING. FILTER MATERIAL SHOULD C❑NSIST OF AT LEAST 3 INCHES OF MATERIAL ON ALL SIDES OF THE DRAIN PIPE. THE DRAIN PIPE C❑NDUIT SHOULD BE A MINIMUM OF 4 INCHES IN DIAMETER. ACCEPTABLE MATERIALS INCLUDE PERFORATED, C❑NTINU❑US, CL❑SED- J❑INT C❑NDUITS OF CLAY, CONCRETE, METAL, PLASTIC, OR OTHER SUITABLE MATERIAL. 4. PERFORM ALL CHANNEL C❑NSTRUCTI❑N TO KEEP ER❑SI❑N AND WATER P❑LLUTI❑N TO A MINIMUM. IMMEDIATELY UPON C❑MPLETI❑N OF THE CHANNEL, VEGETATE ALL DISTURBED AREAS OR ❑THERWISE PROTECT THEM AGAINST S❑IL ER❑SI❑N. WHERE CHANNEL C❑NSTRUCTI❑N WILL TAKE LONGER THAN 30 DAYS, STABILIZE CHANNELS BY REACHES. MAINTENANCE INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTI❑N TO THE OUTLET AND INLET SECTI❑NS AND OTHER P❑INTS WHERE CONCENTRATED FLOW ENTERS, CAREFULLY CHECK STABILITY AT ROAD CR❑SSINGS AND LOOK FOR INDICATI❑NS OF PIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY, MAINTAIN ALL VEGETATI❑N ADJACENT TO THE CHANNEL IN A HEALTHY, VIG❑R❑US C❑NDITI❑N TO PROTECT THE AREA FROM ER❑SI❑N AND SCOUR DURING OUT -OF -BANK FLOW, DITCH NO B❑T, WIDTH DEPTH SLOPE 99-4 6' 1, 5' 16. 67% DITCH H WIDTH TYPE 01-4 1.5 0 22" Class II Ri ra 01-6 1.5 2 22" Class II Ri ra 01-10 1.5 0 22" Class II Ri ra 01-13 1.5 2 22" Class II Ri ra 22-1 1.5 3 22" Class II Ri ra TRAPEZOIDAL GRASS CHANNEL %A/ GRASS LINED CHANNELS C❑NSTRUCTI❑N SPECIFICATI❑NS 1, REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER ❑BJECTI❑NABLE MATERIAL FROM THE F❑UNDATI❑N AREA AND DISP❑SE OF PROPERLY. 2, EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSI❑NS SHOWN ON THE PLANS PLUS A 0,2-FT ❑VERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATI❑NS AND SOD BUILDUP. 3, REMOVE AND PROPERLY DISP❑SE OF ALL EXCESS S❑IL S❑ THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4, THE PROCEDURE USED TO ESTABLISH GRASS IN THE CHANNEL WILL DEPEND UPON THE SEVERITY OF THE C❑NDITI❑NS AND SELECTI❑N OF SPECIES. PROTECT THE CHANNEL WITH MULCH OR A TEMPORARY LINER AS NOTED ON THE PLANS TO WITHSTAND ANTICIPATED VEL❑CITIES DURING THE ESTABLISHMENT PERI❑D. MAINTENANCE DURING THE ESTABLISHMENT PERI❑D, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERI❑DICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMP❑RTANT TO CHECK THE CHANNEL OUTLET FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATI❑NS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. DITCH NO B❑T, WIDTH DEPTH SLOPE 99-1 3' 1. 5' 5, 07 99-2 3' 1. 5' 7.707 99-3 3' 1. 5' 2, 50% DITCH H WIDTH TEMPORARY LINING 01-5 1.5 0 Straw wl Tack 01-11 1.5 0 Straw w Tack 01-12A 1.5 2 Straw wl Tack 01-12B 1.5 2 Straw w Tack INTERI❑R OF LOT 60' 10' 60' 12' CPP PERMANENT SLOPE DRAIN 0 30' TYPICAL EARTHEN SCREEN SECTION 20' MINIMUM TO HIGHWALL BARRIER HIGHWALL BARRIER PIT WALL DIST VARIES 15' 50' WITH 21 1 SLOPE SLOPE TO MINE SITE -� z SLOPE BENCH TO BERM 25' AT 10i 1 20' MINIMUM TO HIGHWALL BARRIER HEIGHT VARIES WITH 211 SLOPE 30' MAX _�--HIGHWALL BARRIER TYPICAL OVERBURDEN STORAGE SECTION WITH BENCH N. T. S. NOTES: -'PIT WALL 1. SLOPE TOP OF BERM TOWARDS EXISTING GROUND, MIN 1% SL❑PE, 2. PR❑VIDE DIVERSI❑N DITCH TO PERMANENT SLOPE DRAINS. 3. SLOPE DRAINS TO BE INSTALLED AS SHOWN ON PLANS. 4. MAX. SIDE SLOPE TO BE 2: 1. 5. SEE PERMANENT SLOPE DRAIN DETAIL FOR C❑NSTRUCTI❑N N❑TES, 6. PR❑VIDE A GR❑UNDC❑VER ON THE EXTERI❑R SLOPES WITHIN 30 DAYS OF C❑NSTRUCTI❑N, AT THE TIME THAT AN ACTIVE FACE BECOMES A DEAD WALL, INFORMATION WILL BE SUPPLIED IN SUPPORT OF THE DETERMINATION OF FINAL SLOPES FOR UNCONSOLIDATED MATERIAL. SAFETY BENCHES 20' TYP. 12° TYP. 80' TYP. 30' TYP. 8 0' T 30 j TYPICAL PIT CROSS SECTION 4' HIGH FENCE i I TYPICAL RECLAMATION PIT CROSS SECTION CONSTRUCTION SEQUENCE WEST BERM #1 1. INSTALL ROCK DAM RD 01-12 AND SEDIMENT BASIN ST 01-13. 2. INSTALL GRASS TRAPEZOIDAL CHANNEL #01-12A AND TEMPORARY DIVERSIONS ALONG THE PERIMETER OF THE BERM CONSTRUCTION AREA. 3. CONSTRUCT BERM IN ACCORDANCE WITH BERM SECTION AS SHOWN ON EARTHEN SCREEN DETAIL. 4. UPON ACHIEVING PROPER SECTION, SURFACE ROUGHEN, SEED, FERTILIZE, LIME AND MULCH IN ACCORDANCE WITH SEEDING SPECIFICATIONS. WEST BERM #2 1. INSTALL SEDIMENT BASINS ST 01-14, ST 01-15, AND ST 01-16. 2. INSTALL RIPRAP TRAPEZOIDAL DITCH #01-13 AND TEMPORARY DIVERSIONS ALONG THE PERIMETER OF THE BERM CONSTRUCTION AREA. 3. CONSTRUCT BERM IN ACCORDANCE WITH BERM SECTION AS SHOWN ON EARTHEN SCREEN DETAIL. 4. UPON ACHIEVING PROPER SECTION, SURFACE ROUGHEN, SEED, FERTILIZE, LIME AND MULCH IN ACCORDANCE WITH SEEDING SPECIFICATIONS. 1. ENSURE SEDIMENT BASIN 99-1 HAS ADEQUATE SEDIMENT STORAGE. 2. INSTALL SEDIMENT BASIN ST 01-17. 3. INSTALL TEMPORARY DIVERSIONS ALONG THE PERIMETER OF THE BERM CONSTRUCTION AREA. 4. CONSTRUCT BERM IN ACCORDANCE WITH BERM SECTION AS SHOWN ON EARTHEN SCREEN DETAIL. 5. UPON ACHIEVING PROPER SECTION, SURFACE ROUGHEN, SEED, FERTILIZE, LIME AND MULCH IN ACCORDANCE WITH SEEDING SPECIFICATIONS. CLEAR CREEK QUARRY MECKLENBURG COUNTY REVEGETATI❑N PLAN SPRING - FALL - WINTER SEED MIXES SPRING RATE MARCH - JUNE Rye Grain Tall Fescue Switchgrass Va 70 Shrub Lespedeza Sericea Lespedeza Or Red Clover Hulled Common Bermuda Grass Or Weeping Love Grass 15 - 20 lbs, per acre 40 - 80 lbs. per acre 8 lbs. per acre 20 lbs. per acre 15 - 20 lbs, per acre 8 - 14 lbs, per acre 4 lbs. per acre 2 - 4 lbs. per acre FALL RATE (MID) AUGUST - ❑CT❑BER Rye Grain Tall Fescue Sericea Lespedeza (Unscarified) ❑rchard Grass White Clover WINTER RATE N❑VEMBER - FEBRUARY 40 lbs. per acre 80 lbs. per acre 40 lbs. per acre 30 lbs. per acre 5 lbs. per acre Rye Grain 40 lbs. per acre Unhulled Bermuda Grass 10 lbs, per acre Unscarified Sericea Lespedeza 30 lbs. per acre Tall Fescue 80 lbs. per acre FERTILIZER ALL SEASONS 10 - 20 - 20 1500 lbs, per acre Lime 4000 lbs. per acre Mulch 70 bales per acre Mulch to be anchored by one of the following methodsi 1. Crimping with mulch anchoring tool; or 2. Tack with asphalt emulsion - 400 gal. per acre Imo' BERM TO BE CONSTRUCTED OF EARTH OR BOULDERS TEMPORARY HIGHWALL BERM 3 STRANDS OF 4 PT. BARBED WIRE 5' DIA. / WOOD POST (U M ro A A 30 0 M PLAN SECTI❑N A -A NOTES, 1. La IS THE LENGTH OF THE RIPRAP APRON, 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6' 3. IN A WELL DEFINED CHANNEL EX- TEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. OUTLET PROTECTION DETAIL OUTLET PROTECTION C❑NSTRUCTI❑N SPECIFICATI❑NS 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURR❑UNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED S❑IL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATI❑N. REPAIR ANY DAMAGE BY REM❑VING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL C❑NNECTING J❑INTS SHOULD OVERLAP A MINIMUM OF 1 FT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AV❑ID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO ❑VERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE C❑NDITI❑NS, PLACE IT IN THE UPPER SECTI❑N OF THE APRON. 9. IMMEDIATELY AFTER C❑NSTRUCTI❑N, STABILIZE ALL DISTURBED AREAS WITH VEGETATI❑N. MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY ER❑SI❑N AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISL❑DGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. PIPE RIPRAP TYPE LENGTH La WIDTH W 01-1 22" Class II Ri ra 22' 26' 01-2 18" Class I Ri ra 13' 15' 01-3 18" Class I Ri ra 16' 19' 01-4 18" Class I Ri ra 16' 19' PSD 22" Class II Rip ra 10' 12' RSB-01- 8 22" Class II Rip ao 20' 1 24' OVERBURDEN STORAGE AREA CONSTRUCTION SEQUENCE 1. INSTALL ALL SEDIMENT BASINS, ROCK DAMS, RISER BASINS AND TEMPORARY DIVERSION CHANNELS IN THE AREA DOWNSTREAM OF THE PROPOSED BERM CONSTRUCTION. ONE BERM SHOULD BE COMPLETED PRIOR TO BEGINNING CONSTRUCTION IN ANOTHER AREA. ONCE THE EROSION CONTROL MEASURES ARE CONSTRUCTED, THE FOOTPRINT OF THE BERM MAY BE CLEARED. 2. BEGIN PLACING FILL MATERIAL IN THE PROPOSED STORAGE AREA. DIVERT ALL DISTURBED AREAS POSSIBLE INTO THE EROSION CONTROL MEASURES. PERMANENT CULVERTS AND OUTLET PROTECTION SHOULD BE CONSTRUCTED AT THIS TIME. TEMPORARY DIVERSION DITCHES MAY HAVE TO BE REGRADED AS THE FILL PLACEMENT PROCEEDS. 3. CONSTRUCT THE PERMANENT SLOPE DRAINS AND OUTLET PROTECTION AS SOON AS POSSIBLE TO PREVENT SLOPE EROSION. INSTALL DIVERSION DITCHES ALONG THE TOP OF ALL FILL SLOPES TO DIVERT RUNOFF TO THE SLOPE DRAINS OR NATURAL GROUND. DIVERT RUNOFF INTO THE PIT WHERE POSSIBLE. 4. STABILIZE THE OUTSIDE SLOPES WITH VEGETATION AS SOON AS THE AREA IS BROUGHT TO GRADE. FINAL DITCH STABILIZATION SHOULD BE CONSTRUCTED AT THIS TIME. 5. MONITOR ALL EROSION CONTROL MEASURES AFTER EACH RAINFALL. REMOVE ACCUMULATED SEDIMENT, AND REPAIR AND DAMAGE TO THE DIVERSION DITCHES, ROCK DAMS, OR SEDIMENT BASINS. 6. ONCE THE FILL PLACEMENT IS COMPLETED AND ALL AREAS STABILIZED, REMOVE THE EROSION CONTROL MEASURES AND STABILIZE THE IMPACTED AREAS. MEASURES TO BE INSTALLED FOR EACH BERM NORTHEAST WEST BERM WEST BERM SOUTH BERM BERM #1 #2 EXTENSION ST 01-4 RD 01-12 ST 01-14 ST 01-17 ST 01-5 ST 01-13 ST 01-15 ST 01-6 ST 01-16 RD 01-7 ST 01-8 ST 01-9 RD 01-10 RD 01-11 \\�N ••CA!?o oFESS/0 C SEAL 16883 - � NC I NEF'�``���\ DocuSigned by: 11/, FSLE`(.• \\\` 2-25-22 3A0DOMF6BA648B... alley, williams, carmen, & king, inc. CLEAR CREED QUARRY 2022 MINE PERMIT MODIFICATION REVISION No. DESCRIPTION DATE INITIAL SCALE DRIL:AW 12/17/21 JOB NO. 11523 CONSULTING ENGINEERS 1 ADDED RIPRAP DITCH, REMOVED 2/25/22 PV'"' DRAWN BY: BERM DATA RCC SHEET NO. FIRM LICENSE # F-0203 VULCAN CONSTRUCTION MATERIALS, L.P. IHORIZ.: PROFILE CHECKED BY: GWW DETAILS 6 MECKLENBURG COUNTY 1523 120 SOUTH MAIN STREET P.O. BOX 1248 DWG No.:1 KANNAPOLIS, INC 28082 704/938-1515 � NORTH CAROLINA ART" DET\SHEET22 SHEET4 I I OF: 6