Loading...
HomeMy WebLinkAbout20210921_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 56-46 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Waycaster Stone Inc Applicant's Email: County: McDowell Project Name: Mountain Mist Mine YES NO Date Commencing Have land disturbing activities started?? — Latitude: 35.75092 Longitude: -82.04268 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 09/24/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? ./ Is the RO concerned that the operation, as proposed, would violate standards of water quality? Comments: Mountain Mist Mine project area is located within the Catawba Watershed, adjacent to an Unnamed Tributary to Toms Creek (Classification C). The project location is also within the Lake Does this mine (or previous owner) have DWR back fees to pay? Ll✓ (If Yes, amount): Watershed/Stream Name & Classification: Catawba Watershed/ UT to Toms Creek (Classification C) DWR Compliance Status of Mine: Unaware of compliance issues 401 Wetland Cert. required? 401 Wetland Cert. existing? ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? �✓ Is a Pumping Operation & Monitoring (OM) Plan needed? ✓ Are wetlands disturbed at this site? I ❑ I Z Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1�✓ Is a wetland delineation required prior to DWR issuing the permit? I El I✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? I ❑I Z Stream Determination Completed? 1 ❑ z Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ✓ Buffer Determination Completed? �✓ Recycle system permit existing? Ll I z (If Yes, Permit #): New Recycle System permit required? ❑ ✓ Enough information to determine? 1 �✓ El I Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements �H ./ HQW/7Q10 Concerns ./ Pay back fees or renew DWR permit z Other 7 Please describe the reason to hold the permit: The project application does not identify or clearly identify surface waters within Sediment, Soil Erosion, and Mining Permit Plan as required in part B.2.i. of the mining permit application. A Unnamed Tributary (UT) to Toms Creek (Class C) in within the approximate area of the project as depicted as a blue line on the USGS 7.5-minute quadrangle. It's not clear if additional streams are present within the project area. Plans must indicate the locations of all surface waters so that accurate determinations of impacts to water quality can be provided. RO contact: I I Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed Central Office Date Regional Office ❑ Date DWR RO Surface Water Mitchell Anderson 09/17/2021 RO Aquifer Protection Section Rev. April 2021