Loading...
HomeMy WebLinkAbout20210614_DWR_CommentReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 09-18 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Donald Smith Applicant's Email: smithstruck@yahoo.com County: Bladen Project Name: Rosindale Sand Mine YES NO Date Commencing Have land disturbing activities started?? X Latitude: 34.4545 Longitude: -78.5166 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 07/06/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? ✓ Is the RO concerned that the operation, as proposed, would violate standards of water quality? El Comments: Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: Boggy Branch C;Sw DWR Compliance Status of Mine: 401 Wetland Cert. required? 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ ✓ Is a Pumping Operation & Monitoring (OM) Plan needed? Are wetlands disturbed at this site? I ❑ I ❑ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD Consultant P Onsite ❑ El I Offsite ❑ ❑ Stream Determination Needed? ❑ ❑ Stream Determination Completed? ❑ ❑ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ❑ Buffer Determination Completed? ❑ 1 ❑ Recycle system permit existing? ❑ 1 ❑ (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ Has Violation O&M Requirements HQW/7Q10 Concerns Pay back fees or renew DWR permit Other 7 Please describe the reason to hold the permit: who conducted wetland delineation if an onsite has been done? Not enough information to determine if wetlands will be impacted. RO contact: Chad Turlington Hold Until: Mine must wait to dewater until an O&M plan is approved? ❑ Reviewed Central Office Date Regional Office Date DWR RO Surface Water Chad Turlington 06/14/2021 RO Aquifer Protection Section Rev. April 2021