HomeMy WebLinkAbout20210614_DWR_CommentReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
09-18 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Donald Smith
Applicant's Email:
smithstruck@yahoo.com
County:
Bladen
Project Name:
Rosindale Sand Mine
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
34.4545
Longitude:
-78.5166
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 07/06/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
✓
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
El
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Boggy Branch C;Sw
DWR Compliance Status of Mine:
401 Wetland Cert. required?
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
✓
Is a Pumping Operation & Monitoring (OM) Plan needed?
Are wetlands disturbed at this site?
I
❑
I
❑
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
Consultant
P
Onsite
❑
El
I
Offsite
❑
❑
Stream Determination Needed?
❑
❑
Stream Determination Completed?
❑
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
❑
Buffer Determination Completed?
❑
1
❑
Recycle system permit existing?
❑
1
❑
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Rev. April 2021
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
O&M Requirements
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
Other
7
Please describe the
reason to hold the
permit:
who conducted wetland delineation if an onsite has been done? Not enough information to determine if wetlands will be impacted.
RO contact:
Chad Turlington
Hold Until:
Mine must wait to dewater until an O&M plan is approved? ❑
Reviewed
Central Office Date Regional Office Date
DWR RO Surface Water Chad Turlington 06/14/2021
RO Aquifer Protection Section
Rev. April 2021