Loading...
HomeMy WebLinkAboutrevised sheet C301 06-26-2020PPROX NORTHI LEGEND EXISTING PROPERTY LINE - - PROPOSED PROPERTY LINE EXISTING BUILDING L__J PROPOSED BUILDING Q MINE PERIMETER PROPOSED SECURITY FENCE -x-x-x-x- TEMPORARY DIVERSION DITCH TD> TEMPORARY SILT FENCE PROPOSED ENERGY DISSIPATOR TEMPORARY CHECK DAM • MINE HAUL ROAD DISTURBED AREA FLJ STONE OUTLET 10 TEMP. SLOPE DRAIN STONE INLET PROTECTION .. S.D.O. STORM DRAINAGE OUTLET SKIMMER BASIN #2/S.D.O #2 J��/I - f Se f f ^\ PERIMETER SECURITY SKIMMER BASIN //...� FENCE TO CSPAN / S \ \ ''�)i�p° / /#3� .D.01 #3 _JURISDICTIONAONA L AREA \ '" STONE OUTLET (TYP.) SEE DETAIL 7/C502 i1"1 SKIMMER BASIN #1 _SKIMMER BASIN / `.. � C_�/�� _#16/S.D.O. #16 /S.D.O #tf CONTRACTOR TO PROVIDE CURLEX I \ �� ) ( 1EXCELSIOR MATTING ACROSS THE ��LIMITS OF / ENTIRE LENGTH &WIDTH OF ALL j f //o DISTURBANCE' X/ SKIMMER BASIN SLOPES 3H:1V AND STEEPER \ y�/ / STONE OUTLET TYP. `\ a�i#12/S.D.O #12 SKIMMER BASIN \� ��\ r SEE DETAIL 7/C502) \ `\ #29/S.D.O. #29 \ \ PERIMETER SECURITY LIMITS OF ,...� FENCE TO CLEAR SPAN-°q-°.• ____ DISTURBANCE \ JURISDICTIONAL AREA \ V LIMITS OF GS P DISTURBANCE Jy# IAV TAILINGS POND #2 SKIMMER BASIN ASH PLq SKIMMER BASIN \TEMP. SEDIMENT \�\ N7 FENCE TAIL #28/S.D.O #28 ( � 1 I#11/S.D.O. #11 SEE DETAIL 2/C501 TEMP. SE MENT ( I I / ' J, 11, l I \ I ' 0 FENCE (TYP.) \ �/ `DLU o \ ' 1 5010Ix100 POND #1 r � DETAIL 2/C501 \\ \ �4 , J 50' UNDISTURBED SKIMMER BASIN �. 9 S.D.O #9 ,BUFFER # / \ 600 SKIMMER BAST\ ✓ m \ v l LIMITS OF ` 1 + i / Z \l #22/S.D.O. #22 /� DISTURBANCE \ \\ : , DISTLIMITS URBANCE SKIMMER BASIN #10/S.D.O. \ \ \ 65.00 LF- / (STORM DRAINAGE OUTLET) #10 j OF 15- RCP �� \ BUF ERDISTURBED SKIMMER BASIN _--'• I �G \ DISTURBANCE � 1 SKIMMER`�L1�%tom-�� BASIN I X// ��r �•` .. . SEE DETAIL 2/( 1"e,005 Mao , TEMP. SEDIMENT FENCE CrY 1 TOTAL DISTURBED AREA = 86.76 ACRES EROSION CONTROL SEQUENCE NOTES 1. OBTAIN GRADINQ/EROSION CONTROL PLAN APPROVAL AND PERMIT. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ----- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS, THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OF DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT AT CLARK ROAD. B. THIS SITE HAS TEMPORARY SKIMMER BASINS AND SEDIMENT BASINS AS SHOWN. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING AND STONE OUTLETS E. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING °CLEAN' WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL. AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING MUST BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. DESCRIPTION STABILIZATION STABILIZATION TIMEFRAME TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & 7 DAYS NONE SLOPES SLOPES STEEPER THAN 7DAYS IFSLOPES ARE IO'OR LESS IN 3:1 LENGTI &ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES > 50' FLATTER IN LENGTH ALL OTHER AREAS WITH SLOPES 14 DAYS NONE FLATTER THAN 4:1 t �� TEMPORARY DIVERSION / STONE OUTLET (TYP.) ('` �^ SKIMME�#6/S.D.O` ` \ / / ;; SEE DETAIL 7/C502 BASIN #1 \ DITCH (TYP.) l f / 50 UNDISTURBED \ q ��r(r Q #5/S.D.O. \\ \ \ / I '� SE AIL 3/C502 �f / / / / l' BUFFER i f / 72 -� / LIMrTS OF / #5 670 _ 1 / / //j �/ / �� . C j1 SKIMMER BASIN f 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE (AT APPROXIMATELY 45 DAYS PRIOR TO J f SKIMMER BASIN / / / t / / - J 1 11 / #21/S.D.O. #21. ) / \ DISTURBANCE �• SKIMMER BASIN #7/ 27 /614 (/i DEMOBILIZATION), THE FINANCIAL RESPONSIBLE PARTY (OR THEIR DESIGNEE WILL NOTIFY THE ENGINEER AND THE 70,00 LF S.D.O #7 / j 1 !( J/ /�/'// I /j-'" J/- �� `!1 / `O,o/616 \ 1 ATE TO LEAVE THE SITE. AN ON -SITE INSPECTION WILL EROSION E CONDUCTED PRIOR TO THE LEAVE EAVE DATE BY THEHEIR ANTICIPATED ENGINEER AND/OR THE DESIGNATED EROSION SKIMMER BIN_ f / �\ 0 \ 5" RCP �_ / -� , • J r�� 'L CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTIONS ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR. #14� D. i #14^ \ % / / PROP. f / _ j / /� m KEYSTONE STREAM CROSSING SKIMMER BASIN • 50' UNDISTURBED 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED LIMITS OF- WALL j STRUCTURAL PLATE ARCH #24/S.D.O. #24 l BUFFER ' / ( 620 / / OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY DISTURBANCE \ \ I- �' ) I I METAL 24' SPAN x 10'-4" \i / \\` `_ j l l l O Y /� / I ) (i % AFTER FINAL INSPECTION AND APPROVAL BY ENGINEER. i SKIMMER ` RISE BRIDGE CULVERT BY \ 01 ° N /// o 0 /� / \ 1 ✓ p\ -fin. SKIMMER BASIN 000 0 \ BASIN \\ CONTECH CONSTRUCTION / / '0 ' EROSION CONTROL MAINTENANCE PLAN (CONTRACTOR MUST INCLUDE MAINTENANCE IN BASE BID) \ PRODUCTS d '� #20/S.D.O. #20 / _ I / O O ) S 64.00 LF � #4/S.D.O #4 � � cp / 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITY AND FUNCTION EACH WEEK / •� OF 15" RCP \ % \\ \ / / /AND FOLLOWING EACH RAINFALL EVENT. LIMITS OF / MINING LIMITS /� O \61g / DISTURBANCE ` ��/. �^ ,- �' /� / I ! �� \ \ \ ` ✓ �� / / \ \� \\ \�\�� /' / / // / / Sw/1 -616 f / C2. APACITY, REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% { SKIMMER BASIN ( / / MONrrORINC�VELL _\\ \ #26/S.D.O #26 / \ (\ / / 614 - LIMrTS OF TEMP. CHECK DAM - (! I \ ( / s / ✓ TET� SEDIMENT / / / 3. REMOVED ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH //'� /i DISTURBANCE `\ (TYP.) -�� \ 1 / / / �/ 129.73 IF OF FENCE (TYP.) E'�2 EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY. / SEE DETAIL 4/C5C \ 1 66 `I 16" RCP SEE DETAIL 2/C501 (\\ (/ �0/ // ^ 48.03 LF \ LIMITS OF / \ \ \ // \ r Q 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION DISTURBANCE LIMITS OF ( / INCLUDING °CLEAN° WATER DIVERSION BERMS. RE-GRADUREPAIR BERMS AS REQUIRED. \�\\ OF 15" RCP \\\ \ \ \ \ ` \ / I` \� / \ \\ \ I i 088J / I 1 / DISTURBANCE \ \ _, 63 \ \\ �y -9 5. CONTRACTOR SHALL APPOINT AN THE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN \ ` / \\ 126.90 LF \ / / 0 \ 6 6 O ACCORDANCE WITH THE PROVISION OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR \ CONSTRUCTION ACTIVITIES. SKIMMER BASIN \ / �\ `OF 15" RCP1 TEMP. #18/S.D.O #18 \ \ / ` \ \ �/ 1 \ 70.00 LF OF I FENCE SENT ONITORING WELL 1 \\ \` & q C \ \ \ �/ 15" RCP (TYP.) } ) ` \ �\ •O p�� DETAILED CONSTRUCTION SEQUENCE FES 2 \ 1 1 \ SEE DETAIL 2/C501 \\9 yp •(N\ �� P�c� LIMITS \� t \ SKIMMER `BASIN `�9i� s�\� 1. CONSTRUCT THE TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE/EXIT OFF CLARK ROAD. DISTURBANCE / f f PROP. SEPTIC / �o / { 1 1 f \ \ \ \ �A \ \ \ / / 80' OF / / FIELD o / \ \ \ \ ((Si #19/S.D.O. #19 �_ / \ \ 2. INSTALL SILT FENCE AND STONE OUTLETS FROM CLARK ROAD TO THE SOUTH SIDE OF THE STREAM 24" RCP j' r j j / // `/ f\ \ �'^. -� / \ \ LOCATED AT 16+87. SILT FENCE TO BE LOCATED ON BOTH SIDES OF THE ROAD AND SOUTH BANKS OF 7 TEMPORARY EMP. SEDIMENT \ \ \ \ \ \ ��� y /� \�\ \ THE STREAM. 1 ES 1 FENCE CONSTRUCTION / f J (\ , \ \ / A ENTRANCE/EXIT 1 --� � � { SEE DETAIL 2/C5010501 ) � J � , SKIMMER BASIN \ $O. U � / \ � \ \ \ '•�.�- --•-' --�_ �-� / / Ate\ __ � ' � � � \ LG�\\\ \ 3. INSTALL SKIMMER BASIN 6 AND SKIMMER BASIN 7 AND THEIR ASSOCIATED TEMPORARY DIVERSION SKIMMER BASIN O \ \ l #25/MINE S%R ROISTUR ) ` \ / j 1 J / \\ �rL� \ DITCHES AND SLOPE DRAIN (IF CALLED FOR). #17/S.D.0 (STORM \ \ \ \ /� / f DEWATERING \ TEMP. SEDIMENT \� �/ / �__ ` f� DRAINAGE OUTLET j S.D.O #25 /�� " R ` 4. INSTALL IMPERVIOUS CLEAN WATER DIKE AND BYPASS PUMPING SYSTEM AS SHOWN ON SHEET C402. STONE PIPE INLET - OP DRAINAGE \ \ \ #17'. FENCE (TYP.) 6 / \� / I �g9�\ \\ \ INSTALL THE PERMANENT 54' PIPE AND ENDWALLS AT STATION 16+87. _PROTECTION \ \ \ \ SEE DETAIL 2 C501 5. APPLY 10' STONE BASE LAYER TO ENTRANCE ROAD AND COMPACT. :(J i LIMITS OF J i c D \ \ \ \\ ^ DISTURBANCE \ \ / \ / / \ \ \ \ \ \ 1 \ \ \� //,,...� \ ` �� g.7 \ 6. BACKFILL, PREPARE SLOPES AND OTHER DISTURBED AREAS AND STABILIZE. �Z W5W-4 IN / � \\ \ >� / / ✓ '� �\/L �/ /� �� I D v \ 7. INSTALL SILT FENCE AND STONE OUTLETS ALONG NORTH SIDE OF THE STREAM. D ONITORING WELL \ l \ `- -_ �o / �-•- �- � Z ? 8. INSTALL SILT FENCE AND STONE OUTLETS AROUND THE EXISTING STREAM BUFFER AND PROPERTY / 1 =�D , �\ \ \ \ EXISTG,BWELLING �„`\ �,-ST /� i �- BOUNDARY (WHERE DENOTED ON PLANS). INSTALL SKIMMER BASINS 4, 5, 13, 11, 3, 2, 1, 12, 8, AND 1 o r \ A� \ \\ \ \ \ APPROX. CATION \ \ ' ( ( \ ( ( 0 \\C /� 1 1 \ \ / 10 AND THEIR ASSOCIATED TEMPORARY DIVERSION DITCHES AND SLOPE DRAINS (IF CALLED FOR). (n O \ \ O\ I \ -� \ \ \ \ \ \ \ _10/ 9. PLACE ALL SILT FENCE AND STONE OUTLETS DOWN SLOPE OF ALL PROPOSED BERMS. rn \ J ��s�\\ 1 \ \ \` \ \ \ \ \\ / ORTH AS LL 00. / ' / y / / O / j 1 / J r--- _= \\ �\ \ \ ,p \ \ / } \ / t ` \ `\\ \ F9'�� 10. BEGIN GRADING THE INITIAL MINE AREA, MOVE AND PLACE MATERIAL FOR BERMS. PLACE AND RE J / Z STTABIIZED WITCT HRIAL FOR PLANT AND IN 1 YEAR OF STARTINGOCKPILE AREA. ALL MINIING ACTIVITIES. BERMS SHALL BE CONSTRUCTED AND tx a F1 , \ \ \ \ \ \\ �� _�'•�630� 11. CONSTRUCT TAILINGS PONDS BEFORE MINING OPERATION BEINGS. C � v\ \ �� _ \ 12. SEED AND MULCH ALL AREAS THAT ARE NOT COVERED WITH ASPHALT OR STONE. - _\ STORMWATER SEWER CALCULATIONS AND DESIGN TABLE 13. STABILIZE ALL CHANNELS AND SLOPES WITH MATTING AS NOTED ON THE PLANS. c s m _ \ _ _ ` 1 l ` \ \ ✓ /i 1 \ INLET Q BASED ON 4"/HOUR E -n� / �\ ` //�\\ n7- - _l/ ) STORM RETURN PERIOD: 10Yrfor TOC=511linutes 640 Airy 97, / O \\ n N`3> pO O 400 \ v t00 200 ' 7W--'400 TYPE GRATE RIM FROM TO INLET AREA (Ac.) INLET Q CFS TOTAL AREA (Ac.) I (in/hr) C Q I CFS GRATE/ RIM/ THROAT FROM INV. (ft) TO INV. (ft) APPROX. LENGTH (ft) SLOPE % N D(THEO.) (inches) PIPE SIZE (inches) PIPE MATERIAL N/A FES 1 FES 2 7.91 9.49 7.910 7.04 0.30 16.71 N/A 612.59 611.79 80.00 1.00 0.013 21.40 24 RCP 840.16 DI D12 0.45 0.90 0.450 7.04 0.50 1.58 632.50 630.25 626.95 126.90 2.60 0.013 7.39 15 RCP 840.16 DI FES 13 0.19 0.61 0.64 7.04 0.80 3.60 629.20 626.95 624.48 48.03 5.14 0.013 8.86 15 RCP N/A FES 3 FES 4 4.24 5.09 4.240 7.04 0.30 8.95 N/A 600.24 597.31 64.00 4.58 0.013 12.73 15 RCP N/A FES 5 FES 6 2.51 3.01 2.510 7.04 0.30 5.30 N/A 630.50 628.00 70.00 3.57 0.013 10.96 15 RCP N/A FES 7 FES 8 5.52 6.62 5.520 7.04 0.30 11.66 N/A 617.75 616.12 129.73 1.26 0.013 17.92 18 RCP N/A FES 9 FES 10 0.31 0.37 0.308 7.04 0.30 0.65 N/A 611.00 607.00 65.00 6.15 0.013 4.51 15 RCP N/A FES 11 FES 12 3.24 3.89 3.240 7.04 0.30 6.84 N/A 609.60 606.92 64.00 4.19 0.013 11.71 1 15 1 RCP N/A FES 13 FES 14 7.58 9.10 7.580 7.04 0.30 16.01 N/A 607.20 606.40 32.00 2.50 0.013 17.74 1 18 1 RCP N/A FES 15 FES 16 0.54 0.86 0.536 7.04 0.40 1.51 N/A 609.84 609.00 56.00 1.50 0.013 8.05 1S RCP REINFORCED CONCRETE PIPE(RCP) TO BE CLASS KPIPEJOINTS PER ASTMC443; TYPE 2 PIPE INSTALLATION ASTAI CI 479 E DROP INLETS 1 & 2 TO BENCDOT STANDARD 840.14 WITH 840.16 FRAME& GRATES e° } FLARED END SECTION (FES) 0 0_ SEEDING NOTE SEED MIXTURE, SEEDING RATE, AND SOIL AMENDMENTS TO BE APPROVED BY AN ENVIRONMENTAL PROFESSIONAL AND SUBMITTED TO OWNER AND ENGINEER PRIOR TO APPLICATION. SEED MIXTURE TO BE A MIXTURE OF RED CLOVER, CREEPING RED FESCUE, AND A GRAIN, SUCH AS, OAT, WHEAT, OR RYE. 0, LaBeRa Powered by partnership. 615 St. George Square Suite 300 Winston-Salem, NC 27103 336-842-4065 C#0430 labellapc.com 1,,1111111,,,,, T -I y%A CARp� ��i� • Z ti9 A'ST t e L F T 7 L 1 © 2019 LaBella Associates ALAMANCE AGGREGATES, LLC Mr. Chad Threatt, VP Snow Camp Mine 3 6/26/20 REMOVED REFERENCE TO C302 2 3/31/20 NCDEMLR COMMENTS ADDITIONAL STREAM INFO - ALAM. AGG. 1 1/20/20 & LAND QUALITY COMMENTS NO: DATE: DESCRIPTION: REVISIONS PROJECT NUMBER: 2190335 DRAWN BY: KCG/ATC/BWS REVIEWED BY: PAS ISSUED FOR: CONSTRUCTION DATE: 6/26/20 DRAWING NAME OVERALL SEDIMENTATION & EROSION CONTROL PLAN DRAWING NUMBER: C301