HomeMy WebLinkAboutC301 Overall EC PlanX CS PERIMETER SECURITY FENCE JURISDICTIONAL AREA 1 \( e STONE OUTLET (TYP.) � I KIMMER BASIN BAFFLES \\�� SEE DETAIL 7/C502 _ SKIMMER BASIN r% #16/S.D.O. #16LIMITS OF I C �/� ✓ f %' DISTURBANCE Az r/A 1 l/ LIMITS OF �/ / ( / ✓ \ \\ Z/ DISTURBANCE � � I 01 �r r I l / / 1 111 ! / SKIMMER BASIN LNG, QTP.) BASIN #1 1 Fit t SKIMMER BASIN #12/S.D.0 #12 #26/S.;0 #26 D ( r TEMP. SEDIMENT FENCE (TYPJ�_ // ��t°w - \ ' I TAILINGS POND #1 SEE DETAIL 2/C501 - /� / �1� ,� 500'x100' SKIMMER BASIN 600 -OF SK OW '-�-� \ 22IMMER BA212 v A � \ � LIMITS DISTURBANCE~ SKIMMER BASIN #10/S.D.O. \ 65.00 LF / STORM DRAINAGE OUTLET 10 OF 15" RCP f ✓ ) # I � f s' ` a BUFFER DISTURBED SKI / ER -4 IN SKIMMER BASIN ^�� - t Ili 13 S DO 13 LEGEND EXISTING PROPERTY LINE - - PROPOSED PROPERTY LINE EXISTING BUILDING , L_J PROPOSED BUILDING MINE PERIMETER PROPOSED SECURITY FENCE -x-x-x-x- TEMPORARY DIVERSION DITCH TDi- TEMPORARY SILT FENCE PROPOSED ENERGY DISSIPATOR Dl TEMPORARY CHECK DAM e MINE HAUL ROAD DISTURBED AREA El STONE OUTLET p TEMP. SLOPE DRAIN STONE INLET PROTECTION r S.D.O. STORM DRAINAGE OUTLET NO-RTHW LL 1 / SKI MER� BASIN #2/S.D.0 #2 I `{ SKIMMER BASIN \\ #3/S.D.0 #3 ' SEA 3 ET 302 FOR I � ` /AND GRADINGSKIMMER , ry 1 CONTRACTOR TO PROVIDE CURLEX I 0 EXCELSIOR MATTING ACROSS THE \\ ENTIRE LENGTH & WIDTH OF ALL SLOPES 3H:1V AND STEEPER \\j;' - STONE OUTLET (TYP.) \ SKIMMER BASIN`\ ��t 4 SEE DETAIL 7/C502U�\` #29/S.D.D. #29 PERIMETER SECURITY J r \ FENCE TO CLEAR SPAN \ JURISDICTIONAL AREA L Lts- IMITS OF DISTURBANCE a A rTAILINGS POND 2 � SKIMMER BASIN FENCE (TYP,� SEDIMENT Q�,\ % I#11/S.D.O. #11 SEE DETAIL 2/C501 Q \� .--`- _ 50' UNDISTURBED BUFFERf LIMITS OF �Q / DISTURBANCE I �` NO GRADING, CLEARING, OR OTHER CONSTRUCTION ACTIVITIES TO OCCUR WITHIN THE 50' UNDISTURBED STREAM BUFFER UNLESS PRIOR WRITTEN APPROVAL 1S GIVEN. 1 "! j O�� LIMITS OF\ / /� / #8/S.D.0 #8_ - % f p / G� ��DISTURBAt\; `\ /r / ! G P �\ p F r ,.� t\ mac° I b0 y/6 ® \ OF SKIMMER BASIN r S , - IST BANCE / / f O SKIMMER BASIN, #15/S.D.0 #15) 7\STR�GIO/S \ ` \ #23/S.D.O. #23 TEMP.. SEDIMENT �� �41efZiP \ f \. \\ Gam\ % r / ` cQ to 20 r FENCE (TYP.) �oKID SEE SKI �� C BASIN? �l - I / `/ ' P / TOTAL DISTURBED AREA = 86.76 ACRES EROSION CONTROL SEQUENCE NOTES 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ..... EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS, THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER, 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OF DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT AT CLARK ROAD. B. THIS SITE HAS TEMPORARY SKIMMER BASINS AND SEDIMENT BASINS AS SHOWN. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING AND STONE OUTLETS E. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES INCLUDING "CLEAN° WATER DIVERSION UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION. 4. BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL. AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING MUST BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. DESCRIPTION STABILIZATION STABILIZATION TIMEFRAME TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & 7 DAYS NONE SLOPES SLOPES STEEPER THAN 7DAYS IF SLOPES ARE IDOR LESS IN 3 i LENGTH A ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES - 50' FLATTER IN LENGTH ALL OTHER AREAS WITH SLOPES 14 DAYS NONE FLATTER THAN 41 A \ TEMPORARY DIVERSION � / � - / - ) �� SKIMMER''`#6/S.D.O STONE OUTLET (TYP.` / if r f J / \s0� SEE DETAIL 7/C502 ¢ BASIN #6 I DITCH (TYP.) / / �j ' 50' UNDISTURBED SEE DETAIL 3/C502 f f f /J1 /BUFFER -I LIMITS OF #5 �i0 `/ < i t ✓ / / �f /`f/ / f1 r/,•- - - SKIMMER BASIN12-/ f J//-""' 1 ``� 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE AT APPROXIMATELY 45 DAYS PRIOR TO DISTURBANCE �/� SKIMMER BASIN s� f/ /% 1I % _ 21 S D.O. 21. -h14 - !y,/�f,, SKIMMER BASIN #7/ #27/S.D.O #27�! '� / ,✓ f ` /i f'" ` 11 ,/ ✓ / # / z� # ` %DEMOBILIZATION),THE FINANCIAL RESPONSIBLE PARTY OR THEIR DESIGNEE WILL NOTIFI'THE ENGINEER AND THE 70.00 LF S.D.O #7 s / t �^' p f / / `f r/ ` r "`� -"`r l / !� ` `Q N N �..s` ,,. -Fi 1 LT"-'- DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE. AN ON -SITE / r --� ` -, �`, _ r,,./ I P ,�% ,,%.•''"` ,%/ „ram'INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE ENGINEER AND/OR THE DESIGNATED EROSION SKIMMER BASIN OF 15" RCP / - / f d /^' ( / f % / M n n 14 S. D.O 14 /� ^~ PROP. % /�€tl CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTIONS ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR. # / # /� �✓ \ \ % f f r STREAM CROSSING / SKIMMER BASIN I 50' UNDISTURBED E ��// d/ ) I ' / / r / / f 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED f� LIMITS OF \ STRUCTURAL PLATE ARCH / # BUFFER A%l WALL #24 S.D.O. 24 ( .!" ✓ _(�20 / OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY IV DISTURBANCE / -�V I I METAL 24' SPAN x 10'-4" 4✓ _ ( ( i F 1' l� '_'_- l f i AFTER FINAL INSPECTION AND APPROVAL eYENGINEER. r RISE BRIDGE CULVERT BY ` % SKIMMER BASIN So N ° /((� o BASIN ER \\ CONTECH CONSTRUCTION / 4. ..-.- /#20/S. D.O. #20 �' _ � ^ ca ) EROSION CONTROL MAINTENANCE PLAN (CONTRACTOR MUST INCLUDE MAINTENANCE IN BASE BID) 64.00 LF �� #4/S.D.O #4 PRODUCTS / c' l I ( 4 M f o ....---"""-".._.,_ 1 Y \ \ \ `\41 ,-� �,,,•'" ,%� m 1. INSPECT ALL SEDIMENTATION AND EROSIONCONTROL DEVICES FOR STABILITYAND FUNCTION EACHWEEK OF 15" RCP r _ % r / ✓ �"'^�. � ..•-• LIMITS OF \ ! MINING LIMITS �'+ %'" •' co '`^,.. � ,% i / AND FOLLOWING EACH RAINFALL EVENT. /j S 9�ip r ✓- % ✓' a DISTURBANCE d J / i �~ �,„...- ---- --._ �„"/ `f./r ""� ~\ / �- \ ` 5 `"� �" \ �''•, `"'� `, SW/1 ---_ G 1 H s/ ! 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% �' / MO ITORING/WVELL �6q r'' / / % SKIMMER BASIN � _--. � /y/� ! �.✓� f -"'� � CAPACITY. q / #26/S.D.O #26 / '`T \. ` ✓ , r 6`, LIMITS OF o' / TEMP. CHECK DAM - t ,.- DISTURBANCE TYP. '--- �` ✓ 129.73 LF OF TEMP. SEDIMENT f ;,..---' ,�j• ` 3. REMOVED ACCUMULATED SILTJSEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH ( ) "--� \ ` t` .-'`� l'FENCE (TYP.) ,„, 6 -- '" / EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY• SEE DETAIL 4 C501 ` /� 18"RCP / �✓ �% - O / LIMITS OF �� \ SEE DETAIL 2/C501 `j\\ �t0 Q \ _ 48.03 LF DISTURBANCE-- -`~'' 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION OF 15" RCP `\ ` LIMITS INCLUDING 'CLEAN'WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED DISTURBANCEq , f 08 -� 5. CONTRACTOR SHALL APPOINT ANON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN ( t/ r /` \0d fCC� s 'O CONSTRUCTION ACTIVRDANCE WITH ITIES PROVISION OF THE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR SKIMMER BASIN % 126.90 LF 1 \ ` \ r -" 0f7 # / # \ \ `F }15 \ I }} / ( __ 70.00 LF OF I TEMP. SEDIMENT // OSW-2 \ ` FENCE (TYP.) ONITORING WELL \ \ \\\ \ ` \ { o\ FES 2 \� 'P� i ( '•� 15° RCP 7` DETAILED CONSTRUCTION SEQUENCE SEE DETAIL 2/C501 Y. y �� LIMITS OF,���`-".,, % J I ,+'" A �`� >, ( f ✓ / / ' \ \ �, a 1. CONSTRUCT THE TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE/EXIT OFF CLARK ROAD. DISTURBANCE / PROP. SEPTIC /o / / -- / �� "'SKIMMER BASIN \ \ f 9 �` 80' OF, % �.,. FIELD �a ( _ % -'^�., ^"\ '^��,,��N V'(� - ;i `_ #19/S.D.O. A19 \ .,,'`�.•�f; r / \ �9 2. INSTALL SILT FENCE AND STONE OUTLETS FROM CLARK ROAD TO THE SOUTH SIDE OF THE STREAM ( \ ,O� ( ( .1 !,� �`" \ - M1f3" \\'\ '___ -'"' `- / ,J"� ��`' 9Ci \ C LOCATED AT 16+87. SILT FENCE TO BE LOCATED ON BOTH SIDES OF THE ROAD AND SOUTH BANKS OF 24' RCP r SEE SHEETC302 FOR \ TEMPORARY TEMP. SEDIMENT n \ \ \\ SKIMMER BASIN BAFFLES s'r,/' \ ` � L-\ (� THE STREAM. FES 1 CONSTRUCTION / FENCE TYP. t{ ai I \\\ (TYP.) ` �' I \ AND GRADING, (TYP.) ✓ \ \ \ \ ENTRANCE/EXIT ..----• o ( -50, / t ` "� �M�. ��.A�, 3. INSTALL SKIMMER BASIN 6AND SKIMMER BASIN 7AND THEIR ASSOCIATED TEMPORARY DIVERSION \ SEE DETAIL 2/C501 I \ , SKIMMER BASIN \ / ` \ - - 1 f \ C` \ SKIMMER BASIN j `O \ ` \ -\ } #25/MINE '� STRST(7Re`" J / } \ ry^ YY '"�\, O - ! l \ ` `\ \ DITCHES AND SLOPE DRAIN (IF CALLED FOR). #17/S.D.0 (STORM j \ l\ \ / DEWATERING\\ f f } I, -I 1 ✓ lr DRAINAGE OUTLET) �' \ /4`'� /� ! S.D.O #25 "-- tii"�UFFFR \ TEMP. SEDIMENT - '•-�, TfN f„/°f/ f/ I -_� \ J'J, ti 4. INSTALL IMPERVIOUS CLEAN WATER DIKE AND BYPASS PUMPING SYSTEM AS SHOWN ON SHEET C402. STONE PIPE INLET - Ot #17 \ - _�• FENCE (TYP.) _- 6? ��-RcP / I I� �� _PROTECTION `-., \/ \,.-.--- / n I\ \ INSTALL THE PERMANENT 54' PIPE AND ENDWALLS AT STATION 16+87. _ _ _ ✓ 6 SEE DETAIL 2/C501 Rv SE SHEET C3G2 FOR / e \\ j - ` % / �__�C�'N, lSA 5. APPLY 10" STONE BASE LAYER TO ENTRANCE ROAD AND COMPACT. CDTS OF SKIMMER BASIN BAFFLES �DISTURLIMIBANCE\\ \ \ _ ///O9A °s. p1 \ AND GRADING, (TYP.) \ "\ I \ ,"--- r'\ / ° J 7 6. BACKFILL, PREPARE SLOPES AND OTHER DISTURBED AREAS AND STABILIZE. I�T�' y� P MONITORING WELL` \ / ` \�Y- Oho / "z L"� `l\' ,/ / ''�� T`�'"� �' ✓' "� r""`m m '\�' 7. INSTALL SILT FENCE AND STONE OUTLETS ALONG NORTH SIDE OF THE STREAM. Z \} 4 `., �•,� '�. `---- >� _..- , \ (( /,,F;/'f „/ ^-- --" \ 1QQ,----.---"" B. INSTALL SILT FENCE AND STONE OUTLETS AROUND THE EXISTING STREAM BUFFER AND PROPERTY f p�r 1 4 { \ A 1 en ~ \ EXISTING WELLING ' \ `----Sj.R / f,•` t� (� BOUNDARY (WHERE DENOTED ON PLANS). INSTALL SKIMMER BASINS 4, 5, 13, 11, 3, 2, 1, 12, 8, AND I ` p� ^�,,h �, ���`'•�. APPROX. CATION ' \ \\\ \„ \ C'iQ �,,,.� �L',.F(} t C �� _.. 10 AND THEIR ASSOCIATED TEMPORARY DIVERSION DITCHES AND SLOPE DRAINS (IF CALLED FOR). l IN, n `�, \ �6'`,., •�.,�_ ~"" �-1 '^��' ~'`� '-"`•-- \ '"`�• \ / (" PI.PPRQX.`�.� g, PLACE ALL SILT FENCE AND STONE OUTLETS DOWN SLOPE OF ALL PROPOSED BERMS. c�`d / YO�TH AS LL { Epp. a \ f ( / O O / ,% ( I ` �- „�'�°' •-,� ^-� \ ,� '"� r T \ { t \ \ `� f L ~� \ \ ! yFy�i 10. BEGIN GRADING THE INITIAL MINE AREA, MOVE AND PLACE MATERIAL FOR BERMS. PLACE AND / Z 1 /_,� \ "�---..�„ .� , \ 4 ,," S�"'TT'(� "-"" ""---•-'' \\ 1\\8,•,..'` COMPACT MATERIAL FOR PLANT AND STOCKPILE AREA. ALL BERMS SHALL BE CONSTRUCTED AND 41 `( y ,� ` �/ J _ , „ '� \ $��\„1 •.\`f f j �je�J}",-� �.� ",. •,�-" �C STABILIZED WITHIN 1 YEAR OF STARTING MINING ACTIVITIES. (� } ( \ _ m :D \ •�., f I \ 1 -„ �-�V m.�, •.,y`� �� \ rI J--�._ ..P._ .,l (� ,h �� 17. CONSTRUCT TAILINGS PONDS BEFORE MINING OPERATION BEINGS. FIT n f y,-,..,._ ( \�. .,,, --`^- a / f ,,,^�,+' r ✓ / %� %� (,. \ \ C T ,�}, `.,,�, , \, 12. SEED AND MULCH ALL AREAS THAT ARE NOT COVERED WITH ASPHALT OR STONE. rnm _ ���� \� STORMWATER SEWER CALCULATIONS AND DESIGN TABLE C 1T1 -„�.-- l r ``�. "" """ `�• \� `� .--"� 13. STABILIZE ALL CHANNELS AND SLOPES WITH MATTING AS NOTED ON THE PLANS. T1 � s \ e � � N� � � } INLETQBASED ON4"/HOUR l\ \ C_ / STORM RETURN PERIOD: 10 Yr for (TOC=S Minutes) 40 (' Z-^--•^.'"" T� �,. ""' -.._.. .�._ � '"`""- �_ � ,`'` \ ""_ /�-.' Off- _._-----'�,.��'�,` _X\`T M1l r ,� /100 \ 100 200 300- 400 -``•+- ` L_ ._. ��y '-`",` -- TYPE GRATE RIM FROM TO INLET AREA (Ac•) INLET Q CPS TOTAL AREA (Ac.) I (in1hr) C Q CPS GRATE/ RIM/ THROAT FROM INV. (ft) TO INV. (ft) APPROX. LENGTH (ft) SLOPE % N D(THEO.) (inches) PIPE SIZE (inches) PIPE MATERIAL N/A FES 1. FES 2 7.91 9.49 7.910 7.04 0.30 16.71 N/A 612.59 611.79 80.00 1.00 0.013 21.40 24 RCP 840.16 DI D12 0.45 0.90 0.450 7.04 0.50 1.58 632.50 630.25 626.95 126.90 2.60 0.013 7.39 15 RCP 840.16 D12 FES 13 0.19 0.61 0.64 7.04 0.80 3.60 629.20 626.95 624.48 48.03 5.14 0.013 8.86 15 RCP N/A FES 3 FES 4 4.24 5.09 4.240 7.04 0.30 8.95 N/A 600.24 597.31 64.00 4.58 0.013 12.73 15 RCP N/A FES 5 FES 6 2.51 3.01 2.510 7.04 0.30 5.30 N/A 630.50 628.00 70.00 3.57 0.013 10.96 15 RCP N/A FES 7 FES 8 5.52 6.62 5.520 7,04 0.30 11.66 N/A 617.75 616.12 129.73 1.26 0.013 17.92 18 RCP N/A FES 9 FES 10 0.31 0.37 0,308 7.04 0.30 0.65 N/A 611.00 607.00 65.00 6.15 0.013 4.51 15 RCP N/A FES I FES 12 3.24 3.89 3.240 7.04 1 0.30 G.84 N/A 609.60 606.92 64.00 4.19 0.013 11.71 15 RCP N/A FES 13 ITS 14 7.58 9.10 7.560 7.04 0.30 16,01 N/A 607.20 606.40 32.00 2.50 0.013 17.74 18 RCP N/A FES 15 FES 16 0.54 0.86 0.536 7.04 0.40 1.51 N/A 609.84 609.00 56.00 1.50 0.013 8.05 18 RCP D ��c7 Y I ! .'v,_200' w-..._ ---'` CCU i- 1 - -r l� ....----- "ems �ti _`"••- '^""_ ! a�?� / ---- s~ , REINFORCED CONCRETE PIPE (RCP)TOBECLASSIII,PIPEJOINTSPERASTMC443;T•YPE2PIPE INSTALLATION ASTMC1479 DROP INLETS I & 2 TO BENCDOT STANDARD 840.14 WITH 540.16 FRAME& GRATES FLARED IND SECTION (FES) s����n,lnatal; SEED MIXTURE, SEEDING RATE, AND SOIL AMENDMENTS TO BE APPROVED BY AN ENVIRONMENTAL PROFESSIONAL AND SUBMITTED TO OWNER AND ENGINEER PRIOR TO APPLICATION. SEED MIXTURE TO BE A MIXTURE OF RED CLOVER, CREEPING RED FESCUE, AND A GRAIN, SUCH AS, OAT, WHEAT, OR RYE. LatseRa Powered by partnership. 615 St. George Square Suite 300 Winston-Salem, NC 27103 336-842-4065 C#0430 labellapc.com s s A GINS .• � � T T __1 J © 2019 LaBelle Associates ALAMANCE AGGREGATES, R1' a1 Threatt, VP 2 3/31/20 NCDEMLR COMMENTS 1 1/20/20 ADDITIONAL STREAM INFO - ALAM. AGE. & LAND QUALITY COMMENTS N0: DATE: DESCRIPTION: REVISIONS PROJECT NUMBER: 2190335 DRAWN BY: KCG/ATC/BWS REVIEWED BY: PAS ISSUED FOR: CONSTRUCTION DATE: 4/8/20 DRAWING NAME: DRAWING NUMBER: o1.