Loading...
HomeMy WebLinkAboutC401 Site Details (1)I ti e� r .y. � :. ;_. Q �' �t � Q U .e'. 41 �� F- :i O Ha •,IIj 4 1 . v;I',` FOUNDATION y . BY OTHERS 4 . Y 24'-0" ARCH SPAN i HEADWALL BY OTHERS BRIDGE PLAN T/GRADE 3'- CROSS SECTION A -A PROTECT WEIR WITH FILTER FABRIC AND RIPRAP NOTES: • MEASUREMENTS ARE TO THE INSIDE CRESTS OF THE CORRUGATION • DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES *PRELIMINARY FOUNDATION DESIGN NOTES: • PRELIMINARY SIZING BASED ON ASSUMED 8000 PSF BEARING CAPACITY, 4'-1" OF COVER, AND CAT 773 LIVE LOADING • SCOUR NOT CONSIDERED IN THIS PRELIMINARY DESIGN • FINAL DESIGN MAY VARY CONTECH METAL ARCH BRIDGE CULVERT NTS 1 I ROPE 12' 7f`FILTER FABRIC ref ---------------- i �j.,y iiiES��iI llli 11 IL�311:1 Ftll'lI11�I1F"�II II IIiWll�,lf"`�I c_ NOTES i 1. USE FOR DRAINAGE AREAS NOT EXCEEDIN FIVE 2. EARTH BERM SHALL HE STABIUZED Wq'SEEDING ACCORDING TOWN SPECIFICATIONS. DESIGN OF SPILLWAYS DRAINAGE AREA WEIR LENGTH 1 (ACRES) (FT) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 1DIMENSIONS SHOWN ARE MINIMUM FILTER FABRIC BAFFLES WITH METAL T—POST, WOVEN WIRE FABRIC BACKING AND COIR FIBER NETTING I LENGTH SKIMMER BASIN CROSS SECTION i UNE WEIR WITH RIPRAP WEIR CROSS SECTION DITCH AND BURY FILTER FABRIC EDGE (MIN. 12' OF FABRIC) MAINTENANCE • INSPECT TEMPORARY SKIMMER BASIN AND EMPTY SKIMMER OF ALL DEBRIS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE BASIN TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE BASIN. PLACE THE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA. REPAIR BAFFLES. • CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SUGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. • STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE BASIN IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING AND MATTING, AS NEEDED. z:) TEMPORARY SKIMMER BASIN (2 OF IN J NTS NOTE: THE SETTLING PONDS WILL BE REMOVED WHEN THE RECLAMATION PLAN IS COMPLETED IN THE FIELD. 1GO' WIDTH 1� TOP OF BERM WATER SURFACE ELEVATION m 595 FT ELEVATION = 594 FT TAILING POND F1 10 too' utDm I I TOP OF BERM ELE 01 591 FT t- WATER SURFACE _n 2. ti T BOTTOM ELEVATION TAIUNG POND J2 NME EACH TATUNG POND SHALL HAVE A MINIMUM FREEBOARD OF 1.0 FEET AND SHALL HAVE DIMENSIONS AT THE SURFACE OF 500 FEET LONG BY 100 FEET WIDE. THE SLOPES OF THE OUTER SIDES OF THE TAIUNG PONDS WILL VARY DEPENDING ON THE SURROUNDING SURFACE. TAILING POND DETAIL MS BAFFLES WITH METAL T-POST, WOVEN WIRE FABRIC BACKING AND COIR FIBER NETTING - SEE BAFFLE DETAIL (THIS SHEET) BOTTOM ANCHORED WITH STAPLES SKIMMER WITH RETRIEVAL ROPE TOP OF DAM 5'-0*, STONE APRON WITH FILTER FABRIC PERSPECTIVE VIEW 1 ) TEMPORARY SKIMMER BASIN (1 OF 401j NTS J TOTES 1. SKIMMER IS TO BE A SURFACE DEWATERING DEVICE SUCH AS BMP SKIMMER OR APPROVED DEVICE. 2. SKIMMER SHOULD RISE TO LEVEL OF WEIR HEIGHT IN TEMPORARY BASIN OR TO RISER INLET. 3. ROPE ATTACHED TO SKIMMER TO HELP KEEP CLEAN. 4. SIZING OF ORIFICE TO ALLOW FOR DEWATERING TIME OF 24-72 HOURS. SCHEDULE RIGID FLEXIBLE JOINT OUTLET END: CONNECTION TO OUTLET PIPE OR RISER — E �O )PE I L NOT INCLUDED WITH SKIMMER SUPPLIED BY USER. I © 2019 LaBelia Associates ALAMANCE AGGREGATES, LU SKIMMER DETAIL Mr. Chad Threatt, VP NTS N=. 1. DRIVE STEEL FENCE POST AT LEAST 18 INCHES INTO SOLID GROUND. 2. WOOD POST ARE NOT ACCEPTABLE, 3. DIRECT WATER TO TOP OF BASIN USING STABILIZED DITCH, SLOPE DRAIN PIPE OR OTHER APPROVED METHOD. BAFFLE DETAIL CORR FIBER MATTING. SECURE WITH NYLON ZIP TES. 36" ZIP TIES - FLOW DIRECTION STAPLES WOVEN WIRE FABRIC. SECURE WITH NYLON ZIP T-POST I I _ NO: DATE: DESCRIPTION: REVISIONS PROJECT NUMBER: 2190335 DRAWN BY: KCG/ATC REVIEWED BY: PAS ISSUED FOR: CONSTRUCTION DATE: 7/18/19 DRAWING NAME: