Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C301 Overall EC (2)
r•,r,;"� •--".,-^-'-��,"�,. a- __'.*._�'.'^� .,`` „ `^l, � '�j `P , `.... `"~ , ,,...v.. ....-.� % f._P.. ,.-r�� _ _,_.. Y P � f J �.+, \V \ l,ww ,"^'""A "" �.._. \,� __ ,-� \�'�. �`",^a, ��\ 9n ��� ,.,.,�_� .^"'" /' r-'""".-f^" � r ,,/r„/ e \ \ ` ` G t \ t t t\ � °••.. Stny0 `"`..'°"\°\ \ 1 ; �� "'`^- 'n .,.,,,r • ✓ ,"•^. lr. -' '__.-_. . ' d f /r,.."-- ~-,,., ` ` 4 ` {t \ -'".' f=.---'" ..�---_ .. �'-=-.� "'.,``.'` \ '�•"�'.�.---� -\,\\ � \;� ,,,�� �--n _ __. _`'• ..,-'°.` �,--. �"' �.-`" - .__---' e ''r'�j'. � 11 � I f' 4 ..___ LEGEND EXISTING PROPERTY LINE - - PROPOSED PROPERTY LINE EXISTING BUILDING - - L_J PROPOSED BUILDING MINE PERIMETER PROPOSED SECURITY FENCE -x-x-x-x- TEMPORARY DIVERSION DITCH TD > TEMPORARY SILT FENCE PROPOSED ENERGY DISSIPATOR �1 TEMPORARY CHECK DAM v MINE HAUL ROAD DISTURBED AREA r STONE OUTLET TEMP. SLOPE DRAIN STONE INLET PROTECTION r S.D.O. STORM DRAINAGE OUTLET ,.- SKIMMER BASIN �� l \ -- l 1 6 t PERIMETER SECURITY J FENCE TO CLEAR SPAN _JURISDICTIONAL AREA �� !r.•'/'����� / 1 j � _�, , "� �-� STONE OUTLET (TYP.) SEE DETAIL 7/C502 SKIMMER BASINI / #16/S.D.O. #16 �I LIMITS OF DISTURBI r �/1 ll ( z l � f TEMP. SEDIMENT f �� (� f / FENCE TYP. SEE DETAIL 2/C501 r70 r - / SKIMMER BASIN /O �\� #22/S.D.O. #22 Xx- -% SKIMMER BASIN #10/S.D.O. \` \ 65.00 LF Z' (STORM DRAINAGE OUTLET) #10 \ OF 15" RCP_ - < SKIMMER BASIN _ 0 j %%r' �•�p-...-. LIMITS OF jj f /i' #8/S.D.O #8 QR �s 2. DISTURBANCE (� O r - --- - NO GRADING / CLEARING,OR OTHER / / - !��-o X1 [ I ' CONSTRUCTION ACTIVITIES TO OCCUR "+ �!' WITHIN THE 50' UNDISTURBED STREAM BASIN '" BUFFER UNLESS PRIOR WRITTEN # / D O #3 G APPROVAL IS GIVEN. SKIMMER BASIN #1 6s -� R l /S.D.O #1_� r / CONTRACTOR TO PROVIDE CURLEX I \\ 1 EXCELSIOR MATTING ACROSS THE \ ( ENTIRE LENGTH &WIDTH OF ALL \ SKIMMER BASIN SLOPES 3H:1V AND STEEPER #12/S.D.0 #12 ° " -. ---"STONE OUTLET (TYP.) `t ` SKIMMER BASIN'\ ® / #29/S.D.O. #29 \ SEE DETAIL 7 C502 PERIMETER SECURITY 0•, ) LIMITS OF ��I ✓ \ � \-� FENCE TO CLEAR SPAN DISTURBANCE'" Y 1\ JURISDICTIONAL AREA / - _ LIMITS OF DISTURBANCE tj /5/00*x1 OO' SKIMMER BASIN Q 3y PIgNr 1 e xt TEMP. SEDIMENT `P SKIMMER BASIN `FENCE (TYP.) #28/S.D.O #28 ( I#11/S.D.O. #17 SEE DETAIL 2/C501 _ Stt i ow----- _ TAILINGS POND fzm SKIM ER BASIN \ { 50' UNDISTURBED } \ \ Z, #9/S.D.O #9 1 __.._ \` / LIMITS OF DISTURB \ ANCE LIMITS OF DISTURBANCE •- O r- .: i \ y SKIMMER BASIN BUFFER #13/S'.D.O #13, �,r �ti� i ./ 1 _ f�j` I SKIMMER BASIIN/// ( S0,� LIMITS OF / DISTURBANCE f „ l SKIMMER BASIN, ,- #15/S.D.O #15) },S GN ( � 23 S. TEMP. SEDIMENT �\p /Ii jINC / , J / FENCE (TYP.)�OFO \ o� l SEE DETAIL G A SKIMMER BASIN / #6/S D 0 TEMPORARY DIVERSION TOTAL DISTURBED AREA = 86.32 ACRES EROSION CONTROL SEQUENCE NOTES 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT. 2. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION ----- EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS, THE PHASES ARE AS FOLLOWS: 1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS, 4. INSTALLATION OF STORM DRAINAGE FACILITIES. 5. COMPLETION OF CONSTRUCTION OF DEVELOPMENT. 6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION, 3. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT AT CLARK ROAD. B. THIS SITE HAS TE MPORARY EFdPORARY SKIMMER BASINS AND SEDIMENT BASINS AS SHOWN, C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENCING AND STONE OUTLETS E. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "CLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA BELOW FOR MORE INFORMATION, 4. BEGIN CLEARING GRUBBING, RUBB NG, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL. AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 5. BEGIN SITE GRADING, MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 6. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING MUST BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. DESCRIPTION STABILIZATION STABILIZATION TIMEFRAME TIMEFRAME EXCEPTIONS PERMANENT DIKES, SWALES, DITCHES, & 7 DAYS NONE SLOPES LOPES STEEPER THAN 7DAYS IFSLOPESARE 10 OR LESS IN LENGTH S ARE NOT STEEPER THAN 2:1, 14 DAYS ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES 1 50' - FLATTER IN LENGTH ALL OTHER AREAS WITH SLOPES 14 DAYS NONE FLATTER THAN 41 STONE OUTLET (TYP.) �C" SKIMMER ' . __ // r , -- ' �- o R DITCH TYP SEE DETAIL 7/C502 / BASIN #6 SEE DETAIL 3 (502 / r y ti 50' UNDISTURBED' 4. 1"V P M #5/S.D.O. -�a. / BUFFER .... •'� // LIMITS OF r #5 `67C�--�...� f�/ I -'` 2 / / f / �'`� ��"'" t / �r''" -- SKIMMER BASIN / ~� 7. PRIOR TO THE CONTRACTOR DEMOBILIZING FROM THE SITE AT APPROXIMATELY 45 DAYS PRIOR TO DISTURBANCE SKIMMER BASIN / ,! f / / __ r 21 S D.O. 21. \ / 40' SKIMMER BASIN #7/ # / # J r f -`' / --�., # / 'II �� "�-.� DEMOBILIZATION), THE FINANCIAL RESPONSIBLE PARTY (OR THEIR DESIGNEE) WILL NOTIFY THE ENGINEER AND THE / !" 27 S.D.O 27 j / r / / r 70.00 LF _,. j S.D.O _ / / t f�1/ r/ / / / { / % ` } / / ,r'r / / % / / /f / � y -`y � � ' -,, i DESIGNATED EROSION CONTROL INSPECTOR OF THEIR ANTICIPATED DATE TO LEAVE THE SITE, ANON -SITE SKIMMER BASIN. OF 15" RCP' % ,./"? /,,��/ / r' .�/ / /_ / t j{{ { / / INSPECTION WILL BE CONDUCTED PRIOR TO THE LEAVE DATE BY THE ENGINEER AND/OR THE DESIGNATED EROSION # / # �` / \ / /s-_� r ' // �.,.--^^' �~ f f CONTROL INSPECTOR TO MAKE CERTAIN ALL ACTIONS ITEMS HAVE BEEN ADDRESSED BY THE CONTRACTOR. 14 S.D.O 14 ` f ---" STREAM CROSSING t "" "'`" -''r` `f � r f KEYSTONE j SKIMMER BASIN r -, --`50' UNDISTURBED LIMITS OF'-'` / WALL l STRUCTURAL PLATE ARCH #24/S.D.O. #24 "'- ' �, BUFFER r' / J /'' �I �� j f B. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER I1A5 BEEN ESTABLISHED " DISTURBANCE % / '^+Y 1 0 I { METAL 24' SPAN x 10'-4" °^....-• /f Y"- / OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTR01. MEASURES ONLY SKIMMER RISE BRIDGE CULVERT BY AFTER FINAL INSPECTION AND APPROVAL BY ENGINEER. 5 BASIN CONTECH CONSTRUCTION / _ �� �" SKIMMER BASIN%y�/ / % j r ,-_ --. \� # / # \ `PRODUCTS ,r ca' "\` ♦ #20/S. D.O. #20, / f� !� \,�»._ / r % / / • EROSION CONTROL.MAINTENANCE PLAN (CONTRACTOR MUST INCLUDE MAINTENANCE IN BASE BID) 64.00 LF 4 S.D.O 4 \ \ / ,5�•'`�'r -"' OF 15" RCP ,„... \ / . ` \ \,, f,, 1 '•�.. `,, / Yam.-' / ,f'J f f 1. INSPECT ALL SEDIMENTATION AND EROSION CONTROL DEVICES FOR STABILITYAND FUNCTION EACH WEEK 9 --- ^- ,r' "~"�. -•.,- \ LIMITS OF \ t , , l f MINING LIMITS �` / r /t AND FOLLOWING EACH RAINFALL / f' j EVENT. - - / DISTURBANCE X i % y / ' Y .�-" ""'� ,�/�/ /`r ''/,,r �" ` } ' y'''""" \'�° ' ,.--'" f ` \�\ �'�' `�� / """•" ''� .-' �.� / r / 2. REMOVE SILT/SEDIMENT FROM TEMPORARY DEVICES WHEN ACCUMULATED VOLUME HAS REACHED 50% e i,,,✓ r' /f - I / - -_ \ `1 �. SKIMMER BASIN �,. �%r,% F,,..' r,." CAPACITY. LIMITS OF / TEMP. CHECK DAM #26/S.D.O #26 r/ ( // l -DISTURBANCE / l / f / _._-.,_ - / (TYP-) "' \ \II -"' 139.73 LF ` / / ..r- 3. REMOVED ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH SEE DETAIL 4/C501 "'-- \ !I f t \\\ q ,r �k0 - 13 18" RCP ''l-,,., _ `,, / .. R,„✓� EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY. / 48.03 LF O \ \ LIMITS OF / - ( ( % 10 I ` / l ` \ DISTURBANCE \ ._.. -- �/' TEMP. SEDIMENT ",,.M ",�• l '"" Q 4. SEED AND STABILIZE TEMPORARY DIVERSION BERMS IMMEDIATELY AFTER CONSTRUCTION INCLUDING OF 15' RCP \ LIMITS OF -FENCE (TYP.) \\\ / I \� \ ` /" j '`�,� r'.�j,,. ``•� ` \\ ` \\ r'"� -\ / I I ` O,� " DISTURBANCE "CLEAN" WATER DIVERSION BERMS. RE-GRADE/REPAIR BERMS AS REQUIRED. SEE DETAIL 2/C501 ( \� (\ ` `63 \ " \ f""``•� 5. CONTRACTOR SHALL APPOINT AN ON -SITE INSPECTOR AND MAINTAIN RECORDS OF INSPECTIONS IN 126.90 LF ACCORDANCE WITH THE PROVISION OFTHE GENERAL NPDES STORMWATER DISCHARGE PERMIT FOR _ p r C O CONSTRUCTION ACTIVITIES. SKIMMER BASIN \ \ \\ \ #18/S.D.O #18 \ OF 15" RCP �/ \ " FES 2 1 \ \ , P° \ 1 \ \ 70.00 LF OF I / TEMP. SEDIMENT �' 15" RCP FENCE (TYP.) \ „J A10 � % DETAILED' CONSTRUCTION SEQUENCE LIMITS OF f� ( j / /� \ 1 r SEE DETAIL 2 C501 ( O g, DISTURBANCE �! / PROP. SEPTIC / f' /j f, _ a �. a % / ` F \ /\� ...� 2t •..,, -°.., i. CONSTRUCT THE TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE/EXIT OFF CLARK ROAD. 'h "" "^°" �. % � '"`'SKIMMER BASIN / ` ] tY ,� 80' OF/ / \ 1 / \ FIELD ! 00 / { _ \ \ a a, - \S`3 �..#19/S.D.O. #19 �. - % / + R. ��\ yF) 24" RCP�_ 6`P \ 1 2. INSTALL SILT FENCE AND STONE OUTLETS FROM CLARK ROAD TO THE SOUTH SIDE OF THE STREAM TEMPORARY TEMP. SEDIMENT �` ~'' ( { \ \ `�.. ---.,.., h /// `44V `"., ` LOCATED AT 16+87, SILT FENCE TO BE LOCATED ON BOTH SIDES OF THE ROAD AND SOUTH BANKS OF FES 1 ' CONSTRUCTION j / ( ) - .. \ \ s /' i l Jrj (HE STREAM I FENCE TYP. \ \ (�" \ m ENTRANCE/EXIT _ SEE DETAIL 2/C501 , SO, \\\ / 2 �•,% SKIMMER BASIN co \ -` ,.w SKIMMER I \ UNa/ ~`)`^-.,, ` ----" ----- --„_.. _- •' ,p��•.,,, �2p� + 3. INSTALL SKIMMER BASIN 6 AND SKIMMER BASIN 7 AND THEIR ASSOCIATED TEMPORARY DIVERSION # / ( ` \ \ / #25/MINE R�MS�R@ / ! i _. ✓O _ l! ). I ,✓ // � r 17 S D.0 STORM ` `-- / f DITCHES AND SLOPE DRAIN IF CALLED FOR \ �,� j DEWATERING / BU fp - DRAINAGE OUTLET) / / FFF \ TEMP. SEDIMENT _ 0 \ G ° STONE PIPE INLET 1 % S.D.O #25 ti R \ _e..,, �� _, f r J 0 PROTECTION #17 \ ""� FENCE (TYP.) ---' '•-,, x --"`"'/✓fir % --� ti .�� 4. INSTALL IMPERVIOUS CLEAN WATER DIKE AND BYPASS PUMPING SYSTEM AS SHOWN ON SHEET C402 fr1 Z^ t ` •�.,, \ "'-., - �'^ „� /_ F,.,...�^'"`" T'`-.,�,' �„-,6. SEE DETAIL 2/C501 �_ ---"f rI j�r�'y�Q \, '\� INSTALL THE PERMANENT 54" PIPE AND ENDWALLS Al STATION 16+87. C O ` ~` �- ~~ `.r ~� ~~� \ 3D^,,, 1 ` \\ �^ \\ `•./ ( I I �,ty�, G 5. APPLY 10"STONE BASE LAYER TO ENTRANCE ROAD AND COMPACT, �� � _ DISTUR ANCE �\ r� �. /l T��� ti` j \ q�P ,„� C` t4 ` Z / ` \ , \ -,.` •--'-'^"� ~"""" \ f "'" _ --_.mm - !-, '"� ` /// / r/ 4 ,E"j �� d �S� �" 6. BACKFILL, PREPARE SLOPES AND OTHER DISTURBED AREAS AND STABILIZE. rD ( \•'-O_- O ,.�' `'\ '�.m.......__.---y C n r1 -1 ` \, �p `�- •� \ 1 } %!~ '' _,�.-.- .,� ,,�'"F .,�'"1 „r °kZ^ 7. INSTALL SILT FENCE AND STONE OUTLETS ALONG NORTH SIDE OF THE STREAM. �\ _�� } A �\ \ �., �\ ^ham, V joo, �r f,,^• �.Y. A z ✓ 8 INSTALLSILT FENCE AND SI ONE OUTLETS AROUND THE EXISTING STREAM BUFFERAND PROPERTY } O ` O \l ry. �, alM1 \ �. \ t ` \ \ _-- CR --------SrR� �r,"% rr' t co - .,� BOUNDARY (WHERE DENOTED ON PLANS). INSTALL SKIMMER BASINS 4, 5, 13, 1 i, 3, 2, t, 72, B, AND \ \ \ \ ��, �'''"��� 10 AND THEIR ASSOCIATED TEMPORARY DIVERSION DITCHES AND SLOPE DRAINS (IF CALLED FOR). 1 ,f� D ) ,q� j f ,,� „� ".� " \ \) \ ' \ �jG� 9. PLACE ALL SILT FENCE AND STONE OUTLETS DOWN SLOPE OF ALL PROPOSED BERMS. FIT FIT r 0 // / ( // 1f( t \ / 1 / OZ �""„ \\\``\N �� "'"�`.,„�~\�.� \ l l ("- "�„ti A -.�„ `" -�, � ( \ �, , 1 1 \ �s "XR� 7\jy _,� ,,. ^,, f y�y ip M BEGIN GRADING THE INITIAL MINE AREA, MOVE AND PLACE MATERIAI. FOR BERMS. PLACE AND STOCKPILE AREA. ` \ �^ l C ��� Tom' ,l \ .,� -�..s.\ .,�� \\\ ` `O " R -„g -"•t `•.. m� "-''" f , `\ J\ / Te �"�� �\ -- ,,, -A Q'�. q ? STABILIZED WITHIN 1 YEAR OFCOMPACT MATERIAL FOR FSTARTING MINING ACTIVITIES. L BERMS SHALL BE CONSTRUCTED AND 11. CONSTRUCT IAILINGS PONDS BEFORE MINING OPERATION BEINGS. STORMWATER SEWER CALCULATIONS AND DESIGN TABLE INLET Q BASED ON 4"/HOUR 12. SEED AND MULCH ALL AREAS THAT ARE NOT COVERED WITH ASPHALT OR STONE. STORM RETURN PERIOD: 10 Yr for TOC=5 Minutes TYPE GRATE RIM FROM TO INLET AREA (Ac.) INLET Q CFS TOTAL AREA (Ac.) I (in/hr) C Q CFS GRATE/ RIM/ THROAT FROM IN (ft) TO INV. (ft) APPROX. LENGTH (ft) SLOPE '%. N D(THEO.) (inches) PIPE SIZE (incises) PIPE MATERIAL N/A FES 1 FES 2 7.91 9.49 7.910 7.04 0.30 16.71 N/A 612.59 611.79 80.00 1.00 0.013 21.40 24 IILP 840.1.6 DI D12 0.45 0.90 0.450 7.04 0.50 1.58 632.50 630.25 626.95 126.90 2.60 0.013 7.39 15 RCP 840.16 D12 FES 13 0.19 0.61 0.64 7.04 0.80 3.60 629.20 626.95 624.48 48.03 5.14 0.013 8.86 15 12CP N/A FES 3 FES 4 1 4.24 1 5.09 1 4.240 7.04 0.30 1 8.95 1 N/A I 600.24 597.31 I Ad no 4.58 0.013 12.73 15 RCT N/A FES 5 FFS 6 2.51 3.01 1 2.510 7.04 0.30 1 5.30 1 N/A 630.50 628.00 70.00 3.57 0.013 I0.96 14 RCP N/A FES 7 FES S 5.52 6.62 5.520 7.04 0.30 11.6G N/A 617.7.5 616.00 139.73 1.25 0.013 17.93 18 RCP N/A FES 9 FES 10 0.31 0.37 0.308 7.04 0.30 0.65 N/A 6t1.00 G07.00 65.00 6.15 0.013 4.51 _ e 15 RCP N/A FES It E•GS 12 3.24 3.89 1 3.240 7.04 0.30 6.84 N/A 609.G0 606.92 64.00 4.19 0.013 11.71 15 RCP O �1 REINFORCED CONCRETE PIPE (RCP)TOBECLASS 1If,P1PEJOfNTSPERASTMC443;TYPE2PIPE INSTALLATION ASTMC1479 too zoo 300 0 / /- fin✓ Y DROP INLETS I & 2 TO BENCDOT STANDARD 840.14 WM1840.16 FRAME& GRATES P' o0 1 FLARED END SECTION (FES) �;�, \�- 13. STABILIZE ALL CHANNELS AND SLOPES WITH MATTING AS NOTED ON THE PLANS, SEEDING NOTE SEED MIXTURE, SEEDING RATE, AND SOIL AMENDMENTS TO BE APPROVED BY AN ENVIRONMENTAL PROFESSIONAL AND SUBMITTED TO OWNER AND ENGINEER PRIOR TO APPLICATION. SEED MIXTURE TO BE A MIXTURE OF RED CLOVER, CREEPING RED FESCUE, AND A GRAIN, SUCH AS, OAT, WHEAT, OR RYE. B( rw Ld Powered by p 615 St. George Square Suite 300 Winston-Sa lem, NC 2710 336-842-4065 C#0430 labellapc.com Rd nershi . p i i- T -I OFESS/C Atop ts t l J- © 2019 LaBelle Associates ALAMANCE AGGREGATES, LL a1 Threatt, P DATE: DESCRIPTION: REVISKIONS PROJECT NUMBER: 2190335 DRAWN BY: KCG/ATC REVIEWED BY: PAS ISSUED FOR: CONSTRUCTION DATE: 7/22/19 DRAWING NAME: DRAWING OVERALL CONTROLSEDIMENTATION & i + � v k