Loading...
HomeMy WebLinkAbout20210924_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RQ DWR SPU. Send a copy to the pennittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM THIS SECTION TO BE FILLED OUT DEMLR PERMIT: 51-05 Proiect Action New I Modification Transfer Release Applicant Name: Hanson Aggregates Southeast I F1X Applicant's Email: Jack.Garvey@lehighhanson.com County: Project Name: Princeton II Cluarry YES NO Date Commencing Have land disturbing activities started?? X Latitude: 135.4748 Longitude: -78.1399 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 09/21/2021 SECTION• TO BE FILLED• YES NO Is this mine an active permit in RIMS? Qa Q Is the RO concerned that the operation, as proposed, would v standards of water quality? Comments: OfEnvironmental Qualit, Does this mine (or previous owner) have DWR back fees to pay? Aus a L 1 Li (if Yes, amount): Watershed/Stream Name & Classification: MCI DWR Compliance Status of Mine: 8 401 Wetland Cert. required? 401 Wetland Cert. existing? (if Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? Is a Pumping Operation & Monitoring (OM) Plan needed? Are wetlands disturbed at this site? Does DWR RO suspect or know of nearby wetlands to the site? Is a wetland delineation required prior to DWR issuing the permit? SDa9k AMandl Oyd JD F- V6, Consultant d Onsite Offsite Stream Determination Needed? ' r CY_ Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ ❑ Buffer Determination Needed? �, y Buffer Determination Completed? Recycle system per existing? (if Yes, Permit #): New Recycle System permit required? Enough information to determine? Rev. April 2021 Retum PDF of this form to DEMLR CO by email. cc DEMLR RO. DWR SPU Send a copy to the permittee .,ion -discharge permit existing? (if Yes, Permit #J: Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ ❑ Has Violation O&M Requirements HQW17QIO Concerns Pay back fees or renew DWR permit Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed Central Office Date Regional Office Date DWR RO Surface Water RO Aquifer Protection Section t J-1e, u2y .Z ✓ l hf t✓ SU1Q1-n1l�YC� ireC1� r'n No ernl-�tcy- o1o,?Oayj d, d no4 � -lc10 b aN a,eas cn- ►'ancd /s mod �Ca4'o� /1 hs t�S dlYea w) (vr\ ) In ot-i� i c1vN l/1S�C�. flan I�)d Cai Gt��lei�d ? pts ate- f i` � 1� �'ro � S ,,,3 b,#v �s h 04 re m i A' n OAV IkV dekrMJ"-)a�i4hS. Rev. April 2021