HomeMy WebLinkAbout20210924_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RQ DWR SPU. Send a copy to the pennittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
THIS SECTION TO BE FILLED OUT
DEMLR PERMIT: 51-05 Proiect Action New I Modification Transfer Release
Applicant Name:
Hanson Aggregates Southeast I
F1X
Applicant's Email:
Jack.Garvey@lehighhanson.com
County:
Project Name:
Princeton II Cluarry
YES
NO Date Commencing
Have land disturbing activities started??
X
Latitude:
135.4748
Longitude:
-78.1399
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 09/21/2021
SECTION• TO BE FILLED•
YES NO
Is this mine an active permit in RIMS? Qa Q
Is the RO concerned that the operation, as proposed, would v standards of water quality?
Comments: OfEnvironmental Qualit,
Does this mine (or previous owner) have DWR back fees to pay? Aus a L
1
Li
(if Yes, amount):
Watershed/Stream Name & Classification:
MCI
DWR Compliance Status of Mine:
8
401 Wetland Cert. required?
401 Wetland Cert. existing?
(if Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
Is a Pumping Operation & Monitoring (OM) Plan needed?
Are wetlands disturbed at this site?
Does DWR RO suspect or know of nearby wetlands to the site?
Is a wetland delineation required prior to DWR issuing the permit?
SDa9k AMandl Oyd JD
F-
V6, Consultant
d Onsite
Offsite
Stream Determination Needed? ' r CY_
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
❑
Buffer Determination Needed? �, y
Buffer Determination Completed?
Recycle system per existing?
(if Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Rev. April 2021
Retum PDF of this form to DEMLR CO by email. cc DEMLR RO. DWR SPU Send a copy to the permittee
.,ion -discharge permit existing?
(if Yes, Permit #J:
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
❑
Has Violation
O&M Requirements
HQW17QIO Concerns
Pay back fees or renew DWR permit
Other
Please describe the
reason to hold the
permit:
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed
Central Office
Date Regional Office
Date
DWR RO Surface Water
RO Aquifer Protection Section
t J-1e,
u2y .Z
✓ l hf t✓ SU1Q1-n1l�YC� ireC1� r'n No ernl-�tcy- o1o,?Oayj
d, d no4 � -lc10 b aN a,eas cn- ►'ancd /s mod �Ca4'o� /1 hs
t�S
dlYea w) (vr\ ) In ot-i� i c1vN
l/1S�C�. flan I�)d Cai Gt��lei�d ?
pts ate- f i` � 1� �'ro � S
,,,3 b,#v �s h 04 re m i A' n OAV
IkV dekrMJ"-)a�i4hS.
Rev. April 2021