HomeMy WebLinkAbout20211217_Driveway_DOTtRo y MoLLY\ IT- Quarry
Arj>rov-PA Dc, vewo-\f Arek I'CA�Vl
r
�b6lowi`t�c-K1.e. 05 /`oZ1 /oi.l7I C7 '�''.�t:.4L/,s
PWrbm%1 STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
August 02, 2018
Withers Ravenel
Ryan Fisher, PE
137 South Wilmington St, Suite 200
Raleigh, NC 27601
Driveway Entrance Onto SR 1250
Driveway Permit Number: D-410331809
Edgecombe County
Hanson Aggregates - Quarry Driveway Crossing
Dear Ryan Fisher, PE:
JAMES H. TROGDON, III
SECRETARY
Attached for your file is a copy of the driveway application which has been properly executed. This
driveway permit is approved subject to the provisions stated in the permit application agreement and the
attached provisions.
PLEASE BE SURE THAT THE CONTRACTOR HAS A COPY OF THIS PERMIT AND
APPROVAL LETTER NCDOT SHALL BE NOTIFIED BEFORE CONSTRUCTION BEGINS
Sincerely,
Kristin W. Barnes, PE
District Engineer
KWB/jsm
cc: Mr. Wayne Wooten, Edgecombe County Maintenance Engineer
Mrs. Kristin W. Barnes, PE, District Engineer
Jack Garvey, 2101 Gateway Centre Blvd. Suite 100, Morrisville, NC 27560
Work Order # : 4.203311
Dd 10331809
MalNngAddress: Telephone: (252) $83-4230 Location:
NC DEPARTMENT OF TRANSPORTATION Fm: (252) 583-1609 14194 HIGHWAY 903
HALIFAX DISTRICT ENGINEER'S OFFICE Ctorooeer Semce: 1-877-368-4968 HALIFAX. NC 27839
14194 HIGHWAY 903
HALIFAX-NC 27839 Webstle: w ,nedot.eov
Page I of4
STANDARD PROVISIONS
1 An executed copy of this driveway permit will be present at the construction site at all times during
construction. NCDOT reserves the right to stop all work unless evidence of approval can be shown.
2 All flagging operations within NCDOT Right of Way require qualified and trained Work Zone Flaggers.
Qualified and trained Work Zone Traffic Control Supervisors are required on significant projects. Training for
this certification is provided by NCDOT approved training sources and by private entities that have been pre -
approved to train themselves. If you have questions, contact our website at
https://connect.ncdot.gov/projects/WZTC/Pages/Training.aspx.
3 NCDOT reserves the right to periodically inspect the work being performed by the contractor to assure
compliance with the PERMIT and the approved plan. The District Engineer or authorized representative can
perform these inspections at the NCDOT's discretion.
4 All materials and construction shall be in accordance with NCDOT standards and specifications, including but
not limited to, the NCDOT Standard Specifications of Roads and Structures, the NCDOT Roadway Standard
Drawings, and NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way.
5 The party of the second part agrees to provide traffic control devices, lane closures, road closures, flaggers,
positive protection and/or any other warning or positive protection devices necessary for the safety of
motorists, pedestrians, and workers during construction and any subsequent maintenance while maintaining
two-way roadway and pedestrian traffic. This shall be performed in conformance with the latest NCDOT
Standard Specifications of Roads and Structures, NCDOT Roadway Standard Drawings, and NCDOT Policies
and Procedures for Accommodating Utilities on Highway Rights of Way. When there is no guidance provided
in the Roadway Standard Drawings or Specifications, comply with the MUTCD (Manual on Uniform Traffic
Control Devices) and Amendment or Supplement thereto. Information to the above rules and regulations may
be obtained from the Division Engineer of party of the first part. No work shall be performed in the Right of
Way unless this requirement is satisfied. NCDOT reserves the right to require a written traffic control plan for
encroachment operations.
6 Two-way traffic shall be maintained at all times.
7 No lane of traffic shall be closed or restricted before 9:00 a.m. or after 4:00 p.m., or as directed by the
Engineer.
8 NCDOT reserves the right to further limit, restrict, or suspend operations within the Right of Way if, in the
opinion of NCDOT, safety or traffic conditions warrant such action.
9 NCDOT does not guarantee the Right of Way on this road, nor will it be responsible for any claim for damages
brought by any property owner by reason of the installation. All Right of Way and easements necessary for
construction and maintenance shal I be dedicated to NCDOT with proof of dedication furnished to the District
Engineer prior to beginning work.
10 It shall be the responsibility of the Permittee to determine the location of utilities in the encroachment area.
The Permittee shall be responsible for notifying utility owners, providing protection and safeguards to prevent
damage or interruption to existing facilities, and for maintaining accessibility to existing utilities.
I I The Traffic Services Supervisor shall be notified in Wilson, NC at (252) 640-6400 prior to beginning work on
the Right of Way if there are existing NCDOT signs, traffic signals, or signal equipment in or near the
proposed work zone. Costs to relocate, replace, or repair NCDOT signs, signals, or associated equipment shall
be the responsibility of the Permittee.
D410331809
Page i of 4
Mailing Address: Telephone: (252) 583-4230 Location:
NC DEPARTMENT OF TRANSPORTATION Fax. (252) 583-1608 14194 HIGHWAY 903
HALIFAX DISTRICT ENGINEER'S OFFICE Customer Service: 1-877-369 4968 HALIFAX NC 27839
14194 HIGHWAY 903
HALIFAX NC 27839 ltiebsite: www.ncdot.gov
12 All erosion control devices and measures shall be constructed, installed, maintained, and removed by the
Permittee in accordance with all applicable Federal, State, and Local laws, regulations, ordinances, and
policies. All earth areas shall be regraded and seeded in accordance with NCDOT Standard Specifications for
Roads and Structures.
13 When surface area in excess of one acre will be disturbed, the Permittee shall submit a Sediment and Erosion
Control Plan which has been approved by the appropriate regulatory agency or authority prior to beginning any
work on the Right of Way. Failure to provide this information shall be grounds for suspension of operations.
14 Notify the Halifax County Maintenance Engineer's Office at (252) 5834240 or Edgecombe County
Maintenance Engineer's Office at (252) 774-6010 prior to beginning work.
15 The District Engineer shall be notified in writing at 14194 Hwy 903, Halifax, NC 27839 upon completion of
work associated with this agreement.
16 Island sections may be al lowed at the entrance, but are subject to review by the District Engineer on an
individual basis. Detailed construction drawings must be submitted to the District Engineer's Office for
approval if an island is proposed.
17 This permit is only for the driveways noted on the driveway permit and any stormwater improvements noted
on the plans (i.e. stormwater pipe installation, curb -and -gutter, catch basins, etc.). Any utility connections or
installation within NCDOT right-of-way must be performed under an approved right-of-way encroachment
agreement.
18 Positive drainage is to be established at all driveway installations, curb and gutter projects and roadway
improvements such that neither NCDOT nor neighboring property owners are effected by standing or backed
up water. Permanent vegetation is to be established on all bare and disturbed areas.
19 The radius of the proposed driveway may not extend beyond the projected property line without a completed
radius encroachment agreement, available at the District Engineer's Office.
20 The encroaching party shall comply with all applicable federal, state, and local environmental regulations, and
shall obtain all necessary federal, state and local environmental permits, including but not limited to, those
related to sediment control, stormwater, wetland, streams endangered species, and historical sites.
21 NCDOT reserves the right to construct additional traffic improvements at the department's expense, based on
traffic conditions and if deemed necessary after the permitted access is installed, (including islands,
widening/lanes, pavement markings, driveway adjustments, signage, etc.) which may include restricting access.
22 Landscape and landscape plantings shall be approved by the Division Engineer under an NCDOT planting
permit. For further information, contact Mr. Tim Robbins, Division Landscape Engineer, at P. 0. Box 3165,
Wilson, NC 27893 (252) 237-6164.
D410331809
Page 3 of 4
Mailing Address: Telephone: (252) 5834230 Location:
NC DEPARTMENT OF TRANSPORTATION Far: (252) 583-1608 14194 HIGHWAY 903
HALIFAX DISTRICT ENGINEER'S OFFICE Customer Service: 1-877-3684968 HALIFAX, NC 27839
14194 HIGHWAY 903
HALIFAX, NC 27839
Website: www.ncdot.gov
SPECIAL PROVISIONS
I NCDOT shall not be responsible for the maintenance of commercial driveways.
2 The entrance apron must be paved with a suitable pavement or concrete structure from the existing edge of
pavement to the end of the radius or to the Right of Way line, whichever is greater. The pavement structure
may consist of 8" ABC and 2" superpave mix SUB, or 4" ABC and 6" Jointed Concrete or as shown on
plans. Please contact the NCDOT County Maintenance Office for inspection of ABC prior to placing concrete
or asphalt for the paved apron (Halifax County 252-5834240). Please provide at least 24 hours advance
notice for inspection.
3 Pipe shall be inspected for proper installation prior to backfilling. Please contact the NCDOT County
Maintenance Office (Halifax County (252) 5834240, Edgecombe County (252) 774-6010) for inspection.
Please provide at least 24 hours advance notice for inspection.
4 All driveway pipes must be installed when inspection is requested.
5 Driveway pipe(s) shall be Reinforced Concrete type with a minimum inner diameter of 18 inches.
6 The driveway pipe to be installed shall be installed parallel to the centerline and ditches graded and realigned
to ensure proper drainage.
7 The Division of Highways requires that all pipe begin a minimum of 10 feet from property or easement lines in
rural areas. The owner, developer, or contractor shall grade and/or realign the existing ditch to place the
proposed pipe a minimum of 22 feet from the existing centerline of the state road or the same distance as other
driveway entrance pipes to project site, whichever is greater. The owner, developer, or contractor shall also be
responsible for any head or tail ditching to ensure positive drainage to or from the pipe. Contact the NCDOT
County Maintenance Office to coordinate construction activities (Halifax County (252) 5834240, Edgecombe
County (252) 823-2982).
t Excavated areas adjacent to pavement having more than a 2" drop shall be safed up at a 6:1 or Flatter slope and
designated by appropriate delineation during periods of inactivity, including, but not limited to, night and
weekend hours. Excavated material shall not be placed on the roadway at any time.
A $50.00 check has been received for the inspection fee.
D410.331909
Page 4 or4
Mailing Address: re%phone: (252) 5934230 Lorohon:
NC DEPARTMENT OF TRANSPORTATION F=:(252) 583.1608 14194 HIGHWAY 903
HALIFAX DISTRICT ENGINEER'S OFFICE Outorner Senire. 1-877-3684968 HALIFAX NC 27839
14194 HIGHWAY 903
HALIFAX, NC 27839
frebsde. wu ncdot eov
Lermit No. D-#tVj3JS 09 W licafion 7-to -/ 8 f
Name: Hanson Aggregates — Dri
SR 1250 (Springfield Road)
STREETAND113 VEWAYACCESS
PERMIT APPLICATION
1
Exact Distance 2,857 ❑ Miles N S E W
®Feet ❑®❑❑
rom the Intersection of Route No. NC Highway 97 and Route No. SR 1250 Toward SR 1243
Property Will Be Used For: ❑ Residential (Subdivision ❑ Commercial ❑ Educational Facilities ❑ TND ❑ Emergency Services M Other
[Property: ❑ is ® is not within Rockv Mount N� 7.�!M m•.
• I, the undersigned property owner, request access and permission to construct driveway(s) or street(s) on public right-
of-way at the above location.
• I agree to construct and maintain driveway(s) or street entrance(s) in absolute conformance with the current "Policy on
Street and Driveway Access to North Carolina Highways" as adopted by the North Carolina Department of
Transportation.
• I agree that no signs or objects will be placed on or over the public right-of-way other than those approved by NCDOT.
• I agree that the driveways) or street(s) will be constructed as shown on the attached plans.
• I agree that that driveways) or street(s) as used in this agreement include any approach tapers, storage lanes or
speed change lanes as deemed necessary.
• I agree that if any future improvements to the roadway become necessary, the portion of driveway(s) or street(s)
located on public right-of-way will be considered the property of the North Carolina Department of Transportation, and
I will not be entitled to reimbursement or have any claim for present expenditures for driveway or street construction.
• I agree that this permit becomes void if construction of driveway(s) or street(s) is not completed within the time
specified by the "Policy on Street and Driveway Access to North Carolina Highways".
• I agree to pay a $50 construction inspection fee. Make checks payable to NCDOT. This fee will be reimbursed if
application is denied.
• I agree to construct and maintain the driveway(s) or street(s) in a safe manner so as not to interfere with or endanger
the public travel.
• I agree to provide during and following construction proper signs, signal lights, flaggers and other warning devices for
the protection of traffic in conformance with the current "Manual on Uniform Traffic Control Devices for Streets and
Highways" and Amendments or Supplements thereto. Information as to the above rules and regulations may be
obtained from the District Engineer.
• I agree to indemnify and save harmless the North Carolina Department of Transportation from all damages and claims
for damage that may arise by reason of this construction.
• I agree that the North Carolina Department of Transportation will assume no responsibility for any damages that may
be caused to such facilities, within the highway right-of-way limits, in carrying out its construction.
• I agree to provide a Performance and Indemnity Bond in the amount specified by the Division of Highways for any
construction proposed on the State Highway system.
• The granting of this permit is subject to the regulatory powers of the NC Department of Transportation as provided by
law and as set forth in the N.C. Policy on Driveways and shall not be construed as a contract access point.
• I agree that the entire cost of constructing and maintaining an approved private street or driveway access connection
and conditions of this permit will be bome by the property owner, the applicant, and their grantees, successors, and
assignees.
• I AGREE TO NOTIFY THE DISTRICT ENGINEER WHEN THE PROPOSED WORK BEGINS AND WHEN IT IS
COMPLETED.
2004-07 NOTE: Submit Four Copies of Application to Local District Engineer, N.C. Department of Transportation TEB 65-04mv.
PROPERTY OWNER(APPLICANT) WITNESS _
COMPANY HansonAggra ates Southey LLC NAME
SIGNATURE 5' k O� at
� �'%'�� � SIGNATURE L
ADDRESS 2101 Gat �nyexa tmCa vd Surte 100 ADDRESS clot
Morrisville, NC 27560 Phone No. 919.380.2746 M.rn .4.,l _ WG 57 Ti_n
COMPANY
SIGNATURE
ADDRESS
AUTHORIZED AGENT
Phone No.
APPLICATION RECEIVED BY DISTRICT ENGINEER
NAME
SIGNATURE
ADDRESS
APPLICATION APPROVED BY LOCAL GOVERNMENTAL AUTHORITY (when requlmd)
WITNESS
SIGNATURE TITLE DATE
APPLICATION APPROVED BY NCDOT
INSPECTION BY NCDOT
TITLE
WZ1ft
~
SR 1250
rc +
`6 Ej'Y�- Erf
v
O ry
v
b
vim..
' _VYYYY_YVV_Y"
�-- 50'
2"
PLAN VIEW
30' ORIVE
PROFILE VIEW
--{ 50' CROSSING
2" I 2„
50' MILLING IL
0'•1 I 0„
AREA TO BE MILLED AT A DEPTH OF 0"
® TO 2" - 50' EACH SIDE OF CROSSING.
2" OF SURFACE COURSE ASPHALT S9.5B
[D2" OF 59.SB OVERLAY @ SO' CROSSING
2" OF 59.58, 3.5 " OF 119.0c, 5.5"
OF 625.00 DRIVEWAY SHALL BE PAVED
FROM EDGE OF EXISTING PAVEMENT TO
THE RIGHT OF WAY ON EACH SIDE
CENTER OF PROPOSED
CROSSING P SR 1250
2"
RIGHT OF WAY
-- EDGE OF PAVEMENT
CENTERLINE OF SR 1250
EDGE OF PAVEMENT
RIGHT OF WAY
CENTER OF PROPOSED
CROSSING @ SR 1250
r- 2"
50' MILLING
NOTES:
DRIVEWAYS SHALL BE SO' WIDE ON SR 1250. MILL
SD' EACH SIDE OF 50' CROSSING AS SHOWN. BLUE
HATCHED AREA REQUIRES FULL DEPTH PAVEMENT
SCHEDULE AS INDICATED. RED AND YELLOW
CROSSHATCHED AREA REQUIRES VARIABLE MILLING AND
ASPHALT SURFACE TREATMENT ALSO AS INDICATED.
-o-- o o-- APPROXIMATE SILT FENCE LOCATION
NOTE: SUBGRADE TO BE CUT DOWN 9" FROM EXISTING EDGE OF PAVEMENT TO RIGHT OF WAY
LINE ON EACH SIDE OF SR 1250.
NANSDN AADREOATE8
SOUTHEAST, LLC
ROCKY MOUNT QUARRY
DRIVEWAY DETMLS
ROCIIT MOUNT, NC-EDGECDOECOUNTY
xxx
""Ha
tt77iO1
N'Ox^^ AgRRHatex
SOWhxxxt, LLC
NOf OYq. Ce,,,,. yy4
Ms.bwN. xc zreeo
e
�W`
SHEET}.O