HomeMy WebLinkAbout20210914_DWRFrom: Tankard, Robert
To: Parr, Adam; Dumoor, Samir; Edgerton, Thom
Cc: Pullinger. Robert C; Edwards, James
Subject: RE: 59-34 - Cherry Island Mine - NEW - Martin County
Date: Monday, September 13, 2021 7:35:22 AM
Attachments: 59-34 CHERRY ISLAND MINE.odf
image002.pnno
Adam, please find our comments. It appears the mine will be sited in agricultural fields and will not
impact wetlands or any streams.
Thanks!
Robert
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
943 Washington Square Mall
Washington, NC 27889
252-948-3921 office
252-975-3716 fax
Robert.tankard9—ncdenr.gov
Nothing Compares..
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Parr, Adam <adam.parr@ncdenr.gov>
Sent: Wednesday, September 1, 2021 3:53 PM
To: Dumpor, Samir <samir.dumpor@ncdenr.gov>; Tankard, Robert <robert.tankard@ncdenr.gov>;
Dunn, Maria T. <maria.dunn@ncwildlife.org>; Harrison, James A <James.Harrison@ncdenr.gov>;
Galamb, Eric <Eric.Galamb@ncagr.gov>; Farrell, Christine E<christine.farrell@ncparks.gov>; DCR -
Environmental _Review <Environmental. Review@ncdcr.gov>; Taylor, Kenneth
<kenneth.b.taylor@ncdenr.gov>; pete_benjamin @fws.gov; Bauer, Michael
<michael.bauer@ncdenr.gov>; Chianese, Gabrielle <gabrielle.chianese@ncdenr.gov>
Subject: 59-34 - Cherry Island Mine - NEW - Martin County
All,
Please see the attached files for the Chery Island Mine in Martin County. This is an application for a
NEW mining operation.
Please provide comments by September 27, 2021.
Thanks,
Adam Parr, PE
Assistant State Mining Engineer
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9207
Cell: (919) 441-7157
FAX: (919) 715-8801
Email: adam.parr(@ncdenr.gov
Physical Address: 512 N Salisbury Street
Mailing Address: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Mining Program Website:
https://deq.nc.gov/mining-program
\l if) I • I ! ,n9461.'"A Q /�
HTPWM 9WM 91 Brdra Iri 0Yi]Ip
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
59-34 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Indiantown Farm, LLC
Applicant's Email:
skipmev@gmail.com
County:
Martin
Project Name:
Cherry Island Min
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
35.8692
Longitude:
-77.0780
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 09/27/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
E71
I
✓
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
Ll./
(If Yes, amount):
Watershed/Stream Name & Classification:
UT TO CONOHO CREEK
DWR Compliance Status of Mine:
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
❑✓
Is a Pumping Operation & Monitoring (OM) Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
I
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
✓
Enough information to determine?
✓
Rev. April 2021
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
✓
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑✓
Has Violation
❑
1
EL
I
O&M Requirements
❑
1
❑
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
❑
Other
❑
I
❑
Please describe the
reason to hold the
permit:
RO contact: 7ROBERT
TANKARD
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed b
Central Office Date Regional Office
Date
DWR RO Surface Water
ROBERT TANKARD
09/13/2021
RO Aquifer Protection Section
Rev. April 2021