Loading...
HomeMy WebLinkAbout20210914_DWRFrom: Tankard, Robert To: Parr, Adam; Dumoor, Samir; Edgerton, Thom Cc: Pullinger. Robert C; Edwards, James Subject: RE: 59-34 - Cherry Island Mine - NEW - Martin County Date: Monday, September 13, 2021 7:35:22 AM Attachments: 59-34 CHERRY ISLAND MINE.odf image002.pnno Adam, please find our comments. It appears the mine will be sited in agricultural fields and will not impact wetlands or any streams. Thanks! Robert Robert Tankard Assistant Regional Supervisor Division of Water Resources Water Quality Regional Operations Section 943 Washington Square Mall Washington, NC 27889 252-948-3921 office 252-975-3716 fax Robert.tankard9—ncdenr.gov Nothing Compares.. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Parr, Adam <adam.parr@ncdenr.gov> Sent: Wednesday, September 1, 2021 3:53 PM To: Dumpor, Samir <samir.dumpor@ncdenr.gov>; Tankard, Robert <robert.tankard@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Harrison, James A <James.Harrison@ncdenr.gov>; Galamb, Eric <Eric.Galamb@ncagr.gov>; Farrell, Christine E<christine.farrell@ncparks.gov>; DCR - Environmental _Review <Environmental. Review@ncdcr.gov>; Taylor, Kenneth <kenneth.b.taylor@ncdenr.gov>; pete_benjamin @fws.gov; Bauer, Michael <michael.bauer@ncdenr.gov>; Chianese, Gabrielle <gabrielle.chianese@ncdenr.gov> Subject: 59-34 - Cherry Island Mine - NEW - Martin County All, Please see the attached files for the Chery Island Mine in Martin County. This is an application for a NEW mining operation. Please provide comments by September 27, 2021. Thanks, Adam Parr, PE Assistant State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9207 Cell: (919) 441-7157 FAX: (919) 715-8801 Email: adam.parr(@ncdenr.gov Physical Address: 512 N Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deq.nc.gov/mining-program \l if) I • I ! ,n9461.'"A Q /� HTPWM 9WM 91 Brdra Iri 0Yi]Ip Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 59-34 Project Acti!7t OUT BY DEIVILR Modification Transfer Release Applicant Name: Indiantown Farm, LLC Applicant's Email: skipmev@gmail.com County: Martin Project Name: Cherry Island Min YES NO Date Commencing Have land disturbing activities started?? X Latitude: 35.8692 Longitude: -77.0780 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 09/27/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? W Is the RO concerned that the operation, as proposed, would violate standards of water quality? E71 I ✓ Comments: Does this mine (or previous owner) have DWR back fees to pay? Ll./ (If Yes, amount): Watershed/Stream Name & Classification: UT TO CONOHO CREEK DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ ❑✓ Is a Pumping Operation & Monitoring (OM) Plan needed? ✓ Are wetlands disturbed at this site? I ❑ I ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? ✓ Enough information to determine? ✓ Rev. April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ Has Violation ❑ 1 EL I O&M Requirements ❑ 1 ❑ HQW/7Q10 Concerns Pay back fees or renew DWR permit ❑ Other ❑ I ❑ Please describe the reason to hold the permit: RO contact: 7ROBERT TANKARD Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed b Central Office Date Regional Office Date DWR RO Surface Water ROBERT TANKARD 09/13/2021 RO Aquifer Protection Section Rev. April 2021