Loading...
HomeMy WebLinkAbout20210721_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 10-82 Project Action New OUT BY DEIVILR Modification Transfer Release Applicant Name: Landsdown Earth & Pipe Inc. X Applicant's Email: landsdown004@aol.com County: Brunswick Project Name: Northwest Mine YES NO Date Commencing Have land disturbing activities started?? —1 04/13/2009 Latitude: 34.34730 Longitude: -78.12400 Please return comments to (at DEMLR CO): Adam Parr adam,parr@ncdenr,gov Comments due by: 07/21/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? NCG020979 F,-(] Is the RO concerned that the operation, as proposed, would violate standards of water quality? W/ �-E Comments: DWR is concerned that the mine expansion is in close proximity to adjacent wetlands. The applicant shows buffers on the site map, but DWR requests that wetland boundaries be defined by a 1D from USACE so that they can be buffered accurately. Does this mine (or previous owner) have DWR back fees to pay? I L I�/ (If Yes, amount): Watershed/Stream Name & Classification: Grist Mill Branch From Source to Cape Fear River Stream Index: 18-65.5 Class: C;Sw DWR Compliance Status of Mine: N/A 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑ ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD ,/ Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit #): NCG020979 Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements HQW/7Q10 Concerns LI Pay back fees or renew DWR permit Other Please describe the reason to hold the permit: JD from USACE needed to confirm wetland boundaries for accurate buffering. RO contact: I Hold Until: Mine must wait to dewater until an O&M plan is approved? LI Reviewed by Central Office Date Regional Office I IL6 Date DWR RO Surface Water I Megan Faulkner, John Perry, 6 Holley Snider 07/20/2021 RO Aquifer Protection Section Rev. December 2020-2020rl