HomeMy WebLinkAbout20210721_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
10-82 Project Action New
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Landsdown Earth & Pipe Inc.
X
Applicant's Email:
landsdown004@aol.com
County:
Brunswick
Project Name:
Northwest Mine
YES
NO
Date Commencing
Have land disturbing activities started??
—1
04/13/2009
Latitude:
34.34730
Longitude:
-78.12400
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 07/21/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS? NCG020979
F,-(]
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
W/
�-E
Comments: DWR is concerned that the mine expansion is in close proximity to adjacent wetlands. The applicant shows buffers on the site map, but
DWR requests that wetland boundaries be defined by a 1D from USACE so that they can be buffered accurately.
Does this mine (or previous owner) have DWR back fees to pay?
I
L
I�/
(If Yes, amount):
Watershed/Stream Name & Classification:
Grist Mill Branch From Source to Cape Fear River Stream Index: 18-65.5 Class: C;Sw
DWR Compliance Status of Mine:
N/A
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
,/
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
✓
(If Yes, Permit #):
NCG020979
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑✓
❑
Has Violation
O&M Requirements
HQW/7Q10 Concerns
LI
Pay back fees or renew DWR permit
Other
Please describe the reason to hold the permit:
JD from USACE needed to confirm wetland boundaries for accurate buffering.
RO contact:
I
Hold Until:
Mine must wait to dewater until an O&M plan is approved? LI
Reviewed by
Central Office Date Regional Office
I IL6
Date
DWR RO Surface Water I Megan Faulkner, John Perry, 6 Holley Snider
07/20/2021
RO Aquifer Protection Section