HomeMy WebLinkAbout20211027_DWRFrom:
Tankard, Robert
To:
Parr, Adam; Dumoor, Samir; Edgerton, Thom
Cc:
Edwards, James; Pullinger. Robert C
Subject:
RE: 54-68 - Alphin Pit - NEW - Lenoir County
Date:
Wednesday, October 27, 2021 3:22:20 PM
Attachments:
54-68 ALPHIN PIT.Ddf
image002.pnno
Please find our comments. The mine is located in prior converted ag fields and the permittee plans
not to dewater. This office has no concerns with the mine. Any questions, please let us know.
Thanks!
Robert
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
943 Washington Square Mall
Washington, NC 27889
252-948-3921 office
252-975-3716 fax
Robert.tankard9—ncdenr.gov
�"Notl�irrg ��mpares..
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Parr, Adam <adam.parr@ncdenr.gov>
Sent: Friday, October 8, 2021 4:32 PM
To: Dumpor, Samir <samir.dumpor@ncdenr.gov>; Tankard, Robert <robert.tankard@ncdenr.gov>;
Dunn, Maria T. <maria.dunn@ncwildlife.org>; Harrison, James A <James.Harrison@ncdenr.gov>;
Galamb, Eric <Eric.Galamb@ncagr.gov>; Farrell, Christine E<christine.farrell@ncparks.gov>; DCR -
Environmental _Review <Environmental. Review@ncdcr.gov>; Taylor, Kenneth
<kenneth.b.taylor@ncdenr.gov>; pete_benjamin @fws.gov; Bauer, Michael
<michael.bauer@ncdenr.gov>; Chianese, Gabrielle <gabrielle.chianese@ncdenr.gov>
Subject: 54-68 - Alphin Pit - NEW - Lenoir County
All,
Please see the attached documents for the application of a new mining permit in Lenoir County.
Hard copies have been routed to your office as well. Please have comments to me by November 5,
2021.
Thanks,
Adam Parr, PE
Assistant State Mining Engineer
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9207
Cell: (919) 441-7157
FAX: (919) 715-8801
Email: adam.parr(@ncdenr.gov
Physical Address: 512 N Salisbury Street
Mailing Address: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Mining Program Website:
https://deq.nc.gov/mining-program
D E
Nk i f I I - i !',f% iM1 A
n U*FAr W a " U"IIy
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
54-68 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Danny Smith Landscaping & Drainage
Applicant's Email:
dannybsmithjr@gmail.com
County:
Lenoir
Project Name:
Alphin Pit
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
35.2804
Longitude:
-77.7404
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 11/05/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
E71
I
✓
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
Ll./
(If Yes, amount):
Watershed/Stream Name & Classification:
DWR Compliance Status of Mine:
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
❑✓
Is a Pumping Operation & Monitoring (OM) Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
I
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
Consultant
Onsite
❑
�/
Offsite
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
✓
Enough information to determine?
✓
Rev. April 2021
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
1,(I
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
❑✓
Has Violation
O&M Requirements
./
HQW/7Q10 Concerns
./
Pay back fees or renew DWR permit
Other
El
Please describe the
reason to hold the
permit:
RO contact:
ROBERT TANKARD
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
Reviewed
Central Office Date Regional Office
Date
DWR RO Surface Water Robert Tankard
10/27/2021
RO Aquifer Protection Section
Rev. April 2021