HomeMy WebLinkAbout20190829 Mine Permit ApplicationNORTH CAROLINA
MINING PERMIT APPLICATION
State of North Carolina
Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
(919) 707-9220
Revised: 2017
NOTE:
It is recommended that you contact the appropriate
Regional Office (see Regional Office listing in the back of this
booklet) or the Raleigh Central Office for a
PRE -APPLICATION MEETING
to discuss your intentions and address any questions.
MINING PERMIT APPLICATION REVIEW
PROCESS FLOWCHART
BEGINNING OF PROCESS
Application received by
State Mining Specialist
Application assigned to
Assistant State Mining Specialist
Assistant State Mining Specialist/Program Secretary
routes application for review and comment
- U.S. Fish & Wildlife Service - Regional Office
- N. C. Geological Survey F
- Wildlife Resources Commission
- Division of Water Resources
- Division of Archives & History
- Division of Parks & Recreation
- Others as appropriate
*All application review comments forwarded to
Assistant State Mining Specialist
Is application complete?
If "YES", Assistant State Mining
Specialist drafts the proposed
permit action
j Applicant issues
I Public Notice
I- Division of Air Quality
- Division of Water Resources
...................................
Review Public Comments;
Public Hearing Possible
...................................:
If "NO", Assistant State Mining
Specialist drafts a letter requesting
additional information from applicant
Additional information from
applicant received and routed
to/reviewed by Assistant State Mining
Specialist and Regional Office Staff
(go to *)
Application & proposed permit action
reviewed by State Mining Specialist
Is application &
proposed permit action
complete/acceptable??
If "Yes", the following permit actions
are issued by the State Mining Specialist:
- Draft Permits
- Permit Transfers/Name Changes
- Bond Substitutions/Cancellations
- Permit Releases
- High Airblast Remediation Plans
- Non -Controversial New Permits
- - Small, Non -controversial Modifications
END OF PROCESS
If "YES", application & proposed
permit action forwarded to and
reviewed by Division Director
Is application &
proposed permit action
complete/acceptable??
If "YES", the proposed permit action is
issued by the Division Director
END OF PROCESS
If "No", application & proposed
permit action returned to Assistant
State Mining Specialist for revision
(go to *)
For other permit actions, if "Yes",
application & proposed permit action
forwarded to and reviewed by Mining
Specialist
Is application &
proposed permit action
complete/ acceptable??
If "NO", application & proposed permit
action returned to State Mining Specialist/
Assistant State Mining Specialist for revision
(go to *)
If "NO", application & proposed permit
action returned to Section Chief/State Mining
Specialist for revision
(go to *)
APPLICATION FOR A MINING PERMIT
ORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
APPLICATION FOR A MINING PERMIT
(PLEASE PRINT OR TYPE)
Name of Mine: Carolina Sunrock Prospect Hill Quarry and Distribution Cer County: Caswell Countsr
River Basin: Roanok
Latitude (decimal degrees to four places) 36.300266
Longitude (decimal degrees to four places)-79.167534
2. Name of Applicant* Carolina Sunrock LLC
3. Permanent address for receipt of official mail** 200 Horizon Drive Suite 100, Raleigh, NC 27615
Telephone
Alternate No. (919) 747-6336
4, Mine Office Address: 1238 Wrenn Road Prospect Hill, NC, 2731
Telephone: (919) ; 17-6336
5. Mine Manager: Scott Martino
6. E-mail Address: smartinoothesunrockgroup.corn
I certify that all details contained in this Permit Application are true and correct to the best of our
knowledge. We fti understand that any willful misrepresentation of facts will be cause for permit
revocation. / � _
Date ef-)
Print Name:
Title: Operating Officer and Chief Financial Officer
This will be the name that the mining permit will be issued to and the name that must be indicated on the
reclamation bond (security f that corresponds to this site.
* * The Division of Energy, Mineral, and Land Resources must be notified of any changes in the permanent address
or telephone number.
*** SiLnature of company officer rgguired.
G.S. 74-51 provides that the Department will grant or deny an application for a permit within 60 days of receipt of a
complete application or, if a public hearing is held, within 30 days following the hearing and the filing of any
supplemental information required by the Department. All questions must be addressed and all required maps
provided before this application can be considered complete. Attach additional sheets as needed.
-2-
APPLICATION FOR A MINING PERMIT
NOTE: All of the following questions must be thoroughly answered regarding your mining operation for
the intended life of the mine. All responses must be clearly conveyed on a corresponding, detailed mine map.
A. GENERAL CHARACTERISTICS OF THE MINE
1. Answer all of the following that apply:
® If this is an application for a NEW permit, indicate the total acreage at the site to be covered by the
permit (this is the acreage that the "new permit" fee will be based upon): 630-Acres
Of this acreage, how much is owned and how much is leased? Acres owned: 630-Acres
Acres leased: 0-Acres Property owner if leased:
❑ If this is an application for a MODIFICATION to a mining permit, indicate the mining permit
number and the total (overall) acreage covered by the existing permit.
Mining Permit No.: Total permitted acreage:
Does the modification involve acreage within the previously approved permitted boundary?
Yes ❑ No ❑. If yes, indicate the acreage to be covered by this modification (this is the acreage
that the "major modification" fee will be based upon):
Does the modification involve acreage outside the previously approved permitted boundary?
Yes ❑ No ❑. If yes, indicate the additional acreage to be covered by this
modification: (NOTE: you must complete all of Section F. of this application form
entitled Notification of Adjoining Landowners).
Of this acreage to be added to the permit, will any portion of this acreage be affected (i.e.: disturbed,
ground cover removed) by the mining operation? Yes ❑ No ❑ (If no, a "minor modification"
fee of $100.00 is required, despite the "undisturbed" acreage to be added). If yes, indicate the
acreage to be affected within the acreage to be added to the permit (the total acreage to be added to
the permit is the acreage that the "major modification" fee will be based upon):
❑ If this is an application for TRANSFER of a mining permit, indicate the mining permit number and
the total (overall) acreage covered by the existing permit.
Mining Permit No.: Total permitted acreage:
SEE THE FEE SCHEDULE AT THE END OF THIS FORM FOR THE PROPER FEE AMOUNT TO BE
PAID FOR THE REQUESTED PERMIT ACTION(S) AND CORRESPONDING ACREAGE NOTED
ABOVE
2. Name of all materials mined: Aggregate (rock -types: Diorite, Diabase, and Granodior e)
3. Mining method:
HHydraulic Dredge
Dragline & Truck
Other (explain):
Front-end Loader & Truck ® Shovel & Truck
Self -loading Scraper
4. a. Expected maximum depth of mine (feet) 550rfeet
Depth is relative to what benchmark? (e.g., natural ground level, mean sea level, road elevation, etc.)
Mean Sea level Orr } , rage site elevation -620 feet tms111
b. Expected average depth of mine (feet) 70-feet [ms11
Has any area(s) at this site been mined in the past? Yes ❑
If yes, when and by whom was this activity conducted?
-3-
APPLICATION FOR A MINING PERMIT
6. Number of years for which the permit is requested (Life of the Mining Operation or Life of Lease from
Public Entity): Life of Mining Operation (currently estimated at 50 years
B. MAPS
1. Clearly mark and label the location of your mining operation on six (6) copies of a 7.5-minute quadrangle
and a county highway map. These maps, in addition to six (6) copies of all mine maps and reclamation
maps, must be submitted with each permit application.
7.5-minute quadrangles may be obtained from the N.C. Geological Survey:
Mailing Address: Physical Address:
1612 Mail Service Center OR 512 North Salisbury Street, 5`h Floor
Raleigh, North Carolina 27699-1612 Raleigh, North Carolina 27604
(919)733-2423
htti)://portal.ncdenr.org/web/Ir/aeoloeical home
County highway maps may be obtained from the N.C. Department of Transportation:
North Carolina Department of Transportation — Geographic Information Systems (GIS)
Mailin, Address:
NCDOT GIS Unit
1587 Mail Service Center
Raleigh, North Carolina 27699-1587
Physical Address:
NCDGT GIS Unit
3401 Carl Sandburg Court
Raleigh, North Carolina 27610
(919) 212-6000
httl2://www.nedot.org/it/Ejs/
2. Mine maps must be accurate and appropriately scaled drawings, aerial photographs or enlarged
topographic maps of the entire mine site. All aspects of the mine site must be clearly labeled on the
maps along with their corresponding (approximate) acreage. Thus, all mine and reclamation maps
must denote those activities that are intended to be conducted during the life of the mining permit.
All maps must be of a scale sufficient (see minimum requirements listed below) to clearly illustrate the
following, at a minimum:
a. Property lines of the tract or tracts of land on which the proposed mining activity is to be located
including easements and rights -of -way.
b. Existing or proposed permit boundaries.
c. Initial and ultimate limits of clearing and grading.
d. Outline and width of all buffer zones (both undisturbed and unexcavated).
e. Outline and acreage of all pits/excavations.
f. Outline and acreage of all stockpile areas.
g. Outline and acreage of all temporary and/or permanent overburden disposal areas.
h. Location and acreage of all processing plants (processing plants maybe described as to location and
distance from mine if sufficiently far removed).
i. Locations and names of all streams, rivers and lakes.
j. Outline and acreage of all settling and/or processing wastewater ponds.
k. Location and acreage of all planned and existing access roads and on -site haul roads.
1. Location of planned and existing on -site buildings.
m. Location and dimensions of all proposed sediment and erosion control measures.
n. Location of 100-year floodplain limits and wetland boundaries.
o. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of
the mine tract, names of owners of record of tracts adjoining these tracts, that are within 1,000 feet of
the mining permit boundary, must be provided on the mine map.
-4-
APPLICATION FOR A MINING PERMIT
p. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary which lie directly across and are contiguous to any highway, creek, stream, river, or
other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned
or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of
tracts adjoining these tracts, that are within 1,000 feet of the mining permit boundary, must be
provided on the mine map(s). NOTE: "Highway" means a road that has four lanes of travel or less
and is not designated as an Interstate Highway.
q. Map legend:
1. Name of applicant
2. Name of mine
3. North arrow
4. County
5. Scale
6. Symbols used and corresponding names
7. Date prepared and revised
8. Name and title of person preparing map
Map scales should meet the following guidelines:
PERMITTED ACREAGE
MAP SCALE
049 Acres
1 inch = 50 feet
50-199 Acres
1 inch = 100 feet
200+ Acres
1 inch = 200 feet
(NOTE: Smaller scaled maps may be acceptable if they clearly illustrate the above items)
A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment
ponds, stockpiles, wastepiles, processing area/haul roads, mine excavation and any other major aspect of the
mining operation that is proposed to be affected/disturbed during the life of the mining permit. A table/chart
similar to the following will be acceptable:
CATEGORY
AFFECTED ACREAGE
Tailings/Sediment Ponds
Stockpiles
30
Wastepiles (Includes all Berms and Disposal areas)
82
Processing Area/Haul Roads
40
Mine Excavation
199
Other (Explain) (asphalt/concrete plant area)
19
Total Disturbed Acreage
.2pF
NOTE:
IN ADDITION TO THE ABOVE, THE MAPS MUST ALSO INCLUDE ANY SITE -SPECIFIC
INFORMATION THAT IS PROVIDED IN THE ANSWERS TO THE FOLLOWING QUESTIONS IN
THIS APPLICATION FORM (PLEASE NOTE THE ITALICIZED QUESTIONS/STATEMENTS
THROUGHOUT THE FORM). THIS APPLICATION WILL NOT BE CONSIDERED COMPLETE
WITHOUT ALL RELEVANT ITEMS BEING ADEQUATELY ADDRESSED ON THE MINE MAPS.
-5-
APPLICATION FOR A MINING PERMIT
C. PROTECTION OF NATURAL RESOURCES
Describe in detail the sequence of events for the development and operation of the mine and reference'the
sequence to the mine map(s). Attach additional sheets as needed.
Below is the summary of the sequence of events for the development of the Property.
ENTRANCES:
1. Establishment of the three (3) construction entrances to the property off Wrenn Road as shown in the
stormwater detail maps
VISUAL SCREENING BERMS:
1. Establishment of sediment and erosion controls (silt fence, Basins land 2 and associated diversion
berms/ditches) per the attached plans
2. Begin construction of all visual screening berms using material from the proposed borrow pit located
on the western end of the permitted area per the attached plans
3. Upon completion of final grading of the visual barricade berms, the berms will be stabilized and
seeded per the seeding specifications and schedule provided within this application
4. Stabilization and seeding of the borrow pit area once its useful purpose has ended
5. Upon stabilization of the borrow pit and visual barricade berms, specific sediment and erosion
control devices serving these areas will be removed and the remaining areas stabilized with groundcover
ASPHALT/CONCRETE PLANTS AREA:
1. Installation of silt fence around asphalt/concrete plant area
2. Installation of Basins 3, 9, and 10 within the asphalt and concrete plants' sites
3. Construction of diversion berms/ditches to basins
4. Grading and construction of the asphalt and concrete plant facilities
PIT DEWATERING POND AND SETTLING PONDS:
1. Installation of silt fence and Basins 13 and 16 including associated berms and ditches as indicated in
the construction sequence and as shown on the attached plans
2. Begin excavation of pit dewatering pond and settling ponds.
QUARRY PLANT AND STOCKPILE YARD:
1. Install silt fence along outside toe of location of diversion berms and diches
2. Installation of diversion berms leading and ditches to Basins 10, 11, 12, 15, and 26
3. Upon completion of diversion berms/ditches, the berms will be stabilized and seeded
4. Installation of permanent access to quarry facility
5. Connection and closure of visual barricade berm at original construction entrance
6. Begin grading quarry plant and stockpile area
7. Installation of scale house, employee building maintenance facility, and associated auxiliary features.
Begin construction of quarry plant facilities
CREEK CROSSING:
1. Installation of horse shoe filters 1, 2, 3, and 4 and associated diversion ditches in area of creek
crossing to overburden disposal area
2. Excavate existing crossing
3. Installation of new culvert crossing as shown on sheet 7e
OVERBURDEN DISPOSAL AREAS (ODA 1, ODA 2, ODA 3)
1. Install silt fence as displayed on mine maps
2. Install Basins, 6, 7, and 8 (ODA- 2); Basins 5, 6, and 7 (ODA-1); Basins 38, 39, 40, and 41(ODA-3)
including all associated diversion berms/ditches
3. Removal of existing vegetation and topsoil within each 10' interval lifts, ultimate foot print of each
overburden disposal area, as storage is needed
-6-
APPLICATION FOR A MINING PERMIT
Construction will begin at topographical low raising contours in 10' intervals along existing
topography
5. Each 10' lift's outer slope is to be constructed at a 2-foot horizontal to 1-foot vertical slope
6. Each 10'lift will be stabilized with groundcover upon completion of final grading of each lift's
perimeter and prior to the deposition of the internal fill
PHASED PIT DEVELOPMENT WITHIN PIT A AND B:
Note: Phases I, H, and III within Pit A will be mined leaving a 50-foot undisturbed buffer along all streams and
wetlands within the ultimate pit boundary of Pit A
Phase I (initial opening)
1. Installation of silt fence
2. Installation of Basins 16, 17, 19, 24, and 25 and their associated diversions berms/ditches as per the
attached plans
3. Begin overburden stripping/mining activities within Phase I
4. Overburden to be used to begin construction of ODA-2
Phase II
1. Installation of silt fence
2. Installation of Basins 14,16, 18, 19, 20, 21, and 22 and their associated diversions berms/ditches as
per the attached plans
3. Begin overburden stripping/mining activities within Phase II
4. Overburden to be used to continue construction of ODA-2 and begin ODA-1
Phase III
1. Installation of silt fence
2. Installation of Basins 22, 23, 24, 26, 27, and 28 and their associated diversions berms/ditches as per
the attached plans
3. Begin overburden stripping/mining activities within Phase III
4. Overburden to be used to continue construction of ODA-1
Phase IV Pit expansion to ultimate mining limits in Pit A and complete mining of Pit B
1. IV Permit modification will be submitted to and approved by NCDEQ DEMLR prior to initiating phase
a. Phase IV involves expanding the Pit A through existing streams and wetlands to achieve the
ultimate pit boundary of Pit A, installation of a creek crossing to access Pit B, and the stripping
and mining of Pit B. Carolina Sunrock will address all applicable State and Federal permitting
requirements, including applying for and obtaining approval of a mine permit modification. In
addition, prior to applying for a mining permit modification, Carolina Sunrock will apply for and
obtain approval of an updated US Army Corps of Engineers Jurisdictional Determination/404
permit, and NCDEQ 401 Water Quality Certification, including addressing any potential
mitigation related to impacts on onsite streams and wetland features within the pit boundaries of
pits A and B.
b. Upon receipt of all applicable permitting and mitigation requirements, Phase IV of the open
pit expansion will begin as follows.
i. Stripping and expansion of Pit A to its ultimate pit boundary's
ii. Installation of the creek crossing to access to Pit B
iii. Installation of silt fence within Pit B areas prior to stripping
iv. Installation of all Basins and their associated diversions berms/ditches within the
limits of Pit B (Basins 29 through 41) prior to stripping and mining activities
V. Begin Stripping and Mining of Pit B
RECLAMATION:
l . Upon completion of mining and as displayed within the attached plans (sheet 6) reclamation will
proceed as follows:
-7-
APPLICATION FOR A MINING PERMIT
a. All stockpiles and mining equipment/facilities will be removed from the site
b. All existing stormwater basins and settling ponds will be backfilled/stabilized/seeded, with the
exception of the pit de -watering pond and the facility entrance pond. These two ponds will remain
onsite for future property use.
c. All mining related refuse will be removed from site and properly disposed of per applicable
regulations
d. Onsite offices, scale house, and maintenance shop structures will remain onsite for future property
use
e. Both the asphalt plant and ready mix concrete facilities, as well as their associated structures,
stockpiles, and refuse will also be removed from the site and properly disposed of per applicable
regulations
f. Open Pits A and B will be allowed to be filled with water for future use as potential potable water
source or recreational facilities
g. The final open pit perimeters shall be fenced
h. Direct access into the open pit internal ramp systems will be barricaded via large boulders stacked
end to end
Property access shall be controlled via the two proposed gated facility access points
All remaining uncompleted cut slopes and/or overburden disposal areas will be graded to a minimum
of 2-foot horizontal to 1-foot vertical slope, stabilized and seeded
Describe specific erosion control measures to be installed prior to land disturbing activities and during
mining to prevent offsite sedimentation (include specifac plans for sediment and erosion control for mine
excavation(s), waste piles, access/mine roads and process areas), and give a detailed sequence of
installation and schedule for maintenance of the measures. Locate and label all sediment and erosion
control measures on the mine maps) and provide typical cross-sections/construction details of each
measure. Engineering designs and calculations are required to justify the adequacy of any proposed
measures.
Carolina Sunrock contracted with the Timmons Group (a licensed engineering firm in North Carolina) in order
to ensure the proper design and placement of all erosion and sedimentation control/stormwater management
measures based upon a 25-year design storm. Timmons' final detailed design and construction details can be
found within the attached Sheets C0.00 through C4.20.
In order to tie the engineered erosion and sedimentation control, and storm water control measures to the
various mining plan sheets, and to avoid duplication of effort, only the locations, generalized shape, and labels
of the designed control measures are provided within the mine maps. The attachment containing Timmons'
detailed designs and actual basin configurations will provide the supporting information for all indicated
measures.
3. a. Will the operation involve washing the material mined, recycling process water, or other waste water
handling? Yes N NoEl. If yes, briefly describe all such processes including any chemicals to be used.
The quarry will be operating two separate wash screens within the proposed aggregate processing facility., One
wash screen (sand plant) and one more traditional three deck aggregate wash screen (future expansion). As
displayed on the mine maps (Sheets 5 through 5 C), both screens will receive water via a pump from the pit
dewatering/plant water pond. The process water from the screens will be captured within the screens and piped
via gravity feed and/or pumped to a series of two separate sets of four interconnected settling ponds. The final
settling pond will then be piped back to the pit dewatering/plant water pond.
For planning purposes, Carolina Sunrock does not anticipate the need to utilize any flocculants. However, if
such treatment is needed, flocculants from the NCDEQ approved list will be tested for applicability. Following
testing and product selection, Carolina Sunrock will notify the department under a separate letter.
The quarry aggregate crushing and screening facility will be outfitted with wet suppression systems utilizing
misting/spray nozzles in order to control fugitive dust emissions. These dust suppression systems typically do
not generate pooling of water, nor significant runoff. Therefore, process water is either consumed within the
APPLICATION FOR A MINING PERMIT
process or evaporates.
The crushing and aggregate facility will also be equipped with high pressure water hoses in various areas to aid
operators in preforming maintenance and cleanup of any potential system blockages and material build up
surrounding the equipment. This water will be captured and diverted via overland flow to Basins 11,12,16, and
26. Ultimately this water will return to the open pit over time.
Included within the Mine Permit Boundary, Carolina Sunrock proposes the installation and operation ofboth a
Hot Mix Asphalt Plant and a Ready Mix Concrete Plant. These facilities will also utilize process water and
recycled water. The Hot Mix Asphalt Plant will utilize process water primarily for dust control. However, the
Ready Mix Concrete Facility will utilize process water for the wetting of stockpiles, truck cleaning, and other
treatments within the production process. Process water produced from mixer truck cleanout will be captured
within a hard bottom weir system. The weir system will be connected to a sloped concrete pad used to divert
process water through four partitioned 12'X 24'X 3' (length, width, depth) settling bays. The water is then
diverted to the final bay consisting of a 15X50X8' (length, with, depth) back basin, where the water is treated
using a ph neutralization system that utilizes carbon dioxide (CO2) injection. From this final bay location, the
process water is either pumped for use in the concrete batching process or utilized to wash mixer trucks. Any
process water from the Hot Mix Asphalt Plant and Ready Mix Concrete Plant will be captured and diverted into
Basins 3, 9, and 10.
b. Will the operation involve discharging fresh or waste water from the mine or plant as a point discharge to
the waters of the State? Yes L No ❑. Ifyes, briefly describe the nature ofthe discharge and locate
all proposed discharge points (along with their method ofstabilization) on your mine map(s).
The discharge of both stormwater and process water is anticipated into waters of the State. All proposed
basins/discharge points are labeled and displayed on the mine maps along with their appropriate method of
stabilization. All basins and engineered construction details are provided within the attached mine maps and
included within the Timmons Group's design document and construction details (Sheets C0.00 through
C4.20).
Provided below is a summary of each discharge location and water type (process vs. stormwater) that is
expected at each Basin location.
Water Control ID
Discharge Type
Pit Dewatering Pond
Process Water Groundwater from Pit)
Basin 1
Storm water
Basin 2
Pit Dewaterin
Basin 3
Stormwater
Basin 4
Stormwater
Basin 5
Stormwater
Basin 6
Storm water
Basin 7
Storm water
Basin 8
Storm water
Basin 9
Comin led Process Water/Stormwater
Basin 10
Comin led Process Water/Stormwater
Basin 11
Comin led Process Water/Stormwater
Basin 12
Comin led Process Water/Stormwater
Basin 13
Stormwater
Basin 14
Stormwater
Basin 15
Comin led Process Water/Stormwater
Basin 16
Stormwater
Basin 17
Stormwater
Basin 18
Stormwater
Basin 19
Stormwater
Basin 20
Stormwater
WZ
APPLICATION FOR A MINING PERMIT
Basin 21
Stormwater
Basin 22
Stormwater
Basin 23
Stormwater
Basin 24
Stormwater
Basin 25
Stormwater
Basin 26
Comingled Process Water/Stormwater
Basin 27
Stormwater
Basin 28
Stormwater
Basin 29
Stormwater
Basin 30
Stormwater
Basin 31
Stormwater
Basin 32
Stormwater
Basin 33
Stormwater
Basin 34
Stormwater
Basin 35
Stormwater
Basin 36
Stormwater
Basin 37
Stormwater
Basin 38
Stormwater
Basin 39
Stormwater
Basin 40
Stormwater
Basin 41
Stormwater
c. Will any part of the proposed mine excavation(s) extend �w the water table? Yes ® No ❑.
If yes, do you intend to dewater the excavation(s)? Yes No ❑.
If yes, what impact, if any, will mine dewatering have on neighboring wells? Estimated withdrawal rate
in gallons per day: . Locate all existing wells on the mine maps) that lie within
500 feet of the proposed excavation area. Provide data to support any conclusions or statements made,
including any monitoring well data, well construction data and current water withdrawal rates. Indicate
whether the proposed mine locale is served by a public water system or private wells.
At the time of this submittal, there is only one known neighboring well within 500 feet of either proposed
open pits (Pit A or Pit B). This well is located at an uninhabited abandoned residential structure which is
located on the mine maps. Currently there is no public water supply available for the proposed facilities.
In order to determine the proposed facility's underlying hydrogeological conditions and to determine potential
groundwater impacts to surrounding/neighboring parcels, Carolina Sunrock retained Piedmont Geologic, LLC
a licensed engineering and geologic firm in NC, to conduct a detailed hydrogeologic site assessment. A copy
of the final report is provided in Appendix A of this submittal.
According to this report, the proposed pits will display cone of depressions extending approximately 728-feet
and 1,300-feet when the pits reach a depth of 300-feet and 550-feet (ultimate depth), respectively. In order to
further safe guard and ensure the accuracy of the findings of the detailed study, Carolina Sunrock proposes to
conduct quarterly groundwater level monitoring for the life of the mine. The results of the monitoring shall be
made available upon request as is the case at our other facilities. The monitoring shall consist of monitoring
nine existing wells which have been installed for the study, the current onsite water supply well, and three
proposed monitoring wells to be installed near the permit boundary. All well locations are provided within the
mine maps.
d. If you answered yes to any of the above questions, provide evidence that you have applied for or
obtained the appropriate water quality permit(s) (i.e., non -discharge, NPDES, Stormwater, etc.) from the
Stormwater Program. In addition, the applicant is required to register water use with the Division of
Water Resources, Ground Water Management Branch, if the operation withdraws more than 10,000
gallons per day and needs a capacity use permit from the Division of Water Resources, Ground Water
Management Branch, if the operation lies in a capacity use area and withdraws more than 100,000
gallons per day.
As noted above, Carolina Sunrock retained the services of the Timmons Group to design all erosion and
-10-
APPLICATION FOR A MINING PERMIT
sedimentation control/stormwater management measures for the entire site. Timmons will also be compiling
the NPDES NCG02 application on behalf of Carolina Sunrock, which will be submitted under separate cover.
Once the NCG02 application has been submitted directly to DEMLR's Stormwater Program, a copy of the
application will be submitted to DEMLR's Mining Program for its information and file.
-11-
APPLICATION FOR A MINING PERMIT
4. a. Will the operation involve crushing or any other air contaminant emissions? Yes N No ❑.
If yes, indicate evidence that you have applied for or obtained an air quality permit issued by the
Division of Air Quality or local governing body.
Carolina Sunrock has retained Trinity Consultants (a licensed engineering company in NC) to complete and
submit the Air Quality Permit application on behalf of Carolina Sunrock. The application submittal will
include all initial and future aspects of the quarry operation. The submittal will also include the required air
dispersion modeling for the proposed asphalt and concrete plants along with generators for future use in
power generation. A copy of the final Air Quality permit application, once it is submitted to the Division of
Air Quality for review and approval, will be delivered to DEMLR's Mining Program for its information and
file.
b. How will dust from stockpiles, haul roads, etc., be controlled?
Fugitive dust emissions have been considered in the design of all aspects of the proposed facility. The
location of the proposed facility's major components (with the highest fugitive dust potential) are not located
within 250' feet of any property or permit boundary. This design and proposed layout will ensure a very low
potential for generated fugitive dust leaving the property and mine permit boundary.
Furthermore, air permit requirements stipulate that fugitive dust produced from conveyor transfer points,
screens, and crushers within the aggregate processing plant will be managed via the use of wet suppression
systems. These fugitive dust suppression systems are to be inspected daily and documented for proper
operation in order to maintain compliance with air quality permit requirements. In order to maintain fugitive
dust control within all haul roads and gravel paved travel ways (i.e. stockpile yard, open pit haul road), a
water truck will be utilized. In addition, to maintain and monitor track out and fugitive dust potential from
the paved access roadway to the facility, a tire wash down facility has been incorporated to the design of the
scale house. Paved access roads will also be maintained and periodically watered and a sweeper will be
utilized on an as -needed basis.
Both the proposed Hot Mix Asphalt Plant and Ready Mix Concrete Plant will be equipped to control
emissions and dust via dust collector systems (bag houses). These systems will be tested, maintained, and
inspected based upon the applicable regulations within the Air Quality Permit. In addition, the roadways at
each plant will also be supported by periodic watering via a water truck and sweeper (in paved areas) as
needed.
5. a. A buffer will be required between any mining activity and any mining permit boundary or right-of-
way. It may be an unexcavated buffer (no excavation, but roadways, berms and erosion &
sedimentation control measures may be installed within it), an undisturbed buffer (no disturbance
within the buffer whatsoever), or a combination of the two, depending upon the site conditions. Note
that all buffers must be located within the mining permit boundaries.
How wide a buffer will be maintained between any mining activity and any mining permit boundary
or right-of-way at this site? A minimum buffer of 25 feet is recommended, although a wider buffer
may be needed depending on site conditions. Show all buffer locations and widths on the mine
map(s).
As documented throughout the attached plan sheets, a combination of 100-foot undisturbed buffer along
with a 100-foot unexcavated buffer will be provided along the mine permit boundary. There are several
areas along Wrenn Road and Ridgeville Road in which there is no natural buffer nor visual barricade to the
proposed operations (due to timbering by the prior landowner). In these areas, Carolina Sunrock has
proposed a 200-foot unexcavated buffer in order to construct and maintain a landscaped visual screening
berms to conceal the operation from public view, along with supplemental overburden berms as material is
available from stripping operations. As referenced within the attached plan sheets, all proposed buffers are
identified as follows:
1. Red — Permit Boundary/Property Boundary
2. Pink — 100-foot Undisturbed Buffer
-12-
APPLICATION FOR A MINING PERMIT
100-foot or 200-foot Unexcavated Buffer
-13-
APPLICATION FOR A MINING PERMIT
b. A minimum 50-foot-wide undisturbed buffer will be required between any land disturbing activities
within the mining permit boundaries and any natural watercourses and wetlands unless smaller
undisturbed buffers can be justified. Depending on site conditions, a buffer wider than 50 feet may
be needed.
How wide an undisturbed buffer will be maintained between any land disturbing activities within the
mining permit boundaries and any natural watercourses and wetlands at this site? Show all buffer
locations and widths on the mine map(s).
As displayed on the attached plan sheets, a 100-foot undisturbed buffer has been provided along all major
natural water courses. This includes Sugar Tree Creek as well as the two larger un-named tributaries which
bisect the central and northern portions of the property. All other known wetlands and intermittent or
ephemeral streams have been provided a 50-foot undisturbed buffer.
Carolina Sunrock retained the services of Palmetto Environmental Consulting, Inc, (a licensed professional
wetland scientist) to delineate the proposed site for wetlands and natural water courses. A site visit was
subsequently conducted by Mr. David E. Bailey, PWS, Regulatory Project Manager of the US Army Corps
of Engineers on July 30'b and 31', 2019 in order to verify all stream and wetland boundaries previously
delineated. All verified natural wetlands and natural water courses have been surveyed and are displayed
within the mine maps as they were observed and discussed during the July 30th US Army Corps of
Engineers site visit. Upon receipt of the Preliminary Jurisdictional Determination Approval, a copy will be
provided to DEMLR's Mining Program for its information and file.
In addition, as part of the initial site development and construction, two small wetland area will be
permanently impacted. Carolina Sunrock is currently in the process of obtaining all applicable State and
Federal permits associated with these minor impacts. The proposed impact as highlighted on Sheet 7E areas
will be limited to a maximum disturbance of 0.1-acres and will be addressed by obtaining a COE Nationwide
Permit. The first proposed impact area includes the refurbishment of an existing creek crossing to the
overburden disposal areas 1 and 2 from the proposed quarry plant -processing area and initial pit opening.
The second proposed impact area is a proposed conversion of land heavily disturbed from timber activity
located near the entrance pond to create a formal site access. Once COE sign off has been obtained, a copy
of such approval will be provided to DEMLR's Mining Program for its information and file.
As noted above, prior to completion of Phase 3 development, a mine modification, revised jurisdictional
stream and wetland determinations, and all applicable State and Federal impact permits and mitigation will
be applied for and obtained prior to any disturbance within the proposed Phase 4 areas.
6. a. Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries
during mining. Minimum 2 horizontals to 1 vertical slopes or flatter for clayey material and
minimum 3 horizontals to 1 vertical slopes or flatter for sandy material are generally required, unless
technical justification can be provided to allow steeper slopes.
Below is the summary of the construction of the overburden disposal berms and the Overburden/Pond Fine
Disposal Areas as well as how both Pit A and Pit B will be mined to ensure slope stability.
Visual Screening Berms — As part of initial site development, these berms are intended to provide visual
screening for the operation. The berms will initially be constructed along the mining permit boundaries
along Ridgeville and Wrenn Roads as indicated on the attached plan sheets. The outward facing slope along
the roadways is proposed to be a 3-foot horizontal to 1-foot vertical slope, while the inward property slope
will be graded to 2-foot horizontal to 1 foot -vertical slope. Following construction completion, the berms
will be seeded and tops of the berms will be landscaped with native grasses and trees as indicated on the
attached plan sheets.
Overburden/Pond Fine Disposal Areas Berms — This secondary berm type is proposed to be located within
the 100' unexcavated buffer behind the above mentioned Visual Barricade Berms surrounding the property.
These berms will be constructed over time and as space is needed for placement of overburden stripping
materials. They will be constructed in approximately 10 to 12 foot lifts while simultaneously being graded to
-14-
APPLICATION FOR A MINING PERMIT
a 2-foot horizontal, 1-foot vertical grade slope. These berms will be no higher than 20-foot in height based
upon current topography to maintain compliance with established mine permit standards. Lastly, upon
completion of annual stripping and overburden disposal activities within these areas, they will be either
permanently seeded or temporarily seeded depending upon if the maximum designed capacity has been
obtained for each proposed berm as displayed on the attached plan sheets.
Overburden/Pond Fine Disposal Areas — As displayed on the attached plan sheets, three large disposal areas
have been proposed at the site. These areas are to serve as disposal area for overburden and pond fines
generated by the aggregate processing plant only. Each disposal area is to be constructed with 2-foot
horizontal 1-foot vertical perimeter slopes in 10 to 12-foot lifts. Upon completion of each 10 to 12-foot
perimeter lift, the outer slope will be reclaimed upon deposition of the internal fill (pond fines). Each 10 to
12-foot lift will consist of a 40-foot travel way and 75-foot base. All flat surfaces are proposed to be sloped
^-2% towards the center of the structure. The proposed stormwater swales that will carry surface water
runoff to periodic slope drains leading to measures to capture and treat the runoff before discharge into the
buffer.
Open Pit Mine Slopes — As displayed in the cross sections sheet 7a, the top edge of the 2-foot horizontal to
1-foot vertical overburden cut slope for both Pit A and Pit B have been designed to be a minimum of 240
feet off of any adjoining property/mining permit boundary. As designed, there will be a minimum 10 foot
wide safety bench at the toe of the overburden cut slope and the top of rock. Once in rock, no final batter
bench angle will exceed 72 degrees (estimated pre -split wall angle per bench). In addition, the steepest inter
slope angle will be 45-degrees.
b. Provide a cross-section on the mine maps) for all fill slopes (berms, wastepiles, overburden
disposal areas, etc), clearly indicating the intended side slope gradient, installation of any benches
and/or slope drains (with supporting design information) if needed, and the method of final
stabilization.
All cross -sections of typical visual barricade berms and overburden and fines disposal areas have been
provided in the attached plan sheets, along with construction details for each.
c. In excavation(s) of unconsolidated (non -rock) materials, specify the angle of all cut slopes including
specifications for benching and sloping. Cross -sections for all cut slopes must be provided on the
mine map(s).
Cross-section of all non -rock excavations are included within the attached plan sheets. All cut slopes within
open Pit A and Pit B will be cut at a 2-foot horizontal to 1-foot vertical slope to the top of rock with a ten -
foot wide safety bench surrounding the top of the first bench of each open pit.
The proposed borrow area on the western portion of the site to be used initially to construct the visual
barricade berms along Ridgeville and Wrenn Roads will entail a 20-foot overburden cut slope (removal of a
hill). All slopes within this proposed area will be graded/cut to a 2-foot horizontal to 1-foot vertical slope to
provide slope stability as well as to allow for positive drainage to nearby basins, seeded and subsequently
planted with shortleaf pines for future timbering upon completion of the visual barricade berms.
d. In hardrock excavations, specify proposed bench widths and heights in feet. Provide cross -sections
of the mine excavation clearly noting the angles of the cut slopes, widths of all safety benches and
mine benches, and the expected maximum depth of the excavation.
Cross -sections of both proposed Pit A and Pit Bare provided within the attached plan sheets. Bench heights
are proposed to be approximately 50-feet in height and to allow for a 35-foot step out (safety catch bench).
7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling
house, public road, public, commercial or industrial building from any mine excavation. Locate all such
structures on the mine map if they are within 300 feet of any proposed excavation.
Currently, there is only one non -owned structure within 300 feet of any proposed hard rock excavation,
which is a non -occupied, uninhabited, abandoned residential structure across Wrenn Road. The next closest
-15-
APPLICATION FOR A MINING PERMIT
non -owned structure to either of the proposed open pit excavations is located —1,000 feet north of Pit A's
ultimate boundary, and —1,200 feet away to the east of Pit B's ultimate boundary. Therefore, no physical
hazards to any non -owned occupied structures are anticipated from a slope stability or blasting aspect of the
operation. All immediately adjoining non -owned structures are displayed on the attached plan sheets.
Portions of Wrenn Road and Goose Creek Road (northeast corner of site map), which are both public
roadways, are located within 300 feet of the proposed excavations. Based upon the open pit designs and
inner slope angle of 45 to 39 degrees, there is no anticipated physical hazard to the roadways.
However, given that these are public roadways, Carolina Sunrock proposes that when blasting is scheduled
to be conducted within 600-feet of these roadways, quarry personnel will temporarily close portions of the
roadway closest to the blast during the blasting initiation process only. This temporary closure will last
approximately 10 minutes, utilizing appropriate traffic control measures. It should be noted that no blasting
will be conducted within this radius until the operation approaches Phase II and Phase IV, respectively.
8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area
and when it will be implemented. Vegetated earthen berms, appropriate fencing and adequate boulder
barriers may be acceptable high wall barricades. A construction detail/cross-section and location of each
type of barricade to be used must be indicated on the mine map(s).
The mining property will have two monitored and controlled, gated access points as shown on the attached
plan sheets.
In addition to monitored and controlled access points, visual barricade berms and overburden disposal berms
have been proposed, which will also serve as barricades against inadvertent public access.
Surrounding all active open pit excavations will be a 20-feet wide roadway that will be maintained
surrounding the circumference of each pit's first bench. This road will be maintained with a minimum of
three -foot -high berms on both sides of the roadway for mine operator safety as per the Federal Mine Safety
and Health Administration requirements. In addition, the pit and this roadway will begin well within the
mine property during the early mine phases of the operation. The road will then gradually move outward
during overburden stripping activities and pit expansions over the course of the mine until the ultimate pit is
achieved — see the attached plan sheets for further clarification. Active drill and blast areas will also be
maintained and enclosed with three-foot berms, chain -gated access points, and posted for employee and
contractor protection.
9. Are acid producing minerals or soils present? Yes ❑ No
If yes, how will acid water pollution from the excavation, stoc piles and waste areas be controlled?
There are no known rock types, mineral assemblages, or soils present onsite that would be considered acid
producing.
10. a. Describe specific plans (including a schedule of implementation) for screening the operation from
public view such as maintaining or planting trees, bushes or other vegetation, building berms or other
measures. Show the location of all visual screening on the mine map(s) and provide cross -sections
through all proposed berms or proposed spacing, sizes and species for tree plantings.
Visual Barricade Berms are proposed as part of initial site development activities, as stated above and shown
on the attached plan sheets. These berms are proposed along mining permit boundaries that face Ridgeville
Road and Wrenn Road to screen the operation from public view. These berms are to be 10-feet in height
with the proposed outward facing slope being graded to a final Meet horizontal to 1-foot vertical slope,
while the inward property slope will be graded to 2-feet horizontal to 1 foot -vertical slope. Upon their
completion, these berms will be seeded with native grasses, and tops of the berms landscaped with trees.
The remainder of the property's perimeter, where existing dense vegetative cover already exists, will remain
in place as part of the outer undisturbed buffer. In those areas along the property boundary, which are not to
be disturbed by the proposed mining operation and were impacted by the prior landowner's timbering
activities, native grasses shortleaf/long leaf pines will be planted to reestablish a visual buffer within the
-16-
APPLICATION FOR A MINING PERMIT
outer 100-foot undisturbed buffer.
b. Could the operation have a significantly adverse effect on the purposes of a publicly owned park,
forest or recreation area? If so, how will such effects (i.e., noise, visibility, etc.) be mitigated?
There are no known publicly owned parks, forests, or recreational facilities within the immediate vicinity of
the proposed facility.
11. Will explosives be used? Yes No ❑.
If yes, specify the types of explosive(s) and describe what precaution(s) will be used to prevent physical
hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations.
Depending on the mine's location to nearby structures, more detailed technical information may be
required on the blasting program (such as a third -party blasting study). Locate the nearest offsite occupied
structure(s) to the proposed excavation(s) on the mine map and indicate its approximate distance to the
proposed excavation.
All blasting activities will be conducted by a licensed and registered blasting professional sub -contractor.
All blasts will be scaled and executed to ensure compliance with the established ground vibration, and air
blast standards, and to minimize the potential for fly rock. All blasts will be monitored via a seismograph to
be located at the closest non -owned structure to the specific blast location.
Based upon the proposed initial excavation opening (Phase 1), the nearest non -owned structure is located to
the north of the excavation sits at a distance in excess of —1,800 feet. In order to further establish a baseline
characterization of blasting effects at various distances from any given blast, Carolina Sunrock has retained a
third party blasting expert (Vibra-Tech) to estimate the effects of blasting at various distances based upon a
typical, standardized blast. The final Vibra-Tech blasting analysis report, including its findings and
recommendations, is attached as Appendix B. It should be noted that the blasting characterizations
provided in the report are conservative, and all blasts conducted on site are individual by nature of location,
size, power factor, and geology. In any case, Carolina Sunrock has extensive blasting experience over
several decades at its various permitted quarry facilities and will continue to use best blasting practices at
this proposed facility.
12. Will fuel tanks, solvents, or other chemical reagents be stored on -site? Yes ® No ❑.
Ifyes, describe these materials, how they will be stored and method of containment in case ofspill. Indicate
the location(s) of all storage facilities on the mine map(s).
All tanks and are labeled and are shown in their proposed locations on the attached plan sheets. All tanks
proposed for the facility will be double -walled, aboveground storage tanks and/or placed within engineer
designed concrete secondary containment structures. Below is a summary of all proposed tanks and
appropriate containments.
Tank ID
Location
Size
Content
Containment
1
Asphalt Plant
20,000 al
Used Oil
Double Wall Tank
2
Asphalt Plant
20.000 gal
Used Oil
Double Wall Tank
3
As )halt Plant
30.000 gal
A.C. (spell out?)
Concrete Containment
4
Asphalt Plant
30.000 gal
A.C.
Concrete Containment
5
As )halt Plant
20.000 gal
Fuel
Double Wall Tank
6
As halt Plant
20,000 gal
Fuel
Double Wall Tank
7
Concrete Plant
2.000 gal
Add Mix
Concrete Containment
8
Concrete Plant
2.000 gal
Add Mix
Concrete Containment
9
Concrete Plant
2.000 gal
Add Mix
Concrete Containment
10
Concrete Plant
2,000 gal
Add Mix
Concrete Containment
11
Concrete Plant
2,000 gal
Add Mix
Concrete Containment
12
Concrete Plant
2,000 gal
Add Mix
Concrete Containment
13
Quarry
20,000 gal
Fuel
Double Wall Tank
14
Quarry
20,000 gal
Fuel
Double Wall Tank
-17-
APPLICATION FOR A MINING PERMIT
D. RECLAMATION PLAN
1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate
the sequence and general methods to be used in reclaiming this land. This must include the method of
reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment
of any permanent drainage channels to a condition minimizing erosion, siltation and other pollution. This
information must be illustrated on a reclamation map and must correspond directly with the information
provided on the mine map(s). In addition, design information, including typical cross -sections, of any
permanent channels to be constructed as part of the reclamation plan and the location(s) of all permanent
channels must be indicated on the reclamation map.
All proposed features for the active operation have been designed with final reclamation in mind and will be
constructed as described in the attached plan sheets. Reclamation will be conducted as needed throughout
the life of the mine and immediately upon completion of each mine segment of the operation.
Upon the conclusion of mining activities, the open pit excavations will be allowed to fill with water and will
be barricaded via a perimeter fence along the pit perimeter road. In addition, the haul road access point/ramp
into each of the proposed open pit mines will be provided with berms and barricaded.
All onsite structures, equipment, stockpiles, and refuse will be removed from the site and properly disposed
of according to the materials' applicable standards at the time of removal. All proposed sediment and
erosion control basins will be backfilled, stabilized and seeded, with the exception of the pit dewatering
pond which will remain. All process water settling ponds will be backfilled, stabilized and seeded. All
remaining uncompleted ultimate slopes within the designed overburden and fines disposal areas will be
graded to a minimum of 2-feet horizontal, 1-foot vertical slope or flatter and provided with a permanent
groundcover.
Is an excavated or impounded body of water to be left as a part of the reclamation? Yes ® No ❑.
If yes, illustrate the location of the body(s) of water on the reclamation map and provide a scaled
cross-section(s) through the proposed body(s) of water. The minimum water depth must be at least 4 feet,
measured from the normal low water table elevation, unless information is provided to indicate that a more
willow water body will be productive and beneficial at this site.
Will the body(s) of water be stocked with fish? Yes No ❑.
If yes, specify species.
Cross -sections and locations have been provided on the attached plan sheets. Fish species will be selected via
consultation and recommendations obtained from the North Carolina Wildlife Resource Commission prior to
stocking as specific species and recommendations will ultimately change through the course of the mine life.
3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock
including what kind of permanent barricade will be left. Acceptable permanent barricades are appropriate
fencing, large boulders placed end -to -end, etc. Construction details and locations of all permanent
barricades must be shown on the reclamation map.
Upon the conclusion of mining activities, the open pit excavations will be allowed to fill with water and will be
barricaded via a fence along the pit perimeter road. In addition, the haul road access point/ramp into each of the
proposed open pit mines will be provided with berms and barricaded. These and other safety provisions are
provided on the Reclamation Map (Sheet 6) and associated details sheets.
4. Indicate the method(s) of reclamation of overburden, refuse, spoil banks or other such on -site mine waste
areas, including specifications for benching and sloping. Final cross -sections and locations for such
areas must be provided on the reclamation map.
All proposed overburden and fines disposal areas, berms, and cut slopes are designed to a minimum 2-feet
horizontal, I -foot vertical slope, and will be permanently stabilized with vegetation, including native grasses and
-18-
APPLICATION FOR A MINING PERMIT
trees. Cross -sections and locations are provided on the attached plan sheets.
5. a. Describe reclamation of processing facilities, stockpile areas, and on -site roadways.
All processing facilities and stockpiles will be removed from the site in compliance with the mining permit
conditions and any applicable local, state and federal requirements. Onsite roadways will be regraded to non -
erosive conditions and/or conditioned for re -purposing the property for future residential, commercial and/or
industrial uses.
b. Will any on -site roadways be left as part of the reclamation? Yes ®No ❑.
If yes, identify such roadways on the reclamation map and provide c entails on permanent road and ditch
line stabilization.
Both gated entrance roadways along with the pit perimeter access roadways will remain in place in stabilized
condition in order to provide access for monitoring and maintenance activities until future conveyance of the
property.
6. Describe the method of control of contaminants and disposal of scrap metal, junk machinery, cables, or
other such waste products of mining. (Note definition of refuse in The Mining Act of 1971.)
No off -site generated waste will be disposed of on the mine site without prior written approval
from the NC Department of Environmental Quality, Division of Energy, Mineral, and Land
Resources and either the Division of Waste Management (DWM) or local governing body. If a
disposal permit has been issued by DWM for the site, a copy of said permit must be attached to
this application. All temporary and permanent refuse disposal areas must be clearly delineated on the
mine maps) and reclamation map, along with a list of items to be disposed in said areas.
All refuse associated with the proposed activities will be removed from site and properly disposed of offsite
according to the governing applicable regulations at the time of removal.
7. Describe your plan for revegetation or other surface treatment of the affected areas. This plan must
include recommendations for % ear -round seedin,, including the time of seeding and the amount and type
of seed, fertilizer, lime and mulch per acre. The recommendations must include general seeding
instructions for both permanent and temporary revegetation. Revegetation utilizing only tree plantings is
not acceptable. Recommendations can be sought from:
a. Authorized representatives of the local Soil and Water Conservation District;
b. Authorized representatives of the NC Forest Service, Department of Agriculture and Consumer
Services;
c. Authorized county representatives of the North Carolina Cooperative Extension Service, specialists
and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at
North Carolina State University,
d. North Carolina licensed landscape architects;
e. Private consulting foresters referred by the NC Forest Service, Department of Agriculture and
Consumer Services;
f. N.C. Erosion and Sedimentation Control Planning and Design Manual;
g. N.C. Surface Mining Manual: A Guide for Permitting, Operation and Reclamation;
h. Others as may be approved by the Department.
LIME - RATE OF APPLICATION (tons/acre):
Ground Agricultural ' Lime 4,000 lbs./ac
I.
FERTILIZER - ANALYSIS AND RATE OF APPLICATION (pounds/acre):
-19-
APPLICATION FOR A MINING PERMIT
10-10-10 1 1.000 lbs./ac
SEED - TYPE(S) AND RATE(S) OF APPLICATION INCLUDING YEAR-ROUND SEEDING
SCHEDULE (pounds/acre): [NOTE: Include Legumes]
Seed Types: Seedine Dates: Seeding Rates:
Date
Type
February -April
Aug12 — Nov 1
Talll Fescue
300 lbs./ac
Nov 1 —Mar 1
Tall Fescue &
3001bs./ac
Abruzzi Rve
251bs./ac
Mar 1 — Apr 15
Tall Fescue
300 lbs./ac
Apr 15 — Jun 30
Hulled Common
25 lbs./ac
Bermuda -ass
Tall Fescue &
1201bs./ac
Jul 1 — Aug 15
Browntop Millet
35 lbs./ac
or Sorghum —
301bs./ac
Sudan HN brids
Slopes 3:1 to 2.1
Mar 1 —Jun 1
Sericea
Les edeza
50 lbs./ac
Marl — A r 15
Add Tall Fescue
120 lbs./ac
Mar 1— Jun 30
Or Add Weeping
10 lbs./ac
Love grass
Or Add Hulled
Mar 1 — Jun 30
Common
25 lbs./ac
Bermuda grass
Tall Fescue and
120lbs./ac
June 1 — Sep 1
Browntop Millet
or Sorghum —
35 lbs./ac
Sudan Hvbrids
30lbs./ac
Sericea
70 lbs./ac
Sep 1 —Mar 1
Lespedeza and
120 lbss./ac
Tall Fescue
Nov 1 —Mar 1
Add Abruzzi Rye
251bs./ac
MULCH - TYPE AND RATE OF APPLICATION (pounds/acre) AND METHOD OF ANCHORING:
Mulch — 2 tons/ac — small grain straw with asphalt emulsion @ 300 gals/ac
OTHER VEGETATIVE COVERS — TYPE (S) AND RATE (S) OF APPLICATION INCLUDING
SEEDING SCHEDULE (pounds/acre, trees/acre, spacing of trees/shrubs, etc.):
Fall
(September -October)
Loblolly Pine
3.633/ac
Shortleaf Pine
3.633/ac
Maple
1 555/ac
Revegetation and/or reforestation plan approved by:
Signature _
Print Name
Title
Agency
Date
-20-
APPLICATION FOR A MINING PERMIT
E. DETERMINATION OF AFFECTED ACREAGE AND BOND
The following bond calculation worksheet is to be used to establish an appropriate bond (based upon a range
of $500 to $5, 000 per affected acre) for each permitted mine site based upon the acreage approved by the
Department to be affected during the life of the miningpermit. Please insert the a roximate acreage or each
aWect of the mining operation, that you intend to affect during the Z fe of this mining Dermit Lin addition,please
insert the appropriate reclamation cost/acre for each category from the Schedule of Reclamation Costs
provided with this application form) OR you can deer to the Department to calculate your bond f or you based
upon your maps and standard reclamation costs:
AFFECTED
RECLAMATION
CATEGORY
ACREAGE
COST/ACRE*
Tailings/Sediment Ponds:
10 Ac.
X
$ 1,500 /Ac. _
Stockpiles:
30 Ac.
X
$ 2,000/Ac. _
Wastepiles:
82 Ac.
X
$ 2,000/Ac. _
Processing Area/Haul Roads:
59 Ac.
X
$ 2.000/Ac. _
Mine Excavation:
199 Ac.
X
$ 500/Ac. _
Other:
Ac.
X
$ /Ac.
TOTAL AFFECTED AC.:
380 Ac.
(TOTAL PERMITTED AC.:
630 Ac.)
RECLAMATION
COST
$15,000
$60,000
$164, 000
$118,000
$99,500
Temporaa & Permanent Sedimentation & Erosion Control Measures:
Divide the TOTAL AFFECTED AC. above into the following two categories: a) affected acres that drain into
proposed/existing excavation and/or b) affected acres that will be graded for positive drainage where measures will
be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands.
a) Internal Drainage 307 Ac.
b) Positive Drainage 80 Ac. X $1,500.00 = $ 120,000
SUBTOTAL COST: $576,500
Inflation Factor:
0.02 X SUBTOTAL COST: $11,530 X Permit Life Provided by Applicant (Life of the Mining Operation or Life
of Lease from Public Entity (in Years)): 50 years
INFLATION COST: $L153.000
Total Reclamation Bond Cost: $1,000,000.00
(round down to the nearest $100.00)
(NOTE: The reclamation bond cannot exceed $1 million per GS 74-54)
-21-
APPLICATION FOR A MINING PERMIT
F. NOTIFICATION OF ADJOINING LANDOWNERS
The "Notice" form, or a facsimile thereof, attached to this application must be sent certified or registered mail,
return receipt requested, to:
(1) the chief administrative officer of each county and municipality in which any part of the permitted
area is located as indicated on the mine map(s);
(2) all owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor
of the mine tract, all owners of record of tracts adjoining these tracts must be notified (that are
within 1,000 feet of the mining permit boundary) as indicated on the mine map(s); and
(3) all owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary which He directly across and are contiguous to any highway, creek, stream, river,
or other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is
owned or leased by the applicant or is owned by the lessor of the mine tract, all owners of record of
tracts adjoining these tracts must be notified (that are within 1,000 feet of the mining permit
boundary) as indicated on the mine map(s). "Highway" means a road that has four lanes of travel
or less and is not designated as an Interstate Highway.
The only exception to the above method of giving notice is if another means of notice is approved in advance by
the Director, Division of Energy, Mineral, and Land Resources.
A copy of a tax map (or other alternative acceptable to the Department) must be mailed with the completed
"Notice" form (the proposed overall permit boundaries and the names and locations of all owners of
record of lands adjoining said boundaries must be clearly denoted on the tax map).
The "Affidavit of Notification" attached to this application must be completed, notarized and submitted to the
Department, with the remainder of the completed application form, before the application will be considered
complete.
THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS
AND ALL MODIFICATIONS OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA, AS
REQUIRED BY NCGS 74-50(bl).
SEE THE NEXT TWO PAGES FOR THE "NOTICE" FORM AND THE "AFFIDAVIT OF
NOTIFICATION"
-22-
NOTICE
Pursuant to provisions G.S. 74-50(bI) of The Mining Act of 1971, Notice is hereby given that
(Applicant Name)
has applied on
(Date)
to the Division of Energy, Mineral, and Land Resources, North Carolina Department of Environmental Quality,
1612 Mail Service Center, Raleigh, North Carolina 27699-1612, for (check one):
a new surface mining permit,
❑ a modification of an existing surface mining permit to add land to the permitted area; or
❑ a modification of an existing surface mining permit to add land to the permitted area with no disturbance
in the area proposed. Please note that future modification(s) may be submitted by the applicant to
allow disturbance within this area without re -notification of adjoining landowners.
The applicant proposes to mine on acres located
(Mineral, Ore) (Number) (Miles)
(Direction)
in
of
County.
(Nearest Town)
off/near road
(Number/Name)
*SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING
ADJOINING LANDOWNER NAMES AND LOCATIONS*
In accordance with G.S. 74-50(b1), the mine operator is required to make a reasonable effort, satisfactory to the
Department, to notify all owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,
all owners of record of tracts adjoining these tracts must be notified (that are within 1,000 feet of the mining permit
boundary). In addition, the mine operator must also notify the chief administrative officer of the county or
municipality in which any part of the permitted area is located. Any person may file written comment(s) to the
Department at the above address within thirty (30) days of the issuance of this Notice or the filing of the application
for a permit, whichever is later. Should the Department determine that a significant public interest exists relative to
G.S. 74-51, a public hearing will be held within 60 days of the end of the 30-day comment period specified above.
A copy of the permit application materials is on file and available for public review during normal business
(919)_ 747-6331 . For informatic
Program staff at (919) 707-9220.
(Addressee/Owner of Record's
Name and Address)
(Date of Issuance of this Notice/
Mailed to Addressee/Owner of Record)
(Name of Applicant: Include Contact Person
& Company Name, if Applicable)
(Address of Applicant)
-23-
APPLICATION FOR A MINING PERMIT
AFFIDAVIT OF NOTIFICATION
I, Scott Martino, an applicant, or an agent, or employee of an applicant, for a new Mining Permit, or a modification
of an existing Mining Permit to add land to the permitted area, from the N.C. Department of Environmental Quality,
being first duly sworn, do hereby attest that the following are all known owners of record, both public and private, of
all tracts of land that are adjoining the mining permit boundary (including, where an adjoining tract is owned or
leased by the applicant or is owned by the lessor of the mine tract, all owners of record of tracts adjoining these
tracts, that are within 1,000 feet of the mining permit boundary) and that notice of the pending application has been
caused to be mailed, by certified or registered mail, return receipt requested, to said owners of record at their
addresses shown below, such notice being given on a form provided by the Department:
(Adjoining Landowner Name) (Address)
See Attached Appendix C for Provided map and table displaying all notified surrounding parcel owners within
1,00 feet of any proposed mining permit boundary
I do also attest that the following individual is the chief administrative officer of the county or municipality in which
any part of the permitted area is located and that notice of the pending application has been caused to be mailed, by
certified or registered mail, return receipt requested, to said office at the following address:
(Chief Administrative Officer Name)
[i.e.: City Manager, County Manager, Mayor, etc.]
Mr. Bryan Miller (Caswell County Manager)
(Address)
144 Court Square Yanceyville NC 27379
The above attestation was made by me while under oath to provide proof satisfactory to the Department that a
reasonable effort has been made to notify all known owners of record, both public and private, of all tracts of land
that are adjoining the mining permit boundary (including, where an adjoining tract is owned or leased by the
applicant or is owned by the lessor of the mine tract, all owners of record of tracts adjoining these tracts, that are
within 1,000 feet of the mining permit boundary) and the chief administrative officer of the county or municipality in
which any part of the permitted area is located in compliance withN.C.G.S. 74-50(b1) and 15ANCAC 5B .0004(d).
I understand that it is the responsibility of the applicant to retain the receipts of mailing showing that the above
notices were caused to be mailed and to provide them to the Department upon request.
r-� ~ .
Signature of Apples Date
If person executing Affidavit is an ag nt or employee of an applicant, provide the following information:
Name of applicant: dnEon
Title of person executing Affidavit viconrben46J CavtEkaxCe
I . S a Notary Public of the County of Wa Ve—
State of North Carolina, do hereby certify that <�: f ram- WLr+'no
appeared before me this day and under oath acknowledged that the above Affidavit was made b&
Witness my hand d n anal seal, this day of 2 10).
Notary: _ my OmMission expires: b tF � 2= � J 2-
HEATHER M. YEOMANS
Notary Public, North Carolina
T { Wake County - 24 -
ri My Commi 5� E it s
APPLICATION FOR A M11UNG PERMIT
G. LAND ENTRY AGREEMENT
We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or
operation during regular business hours for the purpose of making necessary field inspections or investigations as may be
reasonably required in the administration of the Mining Act of 1971 pursuant to G.S. 74-56.
We further grant to the Department or its appointed representatives the right to make whatever entries on the land as
mad be reasonablynecessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation
which the operator leas failed to complete in the event a bond forfeiture is ordered pursuant to G.S. 74-59,
LANDOWNER: X",---A
Signature: Signature:*
Print Name: u Print Name: omit nowier
(Title, if applicable)
Company F 7-lZ L L L Title: C1aa N
(If
applie i� a xina:®F cer rs41 It ►ate "n w fffi%er
Address: Com
PAY: aralhu Sunrock, uc
t' 7 C.t Il /✓ fJv'') % 2 Mine Name: pres�as�*ct, t#i!t " wr�d nutrlb n. center
Telephone: ( G) Q- 6 0 r% 2-4 Telephone: (914+0 0 747-60
Date Signed: -�� Date Signed:
*Signature must be the same as the individual who signed Page 1 of this application.
.25.
APPLICATION FOR A MINING PERMIT
G. LAND ENTRY AGREEMENT
We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or
operation during regular business hours for the purpose of making necessary field inspections or investigations as may be
reasonably required in the administration of the Mining Act of 1971 pursuant to G.S. 74-56.
We further grant to the Department or its appointed representatives the right to make whatever entries on the land as
may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation
which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S. 74-59.
LANDOWNER:
Signature:
Print Name:
(Title, if applicable)
Company
(If applicabTe)
Address
APPLICANT:
Signature:*
Print Name: Gregg Bowler
Title: Chief Operating Officer and Chief Financial Officer
Company: Carolina Sunrock LLC
Mine Name: Prospect Hill Quarry and Distribution Center
Telephone: ( ) Telephone: 9t 19j 747-6400
Date Signed: Date Signed:
*Signature must be the same as the individual who signed Page 1 of this application.
-25-
APPLICATION FOR A MINING PERMIT
I CU14111411un u141^ 4HU LUC iluuru{ F1aLC PruCessmV, lee knee next page lur ice senectule) m me Iorm a cnecK or money
order payable to the North Carolina Department of Environmental Quality must be sent to the Raleigh Central
Office at the address listed on the front cover of this application form.
Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at (919) 707-
9220.
MINING FEE SCHEDULE
A nonrefundable permit application processing fee when filing for a new mining permit, permit modification or transferred permit is
required as follows:
0-25 acres
26+acres
New Permit Applications
$3,750.00
$5,000.00
Permit Modifications
$750.00
$1,000.00
Permit Transfers
$100.00
$100.00
Annual Operating Fee
$400.00
$400.00
Acres for new permits means the total acreage at the site. Acres for modification of permits means that area of land affected by the modification within the permitted mine
area, or any additional land that is to be disturbed and added to an existing permitted area, or both.
-26-
APPLICATION FOR A MINING PERMIT
There are seven Division of Energy, Mineral, and Land Resources (DEMLR) Regional Offices. Use the map below to
locate the Regional Office serving your county.
Asheville Regional Office
• Counties: Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson,
Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey
• Address: 2090 U.S. Highway 70, Swannanoa, NC 28778
• Voice:828.296.4500
• FAX:828.299.7043
Fayetteville Regional Office
• Counties: Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Richmond, Robeson, Sampson,
Scotland
• Address: 225 Green Street, (Systel Building), Suite 714, Fayetteville, NC 28301-5094
• Voice:910.433.3300
• FAX:910.486.0707
Mooresville Regional Office
• Counties: Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly,
Union
• Address: 610 East Center Ave., Suite 301, Mooresville, NC 28115
• Voice:704.663.1699
• FAX:704.663.6040
Raleigh Regional Office
• Counties: Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton,
Orange, Person, Vance, Wake, Warren, Wilson
• Address: 1628 Mail Service Center, Raleigh, NC 27699-1628 or 3800 Barrett Drive, Raleigh, NC 27609
• Voice:919.791.4200
• FAX:919.571.4718
Washington Regional Office
• Counties: Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones,
Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne
• Address: 943 Washington Square Mall, Washington, NC 27889
• Voice:252.946.6481
• FAX:252.975.3716
-27-
APPLICATION FOR A MINING PERMIT
LAND QUALITY REGIONAL OFFICES (continued)
Wilmington Regional Office
• Counties: Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender
• Address: 127 Cardinal Drive Extension, Wilmington, NC 28405
• Voice:910.796.7215
• FAX:910.350.2004
Winston-Salem Regional Office
• Counties: Alamance, Alleghany, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph,
Stokes, Surry, Watauga, Wilkes, Yadkin
• Address: 1450 Hanes Mill Road, Suite 300, Winston-Salem, NC 27103
• Voice:336.776.9800
• FAX:336.771.4631
- 28 -
APPLICATION FOR A MINING PERMIT
SCHEDULE OF RECLAMATION COSTS
(Based upon ranee of $500 - $5,000 per affected acre}
COMMODITY CODES: SG = Sand and/or Gravel, GS = Gemstone, Borrow = Borrow/fill dirt, CS = Crushed Stone,
DS = Dimension Stone, FS = Feldspar, MI = Mica, LI = Lithium, PF = Pyrophyllite, OL = Olivine,
KY = Kyanite/Sillimanite/Andalusite, PH = Phosphate, CL = Clay/Shale, PE = Peat, AU = Gold, TI = Titanium, and OT
= Other
Type
T/S Ponds
S.piles
W.piles
P.area/H.R.
Mine Excay.
SG, GS,
$500/ac.(L)
$1800/ac.
$2000/ac.
$1800/ac.
$500/ac.(L)
Borrow
1500(FI)
$2000(PD)
CS, DS,
500(L)
1800
2000
2000
500(L)
FS, MI,
1500(FI)
2500(PD)
LI, PF, OL, KY
PH
1000(L)
2500
5000
5000
2000(L)
2500(FI)
5000(PD)
CL
1000(L)
2500
5000
5000
2000(L)
2500(FI)
3700(PD)
PE, AU,
1000(L)
2500
3000
3500
2000(L)
TI, OT
2500(FI)
5000(PD)
(L) = reclamation to a lake and revegetating sideslopes
(FI) = reclamation by filling in and revegetating
(PD) = reclamation by grading for positive drainage & revegetating
AS PER NCAC 15A 5B.0003, IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE
BOND CALCULATION WORKSHEET, YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS
FROM A THIRD PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO
THE FOLLOWING ADDRESS: Mining Program,1612 Mail Service Center, Raleigh, North Carolina 27699-1612
ALL ESTIMATES MUST INCLUDE THE FOLLOWING AS A MINIMUM:
• FINAL GRADING COSTS PER ACRE
• LIME AND FERTILIZER COSTS PER ACRE
• YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE (FROM APPROVED REVEGETATION
PLAN IN APPLICATION/PERMIT DOCUMENT)
• MULCH AND ANCHORING COSTS PER ACRE
• ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED
RECLAMATION PLAN FOR THE SITE IN QUESTION
YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERNIINATION.
-29-