Loading...
HomeMy WebLinkAbout20211108_Mine_MapsC Z T D f� ro OVERALL SITE PLAN THOMAS BORROW PIT NOV 08 2021 RALPH THOMAS JR _ NC MINING PERMIT 16-83 CARTERET COUNTY 1'=200' OCTOBER 25, 2021 APPLICATION FOR MODIFICATION PAGE 1 OF 4 PREPARED BY CAROLINA GEOLOGIC: 0 oM H � H'HZ 00 rr "Mvro HZ I b =MZ; m =cSo ZH-Dr-T' 00Z 7 D n ono on H 0 z m Z r y uI In O = z 0 � O Do 11 � MZ Z M RI'I ' O s 8' MAX. WITH WIRE I t8' MAX. WITHOUT WIRE MIDDLE AND VERTICAL WIRES SHALL BE 121/t GAUGE MIN. TOP AND BOTTOM STRAND - SHALL BE 10 GAUGE MIN. WIRE NOTES FILTRATION GEOTEXTILE USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS DIRECTED. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE, FILTRAT B47228 EC-1 Carteret County Project Special Provisions Erosion Control STABILIZATION REOUIREMENTS: Stabilization for this project sball comply with the time frame guidelines as specified by the NCO 010000 general construction permit effective August 3, 2011 issued by the North Carolina Department of Environment and Natural Resources Division of Water Quality. Temporary or permanent ground cover stabilization shall occur within 7 calendar days, from the last land - disturbing activity; with the following exceptions in which temporary or permanent ground cover shall be provided in 14 calendar days from the last land -disturbing activity: • Slopes between 2:1 and3:1, with a slope length of 10 RL or less • Slopes 3:1 or flatter; with a,slope of length of 50 ft. or less • Slopes 4:1 or flatter The stabilization timeframefor High Quality Water (HOW) Zones shall be 7 calendar days with no exceptions for slope grades or lengths. High Quality Water Zones (HQW) Zones are defined by North Carolina Administrative Code 15A NCAC 04A.0105 (25). Temporary and permanent ground cover stabilization shall be achieved in accordance with the provisions in this contract and as directed. SEEDING AND MULCHING: (East) The kinds of seed and. fertilizer, and the rates of application of seed, fertilizer, and limestone, shall be as stated below, During periods of overlapping dates, the kind of seed to be used shall. be determined. Ali rates are in pounds per acre. All Roadway Areas March 1 - August 31 September I - February 28 50# Tall Fescue 50# Tall Fescue 10# Centipedes 10# Centipede 25# Bemmdagmss (hulled) 35# Bemrudagrass (upbulied) 500# Fertilizer 500# Fertilizer 4000# Limestone 40W# Limestone Waste and Borrow Locations March 1 - August 31 September I - February 28 75# Tall Fescue 75# Tall Fescue 25# Bermudagrass (hulled) 35# Bermudagrass (unhulled) 5001S Fertilizer 500# Fertilizer 4000# Limestone 4000# Limestone 12/2I2014 24" MAX. (18" MIN.) EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH 15.. a..-.-- ___ . 10- EXSILT FENCE SP^_'CTOREMAIN 0- h -� 10IIF -- V -20. S2 Iz > -2 S--- r' A z o co } QF3 . IZ,•� 0 U w H Z O0 O_ U)LU ¢UCC yQw"J O Z N ro ao 11 w 0 o W w V z Z H W 3 V" DID In J N a N Z } z In Q = O to CL H W Z P Z w uu/unununuuo/ �,i - ' tttY/rrrr/tt//Y■tu/YY ruuuuurruuuruur�� r/rr� r�iii Ian/tY■/rrtrri///rr/■Yrr�t ttYli/r/al // - nuruur/rurn/YuuYY�nu a11W//t/■■■t/t/t////t///YYYUIa/ W!1WrrrrrrrtrrrW\rrrr/rrrr/NraltaWll E rn ■raj 'oral rt/t////Yrrr ■■/YY//YYYIr•,�Y//tl/trtCRl -. -- ERECT LINE BRACES BETWEEN END, CONNER OR m GATE KSTS AT INTERVALS NOT EXCEEDING Z o 924 FEET. 0- THIS MAXIAIUM INTERVAL MAY BE REOUOEO BY THE ENGINEER ON CURVES "ERE THE DEGREE a OF CURVATURE IS GREATER THAN 3 DEGREES. ORIXWC Li NE Z Cn PLACE LINE BRACES AT THE END OF EACH ROLL - I ( e" e' `V OR PIECE OF WOVEN WIRE, QI �+--BRACE POSTS II r^ M A LINE BRACES 00 m p (MAXI" SPACING 824') PLACE THE BRACE WIRE AROUND THE POST. DRAW WINE TAUT BY TWISTING BETWEEN 00 'n X) EACH POST. THIS APPLIES TO ALL SPACE WINES. NOTCH POETS FOR BRACES. co MPLACE TWO GALVANIZED 12e OR THREE GALVANIZED 100 ON ALL BRACES AT EACH END. Z M Z m 0 p!lIVEO TO FITS Rt g g CD`VE0 OF TO FIT �j BOILTEHINGE � NINOE CLAMP to naaurneOH USE LATCH DEVICE APPROVED BY THE ENGINEER, HINGE ASSEMBLY, AS DETAILED, IB SUGGESTED. suasTITuTION MAY BE MADE SUBJECT TO 68LT H�i',� APPROVAL BY THE ENGINEER. T i OF 3 12 REQUIRED) USE AW' DIAMETER GALVANIZED ry�T STEEL PIPE GATE FRAME EXCEPT id . O AS SHOWN HERE. ---------------- __.---- B4722B i EC-2 Carteret County Note: 50# of Bahiagrass may be sebstimted for either Centipede or Bennudagrass only upon Engineer's request. .Aliproved Tall Fescue Cultivars 2v° Millennium Duster Magellan Rendition Avenger Endeavor Masterpiece Scorpion Barlexas Escalade Matador Shelby BarleXas B Falcon B, L TV & V Matador GT Signia Bailer Fidelity Millennium Silverstar Barrington Finesse 11 Montauk Southern Choice 11 Bittmorc Firebird Mustang 3 Stetson Bingo Focus Olympic Gold Tarheet Bravo Grande ll Padre Titan Ltd Cayenne Greenkeel Ir Paraiso Titanium Chapel Hill Greystme Picasso Tomahawk Chesapeake Inferno Piedmont Tatter Constitution justice Pure Gold Trooper Chipper Jaguar Prospect Turbo Coronado Kalahari Quest Ultimate Coyote Kentucky I Rebel Exeda Watchdog Davinat Kitty Haw Rebel Sentry Wolfpack Dynasty Kitty Ha 2000 Regiment It Dominion Lexington Rembrandt On cut Bud fill slops 2:1 or stee Centipede shall be applied at the rate of 5 pounds per acre and add 20N of Sericea LespedezajRom January 1 - December 31. I Fertilizer shall be 10-20-20 anai A different analysis of fertilizer may be used provided the 1-2-2 ratio is maintained and the of application adjusted to provide the same amount of plant food as a 10-20-20 analysis and rected. Native Grass Seeding and Mulching (East) Native Gnus Seeding and Mulch'- shall be performed on the disturbed areas of wetlands and riparian areas, and adjacent to S Relocation construction within a 50 foot zone on both sides of the stream or depressio Ineastued from top of stream bank or center of depression. The stream bank of the stream r on shall be seeded by a method that does not alter the typical cross section of the stye bank. Native Gress Seeding and Mulching shall also be performed in the permanent soil enforcement mat section of preformed Boozer holes, and in other areas as directed. The kinds of seed and fertilizer, lid the rates of application of seed, fertilizer, and limestone, shall be as stated below. During:#Tiods of overlapping dates, the kind of seed to be used shall be determined. All rates are in Do" per acre. 12/2/2014 DEPTH FENCE CORNER USE MEN CORNER ANGLE IB IS- OR GREATER 1 11 11 It i_U u U U POST FOR BLOCKING DRIVEY4sV6 OR OTHER ENTRANCES INSTALL IN ADDITION TO FENCE MERE SHOWN IN P-ANS OR WHERE DIRECTED BY THE ENGINEER CROSS SECTION A - A HORIZONTAL SCALE: V-30' VICINITY MAP 111=2,00011 I 70 f - SITE . -.. .. ..- . _:. i N , .N• 4 V� m4 e•. o JirIn (( Q Dfu1 C� s (��a d �81� �NIL3 RUsSELL RD Dead Cow N� .Field V� i .I ' ., $1C��(•f� 4 "o; -x<av ca - �/ 4 -�XYIN CT k Z O U Q Q Q H Q U, U = UD 00Z oorjj = Z S Q - m0eq F 2' " UU �=0Q_J Z '> OL H ��� D- Q LLI J o L; Z L) Z Lu co Cc LL O ct CC N4 2 O h-Z N �W$ vl 3H 0 Z Z w 0 o I'I'I H � -H "C. Z r0M Da -1 on H Z = D =amnm 2InOO ZHOF. s n D p q co 0 z t d oN H F- NOTE$ O 00a) Z z o 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. I__ =1' z W 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION tnt­-U_a-1 BY ALL CONSTRUCTION VEHICLES. z o to 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. w o PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. o 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY, 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO Uj BE DETERMINED BY THE ENGINEER. V 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED Z BY THE ENGINEER. o S. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. CZ7 W 3 Q O N cc 0 o = z Ina 65 V H -I J W > NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE 15 10 CATEGORY CURRENT AFFECTED ACREAGE PROPOSED CHANGE TO AFFECTED ACREAGE TOTAL AFFECTED ACREAGE Tailings/Sediment Ponds 0.00 0.00 0.00 Stockpiles 0.00 0.00 0.00 Waste piles 0.00 0.00 0.00 Processing Areas/Haul Roads 1.07 0.00 1.07 Mine Excavations 4.82 7.00 11.82 Other (Please explain) 1.07 0.75 1.82 Total Affected Acreage 6.96 7.75 14.71 Total Permitted Acreage 6.96 14.71 NOV 08 2021 20 Designer Scale As SHOWN Drawn By Date lab No. Checked By THOMAS BORROW PIT �BEAUFORT CARTERET NORTH CAROLINA DETAILS Sheet No. 30F4 a 0 f1d N O N L O s T O 9 e O L N P 3 O C W 2 Z Z pi ryZI W a� 0 n N O s V C O "m c 0 n a t 0 t 0 m w 0 O_ m h O n i v� 0 n i i ]t