Loading...
HomeMy WebLinkAbout2003_renewal_mapsvAv 0 Y AUN IGUL IUNAL. J� DATE REVISIONS AND RECORD OF ISSUE 'IN O'lBY'lCK'IAPPI DATE I REVISIONS AND RECORD OF ISSUE Ire �1 I "' •; ' ' 1 sti � ,ai: 750 740 r- 100' RAILROAD ROW/ 100' BUFFER FROM PRCIPFRTY 1IMP PROPERTY LINE/ (L OF RAILROAD i I 0 (ROW CROPS ) \ DESIGNED RJH 2301 WEST MEADOWVIEW ROAD SALE PROJECT N0, DRAWN CADD/RLB �_ r GREENSBORO, NC 27407 CHECKED ___ M PHONE: (336) 323-0092 APPROVED -� �r 1 "=200' 624.01 T ENGINEERING © rights Joyce Engineering, Inc. APP D �' ' E 1 !23/O3 , INC. Al� �gnts reservau. LEGEND EXISTING 10' TOPOGRAPHIC CONTOUR — — 710 — - EXISTING 2' TOPOGRAPHIC CONTOUR - - PROPERTY LINE PERMIT LIMITS EXISTING ROAD STREAM ... _ .. - FEMA 100 YEAR FLOODPLAIN BOUNDARY AFFECTED AREA LIMITS (2002-2003) 21.8 AC � _ _ J POTENTIAL FUTURE LCID LIMITS _ _ _ _ _ _ _ _ RAILROAD TRACKS BUILDING POWER POLE L� PIEZOMETER E� PZ-1 ABANDONED GROUNDWATER MONITORING WELL LOCATION AND IDENTIFICATION Gw-1 PROPOSED WELL LOCATION AND IDENTIFICATION MW-1 SURFACE MONITORING POINT LOCATION AND IDENTIFICATION © SMP-1 EXISTING ROCK DAM NEW ROCK DAM DIVERSION DITCH NOTES: 1. THE TOPOGRAPHY SHOWN WITHIN THE PROPERTY LINE/MINING LIMITS WAS COMPILED BY SPACIAL DATA USING ANALYTICAL STEREO PHOTOGRAMMETRIC METHODS FROM PHOTOGRAPHY DATED 06/01/02. HORIZONTAL GRID IS BASED ON THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM, 1983. 2. TOPOGRAPHY OUTSIDE THE LIMITS SHOWN FOR THE 07/97 SURVEY WAS OBTAINED IN 1995 AND WAS PROVIDED BY GUILFORD COUNTY AND THE CITY OF GREENSBORO, NORTH CAROLINA. 3. EXISTING MINE AND SEDIMENT CONTROL FEATURES ARE BASED ON MINE MAP PRGQUCEEU BY ALLE�f, '001VUAMS, CARMEN, & KING, INC., CONSULTING ENGINEERS, DATED NOVEMBER 13, 1998. 4. CONTOURS SHOWN IN WOODED AREAS ARE APPROXIMATE. 5. THE PROPERTY LINES SHOWN ARE BASED ON THE RECOMBINATION MAP FOR RANKIN FRYAR BY MORGAN SURVEYING & DESIGN, DATED MAY 9, 2002, REVISED JUNE 3, 2002. PROPERTY LINE LOCATIONS ARE APPROXIMATE. 6. OWNER HAS CONDUCTED EARTHWORK ACTIVITIES WITHIN THE MINING LIMITS SINCE THE DATE OF THE SURVEY. EXISTING CONTOURS SHOWN MAY NOT BE ACCURATE. 7. PROPOSED USE OF LAND WILL BE HAY PRODUCTION AND PASTURE AFTER MINING OPERATIONS ARE CONCLUDED. 8. FEMA 100-YEAR FLOODPLAIN BOUNDARY WAS TAKEN FROM GUILFORD COUNTY, NORTH CAROLINA FIRM PANEL NO. 370111 0130 C, DATED 11/18/88 AND PANEL NO. 370111 0128 C, DATED 11/18/88. FLOODPLAIN BOUNDARY SHOULD BE CONSIDERED APPROXIMATE. 9. NATIVE SOIL TYPE: ENON (BASED ON GUILFORD COUNTY SOILS MAP). 10. THE SITE IS PERMITTED UNDER THE MINING ACT OF 1971. THE SITE PERMIT NUMBER IS 41-19 AND IS OPERATED BY FRYAR GRADING AND HAULING, INC. 11. THE TOTAL SITE ACREAGE IS APPROXIMATELY 123 ACRES. 12. TOTAL AREA DISTURBED BY MINING IN THE LAST 12 MONTH PERIOD IS APPROXIMATELY 6 ACRES. 13. TOTAL AREA RECLAIMED BY SEEDING IN THE LAST 12 MONTH PERIOD IS APPROXIMATELY 6 ACRES. 14. ESTIMATED AREA TO BE NEWLY DISTURBED BY MINING IN THE NEXT 12 MONTH PERIOD IS APPROXIMATELY 10 ACRES. 15. LIMITS OF CLEARING AND GRADING ARE THE SAME AS THE AREA TO BE MINED. 16. SCC-1 DESIGN PARAMETERS: Q(25)=31 CFS : RIPRAP LINED TRAPEZOIDAL CHANNEL 2W:2H, 2:1 SIDE SLOPES AT 8% SLOPE. 17. ST-1 AND ST-2 TRAP AREA = 145 X 70 X 2.5' Q(10) = 23 CFS TRAP EFFECIENCY: 2i e Cs PEAK SURFANFLOW X .0110_1 .23sf (.23 AC) 75 % TRAP EFFECIENCY PERMANENT AND TEMPORARY SEEDING SPECIFICATIONS UPON COMPLETION AND ACCEPTANCE OF THE IMPROVEMENTS OUTLINED IN THE PHASING PROGRAM, THE ENTIRE AREA DISTURBED BY PROJECT CONSTRUCTION SHALL BE PROVIDED WITH A PERMANENT VEGETATIVE COVER. THE DISTURBED AREAS SHALL BE FINELY TILLED BY HARROWING. WHERE SOIL CONDITIONS ARE UNFAVORABLE FOR SUCCESSFUL ESTABLISHMENT OF COVER, AVAILABLE TOPSOIL SHALL BE SPREAD. DOLOMITIC LIMESTONE SHALL BE APPLIED AT THE RATE OF 4,000 LBS. PER ACRES AND A 10-10-10 COMMERCIAL FERTILIZER MIX SHALL BE APPLIED AT A RATE OF 1,000 LBS. PER ACRE TO THE DISTURBED AREA. IT SHALL BE UNIFORMLY APPLIED TO DISTURBED AREAS ACCORDING TO THE FOLLOWING SCHEDULE BY BROADCASTING WITH A CYCLONE SEEDER OR CLOSE DRILL. SEED SHALL BE LIGHTLY COVERED AND SOIL SHALL BE FIRMED. STRAW MULCH SHALL BE APPLIED TO THE SEEDED AREA AT THE RATE OF 1 1/2 BALES PER 1,000 SQ. FT. TEMPORARY SEEDING SCHEDULE SCHEDULE FOR PROVIDING PERMANENT DATES RATE (LB/ACRE) VEGETATIVE COVER JANUARY 1 - MAY 1 DATES RATE (LB/ACRE) LIMESTONE 2000 NOVEMBER 1 -JANUARY 31 FERTILIZER (10-10-10) 750 TALL FESCUE 100 RYE (GRAIN) 120 RYE 50 MULCH - STRAW & TACK 4000 MAY 1 - AUGUST 15 FEBRUARY 1 - APRIL 30 LIMESTONE 2000 TALL FESCUE 80 FERTILIZER (10-10-10) 750 BLUEGRASS 60 GERMAN MILLET 40 MAY 1 - JULY 31 MULCH - STRAW & TACK 4000 TALL FESCUE 70 AUGUST 15 - JANUARY 1 WEEPING LOVEGRASS 20 LIMESTONE 2000 AUGUST 1 - OCTOBER 31 FERTILIZER (10-10-10) 1000 TALL FESCUE 100 RYE (GRAIN) 120 SUDAN HYBRID c z 50 MULCH - STRAW & TACK 4000 G'' S J 7 FRYAR GRADING AND HAULING, INC. DRAWING GUILFORD COUNTY, NORTH CAROLINA NO. FRYAR MINE MAP I 1 PERMIT #41-19 1 • • • 40 ! • 40 40 40 40