DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
81-10 Project Action New
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Town of Lake Lure
X
Applicant's Email:
loa@townoflakelure.com
County:
Rutherford
Project Name:
Morse Park
YES
NO
Date Commencing
Have land disturbing activities started??
—
01/21/2016
Latitude:
35.43560
Longitude:
-82.22880
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 07/30/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
-/
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
F71
I
✓
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
Ll./
(If Yes, amount):
Watershed/Stream Name & Classification:
Lake Lure B;Tr
DWR Compliance Status of Mine:
DWR is unaware of any compliance issues with this mine.
401 Wetland Cert. required?
401 Wetland Cert. existing?
❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
Is a Pumping Operation & Monitoring (OM) Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
I
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑
1
❑✓
Is a wetland delineation required prior to DWR issuing the permit?
I
El
I
✓
JD
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
Stream Determination Completed?
❑
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?�—I
El
I
Rev. April 2021
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
✓
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
O&M Requirements
./
HQW/7Q10 Concerns
./
Pay back fees or renew DWR permit
z
Other
7
Please describe the
reason to hold the
permit:
The project application indicates temporary construction entrances and temporary mats will be used within Lake Lure.
The US Army Corps of Engineers considers these temporary fills. In addition, if the direct excavation below the normal
water level of Lake Lure involves the double -handling of dredge spoils, that activity may also be considered a fill. DWR
recommends DEMLR secure correspondence from the Corps indicating no 404/401 required.
RO contact:
Andrew Moore
Hold Until:
Mine must wait to dewater until an O&M plan is approved? Ll
Reviewed
Central Office Date Regional Office
Date
DWR RO Surface Water Andrew Moore
07/26/2021