Loading...
HomeMy WebLinkAbout20200910_LQS_CommentsParr, Adam From: Denton, Bill Sent: Thursday, September 10, 2020 8:20 AM To: Parr, Adam Subject: RE: 53-26 - Little River Quarry/Luck Stone - LEE Co. - Transfer Attachments: Review of permit transfer/Little River LLC to Luck stone/permit 53-26 (formerly Little River Quarry to Sanford Quarry Adam: See Diane's comments in the attachment. She comments on the E&SC aspects of the submittal. It would be nice to get those issues addressed on the current mine map, but I'm not sure if it is appropriate for this type of application. It may be better to deal with those in the future. Whichever way you want to go with it is fine with me. William H. Denton, IV, PE Regional Engineer —RRO Division of Energy, Mineral, and Land Resources — Land Quality Section Department of Environmental Quality 919 791 4200 office bill.denton()ncdenr.aov 1628 Mail Service Center, Raleigh, North Carolina 27699 - `Nothing Compares s Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Parr, Adam <adam.parr@ncdenr.gov> Sent: Tuesday, September 8, 2020 10:35 AM To: Denton, Bill <bill.denton@ncdenr.gov> Subject: 53-26 - Little River Quarry/Luck Stone - LEE Co. - Transfer Bill, Did the regional office have any comments for the Little River Quarry / Luck Stone transfer? I believe this is a greenfield, so I don't know if there is much to comment on anyway. Thanks, Adam Parr Assistant State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: (919)707-9207 FAX: (919)715-8801 Email: adam.parrOncdenr.gov Physical Address: 512 N Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deci.nc.gov/mining-program ��a: D�-EC uawnniantof — Ovaty 114, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Parr, Adam From: Adams, Diane Sent: Thursday, September 3, 2020 9:10 AM To: Denton, Bill Subject: Review of permit transfer/Little River LLC to Luck stone/permit 53-26 (formerly Little River Quarry to Sanford Quarry Attachments: 53-26_little river quarry_20200821_inspection report.pdf; 20200821_134119 (1) jpg; 20200821_143630(2)jpg M1 I have reviewed the permit application package and offer the following comments: 1. On the sediment and erosion control plan sheet, all skimmer locations and spillways should be clearly shown (sheet 7 of 16). 2. Plan detail shows a rock dam/sediment basin. Please clarify where such basins are located and drainage area of those basins. 3. Clean water diversion detail on page 13 of 16 needs to be modified to show matting of the diversion. The construction sequence should state that the clean water diversion will be matted and stabilized immediately. Seeding specification should be included in sediment and erosion control plan portion of the package �rosion control plan should include current stormwater requirements language to include: a. "The contractor shall conduct self -inspections of the erosion and sedimentation control measures and compete the following combined self -inspection form found on the DEMLR website (http://deq.nc. gov/about/divisions/energy-mineral-land-resources/erosion-sediment- control/formsl. Complete inspection forms shall be kept on -site and available for inspection at all times. It is recommended a copy be kept in a permits box." (GS 113A-54.1 (e), 15A NCAC 0413.0131, NCG01 Section IIB (3)) . A copy of the form should be i'�ncluded. b "Self -inspections for erosion and sedimentation control measures are to be performed at least wl� once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring." r 7Y. Y Detail the decommissioning of the skimmer basins in the construction sequence. Include the planned \ use of the silt bag during this process. (GS 1�57(3), 15A NCAC 04B .0113) I have included two pictures taken on the 21 st of August and my inspection report for that day. Please advise if you require additional information. Sincerely Diane Adams