Loading...
HomeMy WebLinkAboutFW_ _External_ DENY the New RDU Quarry Mining Permit ApplicationJohnson, Robert E From: Johnson, Robert E Sent: Monday, July 20, 2020 7:44 AM To: NCMiningProgram Subject: FW: [External] DENY the New RDU Quarry Mining Permit Application Robert 'Johnson Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Libby Slight [mailto:libbyslight@gmail.com] Sent: Friday, July 17, 2020 5:36 PM To: Johnson, Robert E <Robert.Johnson@ncdenr.gov> Subject: [External] DENY the New RDU Quarry Mining Permit Application Dear DEQ, The Department of Environmental Quality (DEQ) must deny the mining permit application due to significant environmental harm caused to Umstead State Park, recreational users, and homeowners along Old Reedy Creek Road under subsections 2, 3, 4, 5 and 6. I have been a resident of Wake County for almost 32 years. I participated in both the June 23, 2020 and July 7, 2020 virtual public hearings regarding the permit. During the June 23, 2020 session over 570 participated. Over 75 speakers were allowed to speak during the allotted 4 hour session and they voiced their concern about the proposed new quarry for the Odd Fellows Tract,105 acres adjacent to William B. Umstead State Park, one of the busiest and most popular state parks in North Carolina.The speakers included experts ranging from environmental scientists, wildlife experts, civil and environmental engineers, educators, attorneys, advocacy groups, politicians and concerned Triangle residents. I will sight some of their expertise and comments. (It is highly suspect that the WebEx recordings for both virtual sessions were not made available to all participants. At least they should have been available on your website.) Let's evaluate each subsection of the permit in violation. Subsection 2 states: That the operation will have unduly adverse effects on potable groundwater supplies, wildlife, or fresh water, estuarine, or marine fisheries. a. There is strong evidence for the low flow rates of Crabtree Creek to decrease and thereby affect the permits from the North Cary Water Reclamation Plant. That is because the two 400 ft. deep rock pits on both sides of the Creek with minimal buffers would "suck" the water out of the Creek for the 1.5 miles along Crabtree just down stream of the Cary plant. Many on the call said that Crabtree Creek would die if the quarry is allowed to proceed. b. According to Dr. Ron Sutherland, Chief Scientist, Wildlands Network, the southern end of Umstead represents the best chance to make sure the state park remains ecologically connected to other natural areas, particularly Jordan Lake, which has over 40,000 acres of public forest/gamelands. Jordan Lake's forests are also connected (via several large rivers) to the broader network of habitat across North Carolina, and it is essential to try to keep Umstead linked together with that network. The proposed quarry would close off the wildlife corridor between Jordan Lake and Umstead Park that keeps the wildlife inside the Park thriving, creating habitat fragmentation, resulting in the death of many species in the Park. Deforestation would also negatively impact the habitats of species. Subsection 3 states: That the operation will violate standards of air quality, surface water quality, or groundwater quality that have been promulgated by the Department. a. In addition to the current and future low flow rates described above under 2.a., there is evidence that Wake Stone has been allowing run off from their current operations directly into Umstead Park and Crabtree Creek. Please view photos of the Odd Fellows Tract as taken by an anonymous park patron and then turned into this video, The Ghost of Oddfellows, by documentarian and filmaker, Charles Morris- https:Hvoutu.be/EENixnfBLBw You can also see photos of the run off from their quarry operations directly into Umstead State Park and Crabtree Creek in: The #stopRDUQuarry Explainer Video! b. Further evidence of violation of air quality, surface water quality, and groundwater quality can be found in Charles Morris' documentary, 400 Feet Down. Subsection 4 states: That the operation will constitute a direct and substantial physical hazard to public health and safety or to a neighboring dwelling house, school, church, hospital, commercial or industrial building, public road or other public property, excluding matters relating to use of a public road. a. The proposed quarry is to reside FEET from the Dunn Family residence. Potential home structural damage, and real public health concerns relating to air and water quality are anticipated. Charles Morris' documentary above shows the potential impact of the close proximity of a quarry. Subsection 5 states: That the operation will have a significantly adverse effect on the purposes of a publicly owned park, forest or recreation area. a. Thomas W. Morse, Superintendent of State Parks, North Carolina, states the one basic purpose of state parks is TO SERVE PEOPLE. That's it! b. The new pit would be within feet of the Old Reedy Creek Road Greenway. This is perhaps one of the most popular Greenways in the region. It is part of the East Coast Greenway Trail System, N Mountains to the Sea Trail. The noise, dust, and air quality would be a serious issue impacting people's health. c. Wake Stone anticipates 500 huge dump trucks per day. This would greatly impact our Greenways and would NOT be a safe or pleasant experience for the PEOPLE. Will the PEOPLE BE SERVED with a quarry adjacent to Umstead State Park? NO! Adverse and unmitigable impacts would occur to potable groundwater supplies; wildlife; Crabtree Creek; water and air quality standards; and direct hazard to public health, safety and property; our prized William B. Umstead State Park and the connected Old Reedy Road Corridor. d. There are 1.8 million visitors to Umstead State Park. This number is up 35% over the prior year. THESE are the PEOPLE that YOU MUST SERVE! Do not allow a new quarry to be built adjacent to Umstead State Park. It will adversely affect the purpose of this publicly owned park. Subsection 6 states: That previous experience with similar operations indicates a substantial possibility that the operation will result in substantial deposits of sediment in stream beds or lakes, landslides, or acid water pollution. a. Wake Stone has been allowing run off from their operations directly into Umstead State Park and Crabtree Creek. Heavy sediment from the quarry can be found in Crabtree Creek. I refer you back to Subsection 3, a. and b. for photographic evidence. Finally, the Department of Environmental Quality (DEQ) must deny the mining permit application due to significant environmental harm caused to Umstead State Park, recreational users, and homeowners along Old Reedy Creek Road under subsections 2, 3, 4, 5 and 6. Sincerely, Elizabeth Slight 405 Lochside Drive Cary, NC 27518 libbyslight(a-gmail.com