HomeMy WebLinkAbout20210716_mine_mapCJ12tGINPt Ci.�V ,NO t-EvO-' ___� .�-
z a'F s-n M k-veD
S 25'-ro-twi-
Co M el
--------------
MINING IAREA CRp55-$cGTeO�
NbT 1-0
8' max.
standard strength
fabric with wire fence
6' max.
extra strength
fabric without wire fence
Steel e
post
)
Wire
f)
fence
_
-f5a
Natural
3
},{
ground
Pa
1 r „
8" dowr ..
�..�
ftheteGiootnch
24"
Filter
fabric
24"
Cross -Section
View
Filter
Steel"f f ab ric Backfill trench Natural
post and compact ground
thoroughly
•4i' � Upsl�
min
min
`J 1 LT t'ri N C.c_
o CiA t t`
3\ �
azimtTea ,suam �i;Atl
Na'C iu SLAKE
"IlT Ft Niw -j
5v' w +tavo5
DV
1
r3 ' trlc
1�1ab 5p Tom`
M
t
CR 0 ATALN
_N RTIO Np�
t aT
2 3"
coarse aggregate
Figure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified from Va SWCC).
G"4ZAVEL CONS tTzLjcftoe4 Eiv'azA"CE JG W L
X5e), UNDt S�-11G
aEalmr � °•?
QNn ' n
e
N`D
/ a✓
/ oZa
Jr
F Lp
All ky ' ! �`A �1
p4A 2 ��
z
n
p `0 1r
t� j ! Q T
1.4 ('
rN4 LiM47 l3 t]
o
o
h
CIZDN—tA,rnJ
� txnD N PrC
-�b2C n'L
e
TE
C, AU
v. BELL LAiv£ . 5 G4
OGLE
vtr
V1CIVITY NAP (NOT TO SCALE')
C9 t�N
�� l(ONprt„
'FDR G5T
/ ,jOvNi)Al2
r
,P�ioR"z`1 Lt
Development and Operation Plan
C IZUd�.TAIJ
lt�N�C-
Fe r[ Hs
J04W Z. 5ieNLE-(
6vC-,2-vc"
�- "D1scAA24c
avt+J'(
Gravel Construction Entrance will be established as shown, utilizing existing haul road.
Silt fence will be installed 50 feet from all wetlands. A perimeter berm will be established
inside of the silt fence along the perimeter of the Mining Area. Excavation will begin in
"Initial Mining Area" adjacent to the Haul Road . This initial excavation will serve as
sediment and erosion control for establishment of the remainder of the Mining Area. All
stormwater runoff and excess groundwater from all disturbed areas will be directed into
this excavation and retained without discharge. When water within the "Initial Mining Area
is clear, it will be pumped as necessary into the existing pond (previously mined area). As
that pond fills, overflow will be discharged at "discharge point", which was the discharge
point of the previous mining operation.
Reclamation Plan
All mining areas on this site will be left as a lake. As the excavation reaches the final
mining limits, the slopes will be graded to a 3:1 slope. All disturbed areas that remain
above water will be graded to a 3:1 slope or flatter and seeded according to schedule to
prevent erosion. Perimeter berms will be removed and graded. The plant and processing
area will also be graded and seeded to prevent erosion. Any haul roads will be stabilized
to prevent erosion and left for access to the property.
EML
t-1mz-ra
`1
C raSL r
CJ cov"T
7� \
1,
i.
a Nmeil
ryN0 N "t t=in 12b
O ISO
1"=iED'
1? T0.
MO t<FQiZO
t�� 9c�Sp1'1
ltC
4e�c�s
300 '! so
Affected Acreage:
Mining Area:
Haul Roads:
52.5 acres
1.6 acres
Carteret Dirt Pit
Sunland Sand and Gravel, Inc
Carteret County, NC
1"=150' July 1, 2021
Site Plan
By Carolina Geological Services, Inc.