Loading...
HomeMy WebLinkAbout20210821_Jurisdictoinal_Feature_ReportJURISDICTIONAL FEATURE DELINEATION Sunland Hwy 24 Sand Mine Project Site Carteret County, NC Ground Truth Job # 21-157 Prepared For: TC Cleve Construction Layout/Project Manager Sunland Builders, Inc. P.O. Box 1436 Cape Carteret, N.C. 28584 Prepared By: Ground Truth Soil Consulting, PLLC 1302 Roberts Road Newport, NC 28570 (252) 725-1320 August 13, 2021 j� dhnZC. RoberC.its INTRODUCTION & SITE DESCRIPTION Ground Truth Soil Consulting, PLLC (Ground Truth) was employed to complete a Jurisdictional Feature Delineation within the study area located on the north side of NC Hwy 24 in Newport, Carteret County, NC (PINs: 630501077857000). The project study area consists of approximately 29 acres and is shown in red on Figures 2 and 3. INVESTIGATION METHODOLOGY The field survey was conducted from May to June 2021, by John C. Roberts, LSS. The jurisdictional delineation was performed using the three -parameter approach as prescribed in the 1987 US Army Corps of Engineers (USACE) Wetlands Delineation Manual (Environmental Laboratory 1987). The Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0) was also utilized. Hydric soil determinations were made using Field Indicators of the Hydric Soils in the United States, Version 8.2 (2018). FINDINGS A jurisdictional wetland was identified on the property (Figures 2 - 3). A site visit with Army Corp of Engineers (ACOE) representative Thomas Charles was completed on August 6, 2021. The jurisdictional features shown in the attached figures were confirmed by Mr. Charles. It is highly recommended that development of this property is completed without any impacts to the jurisdictional features. CONCLUSIONS Jurisdictional features were identified within the project study area and were confirmed by the ACOE. Site work is not expected to include the ACOE's jurisdiction if required setbacks are maintained from jurisdictional features that include the wetland in the southern portion of the project study area. Extreme care should be taken to not impact or disturb these features. Please note that no site work is expected north of the Limit of Investigation line shown in Figures 2 and 3. Sunland Hwy 24 Sand Mine Project Site 1 August 13, 2021 Ground Truth Job #21-157 Jurisdictional Feature Delineation ■ gg H5 u 1 I r 7 ,�• S ✓' rw ^' _ yak. e� a. n—� • � t�i�sti Legend Vicinity Map Long:-76.99961 Lat: 34.71451 0 Property Boundary Google Maps Date: Potential Jurisdictional Feature July 2021 ,1Figure Delineation Scale: Sunland Proposed Sand Pit 0 2000 4000 ft HWY 24, Bogue NC 1 Ground Truth Soil q`►r GT Job #: Consulting, PLLC Carteret County, North Carolina 21-157 i i i I 1 Potential Wetland WA I r r r r r f f i 1 Potential Wetland WA Potential Wetland WA \ Legend Existing Culvert 0 Property Boundary Project Study Area LiDAR Map Limit of Investigation Long:-76.99961 Lat: 34.71451 Potential Wetland Line Google Maps Ground Truth Soil Consulting, PLLC Potential Jurisdictional Feature Delineation Sunland Proposed Sand Pit HWY 24, Bogue NC Carteret County, North Carolina Date: July 2021 Scale: 0 125 250 ft GT Job #: 21-157 Figure 3 Mma i I John Roberts <John.robe rts@groundtruthsoi1.com> Sunland HWY 24 Sand Mind Site Review 3 messages John Roberts <john.roberts@groundtruthsoil.com> Mon, Jul 26, 2021 at 11:42 AM To: holley.snider@ncdenr.gov, "Charles, Thomas P CIV USARMY CESAW (USA)" <thomas.P.charles@usace.army.mil> Good morning Holley and Tom. I would like to get on your schedule for a site visit for the Sunland Sand Mine located off HWY 24 in Bogue, Carteret County, NC. I have attached a few maps for your reference and the signed agent authorization forms. Let me know if you need anything further from me. Thanks John John Roberts, LSS, PWS Ground Truth Soil Consulting, PLLC 252-725-1320 john.roberts@groundtruthsoil.com www.groundtruthsoil.com 3 attachments Sunland Hwy 24 Borrow Pit_Figures_vl.pdf 1007K SunIan d_Hwy24_BorrowPit—AG ENT_AUTH0RIZATION_FORM_signed.pdf 27K Sunland _NCHWY24_DWR_ AGENT _ AUTHORIZATION_ FORM_signed.pdf 29K John Roberts <john.roberts@groundtruthsoil.com> Tue, Aug 10, 2021 at 3:37 PM To: holley.snider@ncdenr.gov, "Charles, Thomas P CIV USARMY CESAW (USA)" <thomas.P.charles@usace.army.mil> Good afternoon Tom. Thanks again for meeting with me last Friday. As discussed, the sand mining operation will maintain a 50-ft buffer from the wetland delineation line shown on the attached figures. Mining activities will not extend past into these wetland areas or outside the "Study Area" identified on the attached figures in red. Please let me know if you have any questions or need additional information. Thanks John r Virus -free. www.avast.com [Quoted text hidden] 66,100 Virus -free. www.avast.com i Sunland Hwy 24 Burrow Pit_Figures.pdf 10541 K Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Tue, Aug 10, 2021 at 4:11 PM To: John Roberts <john.roberts@groundtruthsoil.com>, "holley.snider@ncdenr.gov" <holley.snider@ncdenr.gov> John, Your project is not in the Corps jurisdiction Sunland Proposed Sand Pit WHY 24, Bogue NC Carteret County, NC Figure 2 Date 7/2021 GT Job # 21-157. Regards, Tom Tom Charles thomas.p.charles@usace.army.mil Regulatory Specialist 910-251-4101 cell 910-465-7602 https:Hwww.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/ The Wilmington District is committed to providing the highest level of support to the public. E-PCN WilmingtonNCREG@usace.army.mil PJDs' & JD's. http://saw-reg.usace. army.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https:Hregu Iatory.ops. usace.army. mil/customer-service-survey/ [Quoted text hidden] Sunland Hwy 24 Burrow Pit_Figures.pdf 10541 K