HomeMy WebLinkAbout20210821_Jurisdictoinal_Feature_ReportJURISDICTIONAL FEATURE
DELINEATION
Sunland Hwy 24 Sand Mine Project Site
Carteret County, NC
Ground Truth Job # 21-157
Prepared For:
TC Cleve
Construction Layout/Project Manager
Sunland Builders, Inc.
P.O. Box 1436
Cape Carteret, N.C. 28584
Prepared By:
Ground Truth Soil Consulting, PLLC
1302 Roberts Road
Newport, NC 28570
(252) 725-1320
August 13, 2021
j�
dhnZC. RoberC.its
INTRODUCTION & SITE DESCRIPTION
Ground Truth Soil Consulting, PLLC (Ground Truth) was employed to complete a
Jurisdictional Feature Delineation within the study area located on the north side of NC Hwy
24 in Newport, Carteret County, NC (PINs: 630501077857000). The project study area
consists of approximately 29 acres and is shown in red on Figures 2 and 3.
INVESTIGATION METHODOLOGY
The field survey was conducted from May to June 2021, by John C. Roberts, LSS. The
jurisdictional delineation was performed using the three -parameter approach as prescribed in
the 1987 US Army Corps of Engineers (USACE) Wetlands Delineation Manual
(Environmental Laboratory 1987). The Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0) was also
utilized. Hydric soil determinations were made using Field Indicators of the Hydric Soils in
the United States, Version 8.2 (2018).
FINDINGS
A jurisdictional wetland was identified on the property (Figures 2 - 3). A site visit with
Army Corp of Engineers (ACOE) representative Thomas Charles was completed on August
6, 2021. The jurisdictional features shown in the attached figures were confirmed by Mr.
Charles. It is highly recommended that development of this property is completed without
any impacts to the jurisdictional features.
CONCLUSIONS
Jurisdictional features were identified within the project study area and were confirmed by
the ACOE. Site work is not expected to include the ACOE's jurisdiction if required setbacks
are maintained from jurisdictional features that include the wetland in the southern portion of
the project study area. Extreme care should be taken to not impact or disturb these features.
Please note that no site work is expected north of the Limit of Investigation line shown in
Figures 2 and 3.
Sunland Hwy 24 Sand Mine Project Site 1 August 13, 2021
Ground Truth Job #21-157 Jurisdictional Feature Delineation
■
gg
H5 u
1 I r 7
,�• S ✓' rw ^' _ yak. e� a.
n—�
• � t�i�sti
Legend Vicinity Map
Long:-76.99961 Lat: 34.71451
0 Property Boundary Google Maps
Date:
Potential Jurisdictional Feature July 2021
,1Figure
Delineation Scale:
Sunland Proposed Sand Pit 0 2000 4000 ft
HWY 24, Bogue NC 1
Ground Truth Soil q`►r GT Job #:
Consulting, PLLC Carteret County, North Carolina
21-157
i
i
i
I
1 Potential
Wetland WA
I
r
r
r
r
r
f
f
i
1
Potential
Wetland WA
Potential Wetland WA \
Legend Existing
Culvert
0 Property Boundary
Project Study Area LiDAR Map
Limit of Investigation Long:-76.99961 Lat: 34.71451
Potential Wetland Line Google Maps
Ground Truth Soil
Consulting, PLLC
Potential Jurisdictional Feature
Delineation
Sunland Proposed Sand Pit
HWY 24, Bogue NC
Carteret County, North Carolina
Date:
July 2021
Scale:
0 125 250 ft
GT Job #:
21-157
Figure
3
Mma i I John Roberts <John.robe rts@groundtruthsoi1.com>
Sunland HWY 24 Sand Mind Site Review
3 messages
John Roberts <john.roberts@groundtruthsoil.com> Mon, Jul 26, 2021 at 11:42 AM
To: holley.snider@ncdenr.gov, "Charles, Thomas P CIV USARMY CESAW (USA)" <thomas.P.charles@usace.army.mil>
Good morning Holley and Tom. I would like to get on your schedule for a site visit for the Sunland Sand Mine located off
HWY 24 in Bogue, Carteret County, NC. I have attached a few maps for your reference and the signed agent
authorization forms. Let me know if you need anything further from me.
Thanks
John
John Roberts, LSS, PWS
Ground Truth Soil Consulting, PLLC
252-725-1320
john.roberts@groundtruthsoil.com
www.groundtruthsoil.com
3 attachments
Sunland Hwy 24 Borrow Pit_Figures_vl.pdf
1007K
SunIan d_Hwy24_BorrowPit—AG ENT_AUTH0RIZATION_FORM_signed.pdf
27K
Sunland _NCHWY24_DWR_ AGENT _ AUTHORIZATION_ FORM_signed.pdf
29K
John Roberts <john.roberts@groundtruthsoil.com> Tue, Aug 10, 2021 at 3:37 PM
To: holley.snider@ncdenr.gov, "Charles, Thomas P CIV USARMY CESAW (USA)" <thomas.P.charles@usace.army.mil>
Good afternoon Tom. Thanks again for meeting with me last Friday. As discussed, the sand mining operation will
maintain a 50-ft buffer from the wetland delineation line shown on the attached figures. Mining activities will not extend
past into these wetland areas or outside the "Study Area" identified on the attached figures in red. Please let me know if
you have any questions or need additional information.
Thanks
John
r Virus -free. www.avast.com
[Quoted text hidden]
66,100 Virus -free. www.avast.com
i Sunland Hwy 24 Burrow Pit_Figures.pdf
10541 K
Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Tue, Aug 10, 2021 at 4:11 PM
To: John Roberts <john.roberts@groundtruthsoil.com>, "holley.snider@ncdenr.gov" <holley.snider@ncdenr.gov>
John,
Your project is not in the Corps jurisdiction Sunland Proposed Sand Pit WHY 24, Bogue NC Carteret County, NC Figure 2
Date 7/2021 GT Job # 21-157.
Regards, Tom
Tom Charles
thomas.p.charles@usace.army.mil
Regulatory Specialist
910-251-4101 cell 910-465-7602
https:Hwww.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/
The Wilmington District is committed to providing the highest level of support to the public. E-PCN
WilmingtonNCREG@usace.army.mil
PJDs' & JD's. http://saw-reg.usace. army.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf
To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at:
https:Hregu Iatory.ops. usace.army. mil/customer-service-survey/
[Quoted text hidden]
Sunland Hwy 24 Burrow Pit_Figures.pdf
10541 K