DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
16-86 1 Project Acti!7t
OUT BY DEMLR
Modification Transfer Release
Applicant Name:
Sunland Sand and Gravel, Inc.
Li
Li
Applicant's Email:
willifordrick@yahoo.com
County:
Carteret
Project Name:
Carteret Dirt Pit
YES
NO
Date Commencing
Have land disturbing activities started??
IX
Latitude:
34.7156
Longitude:
-77.0000
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 08/13/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
,/
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
W
Comments: DWR is concerned that the mine boundary is in close proximity to wetlands. DWR requests a JD from USACE to define wetland
boundaries in the permit area for accurate buffering. Also, an 0&M plan is needed to demonstrate that dewatering will not affect adjacent wetlands.
Does this mine (or previous owner) have DWR back fees to pay?
I
L
I./
(If Yes, amount):
Watershed/Stream Name & Classification:
Goose Creek Stream Index 20-36-4 From Source to Bogue Sound Class SA;HQW White Oak River Basin
DWR Compliance Status of Mine:
N/A
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
1 ✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
I
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
V
Consultant
Onsite
❑
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
I
❑
I
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
❑✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?�—I
El
I
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
✓
(If Yes, Permit#):
NCG020981 In Review
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
HQW Present, Permittee Must Determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑✓
❑
Has Violation
O&M Requirements
./
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
Other
Ll
Please describe the reason to hold the permit:
JD from USACE needed to confirm wetland boundaries & O&M Plan needed.
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved? ✓
Reviewed
Central Office Date Regional Office
Date
DWR RO Surface Water Megan Faulkner & Holley Snider
08/13/2021
RO Aquifer Protection Section