Loading...
HomeMy WebLinkAbout20210816_DWR_CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 16-86 1 Project Acti!7t OUT BY DEMLR Modification Transfer Release Applicant Name: Sunland Sand and Gravel, Inc. Li Li Applicant's Email: willifordrick@yahoo.com County: Carteret Project Name: Carteret Dirt Pit YES NO Date Commencing Have land disturbing activities started?? IX Latitude: 34.7156 Longitude: -77.0000 Please return comments to (at DEMLR CO): Adam Parr adam,parr@ncdenr,gov Comments due by: 08/13/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? ,/ Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: DWR is concerned that the mine boundary is in close proximity to wetlands. DWR requests a JD from USACE to define wetland boundaries in the permit area for accurate buffering. Also, an 0&M plan is needed to demonstrate that dewatering will not affect adjacent wetlands. Does this mine (or previous owner) have DWR back fees to pay? I L I./ (If Yes, amount): Watershed/Stream Name & Classification: Goose Creek Stream Index 20-36-4 From Source to Bogue Sound Class SA;HQW White Oak River Basin DWR Compliance Status of Mine: N/A 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? 1 ✓ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ I ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓ ❑ Is a wetland delineation required prior to DWR issuing the permit? ✓ JD V Consultant Onsite ❑ ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ ❑✓ Stream Determination Completed? I ❑ I ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑ Buffer Determination Needed? ❑ ❑✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine?�—I El I Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? ✓ (If Yes, Permit#): NCG020981 In Review Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine HQW Present, Permittee Must Determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements ./ HQW/7Q10 Concerns Pay back fees or renew DWR permit Other Ll Please describe the reason to hold the permit: JD from USACE needed to confirm wetland boundaries & O&M Plan needed. RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? ✓ Reviewed Central Office Date Regional Office Date DWR RO Surface Water Megan Faulkner & Holley Snider 08/13/2021 RO Aquifer Protection Section Rev. December 2020-2020r1