HomeMy WebLinkAboutAppendix C - Associated Lithium Hydroxide Conversion Plant DrawingsPiedmont Lithium Carolinas, Inc. I North Carolina Mining Permit Application Appendices PIEDMONT LITHIUM Appendix C: Associated Lithium Hydroxide Conversion Plant Drawings (Sheets 1-18) PIED/�nONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES �N C A PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA LITHIUM HYDROXIDE CONVERSION PLANT- PLAN VIEW PHASE 1 FILENAME - OOC-01 SHEET SCALE I - 1" = 200' 1 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES CA►►►O JJLU PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA LITHIUM HYDROXIDE CONVERSION PLANT- PLAN VIEW PHASE 2 FILENAME I - OOC-02 I SHEET SCALE I - 1" = 200' 2 OF 18 1 2 3 4 5 6 7 V / / � . ♦) —DA1:73. TO OAC \ \\ \\) l l / -\ \— � � � l /// / / ♦ / 1 � � I I I \ ` � II \ \ � / CN878MIN I I I I \ \ \\ `--- \ \ � � \ ` ) I I I 1 I \ — \� \.111 -\ ��1 I l / /i ♦ , If I \\ � _ • =�,\\\\\ 1111 � / � 1 � � � �/ l 11 I / / / � �, � � � ♦ / / Jjl/I(� \��� \\�\ \\\\\\ \ I r � � / I III I � � �� /♦ �' < < � f�� � � - � � �� >, I �l � \« \ � = � � � \ ✓ / // r � � < I \\ \ ,� DA2: 2.50AC ��� \ \ �, CN479MIN / I \\\—/// \\ \\ / •. ��/ \\ \\ \\\\ 11 \ \ \ �� / / 11 l I /��/�// =— � / l �i'._., � •� � 1 \\\\ \ \t� � IIJill vfW _ / \ � -- - I �• \ \\\� \ 1 \ I � / / / � \ - ;�log X\ ST-1 0.50 ac. \ \ I / / I I � /i �/ • / y \ I I III ( / / �► ) \\ (11, IIIIIII,( ��\�� I< < \ \� �� I �I �_ � l III �� ► i i I ►III IIIII \\�\��\�\ \��� \ -- I \} \ \ \ —DA3: 5.59 AC , TOC: 12.9 MIN \ ■ I _ A �� � � /r�^ , � �,� • � •�► I I III \ \ � \\ \\ \\ \ dff ST +_ r• X / � s � I I 1� // / I I I �-� // \\ '� + `'� � • � � �� I l Ill \\\\\ DA4 133.5 AC + ` \ (INCLUDES DA1 3) TOC: 36.3 MIN . CN.76 -X-X—X-X-X-X-X- -X- -X-X-X x1 ST-5 LX _X _X _X —X —X —X /—X ' - x •�♦ • �I LII 1I 1/I1 /I / \ �// / / / I I/l I II III II III I I II II I I I mmmummIII III \ \ \ 'w P I E D/�AON T L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION ;X�- k �► X , ' i ° I 1 \ \ \\ \\ t x o \\ oo ° o 00 ° o / /// ✓\\\ ° O o O O ° - 1 f� ° ° ° o o .� o o f , og g f r� 11� A vv v v -13 �' IIII l l ►I \\ - O o O ° ° k Al } PROJECT MANAGER V. HAYNES x O oO Xf�\ IIIIIII IIII \ ,�� 0 0 0 0 ST-14 I 0 O 0 O yIIII l ■ � o 00 o 'h ■ ° ° > ST-15 ❑ IIII I ✓ ..-. ST-12 X �> o x / - X X So- f x 011111,111111111 �AR0 nn•A �. 11 00 2 K - NP �`8��7/2a21 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA N 200 0 200 400 SCALE IN FEET GENERAL LEGEND ■ ■ ■ ■ ■ STREAM CROSSING DRAINAGE AREA TIME OF CONCENTRATION C ■ - - SEDIMENT BASIN/TRAP DRAINAGE AREA DELINEATED WETLANDS DELINEATED WATERS PROPOSED CONTOURS EXISTING CONTOURS —X—X 6-FOOT FENCE LINE —X— SILT FENCE LOCATION WASTE ROCK CONVEYOR ORE CONVEYOR a BUILDING / STRUCTURE ADJACENT PROPERTY LINE FLUME UNDERDRAIN UD-2 UNDERDRAIN LABEL DRAINAGE DITCH CULVERT CULVERT LABEL SB-4 SEDIMENT BASIN LABEL ST-11 SEDIMENT TRAP LABEL --- FLOW DIRECTION ARROW ❑ EROSION AND SEDIMENT CONTROL STRUCTURE GASTON COUNTY PARCEL LINES MINE PERMIT LINE 25 FT MINE PERMIT BUFFER 100 FT LOT BUFFER 200 FT STRUCTURES BUFFER 300 FT RESIDENTIAL BUFFER 40 FT PLANTING BUFFER 30 FT. DELINEATED STREAM BUFFER ME - - - SEDIMENT TRAP/BASIN DRAINAGE AREA DRAINAGE ANALYSIS MAP, PLAN VIEW FILENAME I - OOC-03 SCALE I - 1" = 200' SHEET 3 OF 18 0 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C ARD 0 0` 2 E/27/2011 �a�m nu►,,. PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 19 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-04 SCALE I - 1" = 50' SHEET 4 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A R V&6 0 K PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 29 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-05 SCALE I - 1" = 50' SHEET 5 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A RO 0 002 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 39 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-06 SCALE I - 1" = 50' SHEET 6 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES 0111111111111, CARD ON v F'R/EK .NF .�°8/�7/.202-1 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 4, PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-07 SCALE I - 1" = 50' SHEET 7 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A R V&6 0 K PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 59 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-08 SCALE I - 1" = 50' SHEET PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 69 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-09 SCALE I - 1" = 50' SHEET 9 OF 18 1 CONSTRUCTION 2 STAGING AREA 4/ OUTLET PROTECTION SEE DETAIL SHEET 14 OF 18 y Approx. 6 acres y y POROUS BAFFLES SEE DETAIL SHEET 14 OF 18 72" OUTLET STRUCTURE WITH SKIMMER AND 50 LF OF 24" DOUBLE BARREL CMP SEE DETAILS THIS SHEET BOTTOM OF POND �� + ELEV. 891.00 / ,+`+ � +`+ TOP OF BERM ELEV. 895.00 1 I + •+� 1 I ' SILT FENCE — - SEE DETAIL SHEET 14 OF 18 x—x-x— + EMERGENCY SPILLWAY xx-x-x-x—x—x-z-x—x-z-x- —x-x-x-x- c�c—x—x—x- x-x_x_x-x_x-x-x x x x x xx xx Xx-x—x—x—x x x_x_x-x-x-x-x-x-x-x-x_x_x_x_x X k k SEE DETAILTHISSHEET x x-x-x + 6' WIRE FENCE SB-7 + SEE DETAIL SHEET 14 OF 18 +, +\ +\ + + f * SB-7 IS FOR PHASE 1 CONSTRUCTION STAGING AREA. ONCE CONSTRUCTION IS COMPLETE AND STAGING AREA HAS BEEN STABILIZED. SB-7 MAY BE REMOVED. PVC ENI PVC PERSPECTIVE VIEW END VIEW "C" ENCLOSURE ,TFP FNTPY IINIT PVC VFNT FRONT VIEW FAIRCLOTH SKIMMER NOT TO SCALE PIEDMONT L I T H I U cr u�ni 11 E 40 LE FOR METER 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION SLATE 5 0 7 Basin Drainage Area Proposed Depth (ft) Cleanout Depth (Ft) Depth of Flow over Spillway(ft) Skinner Size (in) Actual Orfice Diameter (in) Riser Diameter (In) Barrel Diameter (in) Approx.Bottom Length (ft) Approx. Bottom Width (ft) Approx. Top Length (ft) Approx. Top Width (ft) Sediment Storage Required (cf) Sediment Storage Provided (cf) Surface Area Required (sf) Surface Area Provided (sf) Emergency Spillway Size (L) Riser Base Width (ft) Riser Base Length (ft) Riser Base Depth (ft) 7 7.55 ac 1.80 0.9 0.2 6.0 1.75 72 24 x 2 242 60 266 86 13,590 30,240 16,119 18,130 20 7.0 7.0 1.5 INSTALL COLLAR WITH CORRUGATIONS VERTICAL. COLLAR TO BE OF SAME GAGE AS THE PIPE WITH WHICH IT IS USED. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIIIIIIIIIIIIIIIIIIII1 II I I I I I I I I I I I I IIIIIIIIIII III I IIII (IIIIIIII IIIIIIII IQ I i01 1 101 I� 1 101 10 1� 1 101 1 101 Q 1 101 1 101 I�I�I�III II�I�I�I I I I I I I I I I I I I I I I I I I I I I I 111111111111111111111111 I 11111111111111111111111111 I I I I I I I I I I I I I I W ANTI -SEEP COLLARS NOT TO SCALE 1 /2" X 2" SLOTTED HOLES @ 8" C.C. FOR 3/8"0 BOLTS OD OF PIPE ONE PIECE CONNECTING BAND WELDED TO PIPE; CONTINUOUS WELD BOTH SIDES OF BAND CONSTRUCTION, MAINTENANCE AND INSPECTION NOTES 1. INSPECT SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. 2. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACED REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. 3. CHECK EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. 4. MSL = MEAN SEA LEVEL TOP OF BERM 4 VARIES 4 1 (SEE TABLE 1) 1 NOTES: 1. EMERGENCY SPILLWAY IS GRASS LINED. WIDTH (SEE TABLE 1) EMERGENCY SPILLWAY NOT TO SCALE TRASH RACK, SEE - DETAIL THIS SHEET RISER STRUCTURE SKIMMER, SEE DETAIL THIS SHEET RETRIEVAL ROPE ANCHORED IN—\ THE SLOPE SEDIMENT CLEANOUT� GAGE CREST ELEVATION SEDIMENT CLEANOUT MARK w 1 3 Q PROJECT MANAGER V. HAYNES 1_kPE BARREL 20' CONCRETE BASE SKIMMER. SEE DETAIL THIS SH 1" STAIN( STEELS( FLEXIBLE COU WITH TRANSITI( 10' TOP OF SKIMMER PIP BERM WIDTH EMERGENCY SPILLWAY, SEE DETAIL THIS SHEET TOP OF BERM EMBANKMENT STABILIZED WITH VEGETATION 3 OUTLET APRON ANTI —SEEP COLLAR EVERY SEE DETAIL THIS SHEET 20' SEDIMENT RISER BASIN NOT TO SCALE TRASH RACK DETAIL NOT TO SCALE NOTES: 1. ALL PVC PIPES ARE TO BE SCHEDULE 40 UNLESS OTHERWISE NOTED. 2. ALL JOINTS OF THE FLOATATION SECTION SHALL BE SOLVENT WELDED. JOINTS OF SKIMMER SECTION NEED NOT BE WATER —TIGHT. 3. HDPE FLEXIBLE DRAIN PIPE IS TO BE ATTACHED TO THE PIPE BARREL STRUCTURE WITH WATER —TIGHT CONNECTIONS. 4. SEE SCHEDULE FOR ORIFICE SIZE. 5. FAIRCLOTH TYPE OR EQUIVALENT SKIMMER TO BE USED. 6. INSTALL ANTI —VORTEX PLATE IN RISER STRUCTURE. OUTLET STRUCTURE ENLARGEMENT NOT TO SCALE PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 79 PLAN VIEW & PROFILE DETAIL FILENAME - OOC-10 SCALE - 1" = 50' SHEET 10 OF 18 0 C 0 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES C A RO 0 002 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SEDIMENT BASIN NO. 89 PLAN VIEW & PROFILE DETAIL FILENAME I - OOC-11 SCALE I - 1" = 50' SHEET 11 OF 18 PIEDMONT LITHIUM 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES CAA C A 0 002 N P o`� g/27/20Z 1 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA STREAM CROSSING NO. 1, ROAD TO PLANT AREA FILENAME I - OOC-12 SCALE I - 1" = 20' SHEET 12 OF 18 PIEDPAONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA STREAM CROSSING NO. 2, RAIL TO PLANT AREA FILENAME I - OOC-13 SCALE I - 1" = 20' SHEET 13 OF 18 1 2 3 5 0 7 z co J O NATURAL GRADE W2 3 �i�u yr rlrrwi� PI AN MIN. ELEVATION TYPE 2 GEOTEXTILE FILTER FABRIC LAP (IF NEEDED) RIP RAP T (THICKNESS) NOTE: -40=LAYER OF TYPE 2 MINIMUM H=2/3 PIPE DIAMETER GEOTEXTILE FILTER FABRIC NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE SHOWN ON EROSION CONTROL PLANS. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% MAXIMUM DRY DENSITY PER ASTM D-1557 OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON UNLESS OTHERWISE SHOWN. 8. TYPE 2 GEOTEXTILE FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIPRAP AND TRIMMED AFTER RIPRAP PLACEMENT SO THAT NO FABRIC IS VISIBLE. 9. FOR PIPE 2 RIP RAP OUTLET PROTECTION, THE DIMENSIONS BELOW ARE A MINIMUM REQUIREMENT. SHAPE RIPRAP AS SHOWN ON SHEET BUKOC-CV-C-GR.PL-01. RIPRAP OUTLET PROTECTION NOT TO SCALE P I E DAAON T PROVIDE A MINIMUM OF THREE POROUS BAFFLES PER SKIMMER SEDIMENT TRAP F/0w low PROVIDE A MINIMUM 8' WIDE x 16 LONG CLASS 1 RIP -RAP 15" DEEP ON LAYER OF NON -WOVEN GEOTEXTILE FABRIC (MIRAFI 140N OR APPROVED EQUAL) AT DITCH CONVEYANCE DROP ENTRY POINTS INTO THE SEDIMENT TRAPS. MAINTENANCE NOTES INLET ZONE 35% FIRST CHAMBER 25% OF SURFACE AREA OF SURFACE AREA SECOND CHAMBER 25% OF SURFACE AREA _ OUTLET ZONE 15% /OF SURFACE AREA 5'STEEL (TYPICAL) 4'-0" MAX SPACING FLOW 8"DX6"W TRENCH BACKFILL AND COMPACT FENCE AND FABRIC BURIED IN TRENCH 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. 4. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED. 5. DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 6. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT GENERAL NOTES: 1. BAFFLE FABRIC SHALL CONSIST OF 700 G/M COIR EROSION CONTROL BLANKET OR APPROVED SUBSTITUTE. A SINGLE CONTINUOUS LENGTH OF FABRIC SHALL EXTEND ACROSS THE FULL WIDTH OF THE BASIN. 2. POSTS SHALL BE STEEL, MINIMUM 5 FEET LONG, AND OF THE SAME GENERAL TYPE AS THOSE SPECIFIED FOR SILT FENCE CONSTRUCTION. 3. THE TOP EDGE OF THE BAFFLE FABRIC SHALL BE SUPPORTED BY A TENSIONED CABLE OR ROPE EXTENDING ACROSS THE WIDTH OF THE BASIN AND ANCHORED ON EACH END. 4. THE BOTTOM EDGE OF THE BAFFLE FABRIC SHALL BE EMBEDDED IN A TRENCH EXCAVATED ALONG THE BASIN BOTTOM AND SIDE SLOPES. 5. BAFFLE FABRIC SHALL BE ATTACHED TO SUPPORT POSTS WITH HEAVY-DUTY PLASTIC CABLE TIES, OR SIMILAR MEANS. 6. BAFFLES SHALL BE SPACED IN THE DIRECTION OF FLOW TO PROVIDE THE SURFACE AREAS SHOWN. 7. THE BASIN SLOPES SHALL BE SEEDED AND THE SLOPES SHALL BE MATTED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. 8. SEE THIS SHEET FOR ADDITIONAL BASIN INFORMATION. 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION POROUS BAFFLES NOT TO SCALE 6-FT WIRE FENCE NOT TO SCALE 1 PROJECT MANAGER V. HAYNES / C\ 00 �t N O M N MIN. 14 GAUGE GALVANIZED WIRE - FENCE WITH MAX. 6" MESH SPACING 4%4" REINFORCED SAFETY POST CAP (TYP. ALL POSTS) M N O F_ 00 z 00 - N NOTE: 1. SILT FENCE IS TO BE SECURELY FASTENED TO EACH STEEL SUPPORT POST OR TO WOVEN WIRE FENCE WHICH IS IN TURN IS ATTACHED TO THE STEEL FENCE POST. 2. INSPECT FREQUENTLY AND REPAIR OR REPLACE PROMPTLY AS NEEDED. 3. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. UNIFORMLY DISTRIBUTE ON THE SOURCE AREA PRIOR TO TOPSOILING. 4. ALTERNATIVELY, THE CONTRACTOR MAY USE EXTRA STRENGTH SILT FENCE FABRIC WITHOUT WIRE FENCE. MAXIMUM SPACING BETWEEN POST SHALL BE 6-0". NOTE: 8'-0" MAXIMUM 8" DOWN & 4" FORWARD ALONG THE TRENCH FRONT VIEW 4%4" REINFORCED SAFETY POST CAP (TYP. ALL POSTS) SILT FENCE NOT TO SCALE co It N N O H 00 1- - z 00 1. SEE PROJECT SPECIFICATIONS FOR DITCH LINING REQUIREMENTS. TYPICAL DITCH SECTION NOT TO SCALE PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA SYNTHETIC FILTER FABRIC (CERTIFIED TO MEET THE REQUIREMENTS OF ASTM D 6461) 5' PAINTED OR GALVANIZED STEEL POST (1.25 LB/LF) ATTACH TO POSTS WITH >KlvWIRE OR PLASTIC ZIP TIES (MIN. 50 LBS TENSILE STRENGTH) r--- GRADE 5' PAINTED OR GALVANIZED STEEL POST (1.25 LB/LF) MIN. 14 GAUGE GALVANIZED WIRE FENCE WITH MAX. 6" MESH SPACING SYNTHETIC FILTER FABRIC (CERTIFIED TO MEET THE REQUIREMENTS OF ASTM D 6461) TRENCH IN SILT FENCE. BACKFILL AND COMPACT THOROUGHLY AFTER PLACEMENT. FLOW 4" MIN. SIDE VIEW GRADE EROSION CONTROL DETAILS FILENAME - OOC-14 SCALE - N.S. SHEET 14 OF 18 0 1 2 3 CONSTRUCTION NOTES 2 5 1.1 7 GENERAL EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND DEVICES NECESSARY TO COMPLY WITH THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS, UNLESS OTHERWISE DIRECTED. 2. INSTALL CONSTRUCTION ENTRANCES AND ACCESS ROADS IN ACCORDANCE WITH STATE STANDARDS AND WITH MINIMAL DISTURBANCE TO SURROUNDING VEGETATION AND TREES. CONTRACTOR SHALL RECEIVE PRIOR APPROVAL FROM ENGINEER BEFORE TREE REMOVAL FOR ACCESS ROAD CONSTRUCTION. WITHIN 30 DAYS AFTER CONSTRUCTION IS COMPLETED FOR WHICH ACCESS ROAD IS USED, AND UNLESS OTHERWISE APPROVED, CONTRACTOR SHALL REMOVE ALL REMNANTS OF THE ACCESS ROADS AND RETURN AREA TO AS GOOD AS OR BETTER CONDITION. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BASED ON CONTRACTOR'S PRACTICES AND WILL BE EMPLOYED WHERE DETERMINED NECESSARY BY ACTUAL SITE CONDITIONS. 3. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLE OR SITE ONTO PUBLIC ROADWAY OR INTO STORM DRAIN MUST BE REMOVED. 4. ALL DITCH LINES DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED BY THE CONTRACTOR. ON ALL NEW OR DISTURBED, UNPAVED DITCHES INSTALL A SOIL STABILIZATION MEASURES AS APPROPRIATE AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS. 5. PROVIDE SILT FENCE ADJACENT TO DITCHES AND AT THE TOE OF FILL SLOPES. ALSO, PROVIDE ADEQUATE MEASURES IN AREAS WHERE NATURAL VEGETATION DOES NOT PROVIDE A SUFFICIENT BUFFER AND AS DIRECTED BY THE ENGINEER. 6. PROVIDE INLET SEDIMENT FILTER AT ALL NEW STORM INLETS. INLET PROTECTION MAY BE REQUIRED AT EXISTING INLETS IN THE EVENT SEDIMENT WILL RUN DOWNSTREAM TO AN EXISTING INLET. 7. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY: a. THE LIMITS OF LAND DISTURBANCE SHALL BE CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, FENCING, OR OTHER APPROPRIATE MEANS. THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS. b. ALL TREE PROTECTION FENCING SHALL BE INSTALLED, INSPECTED AND APPROVED BY THE INSPECTOR. TREES WITHIN THE PROTECTION AREAS MAY ONLY BE REMOVED WITH APPROVAL BY THE INSPECTOR. 8. COMPLY WITH THE FOLLOWING CONSTRUCTION SEQUENCE FOR EACH CONSTRUCTION PHASE: a. GRUBBING SHALL BE PERFORMED DURING PREDICTED PERIODS OF DRY WEATHER. b. EROSION CONTROL DEVICES AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION AND WITHIN 24 HOURS OF GRUBBING. THIS MAY REQUIRE GRUBBING IN STAGES TO ENSURE EROSION CONTROL MEASURES ARE PUT IN PLACE PRIOR TO RAIN EVENT. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL IMMEDIATELY BE REPORTED TO THE ENGINEER. c. SILT FENCE SHALL BE INSTALLED WITHIN 24 HOURS OF GRUBBING. THE CONTRACTOR SHALL REMOVE ACCUMULATED SILT WHEN THE SILT IS WITHIN 12" OF THE TOP OF THE SILT FENCE UTILIZED FOR EROSION CONTROL. 9. THE CONSTRUCTION OF THE SITE WILL COMMENCE WITH INSTALLATION OF EROSION CONTROL MEASURES SUFFICIENT TO CONTROL SEDIMENT DEPOSITS AND EROSION. ALL SEDIMENT CONTROL WILL BE MAINTAINED UNTIL ALL UPSTREAM GROUND WITHIN THE CONSTRUCTION AREA HAS BEEN COMPLETELY STABILIZED WITH PERMANENT VEGETATION. 10. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES WILL RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB SITE UNTIL SUCH MEASURES ARE CORRECTED TO NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. 11. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE WHENEVER LAND DISTURBANCE ACTIVITY IS IN PROGRESS. 12. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND ANY DEFICIENCIES NOTED WILL BE CORRECTED BY THE END OF EACH DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 13. ON -SITE STOCKPILING OF SOIL IS ALLOWED WITHIN THE LIMITS OF DISTURBANCE SUBJECT TO PLACING APPROPRIATE EROSION CONTROL DEVICES TO PREVENT SOIL LOSS DURING RAIN EVENTS. LOCATIONS SHALL BE PRE -APPROVED BY THE INSPECTOR. 14. PROVIDE NOTIFICATION TO ALL AFFECTED PROPERTY OWNERS PRIOR TO CONSTRUCTION, AS APPLICABLE. 15. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. [15A NCAC 413 .0110] MINIMUM 12" #57 WASHED STONE ON FACE /---SEDIMENT STORAGE VOLUME ­7 2'X2' KEYWAY 2' KEYWAY GEOTEXTILES P I E DAAON T r ✓�r MINIMUM 8 OZ./SY NON -WOVEN EROSION MAINTENANCE REQUIREMENTS 1. SEDIMENT FENCE (SILT FENCE): a. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. MAKE ANY REQUIRED REPAIRS BY THE END OF EACH DAY. b. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. c. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. d. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. e. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE. STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 2. WATTLES: a. INSPECT CHANNELS FOR DAMAGE IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE WATTLE AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE WATTLE. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN WATTLES, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. c. REMOVE SEDIMENT ACCUMULATED BEHIND THE WATTLES AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STRAW WATTLE AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE WATTLE. 3. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT: a. INSPECT ON LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 4. ROCK OUTLET PROTECTION: a. INSPECT STONE ARRANGEMENT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. MAINTAIN SPECIFIED DIMENSIONS AND REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS'/z THE HEIGHT OF THE ROCKS. 5. INLET PROTECTION: a. INSPECT STONE ARRANGEMENT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. REPLACE STONE AS NEED TO MAINTAIN SPECIFIED DIMENSIONS c. REMOVE SEDIMENT BUILDUP WHEN THE SEDIMENT LEVEL IS'/,. THE HEIGHT OF THE ROCKS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL 6. TEMPORARY DIVERSIONS: a. INSPECT EVERY 7 CALENDAR DAYS AND IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGES. ALSO CHECK AND MAINTAIN OUTLETS. b. WHEN THE PROTECTED AREA IS PERMANENTLY STABILIZED, REMOVE THE RIDGES AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE SITE. 7. CHECK DAM: a. INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE IMMEDIATELY FOLLOWING A RAIN EVENT WHICH EXCEEDS 1.0 INCHES IN A 24-HOUR PERIOD. b. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. c. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. U- Iq N CLASS A OR B EROSION CONTROLSTONE OUTLET PROTECTION SEDIMENT TRAP DETAIL NOT TO SCALE 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION SUPPORT ROPE Tn 411 TO PREVENT SAGGING 700 g/m2 COIR EROSION BLANKET, COIR MESH OR SIMILAR, TRENCHED INTO BOTTOM OR SIDE SECTION A -A' INLET OUTLET PLAN PROJECT MANAGER V. HAYNES BOTTOM OR SIDE " INITn �I STAKE TO SUPPORT WIRE •'•••.... • .••' y��.� ''''''1� m * \A `S/27/20 l TEMPORARY STREAM CROSSING CONSTRUCTION DETAIL APPROACHTIMBER MAT STREAM TEMP ./ •RARY BRIDGE CROSSING STREAM CHANNEL TIMBER MAT PERSPECTIVE VIEW TIMBER MAT APPROACH\ SURFACE FLOW DIVERSION TO TRAP INSTALL SIDEBOARDS OR COMPOST FILTER SOCKS, OR OTHER MATERIAL TO PREVENT SEDIMENT FROM EXITING THE TEMPORARY SIDES THE SPAN BRIDGE.. / BRIDGE CROSSING STREAM BED --- LONGITUDINAL SECTION SURFACE FLOW DIVERSION TO TRAP 1. TO BE USED FOR TEMPORARY ACCESS DURING CONSTRUCTION ONLY. 2. EROSION AND SEDIMENT CONTROL MEASURES, AS SHOWN ON PLANS AND SPECIFIED BY NCDEQ, MUST BE IMPLEMENTED PRIOR TO INSTALLATION OF A TEMPORARY CROSSING. 3. TEMPORARY CROSSINGS SHALL BE REMOVED AFTER PERMANENT CROSSINGS ARE COMPLETE. MAINTENANCE: • TEMPORARY STREAM CROSSINGS SHALL BE INSPECTED ON A DAILY BASIS. • DAMAGED CROSSINGS SHALL BE REPAIRED WITHIN 24 HOURS OF THE INSPECTION AND BEFORE ANY SUBSEQUENT USE. • SEDIMENT DEPOSITS ON THE CROSSING OR ITS APPROACHES SHALL BE REMOVED WITHIN 24 HOURS OF THE INSPECTION. • AS SOON AS THE TEMPORARY CROSSING IS NO LONGER NEEDED, IT SHALL BE REMOVED. ALL MATERIALS SHALL BE DISPOSED OF PROPERLY AND DISTURBED AREAS STABILIZED. • GEOTEXTILE FABRIC TO BE WRAPPED AROUND UNDERSIDE OF TEMPORARY SPAN BRIDGE. SEDIMENT TRAP SIZING SEDIMENT TRAP NO. DRAINAGE AREA (ac.) Q25 (cfs) REQUIRED SURFACE AREA (sf) REQUIREDSTORAGE VOLUME (cf) PROVIDED SURFACE AREA (sf) PROVIDED STORAGE VOLUME (cf) ST-1 0.50 2.45 1,067 1,800 1,355 2,190 ST-2 0.40 1.96 854 1,440 1,088 1,713 ST-3 0.65 3.19 1 1,388 2,340 1,640 2,704 ST-4 1.50 7.36 3,202 5,400 3,296 5,762 ST-5 1.75 8.59 3,736 6,300 3,966 7,018 ST-6 1.50 7.36 3,202 5,400 3,296 5,762 ST-7 0.70 3.44 1,494 2,520 1,640 2,704 ST-8 0.80 3.93 1,708 2,880 11808 3,010 ST-9 1.50 7.36 3,202 5,400 3,296 5,762 ST-10 2.25 11.04 4,804 8,100 41821 8,631 ST-11 0.60 2.94 1,281 2,160 1,640 2,704 ST-12 0.80 3.93 1,708 2,880 11808 3,010 ST-13 1.15 5.64 2,455 4,140 2,670 4,596 ST-14 0.50 2.45 1,067 1,800 1,640 2,704 ST-15 0.25 1.23 534 900 621 902 ST-16(Ph 1) 2.80 13.74 5,978 10,080 6,071 10,712 ST-17(Ph1) 1.60 7.85 3,416 5,760 3,966 7,018 ST-18 (Phi) 1 0.50 2.45 1,067 1 1,800 1,224 1 1,826 ST-19 (Ph 1) 1 3.20 15.71 6,832 1 11,520 7,059 1 12,637 PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA EROSION CONTROL NOTES FILENAME I - OOC-15 SCALE I - N.S. SHEET 15 OF 18 Ic 0 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA ROAD PROFILE FILENAME I - OOC-16 SCALE I - 1" = 100' SHEET 16 OF 18 PIEDMONT L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES �,A CAR() PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA RAIL PROFILE 1 FILENAME I - OOC- 17 SCALE I - 1" = 100' SHEET 17 OF 18 P I E D/�AON T L I T H I U 1 8/27/2021 MINING PERMIT ISSUE DATE DESCRIPTION PROJECT MANAGER V. HAYNES N ••CA .�,.aFEss� • �i� v• 0 002 G; ���nnuu�`�� PIEDMONT LITHIUM CAROLINAS, INC. CAROLINA LITHIUM PROJECT LITHIUM HYDROXIDE CONVERSION PLANT GASTON COUNTY, NORTH CAROLINA RAIL PROFILE 2 FILENAME I - OOC-18 SCALE I - 1" = 100' SHEET 18 OF 18