Loading...
HomeMy WebLinkAbout20210824_ESC_calculationsEROSION &SEDIMENT CONTROL t MODIFICATIONS PRINCETON II QUARRY HANSON AGGREGATES, LLC SOUTH REGION Mining Permit 51-05 JOHNSTON COUNTY NORTH CAROLINA ISSUED BY DRAPER ADEN ASSOCIATES Project R14551 N-01 G August202I Draper Aden Associates Engineering ♦ Surveying ♦ Emirunmenial Services 114 Edinburgh South Drive, Suite 200—Cary, North Carolina 27511 Phone: 919-873-1060 - Fax: 919-873-1074 — www.daa.com License No. F-1429 NARRATIVE The calculations attached are for erosion and sediment control measures in connections with the addition of a new pit across Rains Mill Road and overburden piles across Old Cornwallis Road, and associated screening. The revisions and modifications now shown are as follows: • Added overburden piles #6 through #8 with associated Sediment Basins. • Created a new pit limits across Rains Mill Road. Sediment Basin 6 Project: Hanson Aggregates Princeton Quarry Draper Aden Associates Project#: R14551N-01 �Q FngL,nays; • sanrpiux • P.,nynunnentrd Sirvkx•.. Date: 8.2.21 By: APIA Basin Sizing Area= 6.5 loyri= 6.22 Drainage area 6 C= 0.4 25 yr i= 6.94 10-year runoff, Q,o: 16.17 fI3/sec 25-year runoff, Q25: 18.04 Olson Disturbed area: 6.50 acres Volume required = 1800 ft' per acre disturbed area Sklmmer Sizing =1800X 6.5= 11.700 ft' Maximum water volume: 16 Ili Max. Dewalering Time: 120 this Surface area required = 325 112 par ft'/sec Q25 Minimum Skimmer Size: 2 In =325 X 18.044 = Factor to drain in 4 days: 4492 5,864 fe Orifice area = 0.004 in' Orifice diameter= 0.07 in Basin Is rectangular. Surface elevation: 141 Bottom elevation: 139 Ponding depth: 2 fl Side slope ratio: 2 h : 1 v Surface width: 29 ft Surface length: 440 it Surface area = 12,760 ftx ADEQUATE Bottom width: 21 Bottom length: 432 Bottom area = 9072 fir Ponding volume = 21,632 g' ADEQUATE Spillway Design Principal Spillway Emergency Spillway Riser 8 barrel, C.M.P. Trapezoidal channel, 12" riprap lining Basin Bottom Elevation: 139.0 Emergency Spillway Crest Elev.: 142.0 Emergency Spillway Width: 5.0 it Principal Spillway Crest Elevation 141.0 Side Slope Rallo: 3.0 It hlil v Riser Diameter. 24 In Riser Circumference= eft Riser Capacity Q 1.1 it head = 474.03 ft'Isec Water Depth: 0.50 it Barrel Diameter: 18 In Area, A. 3.26 0 Barrel Area, A = 1.767 h Welted Perimeter. 8.16 it Welled Perimeter = 4.712 it Hydraulic Radius, R: 0.398 it Hydraulic Radius, R = 0.38 It VR: 1.79 Roughness Coefficient, n: 0.024 Roughness Coeffiiclent. n: 0.078 (12" nprep) Barrel Slope, S: 0.0200 hgl Slope. S: 0.180 Rlh Velocity, V=1A9/nxRmxSr0•: 4.55 fusee Velocity, V=1.49/nxRa XSrn: 4.49 ft/sec Barrel Capcity = 8.04 f0/sec Emergency Spillway Capachy=VxA: 14.60 00lsec Principal Spillway Capacity= 8.04 ft'/eec Prin. Spillway Capacity Required (2-year Emergency Spillway Capacity Required (025 - 18.044 - 8.04 Runoff, Disturbed Area): 5.86 ft'/sec Principal Spillway Capacity) = 10.00 folsec Top of Embankment Elevation: 143.0 Buoyancy Calculation Unit weight of water: 62.4 Ib/ft' Unit weight of concrete: 140 lb/ft' Riser diameter. 24 in = 2.00 It Riser area: 3.14 ft' Riser depth: 4 ft Riser volume: 12.6 ft' Riser displacement: 784 lb Concrete dimensions: 5 x 5 x 1.5 Concrete volume: 37.5 ft' Concrete weight: 6,250 lb Concrete displacement: 2,340 lb Combined displacement: 3.124 lb Buoyant force: -2,126 lb Sediment Basin 7 Project: Hanson Aggregates Princeton Quarry Associates a Draper Aden Project#: R14551N-01 Fogbrn•ring , Snn+yhry; • Fm•iI...... rl/rll SYn'irc} Date: 8.2.21 BY., APM Basin Sizing Area = 14.78 Drainage area 6 C= 0.4 10-year runo8, Quo: 36.77 ft'/sec Disturbed area: 14.78 acres Volume required = 1800 ft' par acre disturbed area =1800 X 14.78 = 26,604 ft' Surface area required = 325 ft' per ft /sec 025 =325 X 41.02928 = 13,335 ft' Basin is rectangular. Surface elevation: 144 Bottom elevation: 142 Ponding depth: 2 ft Side slope ratio: 2 h : 1 v Surface width: 24 ft Surface length: 833 ft Surface area= 19,992 ft' ADEQUATE Bottom width: 16 Bottom length: 825 Bottom area = 13200 ti' Ponding volume= 33,192 ft' ADEQUATE Spillway Crest Elev.: 144.0 Emergency Spillway Width: 20.0 It Side Slope Ratio: 3.0 ft hilt v Water Depth: 0.75 ft Area. A. 16.69 rl' Welted Perimeter. 24.74 ft Hydraulic Radius, R: 0.674 it VR: 1.73 Roughness Coelfiicienl, n: 0.100 (6-10- grass) Slope. S: 0.050 ft/ft VeloGty, V=1.49/MR'r'xSw: 2.56 ft/sec Emergency Spillway Capacity=Vxk 42.70 ft'Isec 26-year rung, On: 41.03 elsec 10yri= 6.22 25 yr 1= 6.94 25-year mno8, 025: 41.03 ft'/sec Skimmer Sizing Maximum water volume: 26.804 ft3 Max. Dewatering Time: 120 bra Minimum Skimmer Size: 2.5 in Factor to drain In 4 days: 5080 Odfice area = 5.237 In' Orifice diameter= 2.58 in Sediment Basin 8A Project: Henson Aggregates Princeton Qua a Draper Aden Associates Project#: R14551N-01 ,Q F„pm.•,•r/,u • s,,.,ry ns • F,.,re.,,,..1.1 s-,vra,. Date: 8.2.21 By: APM Basin Sizing Area= 19.81 Drainage area 6 C= 0.4 10-year runoff, Q,,: 49.29 ft3lsec Disturbed area: 19.81 acres Volume required = 1800 ft' per acre disturbed area =1800 X 19.81 = 35,658 ft' Surface area required = 325 ft' per ft'/sec Q25 =325 X 54.99266 = 17.873 e Basin is rectangular. Surface elevation: 142 Bottom elevation: 140 Ponding depth: 2 it Side slope ratio: 2 It : 1 v Surface width: 36 ft Surface length: 685 ft Surface area = 24,660 a ADEQUATE Bottom width: 26 Bottom length: 677 Bottom area = 18956 ft' Ponding volume = 43,616 ft' ADEQUATE SpIIMay Crest Elev.: 142.0 Emergency Spillway Width: 25.0 it Side Slope Ratio: 3.0 it hlft v Water Depth: 0.80 it Area, A: 21.92 ft' Wetted Perimeter: 30.06 8 Hydraulic Radius, R: 0.729 it VR: 1.97 Roughness Coef lcient, n: 0.100 (6-10" grass) Slope, S: 0.050 rim Velocity, V=1.49/=R'XS1e: 2.70 Nees Emergency Spillway Capacity=VXA: 59.11 Owe 25-year rung, Qn: 54.99 felsec 10 yr t= 6.22 25 yr l= 6.94 25-year runoff, Q25: 54.99 ft'/sec Skimmer Sizing Maximum water volume: 35,658 113 Max. Dewatering Time: 120 him Minimum Skimmer Sirs: 3 in Factor to drain In 4 days: 5060 Orifice area= 7.019 in' Orifice diameter= 2.99 in Sediment Basin 8B Project. Hanson Aggregates Princeton guar P Draper Aden Associates Project k: R14551N-01 F.nxlrmvynx • .Snnryi„x Enrl.ruun.vilu/Srnlna Date: 8.2.21 By: APM Basin Sizing Area= 6.5 10 yr 1- 6.22 Drainage area 6 C= 0.4 25 yr i= 6.94 10-year runoff. Oro: 16.17 fta/sec 25-year runoff, Q25: 18.04 fOlsec Disturbed area: 6.50 acres Volume required = 1800 ft' per acre disturbed area Skimmer Sizing =1800 X 6.5 = 11,700 ft' Maximum water volume: 16 03 Max Dewatering Time: 120 bra Surface area required = 325 it per ft'/sec Q25 Minimum Skimmer Size: 2 in =325 X 18.044 = Factor to drain in 4 days: 4492 5.864 ft' Orifice area = 0.004 in' Orifice diameter 0.071n Basin Is rectangular. Surface elevation: 141 Bottom elevation: 139 Ponding depth: 2 ft Side slope ratio: 2 h : 1 v Surface width: 29 ft Surface length: 440 ft Surface area= 12,760 ft' ADEQUATE Bottom width: 21 Bottom length: 432 Bottom area = 9072 IV Pending volume= 21,832 ft' ADEQUATE Spillway Design Principal Spillway Emergency Spillway Riser 8 barrel, C.M.P. Trapezoidal channel, 12" dprap lining Basin Bottom Elevation: 139.0 Emergency Spillway Crest Elev.: 142.0 Emergency Spillway Width: 5.0 ft Principal Spillway Crest Elevation 141.0 Side Slope Ratio: 3.0 ft h(ft v Riser Diameter: 24 In Riser Circumference = 6 It Riser Capacity a 1.1 ft head = 474.03 fiIsec Water Depth: 0.60 ft Barrel Diameter: 18 In Area, A 3.25 ft° Barrel Area, A = 1.767 ft Welled Perimeter. 8.16 It Welted Perimeter = 4.712 ft Hydraulic Radius, R: 0.398 It Hydraulic Radius, R = 0.38 it VR: 1.79 Roughness Coefficient, n: 0.024 Roughness Coelficienl, n: 0.078 (12• riprep) Barrel Slope, S: 0.0200 ft/ft Slope, S: 0.190 ft/ft Velocity, V=1.49/nxRv'xS`o": 4.55 ft/sec Velocity, V=1.49Inxfe'XSrn: 4.49 ft/sec Barrel Cepcily = 8.04 ftrlsec Emergency Spillway Capacity=VxA: 14.60 ft'/sec Principal Spillway Capacity= 8,04 ft'/sec Prin. Spillway Capacity Required (2-year Emergency Spillway Capacity Required (O25 - 18.044 - 8.04 Runoff, Disturbed Area): 5.85 Osec Principal Spillway Capacity) = 10.00 ft'/sec Top of Embankment Elevation: 143.0 Buoyancy Calculation Unit weight of water: 62.4 lb/ft' Unit weight of concrete: 140 lb/ft' Riser diameter: 24 In = 2.00 it Riser area: 3.14 ft' Riser depth: 4 ft Riser volume: 12.6 ft' Riser displacement: 784 lb Concrete dimensions: 5 x 5 x 1.5 Concrete volume: 37.5 ft' Concrete weight: 6.250 lb Concrete displacement 2.340 lb Combined displacement: 3.124 lb Buoyant force: -2,126 lb