HomeMy WebLinkAbout20210713_DWR_16-85 NLR MineReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE
16-85 Project Acti!7t
OUT BY DEIVILR
Modification Transfer Release
Applicant Name:
Donald Bryant Jr.
Applicant's Email:
bryantturf@gmail.com
County:
Carteret
Project Name:
NLR Mine
YES
NO
Date Commencing
Have land disturbing activities started??
X
Latitude:
34.8171
Longitude:
-76.85790
Please return comments to (at DEMLR CO):
Adam Parr
adam,parr@ncdenr,gov
Comments due by: 06/30/2021
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
W/
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
El
Comments: DWR has concerns regarding potential wetlands and adequate buffers to adjacent water bodies. Ajurisdictional wetland delineation is requested from USACE.
"undisturbed"
Applicant states the consultant's delineation was approved by tJSAeE but needs to provide documentation. Buffers need to be un niine-m-ap-.-
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Deep Creek Stream Index 21-11 Class: C From Source to Newport River.
DWR Compliance Status of Mine:
N/A
401 Wetland Cert. required?
✓
401 Wetland Cert. existing?
❑
✓
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
❑✓
I
❑
Is an O & M Plan needed?
✓
Are wetlands disturbed at this site?
I
❑
❑✓
Does DWR RO suspect or know of nearby wetlands to the site?
I
❑✓I
❑
Is a wetland delineation required prior to DWR issuing the permit?
✓
JD
,/
Consultant
Onsite
❑
Offsite
❑
❑
Stream Determination Needed?
❑
❑✓
Stream Determination Completed?
❑
❑✓
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
❑
Buffer Determination Needed?
❑
✓
Buffer Determination Completed?
❑
❑✓
Recycle system permit existing?
❑
❑✓
(If Yes, Permit #):
New Recycle System permit required?
F-1
✓
Enough information to determine?
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Non -discharge permit existing?
LI
I
✓
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
Has Violation
O&M Requirements
HQW/7Q10 Concerns
El
Pay back fees or renew DWR permit
❑
Other
❑
Please describe the reason to hold the permit:
JD from USACE or proof of approval of consultant delineation from USACE.
RO contact:
I
Hold Until:
Mine must wait to dewater until an O&M plan is approved? El
Reviewed by
Central Office Date Regional Office
I Z
Date
DWR RO Surface Water I John Perry, Megan Faulkner, and Holley Snider
06/22/2021
RO Aquifer Protection Section
Rev. December 2020-2020r1